UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 10-Q
(Mark One)
x | QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended June 30, 2011
OR
¨ | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
Commission file number 1-31219
SUNOCO LOGISTICS PARTNERS L.P.
(Exact name of registrant as specified in its charter)
Delaware | 23-3096839 | |
(State or other jurisdiction of incorporation or organization) |
(I.R.S. Employer Identification No.) | |
1818 Market Street, Suite 1500, Philadelphia, PA | 19103 | |
(Address of principal executive offices) | (Zip Code) |
Registrants telephone number, including area code: (866) 248-4344
Former name, former address and formal fiscal year, if changed since last report: Not Applicable
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x No ¨
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes x No ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of accelerated filer and large accelerated filer in Rule 12b-2 of the Exchange Act.:
Large accelerated filer | x | Accelerated filer | ¨ | |||
Non-accelerated filer | ¨ | Smaller reporting company | ¨ |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ¨ No x
At June 30, 2011, the number of the registrants Limited Partnership Units outstanding was 33,128,767.
SUNOCO LOGISTICS PARTNERS L.P.
INDEX
Page Number |
||||||
PART I. FINANCIAL INFORMATION | ||||||
Item 1. |
Financial Statements | |||||
3 | ||||||
Condensed Consolidated Balance Sheets at June 30, 2011 (unaudited) and December 31, 2010 |
4 | |||||
5 | ||||||
6 | ||||||
Notes to Condensed Consolidated Financial Statements (unaudited) |
7 | |||||
Item 2. |
Managements Discussion and Analysis of Financial Condition and Results of Operations |
27 | ||||
Item 3. |
33 | |||||
Item 4. |
35 | |||||
PART II. OTHER INFORMATION | ||||||
Item 1. |
36 | |||||
Item 1A. |
36 | |||||
Item 2. |
36 | |||||
Item 3. |
36 | |||||
Item 4. |
36 | |||||
Item 5. |
36 | |||||
Item 6. |
37 | |||||
38 |
2
FINANCIAL INFORMATION
Item 1. | Financial Statements |
SUNOCO LOGISTICS PARTNERS L.P.
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
(UNAUDITED)
(in millions, except per unit amounts)
Three Months Ended June 30, |
Six Months Ended June 30, |
|||||||||||||||
2011 | 2010 | 2011 | 2010 | |||||||||||||
Revenues |
||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||
Unaffiliated customers |
$ | 2,385 | $ | 1,815 | $ | 4,340 | $ | 3,322 | ||||||||
Affiliates (Note 3) |
39 | 214 | 342 | 387 | ||||||||||||
Other income |
4 | 10 | 6 | 18 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total Revenues |
2,428 | 2,039 | 4,688 | 3,727 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Costs and Expenses |
||||||||||||||||
Cost of products sold and operating expenses |
2,266 | 1,939 | 4,411 | 3,533 | ||||||||||||
Depreciation and amortization expense |
19 | 14 | 37 | 29 | ||||||||||||
Selling, general and administrative expenses |
22 | 16 | 44 | 37 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total Costs and Expenses |
2,307 | 1,969 | 4,492 | 3,599 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Operating Income |
121 | 70 | 196 | 128 | ||||||||||||
Net interest cost - affiliates (Note 3) |
1 | | 2 | | ||||||||||||
Other interest cost and debt expense, net |
20 | 20 | 40 | 36 | ||||||||||||
Capitalized interest |
(2 | ) | (1 | ) | (3 | ) | (2 | ) | ||||||||
|
|
|
|
|
|
|
|
|||||||||
Income Before Provision for Income Taxes |
$ | 102 | $ | 51 | $ | 157 | $ | 94 | ||||||||
Provision for income taxes (Note 6) |
6 | | 11 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Net Income |
$ | 96 | $ | 51 | $ | 146 | $ | 94 | ||||||||
Net income attributable to noncontrolling interests |
2 | | 4 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Net income attributable to Sunoco Logistics Partners L.P. |
$ | 94 | $ | 51 | $ | 142 | $ | 94 | ||||||||
|
|
|
|
|
|
|
|
|||||||||
Calculation of Limited Partners interest: |
||||||||||||||||
Net income attributable to Sunoco Logistics Partners L.P. |
$ | 94 | $ | 51 | $ | 142 | $ | 94 | ||||||||
Less: General Partners interest |
(14 | ) | (11 | ) | (26 | ) | (21 | ) | ||||||||
|
|
|
|
|
|
|
|
|||||||||
Limited Partners interest |
$ | 80 | $ | 40 | $ | 116 | $ | 73 | ||||||||
|
|
|
|
|
|
|
|
|||||||||
Net income attributable to Sunoco Logistics Partners L.P. per Limited Partner unit (Note 4): |
||||||||||||||||
Basic |
$ | 2.42 | $ | 1.30 | $ | 3.50 | $ | 2.36 | ||||||||
Diluted |
$ | 2.40 | $ | 1.29 | $ | 3.48 | $ | 2.35 | ||||||||
Weighted average Limited Partners units outstanding: |
||||||||||||||||
Basic |
33.1 | 31.0 | 33.1 | 31.0 | ||||||||||||
Diluted |
33.3 | 31.2 | 33.3 | 31.2 |
(See Accompanying Notes)
3
SUNOCO LOGISTICS PARTNERS L.P.
CONDENSED CONSOLIDATED BALANCE SHEETS
(in millions)
June 30, 2011 |
December 31, 2010 |
|||||||
(UNAUDITED) | ||||||||
Assets |
||||||||
Current Assets |
||||||||
Cash and cash equivalents |
$ | 6 | $ | 2 | ||||
Advances to affiliated companies (Note 3) |
| 44 | ||||||
Accounts receivable, affiliated companies (Note 3) |
| 154 | ||||||
Accounts receivable, net |
1,912 | 1,536 | ||||||
Inventories (Note 5) |
381 | 63 | ||||||
Total Current Assets |
2,299 | 1,799 | ||||||
Properties, plants and equipment |
3,040 | 2,799 | ||||||
Less accumulated depreciation and amortization |
(702 | ) | (671 | ) | ||||
Properties, plants and equipment, net |
2,338 | 2,128 | ||||||
Goodwill |
63 | 63 | ||||||
Investment in affiliates (Note 7) |
73 | 73 | ||||||
Intangible assets, net |
105 | 109 | ||||||
Other assets |
20 | 16 | ||||||
Total Assets |
$ | 4,898 | $ | 4,188 | ||||
Liabilities and Equity |
||||||||
Accounts payable |
$ | 1,900 | $ | 1,591 | ||||
Current portion of long-term debt (Note 8) |
250 | | ||||||
Accrued liabilities |
111 | 76 | ||||||
Advances from affiliated companies (Note 3) |
7 | | ||||||
Accrued taxes payable (Note 6) |
43 | 44 | ||||||
Total Current Liabilities |
2,311 | 1,711 | ||||||
Long-term debt (Note 8) |
1,113 | 1,129 | ||||||
Long-term debt - affiliated companies (Notes 3 and 8) |
100 | 100 | ||||||
Other deferred credits and liabilities |
47 | 42 | ||||||
Deferred income taxes (Note 6) |
223 | 164 | ||||||
Commitments and contingent liabilities (Note 9) |
||||||||
Total Liabilities |
3,794 | 3,146 | ||||||
Total Equity |
1,104 | 1,042 | ||||||
Total Liabilities and Equity |
$ | 4,898 | $ | 4,188 | ||||
(See Accompanying Notes)
4
SUNOCO LOGISTICS PARTNERS L.P.
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
(UNAUDITED)
(in millions)
Six Months Ended June 30, |
||||||||
2011 | 2010 | |||||||
Cash Flows from Operating Activities: |
||||||||
Net Income |
$ | 146 | $ | 94 | ||||
Adjustments to reconcile net income to net cash provided by (used in) operating activities: |
||||||||
Depreciation and amortization |
37 | 29 | ||||||
Changes in working capital pertaining to operating activities: |
||||||||
Accounts receivable, affiliated companies |
154 | (17 | ) | |||||
Accounts receivable, net |
(373 | ) | (127 | ) | ||||
Inventories |
(318 | ) | (282 | ) | ||||
Accounts payable and accrued liabilities |
343 | 329 | ||||||
Other |
6 | 1 | ||||||
|
|
|
|
|||||
Net cash (used in) provided by operating activities |
(5 | ) | 27 | |||||
|
|
|
|
|||||
Cash Flows from Investing Activities: |
||||||||
Capital expenditures |
(69 | ) | (76 | ) | ||||
Acquisitions |
(99 | ) | | |||||
|
|
|
|
|||||
Net cash (used in) investing activities |
(168 | ) | (76 | ) | ||||
|
|
|
|
|||||
Cash Flows from Financing Activities: |
||||||||
Distributions paid to limited and general partners |
(103 | ) | (92 | ) | ||||
Distributions paid to noncontrolling interests |
(2 | ) | | |||||
Payments of statutory withholding on net issuance of limited partner units under restricted unit incentive plan |
(3 | ) | (3 | ) | ||||
Repayments under credit facility |
(63 | ) | (462 | ) | ||||
Borrowings under credit facility |
297 | 308 | ||||||
Net proceeds from issuance of long-term debt |
| 494 | ||||||
Repayment of promissory note to general partner |
| (201 | ) | |||||
Advances to affiliated companies, net |
51 | 5 | ||||||
|
|
|
|
|||||
Net cash provided by financing activities |
177 | 49 | ||||||
|
|
|
|
|||||
Net change in cash and cash equivalents |
4 | | ||||||
Cash and cash equivalents at beginning of year |
2 | 2 | ||||||
|
|
|
|
|||||
Cash and cash equivalents at end of period |
$ | 6 | $ | 2 | ||||
|
|
|
|
(See Accompanying Notes)
5
SUNOCO LOGISTICS PARTNERS L.P.
CONDENSED CONSOLIDATED STATEMENTS OF EQUITY
(UNAUDITED)
(in millions)
Limited Partners |
General Partner |
Accumulated
Other Comprehensive Income (Loss) |
Noncontrolling Interests |
Total | ||||||||||||||||
Balance at December 31, 2009 |
$ | 837 | $ | 27 | $ | (2 | ) | $ | | $ | 862 | |||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Comprehensive Income: |
||||||||||||||||||||
Net Income |
73 | 21 | | | 94 | |||||||||||||||
Change in cash flow hedges |
| | 1 | | 1 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total comprehensive income |
73 | 21 | 1 | | 95 | |||||||||||||||
Units issued under incentive plans |
4 | | | | 4 | |||||||||||||||
Distribution equivalent rights |
(1 | ) | | | | (1 | ) | |||||||||||||
Payments of statutory withholding on net issuance of limited partner units under restricted unit incentive plan |
(3 | ) | | | | (3 | ) | |||||||||||||
Distribution related to IDR transaction |
(197 | ) | (4 | ) | | | (201 | ) | ||||||||||||
Distributions paid to limited partners, general partner and noncontrolling interests |
(68 | ) | (24 | ) | | | (92 | ) | ||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Balance at June 30, 2010 |
$ | 645 | $ | 20 | $ | (1 | ) | $ | | $ | 664 | |||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Limited Partners |
General Partner |
Accumulated
Other Comprehensive Income (Loss) |
Noncontrolling Interests |
Total | ||||||||||||||||
Balance at December 31, 2010 |
$ | 940 | $ | 28 | $ | (3 | ) | $ | 77 | $ | 1,042 | |||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Comprehensive Income: |
||||||||||||||||||||
Net Income |
116 | 26 | | 4 | 146 | |||||||||||||||
Change in cash flow hedges |
| | 2 | | 2 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total comprehensive income |
116 | 26 | 2 | 4 | 148 | |||||||||||||||
Units issued under incentive plans |
4 | | | | 4 | |||||||||||||||
Distribution equivalent rights |
(1 | ) | | | | (1 | ) | |||||||||||||
Payments of statutory withholding on net issuance of limited partner units under restricted unit incentive plan |
(3 | ) | | | | (3 | ) | |||||||||||||
Noncontrolling equity in joint venture acquisitions |
| | | 18 | 18 | |||||||||||||||
Distributions paid to limited partners, general partner and noncontrolling interests |
(79 | ) | (24 | ) | | (2 | ) | (105 | ) | |||||||||||
Other |
1 | | (1 | ) | 1 | 1 | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Balance at June 30, 2011 |
$ | 978 | $ | 30 | $ | (2 | ) | $ | 98 | $ | 1,104 | |||||||||
|
|
|
|
|
|
|
|
|
|
(See Accompanying Notes)
6
SUNOCO LOGISTICS PARTNERS L.P.
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
(UNAUDITED)
1. Basis of Presentation
Sunoco Logistics Partners L.P. (the Partnership) is a publicly traded Delaware limited partnership that owns and operates a logistics business, consisting of refined products and crude oil pipelines, terminalling and storage assets, and refined products and crude oil acquisition and marketing assets. The Partnership is principally engaged in the transport, terminalling and storage of refined products and crude oil and the purchase and sale of crude oil in 28 states located in the northeast, midwest, southeast and southwest United States. Sunoco, Inc. and its wholly-owned subsidiaries including Sunoco, Inc. (R&M) are collectively referred to as Sunoco. Sunoco accounted for approximately 2 and 7 percent of the Partnerships total revenues for the three and six months ended June 30, 2011.
The condensed consolidated financial statements reflect the results of Sunoco Logistics Partners L.P. and its wholly-owned subsidiaries, including Sunoco Logistics Partners Operations L.P. and include the accounts of entities in which the Partnership has a controlling financial interest. A controlling financial interest is evidenced by either a controlling voting interest or a risk and rewards model that identifies the Partnership or one of its subsidiaries as the primary beneficiary of a variable interest entity (VIE). All significant intercompany accounts and transactions are eliminated in consolidation and noncontrolling interests in equity and net income are shown separately in the condensed consolidated balance sheets and statements of income. Equity ownership interests in corporate joint ventures, in which the Partnership does not have a controlling financial interest, are accounted for under the equity method of accounting.
The accompanying condensed consolidated financial statements are presented in accordance with the requirements of Form 10-Q and accounting principles generally accepted in the United States for interim financial reporting. They do not include all disclosures normally made in financial statements contained in Form 10-K. In managements opinion, all adjustments necessary for a fair presentation of the results of operations, financial position and cash flows for the periods shown have been made. All such adjustments are of a normal recurring nature. The Partnership expects the interim increase in quantities of inventory to significantly decline by year end and therefore, has adjusted its interim LIFO calculation to produce a reasonable matching of the most recently incurred costs with current revenues. Results for the three and six months ended June 30, 2011 are not necessarily indicative of results for the full year 2011.
7
2. Acquisitions
In May 2011, the Partnership acquired an 83.8 percent equity interest in Inland Corporation (Inland), which is the owner of 350 miles of active refined products pipelines in Ohio. The pipeline connects three refineries in Ohio to terminals and major markets in Ohio. The Partnership acquired its equity interest for approximately $99 million, net of cash received, through a purchase of a 27.0 percent equity interest from Shell Oil Company (Shell) and a 56.8 percent equity interest from Sunoco. The 56.8 percent equity interest acquired from Sunoco is considered a transaction between entities under common control and therefore the assets and liabilities transferred have been recorded by the Partnership at Sunocos carrying value. As the Partnership now has a controlling financial interest in Inland, the joint venture is reflected as a consolidated subsidiary of the Partnership from the date of the final acquisition and is included within the Refined Products Pipeline segment. The purchase was ultimately financed with a portion of the net proceeds from the Senior Notes offering in July 2011 (see Note 8).
The following information summarizes the estimated effects of the acquisition on the Partnerships balance sheet as of the acquisition date:
Inland | ||||
(in millions) | ||||
Increase in: |
||||
Current assets |
$ | 3 | ||
Properties, plants & equipment, net |
175 | |||
Current liabilities |
(1 | ) | ||
Other deferred credits and liabilities |
(1 | ) | ||
Deferred income taxes |
(59 | ) | ||
Noncontrolling interests |
(18 | ) | ||
|
|
|||
Net cash paid for acquisition |
$ | 99 | ||
|
|
In June 2011, the Partnership announced the agreement to acquire a refined products terminal, located in East Boston, Massachusetts from affiliates of ConocoPhillips for $56 million plus inventory. The terminal is the sole service provider of Logan International Airport under a long-term contract. The acquisition is expected to close within the third quarter 2011 and will be included within the Terminal Facilities segment as of the acquisition date.
In July 2011, the Partnership acquired the Eagle Point tank farm and related assets from Sunoco for $100 million. The tank farm is located in Westville, New Jersey and consists of approximately 5 million barrels of active storage for clean products and dark oils. The acquisition was funded by the issuance of $98 million of deferred distribution units to Sunoco, which represent a new class of units on which no distributions are paid, and an additional $2 million general partner interest. The new units convert to common units on the one-year anniversary of their issuance. The acquisition will be included within the Terminal Facilities segment as of the acquisition date.
In August 2011, the Partnership acquired a crude oil purchasing and marketing business from Texon L.P. (Texon) for $205 million plus the fair market value of its crude oil inventory. The purchase consists of a lease crude business and gathering assets in 16 states, primarily in the western United States. The current crude oil volume of the business is approximately 75,000 barrels per day at the wellhead. The purchase was financed with a portion of the net proceeds from the Senior Notes offering in July 2011 (see Note 8). The acquisition will be included within the Crude Oil Pipeline segment as of the acquisition date.
3. Related Party Transactions
Incentive Distribution Rights Exchange
In January 2010, the Partnership entered into a repurchase agreement with its general partner, whereby the Partnership agreed to the repurchase from the general partner the existing incentive distribution rights (IDRs) for $201 million and issue new IDRs. Pursuant to this transaction, the Partnership executed the third amended and restated agreement of limited partnership. This new partnership agreement reflects the cancellation of the original IDRs and the authorization and issuance of the new IDRs. The Partnership ultimately financed the transaction with a portion of the proceeds from the February 2010 issuance of the 5.50 and 6.85 percent Senior Notes.
Promissory Note from Affiliate
In July 2010, the Partnership acquired a butane blending business from Texon L.P. The acquisition was partially funded by a three-year, subordinated, $100 million note from Sunoco, which bears interest at three-month LIBOR plus 275 basis points per annum.
Advances to/from Affiliate
The Partnership has a treasury services agreement with Sunoco pursuant to which it, among other things, participates in Sunocos centralized cash management program. Under this program, all of the Partnerships cash receipts and cash disbursements are
8
processed, together with those of Sunoco and its other subsidiaries, through Sunocos cash accounts with a corresponding credit or charge to an intercompany account. The intercompany balances are settled periodically, but no less frequently than monthly. Amounts due from Sunoco earn interest at a rate equal to the average rate of the Partnerships third-party money market investments, while amounts due to Sunoco bear interest at a rate equal to the interest rate provided in the Operating Partnerships $395 million Credit Facility.
Administrative Services
Under the Omnibus Agreement, the Partnership pays Sunoco an annual administrative fee that includes expenses incurred by Sunoco and its affiliates to perform certain centralized corporate functions, such as legal, accounting, treasury, engineering, information technology, insurance, and other corporate services, including the administration of employee benefit plans. This fee was $5 million for the year ended December 31, 2010. The fee increased to $13 million for 2011 to cover shared management costs, including senior executives, which were previously recorded as a direct expense by the Partnership. The increase was also driven by a higher allocation of fees associated with corporate functions which were previously outsourced to third parties. This fee does not include the salaries of pipeline and terminal personnel or other employees of the general partner or the cost of their employee benefits. The Partnership has no employees, and reimburses Sunoco and its affiliates for these costs and other direct expenses incurred on the Partnerships behalf. These costs may be increased if the acquisition or construction of new assets or businesses requires an increase in the level of general and administrative services received by the Partnership.
In addition to the annual administrative fee, selling, general and administrative expenses in the statements of income include the allocation of shared insurance costs. The Partnerships share of allocated Sunoco employee benefit plan expenses, including noncontributory defined benefit retirement plans, defined contribution 401(k) plans, employee and retiree medical, dental and life insurance plans, incentive compensation plans and other such benefits are reflected in cost of products sold and operating expenses and selling, general and administrative expenses in the statements of income.
Affiliated Revenues and Accounts Receivable, Affiliated Companies
The Partnership is party to various agreements with Sunoco to supply refined products and to provide pipeline and terminalling services. Affiliated revenues in the statements of income consist of sales of refined products and crude oil as well as the related provision, and services including pipeline transportation, terminalling, and storage and blending to Sunoco. Prior to March 2011, affiliated revenues included sales of crude oil to Sunoco, which were priced using market based rates. Sales of refined product are priced using market based rates under agreements which are negotiated annually. Service revenues are recognized based on published tariffs or negotiated rates under agreements.
In March 2011, Sunoco completed the sale of its Toledo refinery to affiliates of PBF Holding Company LLC (PBF). Certain of the Partnerships agreements with Sunoco to supply or purchase crude oil and provide pipeline and terminalling services to support the Toledo refinery have been assigned to PBF or its agents in connection with the sale. The sale of the refinery is not expected to have a material impact on the Partnerships financial results.
Acquisitions
In May 2011, the Partnership acquired a controlling financial interest in Inland from Sunoco. The Partnership acquired its equity interest for approximately $99 million, net of cash received, through a purchase of a 27.0 percent equity interest from Shell and a 56.8 percent equity interest from Sunoco. The purchase price paid to Sunoco in connection with its 56.8 percent equity interest was approximately $73 million.
4. Net Income Per Unit Data
The general partners interest in net income attributable to Sunoco Logistics Partners L.P. (net income attributable to the Partnership) consists of its 2 percent general partner interest and incentive distributions, which are increasing percentages, up to 50 percent of quarterly distributions in excess of $0.50 per limited partner unit (see Note 11). The general partner was allocated net income attributable to the Partnership of $14 and $11 million (representing 15 and 22 percent of total net income attributable to the Partnership) for the three months ended June 30, 2011 and 2010, respectively and $26 and $21 million (representing 18 and 22 percent of total net income attributable to the Partnership) for the six months ended June 30, 2011 and 2010, respectively. Diluted net income attributable to the Partnership per limited partner unit is calculated by dividing limited partners interest in net income by the sum of the weighted average number of limited partnership units outstanding and the dilutive effect of incentive unit awards (see Note 12), calculated using the treasury stock method.
The following table sets forth the reconciliation of the weighted average number of limited partner units used to compute basic net income attributable to the Partnership per limited partner unit to those used to compute diluted net income attributable to the Partnership per limited partner unit for the three and six months ended June 30, 2011 and 2010:
9
Three Months Ended | Six Months Ended | |||||||||||||||
June 30, | June 30, | |||||||||||||||
2011 | 2010 | 2011 | 2010 | |||||||||||||
(in millions) | (in millions) | |||||||||||||||
Weighted average number of limited partner units outstanding - basic |
33.1 | 31.0 | 33.1 | 31.0 | ||||||||||||
Add effect of dilutive incentive awards |
0.2 | 0.2 | 0.2 | 0.2 | ||||||||||||
Weighted average number of limited partner units - diluted |
33.3 | 31.2 | 33.3 | 31.2 | ||||||||||||
5. Inventories
The components of inventories are as follows:
June 30, 2011 |
December 31, 2010 |
|||||||
(in millions) | ||||||||
Crude oil |
$ | 350 | $ | 39 | ||||
Refined products |
21 | 16 | ||||||
Refined products additives |
2 | 2 | ||||||
Materials, supplies and other |
8 | 6 | ||||||
$ | 381 | $ | 63 | |||||
The increase in the Partnerships inventory during 2011 was primarily associated with contango inventory positions, which are expected to be significantly reduced by year-end.
6. Income Taxes
The Partnership is not a taxable entity for U.S. federal income tax purposes, or for the majority of states that impose income taxes. However, there are some states in which the Partnership operates where it is subject to both state and local income taxes. Substantially all of the income tax expense and income tax accruals reflected in the condensed consolidated financial statements relate to the consolidation of Mid-Valley Pipeline Company (Mid-Valley), West Texas Gulf Pipe Line Company (West Texas Gulf) and Inland, all of which are subject to income taxes for federal and state purposes. The Partnership also has deferred tax balances related to the difference between the book and tax bases of the assets and liabilities of Mid-Valley, West Texas Gulf and Inland.
7. Investment in Affiliates
The Partnerships corporate joint ventures own and operate refined products and crude oil pipeline systems. The Partnerships ownership percentages in and method of accounting for these corporate joint ventures as of and for the three and six month periods ended June 30, 2011 and 2010 were as follows:
As of and for the periods ended | ||||||||||||
June 30, 2011 | June 30, 2010 | |||||||||||
Equity Percentage |
Accounting Method |
Equity Percentage |
Accounting Method | |||||||||
Explorer Pipeline Company |
9.4 | % | Equity method | 9.4 | % | Equity method | ||||||
Yellowstone Pipe Line Company |
14.0 | % | Equity method | 14.0 | % | Equity method | ||||||
West Shore Pipe Line Company |
17.1 | % | Equity method | 12.3 | % | Equity method | ||||||
Wolverine Pipe Line Company |
31.5 | % | Equity method | 31.5 | % | Equity method | ||||||
West Texas Gulf Pipe Line Company |
60.3 | % | Consolidated | 43.8 | % | Equity method | ||||||
Mid-Valley Pipeline Company |
91.0 | % | Consolidated | 55.3 | % | Equity method |
The following table provides summarized, unaudited income statement information on a 100 percent basis for the Partnerships equity ownership interests for the three and six months ended June 30, 2011 and 2010:
10
Three Months Ended | Six Months Ended | |||||||||||||||
June 30, | June 30, | |||||||||||||||
2011 | 2010 | 2011 | 2010 | |||||||||||||
(in millions) | (in millions) | |||||||||||||||
Income Statement Data:(1) |
||||||||||||||||
Total revenues |
$ | 104 | $ | 122 | $ | 176 | $ | 218 | ||||||||
Income before income taxes |
$ | 46 | $ | 58 | $ | 69 | $ | 99 | ||||||||
Net income |
$ | 28 | $ | 36 | $ | 41 | $ | 61 |
(1) | The income statement data for the three and six months ended June 30, 2011 excludes amounts related to Mid-Valley and West Texas Gulf. Such amounts are included in the Partnerships condensed consolidated financial statements. |
The following table provides summarized, unaudited balance sheet information on a 100 percent basis for the Partnerships equity ownership interests as of June 30, 2011 and December 31, 2010:
June 30, | December 31, | |||||||
2011 | 2010 | |||||||
(in millions) | ||||||||
Balance Sheet Data: |
||||||||
Current assets |
$ | 142 | $ | 122 | ||||
Non-current assets |
$ | 639 | $ | 646 | ||||
Current liabilities |
$ | 113 | $ | 122 | ||||
Non-current liabilities |
$ | 565 | $ | 546 | ||||
Net equity |
$ | 103 | $ | 100 |
11
8. Debt
The components of the Partnerships debt balances are as follows:
June 30, 2011 |
December 31, 2010 |
|||||||
(in millions) | ||||||||
Affiliated Companies |
||||||||
Promissory note (3.00% as of June 30, 2011), due May 2013 |
$ | 100 | $ | 100 | ||||
|
|
|
|
|||||
Credit Facilities |
||||||||
$63 million Credit Facility (2.69% as of June 30, 2011), due September 2011 |
$ | 31 | $ | 31 | ||||
$395 million Credit Facility (0.50% as of June 30, 2011), due November 2012 |
234 | | ||||||
|
|
|
|
|||||
$ | 265 | $ | 31 | |||||
|
|
|
|
|||||
Senior Notes |
||||||||
Senior Notes - 7.25%, due February 15, 2012 |
$ | 250 | $ | 250 | ||||
Senior Notes - 8.75%, due February 15, 2014 |
175 | 175 | ||||||
Senior Notes - 6.125%, due May 15, 2016 |
175 | 175 | ||||||
Senior Notes - 5.50%, due February 15, 2020 |
250 | 250 | ||||||
Senior Notes - 6.85%, due February 15, 2040 |
250 | 250 | ||||||
|
|
|
|
|||||
1,100 | 1,100 | |||||||
Less: |
||||||||
Unamortized bond discount |
(2 | ) | (2 | ) | ||||
|
|
|
|
|||||
Total debt |
$ | 1,363 | $ | 1,129 | ||||
|
|
|
|
Senior Notes
In July, 2011 the Operating Partnership issued $300 million of 4.65 percent Senior Notes and $300 million of 6.10 percent Senior Notes (the 2022 and 2042 Senior Notes), due February 2022 and February 2042, respectively. The net proceeds of $595 million from the 2022 and 2042 Senior Notes were used to pay down outstanding borrowings under the $63 and $395 million revolving credit facilities, which were used to fund the acquisitions of a controlling financial interest in Inland and the Texon crude oil purchasing and marketing business, and for general partnership purposes.
9. Commitments and Contingent Liabilities
The Partnership is subject to numerous federal, state and local laws which regulate the discharge of materials into the environment or that otherwise relate to the protection of the environment. These laws and regulations can result in liabilities and loss contingencies for remediation at the Partnerships facilities and at third-party or formerly owned sites. At June 30, 2011 and December 31, 2010, there were accrued liabilities for environmental remediation in the condensed consolidated balance sheets of $4 million. The accrued liabilities for environmental remediation do not include any amounts attributable to unasserted claims, nor have any recoveries from insurance been assumed. Charges against income for environmental remediation totaled $1 million and less than $1 million for the three month periods ended June 30, 2011 and 2010, respectively and $3 and $1 million for the six month periods ended June 30, 2011 and 2010, respectively.
Total future costs for environmental remediation activities will depend upon, among other things, the identification of any additional sites, the determination of the extent of the contamination at each site, the timing and nature of required remedial actions, the technology available and needed to meet the various existing legal requirements, the nature and extent of future environmental laws, inflation rates and the determination of the Partnerships liability at multi-party sites, if any, in light of uncertainties with respect to joint and several liability, and the number, participation levels and financial viability of other parties.
Sunoco has indemnified the Partnership for 30 years from environmental and toxic tort liabilities related to the assets contributed to the Partnership that arose from the operation of such assets prior to the closing of the February 2002 initial public offering (IPO). Sunoco has indemnified the Partnership for 100 percent of all losses asserted within the first 21 years of closing of the IPO. Sunocos share of liability for claims asserted thereafter will decrease by 10 percent per year. For example, for a claim asserted during the twenty-third year after closing of the IPO, Sunoco would be required to indemnify the Partnership for 80 percent of its loss. There is no monetary cap on the amount of indemnity coverage provided by Sunoco. The Partnership has agreed to indemnify
12
Sunoco for events and conditions associated with the operation of the Partnerships assets that occur on or after the closing of the IPO and for environmental and toxic tort liabilities to the extent Sunoco is not required to indemnify the Partnership.
Sunoco has also indemnified the Partnership for liabilities other than environmental and toxic tort liabilities related to the assets contributed to the Partnership, that arose out of Sunocos ownership and operation of the assets prior to the closing of the IPO and that are asserted within 10 years after closing of the IPO. In addition, Sunoco has also indemnified the Partnership from liabilities relating to certain defects in title for the assets contributed to the Partnership; liabilities associated with failure to obtain certain consents and permits necessary to conduct its business that may arise within 10 years after closing of the IPO; liabilities relating to legal actions currently pending against Sunoco or its affiliates; and liabilities related to events and conditions associated with any assets retained by Sunoco or its affiliates.
Management of the Partnership does not believe that any liabilities which may arise from claims indemnified by Sunoco would be material in relation to the financial position of the Partnership at June 30, 2011. There are certain other pending legal proceedings related to matters arising after the IPO that are not indemnified by Sunoco. Management believes that any liabilities that may arise from these legal proceedings will not be material in relation to the financial position of the Partnership at June 30, 2011.
10. Equity
The changes in the number of limited partnership units outstanding from January 1, 2010 through June 30, 2011 are as follows:
Units | ||||
(in thousands) | ||||
Balance at January 1, 2010 |
30,981 | |||
Issuance of Limited Partner units to the public in August 2010 |
2,013 | |||
Units issued under incentive plans |
72 | |||
Balance at December 31, 2010 |
33,066 | |||
Units issued under incentive plans |
63 | |||
Balance at June 30, 2011 |
33,129 | |||
In July 2011, the Partnership issued 1.3 million Class A Units to Sunoco in connection with the acquisition of the Eagle Point tank farm and related assets. The $98 million of deferred distribution units are a new class of units that will convert to common limited partner units on the one-year anniversary of their issuance.
11. Cash Distributions
Within 45 days after the end of each quarter, the Partnership distributes all cash on hand at the end of the quarter, less reserves established by the general partner at its discretion. This is defined as available cash in the partnership agreement. The general partner has broad discretion to establish cash reserves that it determines are necessary or appropriate to properly conduct the Partnerships business. The Partnership will make quarterly distributions to the extent there is sufficient cash from operations after the establishment of cash reserves and the payment of fees and expenses, including payments to the general partner.
If cash distributions exceed $0.50 per unit in a quarter, the general partner will receive increasing percentages, up to 50 percent, of the cash distributed in excess of that amount. These distributions are referred to as incentive distributions. The percentage interests shown for the unitholders and the general partner for the minimum quarterly distribution are also applicable to quarterly distribution amounts that are less than the minimum quarterly distribution.
In January 2010, the Partnership repurchased, and its general partner transferred and assigned to the Partnership for cancellation, the IDRs held by the general partner under the Second Amended and Restated Agreement of Limited Partnership, as amended, as consideration for (i) the Partnerships issuance to the general partner of new IDRs issued under the Third Amended and Restated Agreement of Limited Partnership and (ii) the issuance to the general partner of a promissory note in the amount of $201 million. In February 2010, the Operating Partnership issued the 5.50 and 6.85 percent Senior Notes. A portion of the net proceeds from this offering was used to repay in full this promissory note.
13
The following table shows the target distribution levels and distribution splits between the general partner and the holders of the Partnerships limited partnership units under the new IDRs:
Total Quarterly |
Marginal Percentage Interest in Distributions |
|||||||||
General Partner |
Unitholders | |||||||||
First Target Distribution |
up to $0.500 | 2 | % | 98 | % | |||||
Second Target Distribution |
above $0.500 up to $0.575 |
15 | %* | 85 | % | |||||
Third Target Distribution |
above $0.575 up to $1.5825 |
37 | %* | 63 | % | |||||
Thereafter |
above $1.5825 | 50 | %* | 50 | % |
* | Includes 2 percent general partner interest. |
The distributions paid by the Partnership for the period from January 1, 2010 through June 30, 2011 are summarized below. The table excludes the distribution of $201 million paid to the general partner in connection with the repurchase and exchange of the general partners IDRs.
Date Cash Distribution Paid |
Cash Distribution per Limited Partner Unit |
Total Cash Distribution to the Limited Partners |
Total Cash Distribution to the General Partner |
|||||||||
(in millions) | (in millions) | |||||||||||
May 13, 2011 |
$ | 1.195 | $ | 40 | $ | 12 | ||||||
February 14, 2011 |
$ | 1.180 | $ | 39 | $ | 12 | ||||||
November 12, 2010 |
$ | 1.170 | $ | 39 | $ | 12 | ||||||
August 13, 2010 |
$ | 1.140 | $ | 35 | $ | 11 | ||||||
May 14, 2010 |
$ | 1.115 | $ | 35 | $ | 10 | ||||||
February 12, 2010 |
$ | 1.090 | $ | 34 | $ | 14 |
On July 26, 2011, Sunoco Partners LLC, the general partner of Sunoco Logistics Partners L.P., declared a cash distribution of $1.215 per limited partnership unit ($4.86 annualized), representing the distribution for the second quarter 2011. The $53 million distribution, including $13 million to the general partner, will be paid on August 12, 2011 to unitholders of record on August 8, 2011. The change in distribution splits resulted in a $6 million reduction of the general partners cash distribution for the second quarter 2011 as compared to the previous methodology.
12. Management Incentive Plan
Sunoco Partners LLC, the general partner of the Partnership, has adopted the Sunoco Partners LLC Long-Term Incentive Plan for employees and directors of the general partner who perform services for the Partnership. The LTIP is administered by the independent directors of the Compensation Committee of the general partners board of directors with respect to employee awards, and by the non-independent members of the general partners board of directors with respect to awards granted to the independent members. The LTIP currently permits the grant of restricted units and unit options covering an additional 0.4 million limited partnership units. Restricted unit awards may also include tandem distribution equivalent rights (DERs) at the discretion of the Compensation Committee.
During the first six months of 2011 and 2010, the Partnership issued 63 and 72 thousand units under the LTIP. The Partnership recognized share-based compensation expense of $4 million for the six month periods ended June 30, 2011 and 2010. Each of the restricted unit grants also have tandem DERs which are recognized as a reduction of equity when earned.
13. Derivatives and Risk Management
The Partnership is exposed to various market risks, including volatility in crude oil and refined product prices, counterparty credit risk and interest rate risk.
14
Price Risk Management
The Partnership is exposed to risks associated with changes in the market price of crude oil and refined products as a result of the forecasted purchase or sale of these products. These risks are primarily associated with price volatility related to pre-existing or anticipated purchases and sales. Price changes are often caused by shifts in the supply and demand for these commodities, as well as their locations. In order to manage such exposure, the Partnerships policy is (i) to only purchase crude oil and refined products for which sales contracts have been executed or for which ready markets exist, (ii) to structure sales contracts so that price fluctuations do not materially impact the margins earned, and (iii) not to acquire and hold physical inventory, futures contracts or other derivative instruments for the purpose of speculating on commodity price changes. Although the Partnership seeks to maintain a balanced inventory position within its commodity inventories, net unbalances may occur for short periods of time due to production, transportation and delivery variances. When physical inventory builds or draws do occur, the Partnership continuously manages the variance to a balanced position over a period of time. Pursuant to the Partnerships risk management policy, derivative contracts may be used to hedge or reduce exposure to price risk associated with acquired inventory or forecasted physical transactions.
The physical contracts related to the Partnerships crude oil and refined products businesses that qualify as derivatives have been designated as normal purchases and sales and are accounted for using traditional accrual accounting. The Partnership accounts for derivatives that do not qualify as normal purchases and sales at fair value. The Partnership does not utilize derivative instruments to manage its exposure to prices related to crude oil purchase and sale activities. The Partnership does utilize derivatives such as swaps, futures and other derivative instruments to mitigate the risk associated with market movements in the price of refined products. These derivative contracts act as a hedging mechanism against the volatility of prices by allowing the Partnership to transfer this price risk to counterparties who are able and willing to bear it.
While all derivative instruments utilized by the Partnership represent economic hedges, certain of these derivatives are not designated as hedges for accounting purposes. Such derivatives include certain contracts that were entered into and closed during the same accounting period and a limited number of contracts for which there is not sufficient correlation to the related items being economically hedged.
For refined product derivative contracts that are not designated as hedges for accounting purposes, all realized and unrealized gains and losses are recognized in the statement of income during the current period. For refined product derivative contracts that are designated and qualify as cash flow hedges pursuant to generally accepted accounting principles, the portion of the gain or loss on the derivative contract that is effective in offsetting the variable cash flows associated with the hedged forecasted transaction is reported as a component of other comprehensive income and reclassified into earnings in the same line item associated with the forecasted transaction and in the same period or periods during which the hedged transaction affects earnings. The remaining gain or loss on the derivative contract in excess of the cumulative change in the present value of future cash flows of the hedged item, if any (i.e., the ineffective portion), is recognized in earnings during the current period.
As of and for the periods ended June 30, 2011 and 2010, the impact of the Partnerships hedging activities was not material to the condensed consolidated financial statements. The Partnership had open derivative positions of 3 million and less than 1 million barrels of refined products at June 30, 2011 and 2010, respectively. The derivatives outstanding as of June 30, 2011 vary in duration but do not extend beyond one year. As of June 30, 2011 and December 31, 2010, the Partnership had the following derivative asset and liability balances:
June 30, 2011 |
December 31, 2010 |
|||||||
(in millions) | ||||||||
Derivative assets |
$ | 4 | $ | 2 | ||||
Derivative liabilities |
(3 | ) | (6 | ) | ||||
$ | 1 | $ | (4 | ) | ||||
Credit Risk Management
The Partnership faces counterparty credit risk as a result of our use of financial derivative contracts. The Partnerships counterparties consist primarily of financial institutions and major integrated oil companies. This concentration of counterparties may impact the Partnerships overall exposure to credit risk, either positively or negatively, in that the counterparties may be similarly affected by changes in economic, regulatory or other conditions.
The Partnership maintains credit policies with regard to its counterparties that management believes minimize the overall credit risk. The Partnerships customers credit positions are analyzed prior to the extension of credit and periodically after credit has been extended. The Partnership manages its exposure to derivative counterparty credit risk through credit analysis, credit approvals,
15
credit limits, and monitoring procedures. The Partnership does not have over-the-counter derivatives that are entered into with counterparties outside of regulated exchanges.
Interest Rate Risk Management
The Partnership has interest rate risk exposure for changes in interest rates related to its outstanding borrowings. The Partnership manages its exposure to changes in interest rates through the use of a combination of fixed- and variable-rate debt. At June 30, 2011, the Partnership had $365 million of variable-rate borrowings under the revolving credit facilities and promissory notes from affiliated companies.
14. Fair Value Measurements
The Partnership applies fair value accounting for all financial assets and liabilities that are required to be measured at fair value under current accounting rules, primarily derivatives. The assets and liabilities that are measured at fair value on a recurring basis are not material to the Partnerships condensed consolidated balance sheets.
The Partnership determines fair value as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. The Partnership utilizes valuation techniques that maximize the use of observable inputs (levels 1 and 2) and minimize the use of unobservable inputs (level 3) within the fair value hierarchy established by the Accounting Standards Codification.
The Partnership generally applies the market approach to determine fair value. This method uses pricing and other information generated by market transactions for identical or comparable assets and liabilities. Assets and liabilities are classified within the fair value hierarchy based on the lowest level (least observable) input that is significant to the measurement in its entirety.
The estimated fair value of financial instruments has been determined based on the Partnerships assessment of available market information and appropriate valuation methodologies. The Partnerships current assets (other than derivatives and inventories) and current liabilities are financial instruments and most of these items are recorded at cost in the consolidated balance sheets. The estimated fair value of these financial instruments approximate their carrying value due to their short-term nature. The Partnerships derivatives are measured and recorded at fair value, based on observable market prices and other valuation methodologies. At June 30, 2011, the fair values of the credit facilities and the promissory note to Sunoco approximate their carrying value, as these borrowings bear interest based upon short-term floating market interest rates. The estimated fair value of the Senior Notes is based on quoted market prices. The estimated aggregate fair value of the Senior Notes at June 30, 2011 is $1.2 billion, compared to the carrying amount of $1.1 billion. The estimated aggregate fair value of the Senior Notes at December 31, 2010 was $1.2 billion, compared to the carrying amount of $1.1 billion.
15. Business Segment Information
The Partnership operates in three principal business segments: Refined Products Pipeline System, Terminal Facilities, and Crude Oil Pipeline System.
The following tables set forth condensed statement of income information concerning the Partnerships business segments and reconcile total segment operating income to net income attributable to Sunoco Logistics Partners L.P. for the three and six months ended June 30, 2011 and 2010, respectively.
16
Three Months Ended | Six Months Ended | |||||||||||||||
June 30, | June 30, | |||||||||||||||
2011 | 2010 | 2011 | 2010 | |||||||||||||
(in millions) | (in millions) | |||||||||||||||
Segment Operating Income |
||||||||||||||||
Refined Products Pipeline System: |
||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||
Unaffiliated customers |
$ | 15 | $ | 13 | $ | 25 | $ | 24 | ||||||||
Affiliates |
14 | 18 | 31 | 37 | ||||||||||||
Operating Income |
$ | 8 | $ | 13 | $ | 13 | $ | 21 | ||||||||
Terminal Facilities: |
||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||
Unaffiliated customers |
$ | 62 | $ | 27 | $ | 116 | $ | 53 | ||||||||
Affiliates |
25 | 32 | 58 | 61 | ||||||||||||
Operating Income |
$ | 34 | $ | 28 | $ | 63 | $ | 50 | ||||||||
Crude Oil Pipeline System: |
||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||
Unaffiliated customers |
$ | 2,307 | $ | 1,775 | $ | 4,199 | $ | 3,244 | ||||||||
Affiliates |
1 | 164 | 253 | 290 | ||||||||||||
Operating Income |
$ | 79 | $ | 29 | $ | 120 | $ | 57 | ||||||||
Three Months Ended June 30, |
Six Months Ended June 30, |
|||||||||||||||
2011 | 2010 | 2011 | 2010 | |||||||||||||
(in millions) | (in millions) | |||||||||||||||
Reconciliation of Segment Operating Income to Net Income Attributable to Sunoco Logistics Partners L.P. |
||||||||||||||||
Operating Income: |
||||||||||||||||
Refined Products Pipeline System |
$ | 8 | $ | 13 | $ | 13 | $ | 21 | ||||||||
Terminal Facilities |
34 | 28 | 63 | 50 | ||||||||||||
Crude Oil Pipeline System |
79 | 29 | 120 | 57 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total segment operating income |
$ | 121 | $ | 70 | $ | 196 | $ | 128 | ||||||||
Net interest expense |
19 | 19 | 39 | 34 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Income before provision for income taxes |
$ | 102 | $ | 51 | $ | 157 | $ | 94 | ||||||||
Provision for income taxes |
6 | | 11 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Net Income |
$ | 96 | $ | 51 | $ | 146 | $ | 94 | ||||||||
Net Income attributable to noncontrolling interests |
2 | | 4 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Net Income Attributable to Sunoco Logistics Partners L.P. |
$ | 94 | $ | 51 | $ | 142 | $ | 94 | ||||||||
|
|
|
|
|
|
|
|
17
The following table provides the identifiable assets for each segment as of June 30, 2011 and December 31, 2010:
June 30, 2011 |
December 31, 2010 |
|||||||
(in millions) | ||||||||
Refined Products Pipeline System |
$ | 720 | $ | 531 | ||||
Terminal Facilities |
884 | 857 | ||||||
Crude Oil Pipeline System |
3,248 | 2,713 | ||||||
Corporate and other |
46 | 87 | ||||||
|
|
|
|
|||||
Total identifiable assets |
$ | 4,898 | $ | 4,188 | ||||
|
|
|
|
Corporate and other assets consist primarily of cash and cash equivalents, advances to affiliates and deferred charges.
16. Supplemental Condensed Consolidating Financial Information
The Partnership serves as guarantor of the Senior Notes and of any obligations under the $395 million and $63 million Credit Facilities. These guarantees are full and unconditional. For purposes of the following footnote, Sunoco Logistics Partners L.P. is referred to as Parent Guarantor and Sunoco Logistics Partners Operations L.P. is referred to as Subsidiary Issuer. All other consolidated subsidiaries of the Partnership are collectively referred to as Non-Guarantor Subsidiaries.
The following supplemental condensed consolidating financial information reflects the Parent Guarantors separate accounts, the Subsidiary Issuers separate accounts, the combined accounts of the Non-Guarantor Subsidiaries, the combined consolidating adjustments and eliminations and the Parent Guarantors consolidated accounts for the dates and periods indicated. For purposes of the following condensed consolidating information, the Parent Guarantors investments in its subsidiaries and the Subsidiary Issuers investments in its subsidiaries are accounted for under the equity method of accounting.
18
Condensed Consolidating Statement of Income
Three Months Ended June 30, 2011
(in millions, unaudited)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Revenues |
||||||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||||||
Unaffiliated customers |
$ | | $ | | $ | 2,385 | $ | | $ | 2,385 | ||||||||||
Affiliates |
| | 39 | | 39 | |||||||||||||||
Equity in earnings of subsidiaries |
94 | 112 | | (206 | ) | | ||||||||||||||
Other income |
| | 4 | | 4 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Revenues |
94 | 112 | 2,428 | (206 | ) | 2,428 | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Costs and Expenses |
||||||||||||||||||||
Cost of products sold and operating expenses |
| | 2,266 | | 2,266 | |||||||||||||||
Depreciation and amortization expense |
| | 19 | | 19 | |||||||||||||||
Selling, general and administrative expenses |
| | 22 | | 22 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Costs and Expenses |
| | 2,307 | | 2,307 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Operating Income |
94 | 112 | 121 | (206 | ) | 121 | ||||||||||||||
Net interest cost to affiliates |
| | 1 | | 1 | |||||||||||||||
Other interest cost and debt expense, net |
| 20 | | | 20 | |||||||||||||||
Capitalized interest |
| (2 | ) | | | (2 | ) | |||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Income Before Provision for Income Taxes |
94 | 94 | 120 | (206 | ) | 102 | ||||||||||||||
Provision for income taxes |
| | 6 | | 6 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income |
94 | 94 | 114 | (206 | ) | 96 | ||||||||||||||
Net income attributable to noncontrolling interests |
| | 2 | | 2 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income attributable to Sunoco Logistics Partners L.P. |
$ | 94 | $ | 94 | $ | 112 | $ | (206 | ) | $ | 94 | |||||||||
|
|
|
|
|
|
|
|
|
|
19
Condensed Consolidating Statement of Income
Three Months Ended June 30, 2010
(in millions, unaudited)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Revenues |
||||||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||||||
Unaffiliated customers |
$ | | $ | | $ | 1,815 | $ | | $ | 1,815 | ||||||||||
Affiliates |
| | 214 | | 214 | |||||||||||||||
Equity in earnings of subsidiaries |
51 | 69 | | (120 | ) | | ||||||||||||||
Other income |
| | 10 | | 10 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Revenues |
51 | 69 | 2,039 | (120 | ) | 2,039 | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Costs and Expenses |
||||||||||||||||||||
Cost of products sold and operating expenses |
| | 1,939 | | 1,939 | |||||||||||||||
Depreciation and amortization expense |
| | 14 | | 14 | |||||||||||||||
Selling, general and administrative expenses |
| | 16 | | 16 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Costs and Expenses |
| | 1,969 | | 1,969 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Operating Income |
51 | 69 | 70 | (120 | ) | 70 | ||||||||||||||
Net interest cost to affiliates |
| (1 | ) | 1 | | | ||||||||||||||
Other interest cost and debt expense, net |
| 20 | | | 20 | |||||||||||||||
Capitalized interest |
| (1 | ) | | | (1 | ) | |||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Income Before Provision for Income Taxes |
51 | 51 | 69 | (120 | ) | 51 | ||||||||||||||
Provision for income taxes |
| | | | | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income |
51 | 51 | 69 | (120 | ) | 51 | ||||||||||||||
Net income attributable to noncontrolling interests |
| | | | | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income attributable to Sunoco Logistics Partners L.P. |
$ | 51 | $ | 51 | $ | 69 | $ | (120 | ) | $ | 51 | |||||||||
|
|
|
|
|
|
|
|
|
|
20
Condensed Consolidating Statement of Income
Six Months Ended June 30, 2011
(in millions, unaudited)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Revenues |
||||||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||||||
Unaffiliated customers |
$ | | $ | | $ | 4,340 | $ | | $ | 4,340 | ||||||||||
Affiliates |
| | 342 | | 342 | |||||||||||||||
Equity in earnings of subsidiaries |
142 | 179 | | (321 | ) | | ||||||||||||||
Other income |
| | 6 | | 6 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Revenues |
142 | 179 | 4,688 | (321 | ) | 4,688 | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Costs and Expenses |
||||||||||||||||||||
Cost of products sold and operating expenses |
| | 4,411 | | 4,411 | |||||||||||||||
Depreciation and amortization expense |
| | 37 | | 37 | |||||||||||||||
Selling, general and administrative expenses |
| | 44 | | 44 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Costs and Expenses |
| | 4,492 | | 4,492 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Operating Income |
142 | 179 | 196 | (321 | ) | 196 | ||||||||||||||
Net interest cost to affiliates |
| | 2 | | 2 | |||||||||||||||
Other interest cost and debt expense, net |
| 40 | | | 40 | |||||||||||||||
Capitalized interest |
| (3 | ) | | | (3 | ) | |||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Income Before Provision for Income Taxes |
142 | 142 | 194 | (321 | ) | 157 | ||||||||||||||
Provision for income taxes |
| | 11 | | 11 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income |
142 | 142 | 183 | (321 | ) | 146 | ||||||||||||||
Net income attributable to noncontrolling interests |
| | 4 | | 4 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income attributable to Sunoco Logistics Partners L.P. |
$ | 142 | $ | 142 | $ | 179 | $ | (321 | ) | $ | 142 | |||||||||
|
|
|
|
|
|
|
|
|
|
21
Condensed Consolidating Statement of Income
Six Months Ended June 30, 2010
(in millions, unaudited)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Revenues |
||||||||||||||||||||
Sales and other operating revenue: |
||||||||||||||||||||
Unaffiliated customers |
$ | | $ | | $ | 3,322 | $ | | $ | 3,322 | ||||||||||
Affiliates |
| | 387 | | 387 | |||||||||||||||
Equity in earnings of subsidiaries |
94 | 126 | | (220 | ) | | ||||||||||||||
Other income |
| | 18 | | 18 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Revenues |
94 | 126 | 3,727 | (220 | ) | 3,727 | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Costs and Expenses |
||||||||||||||||||||
Cost of products sold and operating expenses |
| | 3,533 | | 3,533 | |||||||||||||||
Depreciation and amortization expense |
| | 29 | | 29 | |||||||||||||||
Selling, general and administrative expenses |
| | 37 | | 37 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Total Costs and Expenses |
| | 3,599 | | 3,599 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Operating Income |
94 | 126 | 128 | (220 | ) | 128 | ||||||||||||||
Net interest cost to affiliates |
| (2 | ) | 2 | | | ||||||||||||||
Other interest cost and debt expense, net |
| 36 | | | 36 | |||||||||||||||
Capitalized interest |
| (2 | ) | | | (2 | ) | |||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Income Before Provision for Income Taxes |
94 | 94 | 126 | (220 | ) | 94 | ||||||||||||||
Provision for income taxes |
| | | | | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income |
94 | 94 | 126 | (220 | ) | 94 | ||||||||||||||
Net income attributable to noncontrolling interests |
| | | | | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net Income attributable to Sunoco Logistics Partners L.P. |
$ | 94 | $ | 94 | $ | 126 | $ | (220 | ) | $ | 94 | |||||||||
|
|
|
|
|
|
|
|
|
|
22
Condensed Consolidating Balance Sheet
June 30, 2011
(in millions, unaudited)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Assets |
||||||||||||||||||||
Current Assets |
||||||||||||||||||||
Cash and cash equivalents |
$ | | $ | 2 | $ | 4 | $ | | $ | 6 | ||||||||||
Accounts receivable, net |
| | 1,912 | | 1,912 | |||||||||||||||
Inventories |
| | 381 | | 381 | |||||||||||||||
Total Current Assets |
| 2 | 2,297 | | 2,299 | |||||||||||||||
Properties, plants and equipment, net |
| | 2,338 | | 2,338 | |||||||||||||||
Goodwill |
| | 63 | | 63 | |||||||||||||||
Investment in affiliates |
1,030 | 2,513 | 73 | (3,543 | ) | 73 | ||||||||||||||
Intangible assets, net |
| | 105 | | 105 | |||||||||||||||
Other assets |
| 6 | 14 | | 20 | |||||||||||||||
Total Assets |
$ | 1,030 | $ | 2,521 | $ | 4,890 | $ | (3,543 | ) | $ | 4,898 | |||||||||
Liabilities and Equity |
||||||||||||||||||||
Current Liabilities |
||||||||||||||||||||
Accounts payable |
$ | | $ | | $ | 1,900 | $ | | $ | 1,900 | ||||||||||
Current portion of long-term debt |
| 250 | | | 250 | |||||||||||||||
Accrued liabilities |
1 | 24 | 86 | | 111 | |||||||||||||||
Advances from affiliated companies |
25 | (46 | ) | 28 | | 7 | ||||||||||||||
Accrued taxes payable |
| | 43 | | 43 | |||||||||||||||
Total Current Liabilities |
26 | 228 | 2,057 | | 2,311 | |||||||||||||||
Long-term debt |
| 1,113 | | | 1,113 | |||||||||||||||
Long-term debt, affiliated companies |
| 100 | | | 100 | |||||||||||||||
Other deferred credits and liabilities |
| | 47 | | 47 | |||||||||||||||
Deferred income taxes |
| | 223 | | 223 | |||||||||||||||
Total Liabilities |
26 | 1,441 | 2,327 | | 3,794 | |||||||||||||||
Total Equity |
1,004 | 1,080 | 2,563 | (3,543 | ) | 1,104 | ||||||||||||||
Total Liabilities and Equity |
$ | 1,030 | $ | 2,521 | $ | 4,890 | $ | (3,543 | ) | $ | 4,898 | |||||||||
23
Condensed Consolidating Balance Sheet
December 31, 2010
(in millions)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Assets |
||||||||||||||||||||
Current Assets |
||||||||||||||||||||
Cash and cash equivalents |
$ | | $ | 2 | $ | | $ | | $ | 2 | ||||||||||
Advances to affiliated companies |
28 | 47 | (31 | ) | | 44 | ||||||||||||||
Accounts receivable, affiliated companies |
| | 154 | | 154 | |||||||||||||||
Accounts receivable, net |
| | 1,536 | | 1,536 | |||||||||||||||
Inventories |
| | 63 | | 63 | |||||||||||||||
Total Current Assets |
28 | 49 | 1,722 | | 1,799 | |||||||||||||||
Properties, plants and equipment, net |
| | 2,128 | | 2,128 | |||||||||||||||
Goodwill |
| | 63 | | 63 | |||||||||||||||
Investment in affiliates |
937 | 2,182 | 73 | (3,119 | ) | 73 | ||||||||||||||
Intangible assets, net |
| | 109 | | 109 | |||||||||||||||
Other assets |
| 7 | 9 | | 16 | |||||||||||||||
Total Assets |
$ | 965 | $ | 2,238 | $ | 4,104 | $ | (3,119 | ) | $ | 4,188 | |||||||||
Liabilities and Equity |
||||||||||||||||||||
Current Liabilities |
||||||||||||||||||||
Accounts payable |
$ | | $ | | $ | 1,591 | $ | | $ | 1,591 | ||||||||||
Accrued liabilities |
1 | 24 | 51 | | 76 | |||||||||||||||
Accrued taxes payable |
| | 44 | | 44 | |||||||||||||||
Total Current Liabilities |
1 | 24 | 1,686 | | 1,711 | |||||||||||||||
Long-term debt |
| 1,129 | | | 1,129 | |||||||||||||||
Long-term debt, affiliated companies |
| 100 | | | 100 | |||||||||||||||
Other deferred credits and liabilities |
| | 42 | | 42 | |||||||||||||||
Deferred income taxes |
| | 164 | | 164 | |||||||||||||||
Total Liabilities |
1 | 1,253 | 1,892 | | 3,146 | |||||||||||||||
Total Equity |
964 | 985 | 2,212 | (3,119 | ) | 1,042 | ||||||||||||||
Total Liabilities and Equity |
$ | 965 | $ | 2,238 | $ | 4,104 | $ | (3,119 | ) | $ | 4,188 | |||||||||
24
Condensed Consolidating Statement of Cash Flows
Six Months Ended June 30, 2011
(in millions, unaudited)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Net Cash Flows from Operating Activities |
$ | 142 | $ | 144 | $ | 30 | $ | (321 | ) | $ | (5 | ) | ||||||||
Cash Flows from Investing Activities: |
||||||||||||||||||||
Capital expenditures |
| | (69 | ) | | (69 | ) | |||||||||||||
Acquisitions |
| | (99 | ) | | (99 | ) | |||||||||||||
Intercompany |
(90 | ) | (378 | ) | 147 | 321 | | |||||||||||||
Net cash used in investing activities |
(90 | ) | (378 | ) | (21 | ) | 321 | (168 | ) | |||||||||||
Cash Flows from Financing Activities: |
||||||||||||||||||||
Distributions paid to limited and general partners |
(103 | ) | | | | (103 | ) | |||||||||||||
Distributions paid to noncontrolling interests |
(2 | ) | | | | (2 | ) | |||||||||||||
Payments of statutory withholding on net issuance of limited partner units under restricted unit incentive plan |
| | (3 | ) | | (3 | ) | |||||||||||||
Repayments under credit facility |
| (63 | ) | | | (63 | ) | |||||||||||||
Borrowings under credit facility |
| 297 | | | 297 | |||||||||||||||
Net proceeds from issuance of long term debt |
| | | | | |||||||||||||||
Repayment of promissory note to general partner |
| | | | | |||||||||||||||
Advances to affiliates, net |
53 | | (2 | ) | | 51 | ||||||||||||||
Net cash provided by financing activities |
(52 | ) | 234 | (5 | ) | | 177 | |||||||||||||
Net change in cash and cash equivalents |
| | 4 | | 4 | |||||||||||||||
Cash and cash equivalents at beginning of period |
| 2 | | | 2 | |||||||||||||||
Cash and cash equivalents at end of period |
$ | | $ | 2 | $ | 4 | $ | | $ | 6 | ||||||||||
25
Condensed Consolidating Statement of Cash Flows
Six Months Ended June 30, 2010
(in millions, unaudited)
Parent Guarantor |
Subsidiary Issuer |
Non- Guarantor Subsidiaries |
Consolidating Adjustments |
Total | ||||||||||||||||
Net Cash Flows from Operating Activities |
$ | 94 | $ | 100 | $ | 53 | $ | (220 | ) | $ | 27 | |||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Cash Flows from Investing Activities: |
||||||||||||||||||||
Capital expenditures |
| | (76 | ) | | (76 | ) | |||||||||||||
Intercompany |
190 | (440 | ) | 29 | 221 | | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net cash used in investing activities |
190 | (440 | ) | (47 | ) | 221 | (76 | ) | ||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Cash Flows from Financing Activities: |
||||||||||||||||||||
Distributions paid to limited and general partners |
(92 | ) | | | | (92 | ) | |||||||||||||
Payments of statutory withholding on net issuance of limited partner units under restricted unit incentive plan |
| | (3 | ) | | (3 | ) | |||||||||||||
Repayments under credit facility |
| (462 | ) | | | (462 | ) | |||||||||||||
Borrowings under credit facility |
| 308 | | | 308 | |||||||||||||||
Net proceeds from issuance of long term debt |
| 494 | | | 494 | |||||||||||||||
Repayment of promissory note to general partner |
(201 | ) | | | | (201 | ) | |||||||||||||
Advances to affiliates, net |
9 | | (4 | ) | | 5 | ||||||||||||||
Other |
| | 1 | (1 | ) | | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net cash provided by financing activities |
(284 | ) | 340 | (6 | ) | (1 | ) | 49 | ||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Net change in cash and cash equivalents |
| | | | | |||||||||||||||
Cash and cash equivalents at beginning of period |
| 2 | | | 2 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Cash and cash equivalents at end of period |
$ | | $ | 2 | $ | | $ | | $ | 2 | ||||||||||
|
|
|
|
|
|
|
|
|
|
26
Item 2. | Managements Discussion and Analysis of Financial Condition and Results of Operations |
Sunoco Logistics Partners L.P.
Operating Highlights
Three Months Ended June 30, 2011 and 2010
Three Months Ended June 30, |
||||||||
2011 | 2010 | |||||||
Refined Products Pipeline System:(1)(2) |
||||||||
Refined products pipeline throughput (barrels per day) |
471 | 519 | ||||||
Revenue per barrel (cents) |
69.1 | 66.5 | ||||||
Terminal Facilities: |
||||||||
Terminal throughput (barrels per day): |
||||||||
Refined product terminals |
479 | 487 | ||||||
Nederland terminal |
771 | 684 | ||||||
Refinery terminals |
393 | 471 | ||||||
Crude Oil Pipeline System: |
||||||||
Crude oil pipeline throughput (barrels per day) (3) |
1,641 | 906 | ||||||
Crude oil purchases at wellhead (barrels per day) |
196 | 191 | ||||||
Gross margin per barrel of pipeline throughput (cents)(3)(4) |
57.8 | 35.7 | ||||||
Average crude oil price (per barrel) |
$ | 102.55 | $ | 77.99 |
(1) | Excludes amounts attributable to equity ownership interests which are not consolidated. |
(2) | In May 2011, the Partnership acquired a controlling financial interest in the Inland refined products pipeline. As a result of this acquisition, the Partnership accounted for this entity as a consolidated subsidiary from the acquisition date. Volumes for the three months ended June 30, 2011 of 72 thousand bpd and the related revenue per barrel, have been included in the refined products pipeline throughput and revenue per barrel. From the date of acquisition, this pipeline had actual throughput of approximately 143 thousand bpd for the three months ended June 30, 2011. The amounts presented for the three month period ended June 30, 2010 exclude amounts attributable to this system. |
(3) | In July 2010, the Partnership acquired additional interests in the Mid-Valley and West Texas Gulf crude oil pipelines, which previously had been recorded as equity investments. The Partnership obtained a controlling financial interest as a result of these acquisitions and began accounting for these entities as consolidated subsidiaries from their respective acquisition dates. Volumes for the three months ended June 30, 2011 of 717 thousand bpd and the related gross margin, have been included in the crude oil pipeline throughput and gross margin per barrel of throughput. The amounts presented for the three month period ended June 30, 2010 exclude amounts attributable to these systems. |
(4) | Represents total segment sales and other operating revenue, minus cost of products sold and operating expenses and depreciation and amortization, divided by crude oil pipeline throughput. |
Analysis of Consolidated Net Income
Net income for Sunoco Logistics Partners L.P. (the Partnership) was $96 million for the second quarter 2011 as compared with $51 million for the second quarter 2010. The $45 million increase is primarily related to expanded crude oil volumes and margins and an increase in operating income associated with the Partnerships acquisitions and organic growth capital in 2010 and 2011. These increases were partially offset by higher depreciation expense and income tax expense related to acquisitions and organic growth capital.
Analysis of Segment Operating Income
The Partnership operates in three principal business segments: Refined Products Pipeline System, Terminal Facilities and Crude Oil Pipeline System.
27
Refined Products Pipeline System
Operating income for the second quarter 2011 decreased from the prior year period due to lower pipeline volumes on the Partnerships refined product pipelines in the southwest and unplanned refinery issues in the northeast. The decreased operating income was partially offset by results from the acquisition of a controlling financial interest in Inland Corporation in the second quarter 2011.
Terminal Facilities
Quarterly operating income was primarily related to increased contributions from the butane blending business acquired in July 2010 and higher tank rentals and fees at the Partnerships Nederland terminal. These improvements were partially offset by lower throughput at the Partnerships refined products and refinery terminals.
Crude Oil Pipeline System
Operating income for the second quarter 2011 increased from the prior year period due primarily to expanded crude oil volumes and margins, which benefited from market-related opportunities and the contango market structure. Operating income associated with the Partnerships acquisitions of additional joint venture interests further contributed to this increase.
28
Sunoco Logistics Partners L.P.
Operating Highlights
Six Months Ended June 30, 2011 and 2010
Six Months Ended | ||||||||
June 30, | ||||||||
2011 | 2010 | |||||||
Refined Products Pipeline System:(1)(2) |
||||||||
Refined products pipeline throughput (barrels per day) |
441 | 488 | ||||||
Revenue per barrel (cents) |
70.4 | 68.6 | ||||||
Terminal Facilities: |
||||||||
Terminal throughput (barrels per day): |
||||||||
Refined product terminals |
479 | 473 | ||||||
Nederland terminal |
734 | 705 | ||||||
Refinery terminals |
391 | 484 | ||||||
Crude Oil Pipeline System: |
||||||||
Crude oil pipeline throughput (barrels per day) (3) |
1,568 | 872 | ||||||
Crude oil purchases at wellhead (barrels per day) |
193 | 188 | ||||||
Gross margin per barrel of pipeline throughput (cents)(3)(4) |
47.4 | 37.8 | ||||||
Average crude oil price (per barrel) |
$ | 98.42 | $ | 78.39 |
(1) | Excludes amounts attributable to equity ownership interests which are not consolidated. |
(2) | In May 2011, the Partnership acquired a controlling financial interest in the Inland refined products pipeline. As a result of this acquisition, the Partnership accounted for this entity as a consolidated subsidiary from the acquisition date. Volumes for the six months ended June 30, 2011 of 36 thousand bpd and the related revenue per barrel, have been included in the refined products pipeline throughput and revenue per barrel. From the date of acquisition, this pipeline had actual throughput of approximately 143 thousand bpd for the six months ended June 30, 2011. The amounts presented for the six month period ended June 30, 2010 exclude amounts attributable to this system. |
(3) | In July 2010, the Partnership acquired additional interests in the Mid-Valley and West Texas Gulf crude oil pipelines, which previously had been recorded as equity investments. The Partnership obtained a controlling financial interest as a result of these acquisitions and began accounting for these entities as consolidated subsidiaries from their respective acquisition dates. Volumes for the six months ended June 30, 2011 of 687 thousand bpd and the related gross margin, have been included in the crude oil pipeline throughput and gross margin per barrel of throughput. The amounts presented for the six month period ended June 30, 2010 exclude amounts attributable to these systems. |
(4) | Represents total segment sales and other operating revenue, minus cost of products sold and operating expenses and depreciation and amortization, divided by crude oil pipeline throughput. |
Analysis of Consolidated Net Income
Net income for Sunoco Logistics Partners L.P. (the Partnership) was $146 million for the six month period ended June 30, 2011 as compared with $94 million for the six month period ended June 30, 2010. The $52 million increase is primarily related to an increase in operating income associated with expanded crude oil volumes and margins, which benefited from market-related opportunities and the contango market structure, and contributions from the Partnerships acquisitions and organic growth capital in 2010 and 2011. These increases were partially offset by an increase in interest expense and tax expense associated with acquisitions and organic growth capital.
Analysis of Segment Operating Income
The Partnership operates in three principal business segments: Refined Products Pipeline System, Terminal Facilities and Crude Oil Pipeline System.
29
Refined Products Pipeline System
Operating income for the six months ended June 30, 2011 decreased from the prior year period due to lower pipeline volumes on the Partnerships refined product pipelines in the southwest and unplanned refinery issues in the northeast. The decreased operating income was partially offset by results from the acquisition of a controlling financial interest in Inland Corporation in the second quarter 2011.
Terminal Facilities
The improvement in operating income from the prior year period was primarily related to increased results from the butane blending business acquired in July 2010 and higher tank rentals and fees at the Partnerships Nederland terminal. These improvements were partially offset by lower throughput at the Partnerships refined products and refinery terminals, which were negatively impacted by unplanned refinery maintenance during the first quarter 2011.
Crude Oil Pipeline System
Operating income for the six months ended June 30, 2011 increased from the prior year period due primarily to expanded crude oil volumes and margins, which benefitted from market-related opportunities and the contango market structure. Operating income associated with the Partnerships acquisitions of additional joint venture interests further contributed to this increase.
Liquidity and Capital Resources
Liquidity
Cash generated from operations and borrowings under our credit facilities are our primary sources of liquidity. At June 30, 2011, we had a net working capital deficit of $12 million and available borrowing capacity under the credit facilities of $192 million. Our working capital position reflects crude oil and refined products inventories based on historical costs under the LIFO method of accounting. The current replacement cost of all such inventories exceeded their carrying value at June 30, 2011 by approximately $153 million. Inventories valued at LIFO are readily marketable at their current replacement values. We periodically supplement our cash flows from operations with proceeds from debt and equity financing activities.
Capital Resources
Credit Facilities
At June 30, 2011 Sunoco Logistics Partners Operations L.P. (the Operating Partnership) had a five-year $395 million Credit Facility, which is available to fund the Partnerships working capital requirements, to finance future acquisitions and future capital projects and for general partnership purposes. The facility, which is scheduled to mature in November 2012, had $234 million outstanding at June 30, 2011. This facility bears interest at the Operating Partnerships option, at either (i) LIBOR plus an applicable margin, (ii) the higher of the federal funds rate plus 0.50 percent or the Citibank prime rate (each plus the applicable margin), or (iii) the federal funds rate plus an applicable margin.
The Operating Partnership also has a $63 million revolving credit facility, which is available to fund the Operating Partnerships working capital requirements, to finance future acquisitions and future capital projects and for general partnership purposes. The facility, which is scheduled to mature in September 2011, had $31 million outstanding at June 30, 2011. This facility bears interest at the Operating Partnerships option, at either (i) LIBOR plus an applicable margin or (ii) the higher of (a) the federal funds rate plus 0.50 percent plus an applicable margin, (b) Toronto Dominions prime rate plus an applicable margin, or (c) LIBOR plus 1.0 percent plus an applicable margin.
The $395 million and $63 million Credit Facilities contain various covenants limiting the Operating Partnerships ability to a) incur indebtedness, b) grant certain liens, c) make certain loans, acquisitions and investments, d) make any material change to the nature of its business, e) acquire another company, or f) enter into a merger or sale of assets, including the sale or transfer of interests in the Operating Partnerships subsidiaries. The $395 million and $63 million Credit Facilities also limit the Operating Partnership, on a rolling four-quarter basis, to a maximum total debt to EBITDA ratio of 4.75 to 1 and 4.5 to 1, respectively, which could generally be increased to 5.25 to 1 and 5.0 to 1, respectively, during an acquisition period. The Partnerships ratio of total debt to EBITDA was 3.1 to 1 at June 30, 2011, as calculated in accordance with the bank covenants.
Senior Notes
In July, 2011 the Operating Partnership issued $300 million of 4.65 percent Senior Notes and $300 million of 6.10 percent Senior Notes (the 2022 and 2042 Senior Notes), due February 2022 and February 2042, respectively. The net proceeds of $595 million from the 2022 and 2042 Senior Notes were used to pay down the outstanding borrowings under our $63 and $395 million revolving credit facilities, which were used to fund the acquisitions of a controlling financial interest in Inland Corporation and the Texon crude oil purchasing and marketing business, and for general partnership purposes.
30
Equity Offering
In July 2011, the Partnership issued 1.3 million Class A Units to Sunoco in connection with the acquisition of the Eagle Point tank farm and related assets. The $98 million of deferred distribution units are a new class of units that will convert to common limited partner units on the one-year anniversary of their issuance. In connection with this offering, the General Partner was issued an additional $2 million general partner interest to maintain its 2 percent general partner interest in the Partnership.
Cash Flows and Capital Expenditures
Net cash used in operating activities for the six months ended June 30, 2011 was $5 million compared with net cash provided by operating activities of $27 million for the first six months of 2010. Net cash used by operating activities in 2011 related primarily to a net increase in working capital of $194 million, partially offset by net income of $146 million and non-cash charges of depreciation and amortization of $37 million. The increase in working capital was primarily the result of the Partnerships contango inventory positions and the associated effect on accounts receivable and accounts payable. The net cash provided by operating activities in 2010 related to net income of $94 million and non-cash charges of depreciation and amortization of $29 million, offset by a $97 million increase in working capital. The increase in working capital was the result of increased contango inventory positions.
Net cash used in investing activities for the first six months of 2011 was $168 million compared with $76 million for the first six months of 2010. Net cash used in investing activities in 2011 consisted of the acquisition of the Inland refined products pipeline system in Ohio for $99 million, capital expenditures to expand upon the Partnerships existing butane blending business, increase tankage at the Nederland facility and expand the Partnerships refined products platform in the southwest United States, as well as maintenance capital associated with the Partnerships existing assets. Net cash used in investing activities in 2010 included construction projects to expand services at the Partnerships refined products terminals, increase tankage at the Nederland facility and expand upon the Partnerships refined products platform in the southwest United States.
Net cash provided by financing activities for the first six months of 2011 was $177 million compared with $49 million for the six three months of 2010. Net cash provided by financing activities for the first six months of 2011 resulted from $234 million in net borrowings under the Partnerships revolving credit facility and a $51 million decrease in advances to affiliates. These sources of cash were partially offset by $103 million in quarterly distributions to limited and general partners. Net cash provided by financing activities for the first six months of 2010 resulted from $494 million in net proceeds from an issuance of senior notes, partially offset by $201 million in distributions to repay in full the promissory note issued in connection with the repurchase and exchange of the general partners IDRs, a $154 million net repayment of the Partnerships credit facilities and $92 million in quarterly distributions paid to limited partners and the general partner.
Capital Requirements
The pipeline, terminalling, and crude oil storage operations are capital intensive, requiring significant investment to maintain, upgrade and enhance existing operations and to meet environmental and operational regulations. The capital requirements have consisted, and are expected to continue to consist, primarily of:
| Maintenance capital expenditures, such as those required to maintain equipment reliability, tankage and pipeline integrity and safety, and to address environmental regulations; and |
| Expansion capital expenditures to acquire and integrate complimentary assets to grow the business, to improve operational efficiencies or reduce costs and to expand existing and construct new facilities, such as projects that increase storage or throughput volume. |
The following table summarizes maintenance and expansion capital expenditures, including net cash paid for acquisitions, for the periods presented:
Six Months Ended June 30, |
||||||||
2011 | 2010 | |||||||
(in millions) | ||||||||
Maintenance |
$ | 10 | $ | 14 | ||||
Expansion |
158 | 62 | ||||||
Total |
$ | 168 | $ | 76 | ||||
Maintenance capital expenditures for both periods presented include recurring expenditures such as pipeline integrity costs, pipeline relocations, repair and upgrade of field instrumentation, including measurement devices, repair and replacement of tank floors and roofs, upgrades of cathodic protection systems, crude trucks and related equipment, and the upgrade of pump stations.
31
Expansion capital expenditures for the six months ended June 30, 2011 were $158 million compared to $62 million for the first six months of 2010. Expansion capital for 2011 includes the acquisition of an 83.8 percent equity interest in Inland Corporation for $99 million, which owns a refined products pipeline system in Ohio, projects to expand the Partnerships butane blending business, increased tankage at the Nederland facility and expansion of the Partnerships refined products platform in the southwest United States. The Partnership expects to invest $100 to $150 million in expansion capital in 2011, excluding major acquisitions.
Additionally in the first quarter 2011, the Partnership announced the development of Project Mariner West as an expansion of Project Mariner to provide additional ethane takeaway capacity out of the Marcellus Shale. Also in the first quarter 2011, West Texas Gulf Pipe Line Company, a consolidated joint venture, announced the development of a project to expand takeaway capacity out of the Permian Basin. Spending on these projects is not included in the estimated $100 to $150 million described above.
In June 2011, the Partnership announced the agreement to acquire a refined products terminal, located in East Boston, Massachusetts from affiliates of ConocoPhillips for $56 million plus inventory. The terminal is the sole service provider of Logan International Airport under a long-term contract. The acquisition is expect to close within the third quarter 2011 and will be included within the Terminal Facilities segment as of the acquisition date.
In August 2011, the Partnership acquired a crude oil purchasing and marketing business from Texon L.P. (Texon) for $205 million plus the fair market value of its crude oil inventory. The purchase consists of a lease crude business and gathering assets in 16 states, primarily in the western United States. The current crude oil volume of the business is approximately 75,000 barrels per day at the wellhead. The transaction is subject to customary closing conditions and is expected to close in the third quarter 2011. The acquisition will be included within the Crude Oil Pipeline segment as of the acquisition date.
Expansion capital for the first six months of 2010 included construction projects to expand services at the Partnerships refined products terminals, increase tankage at the Nederland facility and expand upon the Partnerships refined products platform in the southwest United States.
We expect to fund capital expenditures, including any additional acquisitions, from cash provided by operations and, to the extent necessary, from the proceeds of borrowings under the credit facilities, other borrowings and the issuance of additional limited partnership units.
32
Item 3. | Quantitative and Qualitative Disclosures About Market Risk |
We are exposed to various market risks, including interest rates and volatility in crude oil and refined products commodity prices. To manage such exposure, interest rates and inventory levels and expectations of future commodity prices are monitored when making decisions with respect to risk management.
Interest Rate Risk
We have interest-rate risk exposure for changes in interest rates relating to our outstanding borrowings. We manage our exposure to changing interest rates through the use of a combination of fixed- and variable-rate debt. At June 30, 2011, we had $365 million of variable-rate borrowings under our revolving credit facilities and promissory note to affiliates. The outstanding borrowings bear interest cost of LIBOR plus an applicable margin. An increase in short-term interest rates will have a negative impact on funds borrowed under variable debt arrangements. Our weighted average interest rate on our variable-rate borrowings was 1 percent at June 30, 2011. A one percent change in the weighted average rate would have impacted annual interest expense by approximately $4 million.
At June 30, 2011, we had $1.1 billion of fixed-rate senior notes, with a fair value of $1.2 billion. A hypothetical one-percent decrease in interest rates would increase the fair value of our fixed-rate borrowings at June 30, 2011 by approximately $196 million.
Commodity Market Risk
We are exposed to volatility in crude oil and refined products commodity prices. To manage such exposures, inventory levels and expectations of future commodity prices are monitored when making decisions with respect to risk management and inventory carried. Our policy is to purchase only commodity products for which we have a market and to structure our sales contracts so that price fluctuations for those products do not materially affect the margin we receive. We also seek to maintain a position that is substantially balanced within our various commodity purchase and sales activities. We may experience net unbalanced positions for short periods of time as a result of production, transportation and delivery variances, as well as logistical issues associated with inclement weather conditions. When unscheduled physical inventory builds or draws do occur, they are monitored and constantly managed to a balanced position over a reasonable period of time.
Pursuant to our risk management policy, derivative instruments may be used to hedge or reduce exposure to price risk associated with acquired inventory or forecasted physical transactions. These instruments are not used to speculate on crude oil or refined products prices, as these activities could expose us to significant losses. The physical contracts related to our crude oil and refined products businesses that qualify as derivatives have been designated as normal purchases and sales and are accounted for using traditional accrual accounting. We do not use derivative instruments to manage our exposure to prices related to crude oil purchase and sales activities. We do use derivative instruments as economic hedges against price changes related to our forecasted refined products purchase and sale activities. These derivative instruments are intended to have equal and opposite effects of the purchase and sale activities. At June 30, 2011, the fair market value of our open derivative positions was a net asset of $1 million on 3 million barrels of refined products. These derivative positions vary in length but do not extend beyond one year.
For additional information concerning our commodity market risk activities, see Note 13 to the Condensed Consolidated Financial Statements.
Forward-Looking Statements
Some of the information included in this quarterly report on Form 10-Q contains forward-looking statements and information relating to Sunoco Logistics Partners L.P. that is based on the current beliefs of our management as well as assumptions made by, and information currently available to, our management.
Forward-looking statements discuss expected future results based on current and pending business operations, and may be identified by words such as may, anticipates, believes, expects, estimates, planned, scheduled or similar phrases or expressions. Although we believe these forward-looking statements are reasonable, they are based upon a number of assumptions, any or all of which may ultimately prove to be inaccurate. These statements are subject to numerous assumptions, uncertainties and risks that may cause future results to be materially different from the results projected, forecasted, estimated or budgeted, including, but not limited to the following:
| Our ability to successfully consummate announced acquisitions or expansions and integrate them into its existing business operations; |
| Delays related to construction of, or work on, new or existing facilities and the issuance of applicable permits; |
| Changes in demand for, or supply of, crude oil and petroleum products that impact demand for our pipeline, terminalling and storage services; |
| Changes in the short-term and long-term demand for crude oil, refined petroleum products and natural gas liquids we buy and sell; |
| The loss of Sunoco as a customer or a significant reduction in its current level of throughput and storage with us; |
33
| An increase in the competition encountered by our terminals, pipelines and commodity acquisition and marketing operations; |
| Changes in the financial condition or operating results of joint ventures or other holdings in which we have an equity ownership interest; |
| Changes in the general economic conditions in the United States; |
| Changes in laws and regulations to which we are subject, including federal, state, and local tax, safety, environmental and employment laws; |
| Changes in regulations governing composition of the products that we transport, terminal and store; |
| Improvements in energy efficiency and technology resulting in reduced demand for petroleum products; |
| Our ability to manage growth and/or control costs; |
| The effect of changes in accounting principles and tax laws and interpretations of both; |
| Global and domestic economic repercussions, including disruptions in the crude oil and petroleum products markets, from terrorist activities, international hostilities and other events, and the governments response thereto; |
| Changes in the level of operating expenses and hazards related to operating facilities (including equipment malfunction, explosions, fires, spills and the effects of severe weather conditions); |
| The occurrence of operational hazards or unforeseen interruptions for which we may not be adequately insured; |
| The age of, and changes in the reliability and efficiency of our operating facilities; |
| Changes in the expected level of capital, operating, or remediation spending related to environmental matters; |
| Changes in insurance markets resulting in increased costs and reductions in the level and types of coverage available; |
| Risks related to labor relations and workplace safety; |
| Non-performance by or disputes with major customers, suppliers or other business partners; |
| Changes in our tariff rates implemented by federal and/or state government regulators; |
| The amount of our debt, which could make us vulnerable to adverse general economic and industry conditions, limit our ability to borrow additional funds, place us at competitive disadvantages compared to competitors that have less debt, or have other adverse consequences; |
| Restrictive covenants in our credit agreements; |
| Changes in our or Sunocos credit ratings, as assigned by ratings agencies; |
| The condition of the debt capital markets and equity capital markets in the United States, and our ability to raise capital in a cost-effective way; |
| Performance of financial institutions impacting our liquidity, including those supporting our credit facilities; |
| The effectiveness of our risk management activities, including the use of derivative financial instruments to hedge commodity risks; |
| Changes in interest rates on our outstanding debt, which could increase the costs of borrowing; and |
| The costs and effects of legal and administrative claims and proceedings against us or any entity in which we have an ownership interest, and changes in the status of, or the initiation of new litigation, claims or proceedings, to which we, or any entity in which we have an ownership interest, are a party. |
These factors are not necessarily all of the important factors that could cause actual results to differ materially from those expressed in any of our forward-looking statements. Other unknown or unpredictable factors could also have material adverse effects on future results. We undertake no obligation to update publicly any forward-looking statement whether as a result of new information or future events.
34
Item 4. | Controls and Procedures |
Disclosure controls and procedures are designed to ensure that information required to be disclosed in the Partnership reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified by the rules and forms of the Securities and Exchange Commission. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed in the Partnership reports under the Exchange Act is accumulated and communicated to management, including the Chairman and Chief Executive Officer and Vice President, Chief Financial Officer of Sunoco Partners LLC (the Partnerships general partner), as appropriate, to allow timely decisions regarding required disclosure.
As of June 30, 2011, the Partnership carried out an evaluation, under the supervision and with the participation of the management of the general partner (including the Chairman and Chief Executive Officer and the Vice President, Chief Financial Officer), of the effectiveness of the design and operation of the Partnerships disclosure controls and procedures pursuant to Exchange Act Rule 13a-15. Based upon that evaluation, the general partners Chairman and Chief Executive Officer, and its Vice President, Chief Financial Officer, concluded that the Partnerships disclosure controls and procedures are effective.
No change in the Partnerships internal control over financial reporting has occurred during the fiscal quarter ended June 30, 2011 that has materially affected, or that is reasonably likely to materially affect, the Partnerships internal control over financial reporting.
35
OTHER INFORMATION
Item 1. | Legal Proceedings |
There are certain legal and administrative proceedings arising prior to the February 2002 initial public offering (IPO) pending against our Sunoco-affiliated predecessors and us (as successor to certain liabilities of those predecessors). Although the ultimate outcome of these proceedings cannot be ascertained at this time, it is reasonably possible that some of them may be resolved unfavorably. Sunoco has agreed to indemnify the Partnership for 100 percent of all losses from environmental liabilities related to the transferred assets arising prior to, and asserted within 21 years of February 8, 2002. There is no monetary cap on this indemnification from Sunoco. Sunocos share of liability for claims asserted thereafter will decrease by 10 percent each year through the thirtieth year following the February 8, 2002 date. Any remediation liabilities not covered by this indemnity will be our responsibility. In addition, Sunoco is obligated to indemnify us under certain other agreements executed after the IPO.
Additionally, we have received notices of violations and potential fines under various federal, state and local provisions relating to the discharge of materials into the environment or protection of the environment. While we believe that even if any one or more of the environmental proceedings were decided against us, it would not be material to our financial position, we are required to report environmental proceedings unless we reasonably believe that such proceedings will result in monetary sanctions of less than $0.1 million.
There are certain other pending legal proceedings related to matters arising after the IPO that are not indemnified by Sunoco. Our management believes that any liabilities that may arise from these legal proceedings will not be material to our financial position at June 30, 2011.
Item 1A. | Risk Factors |
There have been no material changes from the risk factors described previously in Part I, Item IA of the Partnerships Annual Report on Form 10-K for the year ended December 31, 2010, filed on February 23, 2011.
Item 2. | Unregistered Sales of Equity Securities and Use of Proceeds |
None.
Item 3. | Defaults Upon Senior Securities |
None.
Item 4. | Reserved |
Item 5. | Other Information |
None.
36
Item 6. | Exhibits |
3.1: | Amendment No. 1 to Third Amended and Restated Partnership Agreement of Sunoco Logistics Partners L.P. dated as of July 1, 2011 (incorporated by reference to Exhibit 3.2 of Form 8-K, file No. 1-31219, filed July 5, 2011) | |
3.2: | Third Amended and Restated Limited Liability Company Agreement of Sunoco Partners LLC dated as of July 1, 2011 (incorporated by reference to Exhibit 3.2 of Form 8-K, file No. 1-31219, filed July 5, 2011) | |
10.1: | Contribution Agreement, dated as of June 29, 2011, to be effective July 1, 2011, by and among Sunoco, Inc. (R&M), Sunoco Logistics Partners L.P., and certain subsidiaries and affiliates of Sunoco Logistics Partners L.P. | |
12.1: | Statement of Computation of Ratio of Earnings to Fixed Charges | |
31.1: | Chief Executive Officer Certification of Periodic Report Pursuant to Exchange Act Rule 13a-14(a) | |
31.2: | Chief Financial Officer Certification of Periodic Report Pursuant to Exchange Act Rule 13a-14(a) | |
32.1: | Chief Executive Officer Certification of Periodic Report Pursuant to Exchange Act Rule 13a-14(b) and U.S.C. §1350 | |
32.2: | Chief Financial Officer Certification of Periodic Report Pursuant to Exchange Act Rule 13a-14(b) and U.S.C. §1350 |
We are pleased to furnish this Form 10-Q to unitholders who request it by writing to:
Sunoco Logistics Partners L.P.
Investor Relations
1818 Market Street
Suite 1500
Philadelphia, PA 19103
or through our website at www.sunocologistics.com.
37
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
Sunoco Logistics Partners L.P. | ||
By: | /S/ BRIAN P. MACDONALD | |
Brian P. MacDonald | ||
Vice President, Chief Financial Officer |
Date: August 4, 2011
38
Exhibit 10.1
CONTRIBUTION AGREEMENT
by and among
SUNOCO, INC. (R&M)
SUNOCO PARTNERS LLC
SUNOCO LOGISTICS PARTNERS L.P.
SUNOCO LOGISTICS PARTNERS GP LLC
SUNOCO LOGISTICS PARTNERS OPERATIONS L.P.
SUNOCO LOGISTICS PARTNERS OPERATIONS GP LLC
AND
SUNOCO PARTNERS MARKETING & TERMINALS L.P.
Effective as of July 1, 2011
TABLE OF CONTENTS
ARTICLE 1 | ||||||||
DEFINITIONS AND INTERPRETATIONS | 2 | |||||||
Section 1.1 | Definitions | 2 | ||||||
Section 1.2 | Interpretations | 2 | ||||||
ARTICLE 2 | ||||||||
BASIC TRANSACTIONS | 2 | |||||||
Section 2.1 | Series of Capital Contributions | 2 | ||||||
Section 2.2 | Contributed Assets | 3 | ||||||
Section 2.3 | Excluded Assets | 5 | ||||||
Section 2.4 | Assumed Liabilities | 6 | ||||||
Section 2.5 | Excluded Liabilities | 7 | ||||||
Section 2.6 | No Assignment If Breach | 8 | ||||||
Section 2.7 | The Closing | 9 | ||||||
Section 2.8 | Deliveries at the Closing | 9 | ||||||
ARTICLE 3 | ||||||||
REPRESENTATIONS AND WARRANTIES CONCERNING THE TRANSACTION | 10 | |||||||
Section 3.1 | Representations and Warranties Concerning the Contributor | 10 | ||||||
Section 3.2 | Representations and Warranties Concerning the Acquirer | 11 | ||||||
ARTICLE 4 | ||||||||
REPRESENTATIONS AND WARRANTIES CONCERNING THE CONTRIBUTED ASSETS | 12 | |||||||
Section 4.1 | Representations and Warranties Concerning the Contributed Assets | 12 | ||||||
ARTICLE 5 | ||||||||
OTHER COVENANTS | 15 | |||||||
Section 5.1 | Further Assurances | 15 | ||||||
Section 5.2 | Retention of and Access to Books and Records | 15 | ||||||
Section 5.3 | Access to Assets | 16 | ||||||
Section 5.4 | Employee Matters | 16 | ||||||
Section 5.5 | Environmental Matters | 18 | ||||||
Section 5.6 | Foreign Trade Zone | 22 | ||||||
Section 5.7 | Termination of Other Agreements | 22 | ||||||
Section 5.8 | Contributed Meters | 22 | ||||||
ARTICLE 6 | ||||||||
REMEDIES FOR BREACHES OF AGREEMENT | 23 | |||||||
Section 6.1 | Survival of Representations and Warranties | 23 | ||||||
Section 6.2 | Indemnification Provisions for Benefit of the Acquirer | 23 | ||||||
Section 6.3 | Indemnification Provisions for Benefit of the Contributor | 24 | ||||||
Section 6.4 | Matters Involving Third Parties | 26 | ||||||
Section 6.5 | Procedures | 26 | ||||||
ARTICLE 7 | ||||||||
TAX MATTERS | 27 | |||||||
Section 7.1 | Tax Preparation | 27 | ||||||
Section 7.2 | Access to Information | 28 | ||||||
Section 7.3 | Transfer Taxes | 28 |
i
Section 7.4 | Assistance and Cooperation | 28 | ||||||
Section 7.5 | Tax Indemnity | 29 | ||||||
Section 7.6 | Tax Indemnity Claims | 29 | ||||||
Section 7.7 | Tax Refunds | 30 | ||||||
Section 7.8 | Certification of Non-Foreign Status | 30 | ||||||
ARTICLE 8 | ||||||||
MISCELLANEOUS | 31 | |||||||
Section 8.1 | Press Releases and Confidentiality | 31 | ||||||
Section 8.2 | No Third Party Beneficiaries | 31 | ||||||
Section 8.3 | Succession and Assignment | 31 | ||||||
Section 8.4 | Counterparts | 31 | ||||||
Section 8.5 | Notices | 32 | ||||||
Section 8.6 | Governing Law | 32 | ||||||
Section 8.7 | Entire Agreement and Amendments | 33 | ||||||
Section 8.8 | Severability | 33 | ||||||
Section 8.9 | Transaction Expenses | 33 | ||||||
Section 8.10 | Waiver of Bulk Sales Law Compliance | 33 | ||||||
Section 8.11 | Arbitration | 33 |
ii
SCHEDULES
Schedule 1.1 | Definitions and Interpretations | |
Schedule 2.2.1 | Contributed Assets Tangible Assets | |
Schedule 2.2.7 | Contributed Assets Miscellaneous Assets | |
Schedule 2.3.2 | Excluded Assets Tangible Assets | |
Schedule 2.3.3 | Excluded Assets Claims | |
Schedule 2.4.1 | Assumed Liabilities Guarantees | |
Schedule 3.1.2 | Authorization of Transaction Contributor | |
Schedule 3.2.2 | Authorization of Transaction Acquirer | |
Schedule 4.1.2 | Licenses | |
Schedule 4.1.4 | Environmental Matters | |
Schedule 4.1.5 | Litigation | |
Schedule 4.1.6(A), (B) and (C) | Employee Matters | |
Schedule 5.4.1 | Current Employees | |
Schedule 5.4.5 | Contributor Benefit Plans | |
Schedule 5.5 | Refinery Site-Wide Licenses |
iii
CONTRIBUTION AGREEMENT
THIS CONTRIBUTION AGREEMENT (the Agreement) is made and entered into as of this 29th day of June, 2011 to be effective as of July 1, 2011 (the Effective Date) by and between
| Sunoco, Inc. (R&M), a corporation organized and existing under the laws of Pennsylvania (the Contributor); |
| Sunoco Partners LLC, a Pennsylvania limited liability company (SPLLC); |
| Sunoco Logistics Partners L.P., a limited partnership organized and existing under the laws of Delaware (Sunoco Logistics); |
| Sunoco Logistics Partners GP LLC, a limited liability company organized and existing under the laws of Delaware (SLPGPLLC); |
| Sunoco Logistics Partners Operations L.P., a limited partnership organized and existing under the laws of Delaware (SLPOLP); |
| Sunoco Logistics Partners Operations GP LLC, a limited liability company organized and existing under the laws of Delaware (SLPOGP); |
| Sunoco Partners Marketing & Terminals L.P., a limited partnership organized and existing under the laws of Texas (SPMT and together with SPLLC Sunoco Logistics, SLPGPLLC, SLPOLP and SLPOGP, the Acquirer). |
RECITALS
1. The Contributor is the owner of the Eagle Point refinery and certain tanks, terminal and logistics and other related assets located near Westville, New Jersey (the Refinery Complex).
2. The Contributor wishes to contribute and SPMT wishes to receive, as a result of a series of related inter-company contributions more fully described herein, certain tanks, terminal and logistics assets and other related assets located at the Refinery Complex, all as more particularly described in Section 2.2, on the terms and conditions set forth in this Agreement.
3. In connection with the contribution of the Contributed Assets, SPMT and the Contributor (or its Affiliates) will enter into (i) a terminaling and storage agreement (the Tank Farm Agreement) setting forth the rights and obligations of the parties thereto with respect to the receipt, storage, measurement and delivery of refined products and VGO at the Tank Farm and over the Docks; (ii) an amended and restated lease agreement (the Ground Lease) amending and restating the 2004 Lease and Access Agreement, which provides for the lease of the Premises by SPMT from the Contributor, to include the additional lease by SPMT from the Contributor of the Leased Real Property and provide SPMT with a right to purchase the Premises and the Leased Real Property; (iii) access agreements (the Access Agreements) setting forth the relative rights of the parties thereto with respect to access by such parties to certain assets
owned or leased by the other party at the Refinery Complex; (iv) an agreement setting forth the rights and obligations of the parties thereto with respect to certain services to be performed in connection with a portion of the Contributed Assets and the Cogeneration Plant (the Utility Services Agreement); (v) an agreement setting forth the terms and conditions pursuant to which the Contributor agrees to perform certain services for SPMT to facilitate the transfer and contribution of the Contributed Assets to SPMT and SPMT agrees to perform certain services for the Contributor at or related to the Refinery Complex (excluding the Cogeneration Plant) (the Site Services Agreement); (vi) a temporary support agreement (the Temporary Support Agreement) setting forth the terms and conditions pursuant to which SPMT agrees to perform, on a temporary basis, certain services for the Cogeneration Plant; and (vii) an agreement setting forth the relative rights of the parties thereto with respect to certain electrical interconnection equipment at the Refinery Complex (the Tenant-in-Common Agreement).
NOW, THEREFORE, in consideration of the foregoing recitals and the agreements contained herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties hereto, intending to be legally bound, do hereby agree as follows:
ARTICLE 1
DEFINITIONS AND INTERPRETATIONS
Section 1.1 Definitions. Unless the context otherwise requires, the capitalized terms used in this Agreement shall have the meanings set forth in Section 1.1 of Schedule 1.1.
Section 1.2 Interpretations. Unless expressly provided to the contrary in this Agreement, this Agreement shall be interpreted in accordance with the provisions set forth in Section 1.2 of Schedule 1.1.
ARTICLE 2
BASIC TRANSACTIONS
Section 2.1 Series of Capital Contributions. Subject to the terms and conditions contained in this Agreement, at the Closing, the contributions described in this Section 2.1 shall be consummated and effected in the order and manner described herein.
2.1.1 Contributor Contribution. The Contributor shall grant, contribute, convey, assign, transfer and deliver all of its right, title and interest in and to the Contributed Assets (collectively, Contribute) to SPLLC, and SPLLC shall accept the Contributed Assets as a contribution to its capital and shall assume and become liable for the Assumed Liabilities and in exchange for which SPLLC shall issue to the Contributor additional membership interests in SPLLC with a fair market value on the date of Closing equal to One Hundred Million Dollars ($100,000,000.00) (the SPLLC Membership Interests).
2.1.2 SPLLC Contribution. SPLLC shall Contribute the Contributed Assets and the Assumed Liabilities to Sunoco Logistics and Sunoco Logistics shall accept the Contributed Assets as a contribution to its capital and shall assume and become liable for the Assumed Liabilities and in exchange for which Sunoco Logistics shall issue and deliver to SPLLC Deferred Distribution Units with a fair market value on the date of Closing equal to
2
Ninety-Eight Million Dollars ($98,000,000.00) and an additional general partner interest with a fair market value on the date of Closing equal to Two Million Dollars ($2,000,000.00). It is acknowledged and agreed to that 2% of the this contribution by SPLLC is in satisfaction of its obligations under Section 5.2(b) of the Third Amended and Restated Agreement of Limited Partnership for Sunoco Logistics, as amended, and results in a continuation of SPLLCs 2% general partner interest in Sunoco Logistics.
2.1.3 Sunoco Logistics Contribution. Sunoco Logistics shall Contribute the Contributed Assets and the Assumed Liabilities to SLPOLP (an undivided 0.01% interest of which shall be contributed on behalf of SLPGPLLC), and SLPOLP shall accept the Contributed Assets as a contribution to its capital and shall assume and become liable for the Assumed Liabilities in exchange for a continuation of the respective interests in SLPOLP held by Sunoco Logistics and SLPGPLLC (the SLPOLP Partnership Interests).
2.1.4 SLPOLP Contribution. SLPOLP shall Contribute the Contributed Assets and the Assumed Liabilities to SPMT (an undivided 0.01% interest of which shall be contributed on behalf of SLPOGP), and SPMT shall accept the Contributed Assets as a contribution to its capital and shall assume and become liable for the Assumed Liabilities in exchange for a continuation of the respective interests in SPMT held by SLPOLP and SLPOGP (the SPMT Partnership Interests).
Section 2.2 Contributed Assets. With respect to each Contribution described in Section 2.1, the following described properties and assets, except to the extent that such properties and assets are Excluded Assets shall be contributed, transferred, assigned and delivered as part of the Contribution (such assets collectively, the Contributed Assets):
2.2.1 Tangible Assets. The equipment, tanks, spheres, bullets, pumps, pipelines (including river water intake structures, the 16 inch EPRF-Wood Pipeline and the 8 inch natural gas pipeline that runs from Woodbury terminal to the Refinery Complex (the Natural Gas Line)), and fixtures, Related to the Tank Farm, the Wastewater Treatment Plant, and the Power & Boiler Houses, including those items identified in Schedule 2.2.1, and the buildings (including the main office/administrative building, firehouse and river water pump house), rail lines and rail system located on the Leased Real Property (the Equipment & Facilities), but excluding (i) power lines, pipelines, telephone lines and other improvements and fixtures owned by public utilities furnishing utilities to the Leased Real Property and the Refinery Complex and (ii) rail lines, pipelines and other improvements and fixtures owned by Third Parties and located on existing easements for such purpose which encumber the Leased Real Property and the Refinery Complex, including any such improvements and fixtures owned by PSE&G and Sunoco Power Generation, LLC.
2.2.2 Licenses. To the extent transferable or assignable, all of the licenses, permits (including Environmental Permits) and consents in favor of the Contributor from any Governmental Authority to the extent applicable to the Contributed Assets and which are necessary to and used in connection with the ownership of the Contributed Assets, including those identified on Schedule 4.1.2 (collectively, the Licenses).
3
2.2.3 Books & Records. All of the records and files Related to the operation of the Contributed Assets, including, plans, drawings, instruction manuals, employment records Related to Continuing Employees and similar items, including all personnel files and, with the consent and release of the affected employees (to the extent legally required), employment related medical records Related to the Continuing Employees, except to the extent prohibited by applicable Law (provided that copies, but not originals, of said personnel files and employment related medical records shall be included in the Books and Records), operating and technical data and records, whether computerized or hard copy, Tax files, books, records, Tax returns and Tax work papers, supplier lists, reference catalogs, surveys, engineering statements, maintenance records and studies, environmental records, environmental reporting information, emission data, testing and sampling data and procedures, data related to the pipelines and tanks associated with construction, inspection and operating records, any and all information necessary to meet compliance obligations with respect to Environmental Laws and any other applicable Laws, in each case Related to the Contributed Assets and existing as of the Effective Date (the Books and Records).
2.2.4 Warranties. All of the Contributors right, title and interest, if any, in and to unexpired warranties and guarantees from Third Parties to the extent Related to the Contributed Assets and to the extent such warranties or guarantees are transferable to the Acquirer, including warranties set forth in any equipment purchase agreement, construction agreement, lease agreement, consulting agreement or agreement for architectural or engineering services, it being understood that nothing in this paragraph shall be construed as a representation by the Contributor that any such warranty remains in effect or is enforceable.
2.2.5 Trade Name. A royalty-free, non-exclusive license to use the name Eagle Point in connection with the Contributed Assets.
2.2.6 Third Party Claims. All claims, demands, causes of action, choses in action, rights of recovery, rights of set-off, rights to refunds and similar rights against Third Parties (including indemnification and contribution) to the extent Related to (i) the ownership or operation of the Contributed Assets after the Effective Date, (ii) any damage to the Contributed Assets not repaired prior to the Effective Date, or (iii) the Assumed Liabilities, or any portion thereof, if any, including any claims for refunds, prepayments, offsets, recoupment, condemnation awards, judgments and the like, whether received as payment or credit against future Liabilities, in each case to the extent Related to the matters covered by clauses (i), (ii) or (iii) above.
2.2.7 Miscellaneous Assets. All those miscellaneous assets, including any Contracts that are assignable or transferable, identified by category on Schedule 2.2.7, and any assets necessary in order for SPMT to provide services under the Utility Services Agreement and the Site Services Agreement, and all of Contributors right, title and interest as a tenant-in-common with respect to certain electrical interconnection equipment at the Refinery Complex as more particularly described in the Tenant-in-Common Agreement. For purposes of this Agreement, any Contracts identified on Schedule 2.2.7 are referred to herein as the Assigned Contracts.
4
Section 2.3 Excluded Assets. The assets to be contributed by the Contributor shall include only the Contributed Assets. For the sake of clarity, the Contributor and the Acquirer agree that the Contributed Assets shall not include any of the following specifically enumerated assets, rights and interests (collectively, the Excluded Assets):
2.3.1 All of the equipment, pumps, tanks, towers, transformers, and switch gear Related to the Cogeneration Plant that are owned by Sunoco Power Generation, LLC or PSE&G, including the high voltage lines, breakers, relaying and metering equipment located at the area commonly referred to as the substation, breaker station, or switchyard, and the two pumps located at the river water pump house (which pump house is a Contributed Asset).
2.3.2 All of the processing units, all process unit piping and equipment, all raw materials, intermediates, products, byproducts and wastes contained in the process units and process unit piping and equipment, and all wastes generated from the Contributed Assets or Excluded Assets that is stored in containers at or prior to the Closing, located at the Refinery Complex, and any other assets and properties of the Contributor that are located on the Leased Real Property and described on Schedule 2.3.2.
2.3.3 Claims, demands, causes of action, choses in action, rights of recovery, rights of set-off, rights to refunds, Creditable Emission Reductions and similar rights in favor of the Contributor or any of their Affiliates of any kind to the extent Relating to (i) the Excluded Assets or the Excluded Liabilities or identified on Schedule 2.3.3 or (ii) the ownership of the Contributed Assets prior to the Effective Date (other than any damage to the Contributed Assets not repaired prior to the Effective Date).
2.3.4 Subject to the license referred to in Section 2.2.5, the rights of the Contributor to the name Eagle Point Refinery or any related or similar trade names, trademarks, service marks, corporate names or logos, or any part, derivative or combination thereof.
2.3.5 All cash on hand and cash equivalents, including bank accounts, money market funds and temporary cash investments.
2.3.6 All of the Contributors and any of its Affiliates right, title and interest in and to all accounts receivable and all notes, bonds, and other evidences of indebtedness of and rights to receive payments arising out of sales, services, rentals and other activities occurring in connection with and attributable to the ownership or operation of the Contributed Assets prior to the Closing and the security arrangements, if any, Related thereto, including any rights with respect to any Third Party collection procedures or any other actions or proceedings in connection therewith.
2.3.7 Any and all of the Contributors and its Affiliates rights arising under any outstanding receivable or payable between the Contributor, on the one hand, and any of its Affiliates, on the other hand.
2.3.8 Any and all accounting and Tax files, books, records, Tax returns and Tax work papers not Related to the Contributed Assets.
5
2.3.9 All assets Related to any pension, profit sharing, stock bonus, stock option, thrift or other retirement plan, medical, hospitalization, dental, life, disability, vacation or other insurance or benefit plan, employee stock ownership plan, deferred compensation, stock ownership, stock purchase, bonus, benefit or other incentive plan, severance plan or other similar plan relating to the Contributor, its Affiliates or their respective employees.
2.3.10 All rights, titles, claims and interests of the Contributor or any of its Affiliates (i) under any policy or agreement of insurance, (ii) under any bond, (iii) to or under any condemnation damages or awards in regard to any taking or (iv) to any insurance or bond proceeds.
2.3.11 All rights or claims by the Contributor or any of its Affiliates to (a) any Tax refund relating to the period prior to the Effective Date or (b) to any refund, claim for drawback or other claims relating to imports, exports, customs or the Subzone relating to the period prior to the Effective Date.
2.3.12 Any equity interest held by the Contributor or its Affiliates in any Person.
2.3.13 Any hydrocarbon inventory located at the Refinery Complex, including linefill.
2.3.14 Any Contract of the Contributor or its Affiliates not listed on Schedule 2.2.7.
Subject to the provisions of the Site Services Agreement, for a period of two (2) years after the Effective Date, the Contributor may remove at any time or from time to time any and all of the Excluded Assets from the Leased Real Property (at the Contributors expense, but without charge by the Acquirer for storage), provided that the Contributor shall do so in a manner that does not unduly or unnecessarily disrupt the Acquirers normal business activities. Notwithstanding anything to the contrary in Article 6, the Contributor shall indemnify, defend and hold harmless the Acquirer and its Affiliates from and against all Adverse Consequences to the extent incurred as a result of the actions of the Contributor or their Representatives in removing such Excluded Assets, in each case other than to the extent resulting from any gross negligence or willful misconduct of the Acquirer, any Affiliate of the Acquirer or any Representatives of the Acquirer.
Section 2.4 Assumed Liabilities. Except as provided in Section 2.5 and the other terms and conditions set forth in this Agreement or any Ancillary Agreement, the Acquirer shall assume and pay, discharge and perform as and when due, the following Liabilities of the Contributor or its Affiliates (the Assumed Liabilities):
2.4.1 Except for any Liabilities of the Contributor that arise under this Agreement or any Ancillary Agreement, all Liabilities that accrue, are caused by, arise out of, are associated with, are in respect of, or are incurred, in each case, at any time after the Closing, in connection with the ownership or operation of the Contributed Assets or other activities occurring in connection with and attributable to the ownership or operation of the Contributed Assets from and after the Closing, including all obligations of the Contributor which arise or
6
accrue under the Assigned Contracts after the Closing and any other Liability of the Contributor or any of its Affiliates (including those related to letters of credit and performance bonds) that is in the nature of a guaranty of any Assigned Contract and that is specifically disclosed on Schedule 2.4.1.
2.4.2 All Liabilities for which the Acquirer is liable pursuant to Articles 5 and 7 hereof.
Section 2.5 Excluded Liabilities. The Parties agree that Liabilities of the Contributor or its Affiliates that are not identified in Section 2.4 as Assumed Liabilities are not part of the Assumed Liabilities, and the Acquirer shall not assume or become obligated with respect to any other Liability of the Contributor or any of its Affiliates, including the Liabilities existing as of the Effective Date whether or not described specifically in this Section 2.5 (collectively, the Excluded Liabilities), all of which shall remain the sole responsibility of, and be discharged and performed as and when due by, the Contributor or its Affiliates. The Acquirer shall not assume nor have Liability with respect to any Excluded Liabilities, including any of the following Liabilities of the Contributor or its Affiliates as the same may exist at or after the Closing:
2.5.1 Liabilities in respect of, associated with or arising from the Excluded Assets and the ownership, operation and conduct of any business by the Contributor or its Affiliates or their respective predecessors and successors in interest Relating to the ownership, operation or use of the Excluded Assets.
2.5.2 Liabilities to Third Parties (including employees) for injury, death or damage to person or property of a Third Party occurring at or prior to the Closing to the extent arising out of the ownership or operation of the Contributed Assets or other activities occurring in connection with and attributable to the ownership or operation of the Contributed Assets prior to the Closing; provided, however, that Excluded Liabilities under this Section 2.5.2 shall not in any event include any Liabilities resulting from negligence or willful misconduct of the Acquirer, any of its respective Affiliates or any of their respective Representatives in connection with any inspection of the Contributed Assets at or prior to the Closing.
2.5.3 Excluded Environmental Liabilities:
2.5.3.1 All Liabilities under or pursuant to ISRA arising from or related to the assignment of assets under this Agreement and all transactions involving the Refinery Complex that occurred prior to the Closing, including ISRA Case Nos. E84158, E20030519, E20030520, and E20030521;
2.5.3.2 All Liabilities arising from or related to the NJPDES DSW/DGW Permit issued June 30, 1989, Permit No. NJ0005401 for closure and post-closure care of the hazardous waste land treatment unit at the Refinery Complex;
2.5.3.3 All Liabilities arising from or related to Contributors failure or alleged failure at or prior to the Closing to comply with Environmental Laws applicable to the Contributed Assets, including the matters disclosed or required to be disclosed on Schedule 4.1.4;
7
2.5.3.4 All Liabilities arising from or related to the CAA Consent Decree attributable to: (a) the ownership or operation of the Refinery Complex at or prior to the Closing, (b) the ownership or operation of the Excluded Assets from and after the Closing, (c) the notice or transfer obligations of Contributor pursuant to Paragraphs 6 or 7 of the CAA Consent Decree, or (d) the termination of the CAA Consent Decree; and
2.5.3.5 All Liabilities arising from or related to the presence of asbestos on Boilers 1, 2, 3 and 4 and Tanks 62 and 63, including the cost of any remediation or removal of such asbestos that may be necessary.
2.5.4 All Liabilities for which the Contributor and/or its Affiliates are responsible pursuant to Article 7 hereof and any Tax that may be imposed on the ownership, operation or use of the Contributed Assets on or prior to the Closing.
2.5.5 Any fines, penalties or costs imposed by a Governmental Authority against the Contributor or its Affiliates, the Contributed Assets or any activities occurring in connection with and attributable to the ownership or operation of the Contributed Assets resulting from the violation of any statute, ordinance, rule or regulation promulgated by a Governmental Authority and attributable to actions or omissions at or prior to the Closing with respect to the Contributed Assets or any activities occurring in connection with and attributable to the ownership or operation of the Contributed Assets at or prior to the Closing.
2.5.6 Liabilities which accrue at or prior to the Closing pursuant to the Assigned Contracts and Licenses.
2.5.7 All Liabilities for which the Contributor and/or its Affiliates are responsible pursuant to Article 5 hereof.
Section 2.6 No Assignment If Breach. Notwithstanding anything to the contrary set forth in this Agreement, this Agreement shall not constitute an agreement of the Contributor to contribute or assign any Contributed Asset to the Acquirer, or cause the Acquirer to assume any Assumed Liability, if the attempted assignment or assumption of the same, as a result of the absence of the consent or authorization of a Third Party or failure of a right of first refusal or first offer notice period to expire, would constitute a breach or Default under any agreement, Encumbrance, or commitment, would violate any Law or would in any way adversely affect the rights, or increase the obligations, of the Acquirer or the Contributor with respect thereto. If any such consent or authorization is not obtained, or if an attempted assignment or assumption would be ineffective or would adversely affect the rights or increase the obligations of the Acquirer or the Contributor, with respect to any such agreement, Encumbrance, or commitment, so that the Acquirer would not, in fact, receive all such rights, or assume the obligations, of the Contributor with respect thereto as they exist prior to such attempted assignment or assumption, then the Contributor and the Acquirer shall enter into such reasonable cooperative arrangements as may be reasonably acceptable to both the Acquirer and the Contributor (including sublease, agency, management, indemnity or payment arrangements and enforcement at the cost and for the benefit of the Acquirer of any and all rights of the Contributor against an involved Third Party) to provide for or impose upon the Acquirer the benefits of such Contributed Assets or the obligations of such Assumed Liability, as the case may be. If the Acquirer and the Contributor
8
cannot agree on any such arrangement, or any such arrangement would not be reasonably practicable, to provide the Acquirer with materially all the benefits of such Contributed Asset or materially all the obligations of such Assumed Liability, as the case may be, then such Contributed Asset or Assumed Liability shall be excluded from the transactions contemplated under this Agreement and shall be deemed to be an Excluded Asset or an Excluded Liability, as the case may be, and the Parties hereto shall negotiate in good faith an equitable adjustment in the Purchase Price, or resolve any disagreement respecting such adjustment in accordance with the procedures of Section 8.11.
Section 2.7 The Closing. The closing of the transactions contemplated by this Agreement (the Closing) shall take place at 1818 Market Street, Philadelphia, Pennsylvania, commencing at 10:00 a.m. local time on the Effective Date. Title to, ownership of, control over and risk of loss of the Contributed Assets shall pass to the Acquirer effective 12:01 a.m., local time on the Effective Date.
Section 2.8 Deliveries at the Closing. At the Closing:
2.8.1 SPLLC shall issue the SPLLC Membership Interests to the Contributor in accordance with Section 2.1.1 of this Agreement, and shall amend the SPLLC Limited Liability Company Agreement to reflect the issuance of the SPLLC Membership Interests to the Contributor;
2.8.2 Sunoco Logistics shall issue the Deferred Distribution Units to SPLLC in accordance with Section 2.1.2 of this Agreement and shall deliver to SPLLC certificates for such Deferred Distribution Units;
2.8.3 SLPOLP shall issue the SLPOLP Partnership Interests to Sunoco Logistics and SLPGPLLC in accordance with Section 2.1.3 of this Agreement;
2.8.4 SPMT shall issue the SPMT Partnership Interests to SLPOLP and SLPOGP in accordance with Section 2.1.4 of this Agreement;
2.8.5 the Contributor shall deliver to the Acquirer the certificate required by Section 7.8;
2.8.6 the Contributor shall deliver to the Acquirer all approvals and actions of, filings with and notices to any Governmental Authority necessary to permit the Contributor to perform its obligations under this Agreement including, if required, ISRA approval, and all required Third Party consents or novations (or, in lieu thereof, waivers), but only to the extent the Contributor has obtained (i) such approvals or actions of such Governmental Authorities or (ii) such consents, novations or waivers of such Third Parties;
2.8.7 the respective parties to the Ancillary Agreements shall execute and deliver the Ancillary Agreements; and
2.8.8 the Contributor and the Acquirer shall deliver any other documents, instruments or agreements that are reasonably necessary or appropriate to consummate the transactions contemplated hereby.
9
ARTICLE 3
REPRESENTATIONS AND WARRANTIES CONCERNING
THE TRANSACTION
Section 3.1 Representations and Warranties Concerning the Contributor. Except as set forth in a correspondingly numbered Schedule delivered to the Acquirer, the Contributor represents and warrants to the Acquirer as of the date of this Agreement as follows:
3.1.1 Organization of the Contributor. The Contributor is a corporation duly organized and validly existing, under the Laws of the Commonwealth of Pennsylvania. The Contributor is duly authorized to conduct business and is in good standing under the Laws of each jurisdiction where such qualification is required, except where the lack of such qualification would not have a Material Adverse Effect. The Contributor has the requisite corporate power and authority necessary to carry on its business and to own and use the Contributed Assets owned or operated by it.
3.1.2 Authorization of Transaction. The Contributor has full corporate power and authority to execute and deliver this Agreement and each Ancillary Agreement to which it is a party and to perform its obligations hereunder and thereunder. This Agreement and each Ancillary Agreement to which the Contributor is a party constitutes its valid and legally binding obligation, enforceable against it in accordance with its terms and conditions, except as enforceability may be limited by applicable bankruptcy, insolvency, reorganization, moratorium or similar laws from time to time in effect that affect creditors rights generally and by legal and equitable limitations on the availability of specific remedies. The Contributor need not give any notice to, make any filing with, or obtain any authorization, consent, or approval of any Governmental Authority or any Third Party in order to consummate the transactions contemplated by this Agreement except for the prior approval of the applicable Governmental Authorities and Third Parties listed in Schedule 3.1.2 or previously obtained by the Parties in connection with the transactions contemplated hereby.
3.1.3 Noncontravention. Except for the prior approval of the applicable Governmental Authorities and Third Parties listed in Schedule 3.1.2 or previously obtained by the Parties in connection with the transactions contemplated hereby, neither the execution and delivery of this Agreement, nor the consummation of the transactions contemplated under this Agreement, will violate any Law to which the Contributor is subject or to which any Contributed Asset is subject, any Licenses or any provision of the Organizational Documents of the Contributor, or result in a breach of, constitute a Default under, result in the acceleration of, create in any party the right to accelerate, terminate, modify, or cancel, or require any notice or trigger any rights to payment or other compensation under any agreement, Contract, lease, License, instrument, or other arrangement to which the Contributor is a party or by which it is bound that is included in the Contributed Assets or that could prevent or materially delay the consummation of the transactions contemplated by this Agreement.
3.1.4 Brokers Fees. The Contributor has no any Liability to pay any fees or commissions to any broker, finder, or agent with respect to the transactions contemplated by this Agreement for which the Acquirer or any Affiliate of the Acquirer will be obligated.
10
3.1.5 Bankruptcy. There are no bankruptcy, reorganization or rearrangement proceedings under any bankruptcy, insolvency, reorganization, moratorium or other similar laws with respect to creditors pending against, being contemplated by, or, to the knowledge of the Contributor, threatened, against the Contributor.
Section 3.2 Representations and Warranties Concerning the Acquirer. Except as set forth in a correspondingly numbered Schedule delivered to the Contributor, each of SPMT, Sunoco Logistics, SPLLC, SLPGPLLC, SLPOLP, and SLPOGP individually (the Acquirer Representing Party), represents and warrants to the Contributor as of the date of this Agreement as follows:
3.2.1 Organization of the Acquirer. The Acquirer Representing Party is duly organized and validly existing under the Laws of the state in which it was formed or incorporated. The Acquirer Representing Party is duly authorized to conduct business and is in good standing under the Laws of each jurisdiction where such qualification is required, except where the lack of such qualification would not have a Material Adverse Effect. The Acquirer Representing Party has the requisite power and authority that is necessary to carry on the business in which it is engaged and to own and use the properties owned and used by it.
3.2.2 Authorization of Transaction. The Acquirer Representing Party has full power and authority to execute and deliver this Agreement and to perform its obligations hereunder. This Agreement constitutes the valid and legally binding obligation of the Acquirer Representing Party, enforceable in accordance with its terms and conditions, except as enforceability may be limited by applicable bankruptcy, insolvency, reorganization, moratorium or similar laws from time to time in effect that affect creditors rights generally and by legal and equitable limitations on the availability of specific remedies. The Acquirer Representing Party need not give any notice to, make any filing with, or obtain any authorization, consent, or approval of any Governmental Authority or any Third Party in order to consummate the transactions contemplated by this Agreement, except for the prior approval of the applicable Governmental Authorities and Third Parties listed in Schedule 3.2.2 or previously obtained by the Parties in connection with the transaction contemplated hereby.
3.2.3 Noncontravention. Except for the prior approval of the applicable Governmental Authorities and Third Parties listed in Schedule 3.2.2 or previously obtained by the Parties in connection with the transactions contemplated hereby, neither the execution and delivery of this Agreement, nor the consummation of the transactions contemplated under this Agreement, will violate any Law to which the Acquirer Representing Party is subject, any of its licenses or any provision of the its Organizational Documents or conflict with, result in a breach of, constitute a Default under, result in the acceleration of, create in any party the right to accelerate, terminate, modify, or cancel, or trigger any rights to payment or other compensation, or require any notice, approval or consent under any agreement, Contract, lease, license, instrument, or other arrangement to which it is a party or by which it is bound that could prevent or materially delay the consummation of the transactions contemplated under this Agreement.
3.2.4 Brokers Fees. The Acquirer Representing Party has no Liability or obligation to pay any fees or commissions to any broker, finder, or agent with respect to the
11
transactions contemplated by this Agreement for which the Contributor or any Affiliate of the Contributor will be obligated.
ARTICLE 4
REPRESENTATIONS AND WARRANTIES
CONCERNING THE CONTRIBUTED ASSETS
Section 4.1 Representations and Warranties Concerning the Contributed Assets. Except as set forth in a correspondingly numbered Schedule delivered to the Acquirer, the Contributor represents and warrants to the Acquirer as of the Effective Date as follows:
4.1.1 Ownership of the Contributed Assets. The Contributor has good and marketable title to all of the Contributed Assets and such title to the Contributed Assets will be transferred at the Closing to SPLLC free and clear of all Encumbrances.
4.1.2 Licenses. Schedule 4.1.2 lists each License that is material to the Contributed Assets. The Contributor possesses all material Licenses necessary for its operation of the Contributed Assets at the location and in the manner presently operated.
4.1.3 Compliance with Law. Except where the failure to be in compliance would not have a Material Adverse Effect, the Contributor is and has been in compliance with all, and to the Knowledge of Contributor is not under investigation with respect to and has not been threatened to be charged with or given notice of any violation of any, applicable Laws and Licenses related to the ownership and operation of the Contributed Assets.
4.1.4 Environmental Matters. Notwithstanding anything in this Agreement to the contrary, the representations and warranties contained in this Section 4.1.4 are the sole and exclusive representations and warranties of the Contributor pertaining or relating to matters arising under or with respect to the environment, Environmental Laws, Environmental Permits, or Hazardous Substances. Except as disclosed or referenced on Schedule 4.1.4 and except for matters that would not reasonably be expected to have a Material Adverse Effect:
4.1.4.1 The Contributors ownership and operation of the Contributed Assets as presently owned and operated are in compliance in all material respects with all applicable Environmental Laws and all Environmental Permits.
4.1.4.2 The Contributor is not a party to any outstanding order, injunction, judgment, decree or ruling that arose from the Contributors operation or ownership of the Contributed Assets and relates to (i) the Contributors compliance with Environmental Laws, (ii) Remedial Work required to be performed by the Contributor, or (iii) any Release of Hazardous Substances or presence of Hazardous Substances.
4.1.4.3 Since January 1, 2009, the Contributor has not received any written communication alleging that, with respect to the Contributors operation or ownership of the Contributed Assets, the Contributor may be in violation of any Environmental Law or may have any liability under any Environmental Law.
12
4.1.4.4 To the Contributors Knowledge, there is no investigation by a Governmental Authority of the Contributed Assets, pending or threatened in writing, that would reasonably be expected to result in the imposition of any material liability pursuant to any Environmental Law.
4.1.5 Litigation. Except as set forth on Schedule 4.1.4 and Schedule 4.1.5, there are no actions, suits, claims or proceedings pending with service of process made on the Contributor (or its Affiliates) or, to the Contributors Knowledge, threatened or pending without service of process made on the Contributor (or its Affiliates), against the Contributor (or its Affiliates) relating to the Contributed Assets at law or in equity, or before or by any Governmental Authority.
4.1.6 Employee Matters. Except for such noncompliance as would not have a Material Adverse Effect on the operation of the Contributed Assets, Contributor is in compliance in all material respects with all applicable federal, state and local Laws pertaining to employment and employment practices, terms and conditions of employment, wages and hours, payment of unemployment benefits and taxes and workers compensation, including Title VII of the Civil Rights Act of 1964, as amended, the Equal Pay Act, as amended, the Fair Labor Standards Act, as amended, the Americans with Disabilities Act, the Age Discrimination in Employment Act, the Worker Adjustment and Retraining Notification Act, the Employee Retirement Income Security Act, the National Labor Relations Act and the Code. Contributor is not a party to, nor is it negotiating, any collective bargaining or other agreement with any union or other association of employees relating to the Current Employees or the Contributed Assets. No labor union or employee organization has been certified or recognized as the collective bargaining representative of the Current Employees. There is no labor strike, slowdown or work stoppage or lockout pending or, to Knowledge of Contributor, threatened against or affecting the Contributed Assets. Except as set forth on Schedule 4.1.6(A), none of the Current Employees have a pending or, to Contributors or its Affiliates Knowledge, threatened claim against Contributor or its Affiliates. Except as set forth on Schedule 4.1.6(B), neither Contributor nor its Affiliates have pending against them related to the Current Employees or the Contributed Assets any unfair labor practice charges, other administrative charges, claims, grievances, proceedings or lawsuits before any court, governmental agency, regulatory body or arbiter arising under any federal, state or local Law governing employment. Except as set forth on Schedule 4.1.6(C), Contributor has no Contracts of employment with any of the Current Employees.
4.1.7 Limitations of Representations and Warranties. NOTWITHSTANDING ANYTHING CONTAINED TO THE CONTRARY IN ANY OTHER PROVISION OF THIS AGREEMENT OR ANY DOCUMENT DELIVERED BY THE CONTRIBUTOR IN CONNECTION WITH THIS AGREEMENT, IT IS THE EXPLICIT INTENT AND UNDERSTANDING OF EACH PARTY HERETO THAT THE CONTRIBUTOR IS NOT MAKING ANY REPRESENTATION OR WARRANTY WHATSOEVER, EXPRESS, IMPLIED, STATUTORY OR OTHERWISE, BEYOND THOSE REPRESENTATIONS OR WARRANTIES EXPRESSLY MADE BY IT IN THIS AGREEMENT OR ANY DOCUMENT DELIVERED BY THE CONTRIBUTOR IN CONNECTION WITH THIS AGREEMENT, AND IT IS UNDERSTOOD THAT, EXCEPT TO THE EXTENT COVERED BY SUCH A REPRESENTATION OR WARRANTY EXPRESSLY MADE HEREIN OR ANY DOCUMENT DELIVERED BY THE CONTRIBUTOR IN CONNECTION WITH THIS
13
AGREEMENT AND WITHOUT LIMITING SUCH EXPRESS REPRESENTATIONS AND WARRANTIES, THE ACQUIRER TAKES THE CONTRIBUTED ASSETS AS IS AND WHERE IS AND WITH ALL FAULTS. WITHOUT LIMITING THE GENERALITY OF THE IMMEDIATELY PRECEDING SENTENCE OR ANY REPRESENTATIONS OR WARRANTIES EXPRESSLY MADE BY THE CONTRIBUTOR IN THIS AGREEMENT OR ANY DOCUMENT DELIVERED BY THE CONTRIBUTOR IN CONNECTION WITH THIS AGREEMENT, THE CONTRIBUTOR HEREBY (I) EXPRESSLY DISCLAIMS AND NEGATES ANY REPRESENTATION OR WARRANTY, EXPRESS OR IMPLIED, AT COMMON LAW, BY STATUTE OR OTHERWISE, RELATING TO (A) THE CONDITION, USEFULNESS OR ADEQUACY OF THE CONTRIBUTED ASSETS (INCLUDING ANY IMPLIED OR EXPRESS WARRANTY OF QUALITY, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, OR OF CONFORMITY TO MODELS OR SAMPLES OF MATERIALS), (B) ANY INFRINGEMENT BY THE CONTRIBUTOR OR ANY OF ITS AFFILIATES OF ANY INTELLECTUAL PROPERTY OR PROPRIETARY RIGHT OF ANY THIRD PARTY OR (C) THE ACCURACY, SPECIFICATIONS, QUALITY, FITNESS, MERCHANTABILITY, REPRODUCIBILITY OR CORRECTNESS OF DATA, PRODUCTS OR RESULTS OF ANY INTELLECTUAL PROPERTY; AND (II) NEGATES ANY RIGHTS OF THE ACQUIRER UNDER STATUTES TO CLAIM DIMINUTION OF CONSIDERATION AND ANY CLAIMS BY THE ACQUIRER FOR DAMAGES BECAUSE OF LATENT VICES OR DEFECTS, WHETHER KNOWN OR UNKNOWN, IT BEING THE INTENTION OF THE PARTIES THAT, SUBJECT TO THE TERMS OF THIS AGREEMENT OR ANY EXPRESS TERM OF ANY DOCUMENT DELIVERED BY THE CONTRIBUTOR IN CONNECTION WITH THIS AGREEMENT, THE CONTRIBUTED ASSETS ARE TO BE ACCEPTED BY THE ACQUIRER IN THEIR PRESENT CONDITION AND STATE OF REPAIR.
4.1.8 WITHOUT LIMITING ANY REPRESENTATIONS, WARRANTIES OR INDEMNITIES EXPRESSLY MADE BY THE CONTRIBUTOR IN THIS AGREEMENT OR ANY DOCUMENT DELIVERED BY THE CONTRIBUTOR IN CONNECTION WITH THIS AGREEMENT, THE CONTRIBUTOR MAKES NO WARRANTY OR REPRESENTATION, EXPRESS, IMPLIED, STATUTORY OR OTHERWISE, WITH RESPECT TO ANY ENVIRONMENTAL CONDITIONS, ENVIRONMENTAL LIABILITIES OR OTHER ENVIRONMENTAL MATTERS, INCLUDING WITH RESPECT TO THE PRESENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS AT, IN, ON OR UNDER, OR DISPOSED OF OR DISCHARGED OR RELEASED FROM, THE CONTRIBUTED ASSETS. FURTHERMORE, WITHOUT LIMITING ANY REPRESENTATIONS OR WARRANTIES EXPRESSLY GIVEN BY THE CONTRIBUTOR IN THIS AGREEMENT OR ANY DOCUMENT DELIVERED BY THE CONTRIBUTOR IN CONNECTION WITH THIS AGREEMENT, THE CONTRIBUTOR MAKES NO WARRANTY OR REPRESENTATION, EXPRESS, IMPLIED, STATUTORY OR OTHERWISE, WITH RESPECT TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION, RECORDS, DATA AND INTERPRETATIONS NOW, HERETOFORE OR HEREAFTER MADE AVAILABLE TO THE ACQUIRER IN CONNECTION WITH THIS AGREEMENT; INCLUDING ANY DESCRIPTION OF THE CONTRIBUTED ASSETS, PRICING ASSUMPTIONS, POTENTIAL FOR PROFITS, PROJECTED COSTS AND, ANY ACQUIRED OR LICENSED DATA, ANY ENVIRONMENTAL INFORMATION, OR ANY OTHER MATERIAL FURNISHED TO THE ACQUIRER BY THE CONTRIBUTOR, ANY AFFILIATES OF THE
14
CONTRIBUTOR OR ANY DIRECTOR, OFFICER, SHAREHOLDER, EMPLOYEE, COUNSEL, AGENT OR ADVISOR OF THE CONTRIBUTOR OR ANY AFFILIATES OF THE CONTRIBUTOR.
ARTICLE 5
OTHER COVENANTS
Section 5.1 Further Assurances.
5.1.1 From time to time after the Closing, and without any further consideration, the Parties agree to execute, acknowledge and deliver all such additional deeds, assignments, bills of sale, conveyances, instruments, notices, releases, acquittances and other documents, and will do all such other acts and things, all in accordance with applicable law, as may be necessary or appropriate to more fully assure that the Acquirer owns all of the Contributed Assets and to more fully and effectively carry out the purposes and intent of this Agreement.
Section 5.2 Retention of and Access to Books and Records.
5.2.1 As promptly as practicable and in any event before thirty (30) days after the Effective Date, the Contributor will deliver or cause to be delivered to the Acquirer, at the Acquirers request, the Books and Records that are in the possession or control of the Contributor or its Affiliates and that relate to the operation of the Contributed Assets. The Acquirer agrees to hold and maintain the Books and Records so that they may be reasonably retrievable and not to destroy or dispose of any portion thereof for a period of three (3) years from the Effective Date or such longer time as may be required by Law, provided that, if it desires to destroy or dispose of such Books and Records during such period, it will first offer in writing at least sixty (60) days before such destruction or disposition to surrender them to the Contributor and if the Contributor does not accept such offer within thirty (30) days after receipt of such offer, the Acquirer may take such action.
5.2.2 The Acquirer agrees to afford the Contributor and its Affiliates and their respective accountants, counsel and other designated individuals, during normal business hours, upon reasonable request, at a mutually agreeable time, full access to and the right to make copies of the Books and Records at no cost to the Contributor or its Affiliates (other than for reasonable out-of-pocket expenses); provided that such access will not be construed to require the disclosure of Books and Records that would cause the waiver of any attorney-client, work product or like privilege; provided, further, that in the event of any litigation, nothing herein shall limit any Partys rights of discovery under applicable Law. Without limiting the generality of the preceding sentences, the Acquirer agrees to provide the Contributor and its Affiliates reasonable access to and the right to make copies of the Books and Records after the Effective Date for the purposes of assisting the Contributor and its Affiliates (a) in complying with the Contributors obligations under this Agreement, (b) in preparing and delivering any accounting statements provided for under this Agreement and adjusting, prorating and settling the charges and credits provided for in this Agreement, (c) in owning or operating the Excluded Assets or Excluded Liabilities, (d) in preparing Tax returns, (e) in responding to or disputing any Tax audit, (f) in asserting, defending or otherwise dealing with any claim or dispute, known or unknown, under
15
this Agreement or with respect to Excluded Assets or Excluded Liabilities or (g) in asserting, defending or otherwise dealing with any Third Party Claim or dispute by or against the Contributor or its Affiliates relating to the Contributed Assets.
Section 5.3 Access to Assets. From and after the Closing, and subject to any applicable provisions of the Ground Lease, the Access Agreements, the Site Services Agreement and the Utility Services Agreement, the Acquirer and its Affiliates shall permit reasonable access to and entry upon the Contributed Assets by the Contributor and its Affiliates and their respective designated individuals, without charge, as necessary (as determined by the Contributor in its sole but reasonable discretion) to conduct and complete any other matters for which the Contributor shall be responsible under this Agreement, including any corrective or remedial actions relating to any Excluded Liabilities. The Acquirer shall use commercially reasonable efforts not to unreasonably interfere with the Contributor in connection with the exercise of such rights of access, including ingress and egress, to perform any corrective action.
Section 5.4 Employee Matters.
5.4.1 Current Employees. Schedule 5.4.1 contains a list of all active employees of the Contributor who are employed in the operation of the Tank Farm or have been designated by the Contributor as having skills which could support the Acquirers operations of the Tank Farm after the Closing, including employees who are receiving short-term disability or are on family and medical leave or military leave (collectively, the Current Employees). Schedule 5.4.1 shall include each Current Employees (a) name, (b) current job title or position, (c) service dates recognized by the Contributor, (d) current base salary or the base hourly rate, (e) accrued but unused vacation benefits, (f) status (e.g., full-time, part-time, on leave) and if on leave, the type of leave (e.g., vacation, short-term disability or Family and Medical Leave Act (FMLA) leave).
5.4.2 Employment Offers. Unless the Contributor and the Acquirer mutually agree to a later date, by no later than six (6) days after the Effective Date, the Acquirer will offer (or will have offered) employment to up to eleven (11) Current Employees it selects based on skills, experience and/or qualifications. Unless the Contributor and the Acquirer mutually agree to a later date, all such offer of employment shall be effective as of ten (10) days after the Effective Date (Offer Effective Date) and on such terms and conditions determined by the Acquirer in its sole discretion and as required by any applicable collective bargaining agreement to which the Acquirer is subject. The Acquirer will provide the Contributor with a list, as soon as practicable but no later than three (3) Business Days after Acquirer has completed its employment offers to Current Employees, which shall contain as of that date the names of the Current Employees the Acquirer made offers of employment to, the rate of pay the Acquirer offered, and whether the Current Employee accepted the offer. Any Current Employee who accepts the Acquirers offer of employment and on the Offer Effective Date is (a) actively at work or (b) on a holiday, scheduled day off pursuant to his or her regular schedule, or a vacation authorized prior to the Offer Effective Date by the Contributor and returns to work as scheduled shall become or be deemed employed by the Acquirer as of the Offer Effective Date (the Employment Date). Any Current Employee who accepts the Acquirers offer of employment and on the Offer Effective Date is on a leave of absence or short-term disability leave consistent with the Contributors established policies and practices which was authorized by the
16
Contributor prior to the Offer Effective Date, including any FMLA leave or military leave, and returns to work at the end of such authorized leave, which shall not be longer than six (6) months after the Offer Effective Date, unless applicable Law gives the Current Employee a longer period for returning to work, shall become employed by the Acquirer as of the day of his or her return to work with such date being deemed the Employment Date for such employee. All Current Employees who become employed by the Acquirer shall be referred to herein as a Continuing Employee.
5.4.3 Retained Employees. Any Current Employee who is on long-term disability on the Effective Date and those Current Employees who are offered and do not accept employment with the Acquirer or do not become employed by the Acquirer shall be referred to collectively as the Retained Employees. The Contributor or its Affiliates may retain the services of any Retained Employee or terminate any such Retained Employees employment on or following the Effective Date. The Contributor shall retain Liability and be responsible for and indemnify and hold harmless the Acquirer against all salaries or wages, severance and benefits and all other claims, costs, expenses and Liabilities related to or arising out of the employment or termination of the Retained Employees by the Contributor.
5.4.4 Continuing Employees. The Contributor will terminate its employment of each Continuing Employee effective as of the date preceding each such Continuing Employees Employment Date. All Continuing Employees shall become employees of the Acquirer as of their Employment Date and, at such time, the Acquirer shall assume and be responsible for and indemnify and hold harmless the Contributor and its Affiliates against payment of all salaries or wages, severance and any benefits provided by the Acquirer and all other claims, costs, expenses and Liabilities related to or arising out of the employment of the Continuing Employees that arise on or after their Employment Date. The Contributor shall retain Liability and be responsible for and indemnify and hold harmless the Acquirer against all salaries or wages, severance and benefits and all other claims, costs, expenses and Liabilities related to or arising out of the employment or termination of the Continuing Employees by the Contributor prior to their Employment Date. Notwithstanding anything in this Agreement to the contrary, Acquirer shall assume and be responsible for, indemnify and hold harmless the Contributor and its Affiliates against any costs, expenses and Liabilities incurred by the Contributor or its Affiliate which arises out of any selection process applied by the Acquirer to the Current Employees to determine which Current Employees it makes offers of employment to. Except as set forth in this Section 5.4, nothing in this Agreement shall limit the right of the Acquirer to terminate the employment of any Continuing Employee following his or her Employment Date, at any time, with or without cause.
5.4.5 Employee Benefit Plans. Schedule 5.4.5 sets forth a list of employee benefit plans maintained by the Contributor for the benefit of the Acquirers employees (Contributor Benefit Plans). Effective as of their Employment Date, Continuing Employees shall continue to participate in Contributor Benefit Plans but such participation shall be pursuant to the terms and conditions of Contributor Benefit Plans applicable to the Acquirers employees. There shall be no interruption in Continuing Employees participation in Contributor Benefit Plans as a result of the transaction contemplated by this Agreement. Contributor Benefit Plans shall recognize years of service with both the Contributor and the Acquirer for purposes of
17
eligibility, vesting and benefit accrual except to the extent that such service recognition results in a duplication of benefits with respect to Continuing Employees.
5.4.6 Vacation. The Acquirer shall assume all Liabilities for unpaid, accrued vacation benefits of Continuing Employees as of each Continuing Employees Employment Date. The Acquirer shall permit each Continuing Employee to use his or her unused vacation entitlement accrued as of his or her Employment Date under the terms of the Acquirers vacation policy or practices or any applicable collective bargaining agreement during the remainder of the calendar year 2011 or until such later date determined by the Acquirer. After the end of calendar year 2011, Continuing Employees will be entitled to vacation under the Acquirers vacation policy or practices or any applicable collective bargaining agreement, which will recognize service with the Contributor, its predecessors and the Acquirer in determining a Continuing Employees vacation entitlement, including eligibility to participate, eligibility for the forms and levels of vacation and vacation accrual.
5.4.7 Workers Compensation. The Contributor shall retain all Liabilities for workers compensation claims with respect to any Continuing Employee or his or her beneficiary if the incident or alleged incident giving rise to the claim occurred prior to his or her Employment Date. The Acquirer shall be responsible for any workers compensation claims with respect to any Continuing Employee or his or her beneficiary if the incident or alleged incident giving rise to the claim occurred on or after his or her Employment Date. In the event of doubt as to the date of the occurrence of the incident or alleged incident, the Acquirer shall process the claim; provided, however, that the Acquirer shall inform the Contributor of the existence and nature of any such claim promptly; and provided further that failure to so notify the Contributor shall not affect any Liability of the Contributor hereunder. Unless the Acquirer is found to be liable for the incident in whole, the Contributor shall reimburse the Acquirer for the payment of the claim and reasonable expenses of processing such claim in direct proportion to the percentage of the Contributors Liability to the total amount of the Liability paid under the claim.
5.4.8 Employee Information. The Contributor agrees to furnish the Acquirer with such information concerning the Current Employees, and to take all such other action, as is necessary and appropriate to effect the transactions contemplated by this Section 5.4, subject to any applicable restrictions under the Health Insurance Portability and Accountability Act of 1996, as amended, and other federal and state privacy laws. As soon as practicable after the Effective Date, the Contributor or its Affiliate will transfer each Continuing Employees employment records to the Acquirer.
5.4.9 No Third Party Beneficiaries. Nothing herein express or implied shall confer upon any employee, Continuing Employee or any legal representative of the Contributor any rights or remedies, including any right to employment, or continued employment for any specified period, of any nature or kind whatsoever under or by reason of this Agreement.
Section 5.5 Environmental Matters.
5.5.1 Refinery Site-Wide Licenses. From and after the Closing, the Acquirer and the Contributor will cooperate and use their respective reasonable best efforts to cause the
18
applicable Governmental Authorities, to the extent allowed by Law, to separate the Contributed Assets and the Leased Real Property from the coverage of the licenses, permits and consents identified on Schedule 5.5 (all of such licenses, permits and consents listed on such Schedule 5.5 being the Refinery Site-Wide Licenses) in order to provide for separate licenses to be held directly by the Acquirer with respect to the Contributed Assets and the Leased Real Property. To the extent that, at and after the Closing, the Contributed Assets or the Leased Real Property remain under any Refinery Site-Wide Licenses or other licenses held directly by the Contributor, the Acquirer will comply with the requirements of such licenses that are applicable to the Contributed Assets and the Leased Real Property, the Contributor will comply with the requirements of such licenses that are applicable to the Excluded Assets, and the Acquirer and the Contributor will cooperate to provide complete and accurate reports, correspondence and other communications with Governmental Authorities under such Licenses.
5.5.2 CAA Consent Decree.
5.5.2.1 Notice to the Acquirer. The Contributor has provided notice to the Acquirer that the Refinery Complex is subject to the CAA Consent Decree and has provided the Acquirer a copy of the CAA Consent Decree as required by Paragraph 6 thereof.
5.5.2.2 Notice to Governmental Authorities. The Contributor has notified the United States and the state of New Jersey of the purchase and sale of the Contributed Assets under this Agreement in accordance with Paragraphs 6 and 192 of the CAA Consent Decree.
5.5.2.3 Condition to Closing. This Agreement is conditioned upon the execution by the Acquirer of a modification of the CAA Consent Decree which makes the terms and conditions of the CAA Consent Decree, except for Section VIII (Environmentally Beneficial Projects) and Section X (Civil Penalty) applicable to the Acquirer.
5.5.2.4 Modification of CAA Consent Decree. The Contributor, with the assistance and cooperation of the Acquirer, will modify the CAA Consent Decree as required by Paragraph 7 thereof. Contributor will use its reasonable best efforts to modify the CAA Consent Decree such that, to the extent allowed by Law, only those terms and conditions applicable to the Contributed Assets become applicable to the Acquirer.
5.5.2.5 Termination of CAA Consent Decree. The Contributor, with the assistance and cooperation of the Acquirer, will use its reasonable best efforts to cause the applicable Governmental Authorities to terminate the CAA Consent Decree as early as practicable. Prior to Closing Contributor will submit a notice to terminate the CAA Consent Decree to facilitate the termination in accordance with Paragraphs 196-198 thereof and provide any additional documents or information that may be requested by the applicable Governmental Authorities after the Closing.
5.5.3 ISRA Compliance.
5.5.3.1 Prior to Closing. The Contributor shall, prior to the Closing, prepare and submit to the NJDEP, or cause a LSRP to prepare, certify and submit to the NJDEP, as the case may be, all ISRA Submissions and otherwise use commercially reasonable efforts to
19
obtain an ISRA Approval. Acquirer shall cooperate with Contributor, as reasonably requested by Contributor, in order to obtain such ISRA Approval, including by executing any documents requested by Contributor. The foregoing notwithstanding, Contributor shall be relieved of any obligation pursuant to this Section 5.5.3.1 upon delivery to Acquirer of an opinion of Contributors counsel, in form and substance reasonably acceptable to Acquirer, that ISRA is not applicable to the transactions contemplated by this Agreement.
5.5.3.2 Following the Closing. Subject to Section 5.5.3.6 hereof, Contributor shall, following the Closing, comply with all requirements and bear all costs, expenses and fees in order to achieve Compliance with ISRA. Without limiting the generality of the foregoing, Contributor shall, to the extent required by ISRA: (i) retain a LSRP to oversee Contributors compliance with ISRA; (ii) take all action required by the NJDEP pursuant to ISRA to cause such LSRP to issue a Response Action Outcome, as defined and used in ISRA, N.J.S.A. 58:10C-2 and N.J.A.C. 7:26C-1.3, or the NJDEP to issue a No Further Action Letter and Covenant Not To Sue as defined and used in ISRA, N.J.S.A. 58:10B-1 and 13.1 and N.J.A.C. 7:26C-1.3; (iii) prepare, certify, and submit to the NJDEP, or cause such LSRP to prepare, certify, and submit to NJDEP, as the case may be, all ISRA Submissions; (iv) perform all Remedial Work required to achieve Compliance with ISRA and do so in a good and workmanlike manner, in accordance with all applicable laws and regulations, including Environmental Laws, and so as not to unreasonably interfere with the Acquirers use of the Contributed Assets or operations of the Acquirer on the Leased Real Property; and (v) establish and maintain a remediation funding source in the form and amount required by ISRA and N.J.A.C. 7:26C-5 and the LSRP until such time as Contributor is permitted under ISRA to release the same.
5.5.3.3 Remediation Standards, Site Access and Utilities. Notwithstanding anything in this Agreement to the contrary, the Contributor and its LSRP shall have the right to employ remedial standards for non-residential use and to select all remedial actions necessary to achieve Compliance with ISRA, including without limitation, Institutional and Engineering Controls, so long as such controls do not unreasonably interfere with the use of the Contributed Assets or the operation of the Leased Real Property by Acquirer. Upon reasonable advance notice as required by Acquirer, Acquirer shall afford Contributor, and its LSRP, personnel of the NJDEP, and all employees, agents, consultants and contractors of Contributor, with reasonable access to the Leased Real Property in order to perform all Remedial Work, including without limitation, reasonable space for the storage or staging of equipment, for temporary storage of excavated soils, extracted groundwater or other waste materials, for the installation, sampling and maintenance of groundwater monitoring wells, and for the installation, operation and maintenance of remedial equipment. Acquirer shall execute any additional agreement, instrument or other document reasonably requested by the Contributor, but subject to the terms and conditions of this Agreement and the Ancillary Agreements, to ensure access to the Leased Real Property to perform Remedial Work. Acquirer shall provide Contributor with sufficient power, water and other utilities to operate any remedial systems installed on the Refinery Complex, including the Leased Real Property, and with access to and use of the wastewater treatment plant on the Leased Real Property for the treatment of extracted groundwater or other wastewater generated by Contributor in the performance of Remedial Work so long as such use of the wastewater treatment plant is in accordance with Environmental Laws and applicable Environmental Permits governing such plant (as the same may be amended to
20
authorize such use). Acquirer shall cooperate with Contributor as reasonably requested by Contributor in applying for and securing any amendment to any Environmental Permit relating to the wastewater treatment plant to enable Contributor to employ such plant in connection with treatment of extracted groundwater or other wastewater generated in the performance of Remedial Work. The Contributor shall reimburse Acquirer for the reasonable and incremental out-of-pocket cost of providing such utility services, including any use of the wastewater treatment plant as provided in the Site Services Agreement.
5.5.3.4 ISRA Submissions. Contributor shall provide Acquirer with a reasonable opportunity to comment on drafts of all ISRA Submissions prepared by Contributor or its LSRP and Acquirer shall have the right to submit comments as to the potential impact of contemplated Remedial Work on Acquirers use of the Contributed Assets or its operations on the Leased Real Property. In the event Acquirer does not submit comments within ten (10) business days of receipt of a draft ISRA Submission, Acquirer shall be deemed to have waived its right hereunder to comment on the same. Contributor shall promptly provide Acquirer with copies of all final ISRA Submissions and all material correspondence to and from the NJDEP relating to its efforts to achieve Compliance with ISRA and shall make the LSRP available to Acquirer on a semi-annual basis to review the status and progress of such efforts (or more frequently as Acquirer reasonably requests, but in such case at Acquirers expense).
5.5.3.5 Institutional and Engineering Controls. In the event Contributor employs any Institutional or Engineering Controls at any portion of the Leased Real Property in connection with any Remedial Work performed by Contributor to satisfy the requirements of ISRA and this Section 5.5.3, Acquirer shall cooperate, as reasonably requested by Contributor, with the recording of a Deed Notice to establish such controls and the securing of any remedial action permit required under Environmental Laws, including N.J.A.C. 7:26C-7.1, et seq. and shall at all times observe, comply with and not impair, alter or disturb such controls (except as permitted by Environmental Laws). Contributor (or any successors) shall be the lead permittee on such remedial action permit required to facilitate the ISRA requirements arising from Environmental Liabilities set forth in Section 2.5.3.1, to post and maintain any remediation funding source required by such permit, and to perform at its sole cost and expense all inspection, maintenance, recordkeeping, biennial certification or other requirements of ISRA or Environmental Laws, in each case in relation to such Institutional or Engineering Controls.
5.5.3.6 Releases After Closing. Anything in this Agreement to the contrary notwithstanding, in the event of a Release of Hazardous Substances on or at the Leased Real Property following the Closing, Acquirer shall perform at its sole cost and expense all actions required under Environmental Laws, including the performance of Remedial Work, to investigate and remediate the same. To the extent Contributor is required, in connection with satisfying its obligations under ISRA and this Agreement, to perform Remedial Work in relation to a Release of Hazardous Substances occurring after the Closing, Contributor shall give written notice of such circumstance to Acquirer and Acquirer shall bear the reasonable cost and expense of such Remedial Work and shall promptly reimburse Contributor for the same. In the event of a dispute between the Parties concerning the existence or extent of a Release of Hazardous Substances as to which Contributor asserts Acquirer bears responsibility pursuant to this subsection or concerning the nature or cost of Remedial Work performed by Contributor in
21
relation to such Release or the Acquirers share of such cost, the Parties shall resolve such dispute as provided in Section 8.11.3.12 hereof.
5.5.3.7 Transfers After Closing. In the event of a transfer of ownership or transferring [of] ownership or operations initiated by Acquirer in relation to the Contributed Assets or the operations conducted by Acquirer on the Leased Real Property or closing [of] operations by Acquirer on the Leased Real Property, as such terms are defined at N.J.A.C. 7:26B-1.4, including the expiration or termination of the Ground Lease or the exercise by Acquirer of its option to purchase the Premises and Leased Real Property together with the completion of such conveyance, Acquirer shall, at its sole cost and expense, prepare, certify and submit to NJDEP, or cause a LSRP to prepare, certify and submit to NJDEP, as the case may be, all required ISRA Submissions and perform all actions, including Remedial Work, required to achieve compliance with ISRA in relation to such transaction or event.
5.5.4 Compliance With RCRA. The Contributor shall take all actions at its sole cost and expense, including the performance of all Remedial Work required by the NJDEP in order to comply with the requirements of the Resource Conservation and Recovery Act, 42 U.S.C. § 6901 and the NJPDES DSW/DGW Permit in relation to the closure and post-closure maintenance, soil monitoring and detection of groundwater monitoring of the hazardous waste land treatment unit present at the Refinery Complex, until such time as the NJDEP terminates such Permit or otherwise confirms in writing that the Contributor has satisfied its requirements or is no longer subject to the same. The Contributor shall perform such Remedial Work in accordance with Section 5.5.3.5 hereof and the Acquirer shall comply with its obligations under Section 5.5.3.5) of this Agreement in relation to such Remedial Work. Acquirer shall be obligated to bear the cost of any such Remedial Work resulting from Releases of Hazardous Substances occurring after the Closing as provided in Section 5.5.3.6 hereof.
Section 5.6 Foreign Trade Zone. The Refinery Complex is operating in the Foreign Trade Subzone 142C (the Subzone) under a valid grant of authority from the Foreign Trade Zones Board and has been activated with the U.S. Customs Service. From and after the Closing, the Contributor will take all actions necessary, with the cooperation of the Acquirer, to allow the Acquirer to own and operate the Contributed Assets and utilize the Subzone in the conduct of its business at the Refinery Complex, including, if necessary, notifying the Foreign Trade Zones Board and any other applicable Governmental Authorities of the transfer of the Contributed Assets from the Contributor to the Acquirer; provided, however, that the Contributor shall remain the operator of the Subzone from and after the Closing and shall provide FTZ-related services to the Acquirer pursuant to and in accordance with the Site Services Agreement.
Section 5.7 Termination of Other Agreements. Contributor and Acquirer agree that, on the Effective Date, the 2004 Site Services Agreement, the 2008 Dock and Throughput Agreement, the Eagle Point Dock Agreement and the Master Tank Lease and Operating Agreement shall terminate and be of no further force or effect.
Section 5.8 Contributed Meters. Within sixty (60) days after Closing, the Contributor shall, at its sole cost and expense, undertake a calibration or testing of the meters and instrumentation included as part of the Contributed Assets (each, a Contributed Meter). SPMT shall have the right to participate in any calibration or testing of a Contributed Meter. The
22
Contributor shall give SPMT timely notice of the results of calibration or testing. If SPMT disputes the result of the calibration or testing with respect to any Contributed Meter, SPMT may have the calibration or testing undertaken by an independent qualified third party mutually acceptable to the Contributor and SPMT, and the costs of such independent calibration or testing shall be shared equally by the Contributor and SPMT. If any Contributed Meter is out of service or discovered to register inaccurately, the Contributor shall, at its sole cost and expense, repair, replace or re-calibrate such Contributed Meter.
ARTICLE 6
REMEDIES FOR BREACHES OF AGREEMENT
Section 6.1 Survival of Representations and Warranties. All of the representations and warranties of a Party contained in this Agreement or in any Schedule, Exhibit, certificate or other writing delivered pursuant hereto or in connection herewith are material, shall be deemed to have been relied upon by the other Parties and shall survive the Closing under this Agreement regardless of any investigations, and continue for a period of two (2) years after the Effective Date, except that the representations and warranties provided in Sections 3.1.1, 3.1.2 and 3.2.1, 3.2.2 shall survive indefinitely. Any claim asserted in writing prior to the expiration of the representation or warranty that is the basis for such claim shall survive until such claim is finally resolved and satisfied, irrespective of the period for the survival of such representation or warranty provided for herein.
Section 6.2 Indemnification Provisions for Benefit of the Acquirer.
6.2.1 The Contributor shall defend, indemnify and hold harmless the Acquirer and its Affiliates and their respective successors and each of the respective directors and officers (or Persons in any similar capacity if such Person is not a corporation), employees, consultants and agents of the Acquirer and its Affiliates and successors (each, a Acquirer Indemnified Party) against and agree to hold each Acquirer Indemnified Party harmless from any and all Adverse Consequences incurred or suffered by such Acquirer Indemnified Party to the extent resulting or arising from, or attributable to, any of the following matters:
6.2.1.1 any breach of any representation or warranty of the Contributor under this Agreement or in any certificate, Schedule or Exhibit delivered pursuant hereto;
6.2.1.2 any breach of any covenant of the Contributor under this Agreement or in any certificate, Schedule or Exhibit delivered pursuant hereto;
6.2.1.3 any of the Excluded Liabilities as set forth in this Agreement (other than Taxes, which are addressed in Section 7.5); and
6.2.1.4 all claims relative to any bulk sales or transfer Laws.
6.2.2 Limitations of Liability. Notwithstanding anything herein provided to the contrary, the Contributor shall have no obligation to indemnify or liability to the Acquirer
23
Indemnified Parties pursuant to this Article 6 to the extent that the aggregate amount of all Adverse Consequences indemnified against under this Article 6 exceeds an amount equal to the Indemnity Cap; provided, however, that the foregoing limitation on the Contributors obligation to indemnify or liability shall not limit the Contributors liability to the Acquirer Indemnified Parties pursuant to this Article 6 for any Excluded Liability or for any breach of any covenant contained in Article 7.
6.2.3 Exclusive Remedy. The Acquirer acknowledges and agrees that the indemnification provisions in this Article 6 and the indemnification provisions in Articles 5 and 7 shall be the exclusive remedies of the Acquirer, the Acquirer Indemnified Parties and their respective Affiliates with respect to the transactions contemplated by this Agreement; provided, that the foregoing shall not be construed as limiting any right of indemnification or other remedy of the Acquirer under any Ancillary Agreement. Without limiting the prior sentence, the Acquirer hereby waives any claim or cause of action pursuant to common or statutory Law or otherwise against the Contributor and its Affiliates with respect to Adverse Consequences of any nature whatsoever that relate to this Agreement or are attributable to the Contributed Assets, whether arising before, on or after the Effective Date. Each Party agrees that the previous sentence shall not limit or otherwise affect any non-monetary right or remedy which any Acquirer Indemnified Party may have under this Agreement or an Ancillary Agreement or otherwise limit or affect any Acquirer Indemnified Partys right to seek equitable relief, including the remedy of specific performance for non-monetary relief. Notwithstanding the limitations contemplated by Section 6.2.2 above, each Party acknowledges that nothing herein or in any Ancillary Agreement (or in any instrument or other writing delivered in connection herewith or therewith) shall be construed as an assumption by the Acquirer of, or otherwise requiring the Acquirer to assume, any Excluded Liability. Accordingly, in the event of any Third Party Claim relating to any Excluded Liability, nothing herein or in any Ancillary Agreement (or in any instrument or other writing delivered in connection herewith or therewith) shall be construed as restricting any Acquirer Indemnified Party from taking the position or otherwise asserting that (i) the Contributor (or its Affiliates) are responsible or liable for such Third Party Claim to the extent that such Third Party Claim constitutes an Excluded Liability, (ii) neither the Acquirer nor any of its Affiliates has ever assumed or agreed to be responsible for any Excluded Liability, and/or (iii) all Excluded Liabilities remain the sole responsibility of, and are to be discharged and performed as and when due by, the Contributor or its Affiliates.
In addition, nothing herein or in any other Ancillary Agreement (or in any instrument or other writing delivered in connection herewith or therewith) shall be construed as restricting any Acquirer Indemnified Party from asserting any claim in respect of any Excluded Liability, Assumed Liability or other matter against any Person (other than any Contributor or current Affiliate thereof), including any prior owner of the Contributed Assets (other than any Contributor or current Affiliate thereof); provided such Person does not have any right to indemnity or other right of recovery from the Contributor or the Contributors current Affiliates with respect thereto, except that the restriction in this proviso shall not apply to any Excluded Liability for which the Contributor is obligated to indemnify the Acquirer Indemnified Parties under this Article 6 or Article 7 and have failed for any reason to provide such indemnification.
Section 6.3 Indemnification Provisions for the Benefit of Contributor.
24
6.3.1 The Acquirer shall defend, indemnify and hold harmless the Contributor, its Affiliates, the Contributors and its Affiliates respective successors and each of the respective directors and officers (or Persons in any similar capacity if such Person is not a corporation), employees, consultants and agents of the Contributor, its Affiliates and their respective successors (each a Contributor Indemnified Party) against and agree to hold each Contributor Indemnified Party harmless from any and all Adverse Consequences incurred or suffered by such Contributor Indemnified Party to the extent resulting or arising from, or attributable to, any of the following matters:
6.3.1.1 any breach of any representation or warranty of the Acquirer under this Agreement or in any certificate, Schedule or Exhibit delivered pursuant hereto;
6.3.1.2 any breach of any covenant of the Acquirer under this Agreement or in any certificate, Schedule or Exhibit delivered pursuant hereto; or
6.3.1.3 any of the Assumed Liabilities as set forth in this Agreement.
6.3.2 Limitations of Liability. Notwithstanding anything herein provided to the contrary, Acquirer shall have no obligation to indemnify or liability to the Contributor Indemnified Parties pursuant to this Article 6 to the extent that the aggregate amount of all Adverse Consequences indemnified against under this Article 6 exceeds an amount equal to the Indemnity Cap; provided, however, that the foregoing limitation on the Acquirers and Sunoco Logistics obligations to indemnify or liability shall not limit the Acquirers liability to the Contributor Indemnified Parties pursuant to this Article 6 for any Assumed Liability.
6.3.3 Exclusive Remedy. The Contributor acknowledges and agrees that the indemnification provisions in this Article 6 and the indemnification provisions in Article 5 and Article 7 shall be the exclusive remedies of the Contributor, the Contributor Indemnified Parties and their Affiliates with respect to the transactions contemplated by this Agreement. Without limiting the prior sentence, the Contributor hereby waives any claim or cause of action pursuant to common or statutory Law or otherwise (except as provided in this Agreement) against the Acquirer and its Affiliates with respect to Adverse Consequences of any nature whatsoever that relate to this Agreement. Each Party agrees that the previous sentence shall not limit or otherwise affect any non-monetary right or remedy which any Contributor Indemnified Party may have under this Agreement or otherwise limit or affect any Contributor Indemnified Partys right to seek equitable relief, including the remedy of specific performance for non-monetary relief. Without limiting the prior sentence, the Contributor hereby waives any claim or cause of action pursuant to common or statutory Law or otherwise against Acquirer and its Affiliates with respect to Adverse Consequences of any nature whatsoever that relate to this Agreement. Each Party agrees that the previous sentence shall not limit or otherwise affect any non-monetary right or remedy which any Contributor Indemnified Party may have under this Agreement or an Ancillary Agreement or otherwise limit or affect any Contributor Indemnified Partys right to seek equitable relief, including the remedy of specific performance for non-monetary relief.
25
Section 6.4 Matters Involving Third Parties.
6.4.1 If any Third Party shall notify any Party with respect to any action or claim by a Third Party (a Third Party Claim) that may give rise to a right to claim for indemnification against any other Party under Section 6.2 or Section 6.3, then the Indemnified Party shall promptly notify the Indemnifying Party thereof in writing; provided, however, that failure to give timely notice shall not affect the right to indemnification to the extent such failure to give timely notice is not prejudicial to the Indemnifying Party.
6.4.2 The Indemnifying Party, in accordance with the procedures set forth in Section 6.5, will have the right to assume and conduct the defense of the Third Party Claim with counsel of its choice reasonably satisfactory to the Indemnified Party; provided, however, that the Indemnifying Party will not consent to the entry of any judgment or enter into any settlement with respect to the Third Party Claim without the prior written consent of the Indemnified Party (not to be withheld unreasonably) unless the judgment or proposed settlement involves only the payment of money damages and does not impose an injunction or other equitable relief upon the Indemnified Party. As provided in Section 6.5, the Indemnifying Party may assume the defense of a Third Party Claim, at the Indemnifying Partys cost and expense, without also accepting and agreeing to the claim for indemnification described in the related Claim Notice.
6.4.3 Unless and until the Indemnifying Party assumes the defense of the Third Party Claim as provided in Section 6.4.2, the Indemnified Party may defend against the Third Party Claim in any manner it reasonably may deem appropriate for the account of the Indemnifying Party.
6.4.4 In no event will the Indemnified Party consent to the entry of any judgment or enter into any settlement with respect to the Third Party Claim without the prior written consent of the Indemnifying Party which consent shall not be withheld unreasonably.
6.4.5 If requested by the Indemnifying Party, the Indemnified Party agrees, at the sole cost and expense of the Indemnifying Party, to cooperate with the Indemnifying Party and its counsel in contesting the Third Party Claim which the Indemnifying Party elects to contest, including the making of any related counterclaim or cross-complaint against any Person (other than a Acquirer Indemnified Party, if the Indemnified Party is a Acquirer Indemnified Party, or a Contributor Indemnified Party, if the Indemnified Party is a Contributor Indemnified Party).
6.4.6 The Party who is conducting the defense against the Third Party Claim shall provide each other Party such information possessed by the Party who is conducting such defense as such other Party shall reasonably request with respect to the Third Party Claim and the defense thereof.
Section 6.5 Procedures. The Party seeking indemnification under this Agreement (the Indemnified Party) may make claims for indemnification hereunder by giving written notice (a Claim Notice) to the Party required to provide indemnification hereunder (the Indemnifying Party). Such notice shall briefly explain the nature of the claim and the parties known to be involved, and shall specify the amount thereof to the extent known by the
26
Indemnified Party. Each Indemnifying Party to which a Claim Notice is given shall respond to any Indemnified Party that has given a Claim Notice (a Claim Response) within twenty (20) days (the Response Period) after the date that the Claim Notice is given. Any Claim Notice or Claim Response shall be given in accordance with the notice requirements hereunder, and any Claim Response shall specify whether or not the Indemnifying Party giving the Claim Response disputes the claim for indemnification described in the Claim Notice and whether it will defend any Third Party Claim specified in such Claim Notice at its own cost and expense. If any Indemnifying Party fails to give a Claim Response within the Response Period, such Indemnifying Party shall be deemed to have disputed the claim for indemnification described in the related Claim Notice and to have elected not to defend any Third Party Claim specified in such Claim Notice. The aforesaid election or deemed election by the Indemnifying Party not to assume the defense of the Indemnified Party with respect to any Third Party Claim specified in such Claim Notice, however, shall, except as contemplated by the following proviso, be subject to the right of the Indemnifying Party to subsequently assume the defense of the Indemnified Party with respect to any such Third Party Claim at any time prior to settlement or final determination thereof, provided that the Indemnifying Party shall not have the right to so assume the defense of the Indemnified Party with respect to any Third Party Claim which the Indemnifying Party has (or is deemed to have) previously elected not to defend to the extent that the Indemnified Party would be prejudiced as a result of such assumption. If an Indemnifying Party then or thereafter elects pursuant to the foregoing to assume the defense of an Indemnified Party with respect to a Third Party Claim specified in such Claim Notice, then, without limiting any action the Indemnifying Party may have on account of actual fraud, the Indemnifying Party shall not be entitled to recover from the Indemnified Party the costs and expenses incurred by the Indemnifying Party in providing such defense, whether or not the Indemnifying Party disputes or is deemed to have disputed the claim for indemnification described in the related Claim Notice. If any Indemnifying Party gives a Claim Response with respect to a Claim Notice and fails to dispute (or reserve the right to dispute) any claim for indemnification described in such Claim Notice, then the Indemnifying Party shall be deemed to have accepted and agreed to each such claim for indemnification as to which it fails to dispute or reserve the right to dispute in its Claim Response.
ARTICLE 7
TAX MATTERS
Section 7.1 Tax Preparation. The following provisions shall govern the allocation of responsibility as between the Acquirer and the Contributor for certain Tax matters following the Effective Date:
7.1.1 Tax Periods Ending on or Before the Effective Date. The Contributor shall prepare or cause to be prepared and file or cause to be filed all Tax Returns with respect to the Contributed Assets and the business conducted in connection with such assets for all periods ending on or prior to the Effective Date regardless of when they are to be filed. Except for various intercompany reimbursements, contractual obligations related to taxes, offsets and/or any other miscellaneous items, the Contributor shall pay or cause to be paid the Taxes attributable to the Contributed Assets with respect to such periods.
27
7.1.2 Tax Periods Beginning Before and Ending After the Effective Date. The Acquirer shall prepare or cause to be prepared and file or cause to be filed any Tax Returns with respect to the Contributed Assets for Tax periods which begin before the Effective Date and end after the Effective Date. Subject to Article VI of the Ground Lease, the Acquirer shall pay or cause to be paid the Taxes attributable to the Contributed Assets with respect to such periods. The Contributor shall pay to the Acquirer within fifteen (15) days after the date on which Taxes are paid with respect to such periods an amount equal to the portion of such Taxes that relates to the portion of such Tax period ending on the Effective Date. In the case of Taxes that are payable with respect to a taxable period that begins before the Effective Date and ends after the Effective Date, the portion of any such Tax that is allocable to the portion of the period ending on the Effective Date shall be (a) in the case of Taxes that are based upon or related to income or gross receipts or sales or use Tax, deemed equal to the amount that would be payable if the taxable year ended with the Effective Date; and (b) in the case of any Taxes other than gross receipts, sales or use Tax and Taxes based upon or related to income, deemed to be the amount of such Taxes for the entire period, multiplied by a fraction the numerator of which is the number of calendar days in the period ending on the Effective Date and the denominator of which is the number of calendar days in the entire period.
Section 7.2 Access to Information. After the Closing, the Contributor shall continue to allow the Acquirer (or their designees) access at all reasonable times to all of the information, books, and records relating to the Contributed Assets within the possession of the Contributor, and shall afford the Acquirer (or its designees) the right (at the Acquirers expense) to take extracts therefrom and to make copies thereof, to the extent reasonably necessary to permit the Acquirer (or its designees) to prepare Tax Returns and to conduct negotiations with Taxing Authorities. After the Closing, the Acquirer shall grant to the Contributor (or its designees) access at all reasonable times to all of the information, books and records relating to the Contributed Assets within the possession of the Acquirer (including Tax work papers and correspondence with Taxing Authorities), and shall afford the Contributor (or its designees) the right (at the Contributors expense) to take extracts therefrom and to make copies thereof, to the extent reasonably necessary to permit the Contributor (or its designees) to prepare Tax Returns and to conduct negotiations with Taxing Authorities.
Section 7.3 Transfer Taxes. The Acquirer and the Contributor shall each pay one-half of all Transfer Taxes resulting from the assignment of the Contributed Assets. The Acquirer shall prepare and timely file all Tax Returns or other documentation relating to such Transfer Taxes; provided, however, that to the extent required by applicable Laws, the Contributor will join in the execution of any such Tax Returns or other documents relating to such Taxes. The Acquirer shall provide the Contributor with copies of each such Tax Return or other document at least fifteen (15) days prior to the date on which such Tax Return or other document is required to be filed for review and approval by the Contributor, such approval not to be unreasonably withheld. The Acquirer and the Contributor believe that the transfer of the Contributed Assets will be exempt from New Jersey sales and use tax as a casual or occasional sale.
Section 7.4 Assistance and Cooperation. After the Effective Date, in the case of any audit, examination, or other proceeding with respect to Taxes (Tax Proceeding) for which the Contributor is or may be liable pursuant to this Agreement, the Acquirer shall inform the Contributor within ten (10) days of the receipt of any notice of such Tax Proceeding, and shall
28
afford the Contributor, at the Contributors expense, the opportunity to control the conduct of such Tax Proceeding. The Acquirer shall execute or cause to be executed powers of attorney or other documents necessary to enable the Contributor to take all actions desired by the Contributor with respect to such Tax Proceeding to the extent such Tax Proceeding may affect the amount of Taxes for which the Contributor is liable pursuant to this Agreement. The Contributor shall have the right to control any such Tax Proceedings and to initiate any claim for refund, file any amended return, or take any other action that it deems appropriate with respect to such Taxes.
Section 7.5 Tax Indemnity. Notwithstanding any other provisions of this Agreement, Sections 7.5, 7.6 and 6.2 shall apply to indemnification by the Contributor to the Acquirer for, and shall be the sole remedy of the Acquirer in respect of, the Adverse Consequences described in the following sentence. The Contributor agrees to indemnify and hold harmless the Acquirer from and against the entirety of any and all Adverse Consequences that the Acquirer may suffer for any Taxes attributable to the Contributed Assets with respect to any Tax year ending on or before the Effective Date or for any Tax year beginning before and ending after the Effective Date to the extent allocable (determined in a manner consistent with Section 7.1) to the portion of such period beginning before and ending on the Effective Date. In no event shall the Contributors obligation to indemnify the Acquirer for any Adverse Consequences under this Section 7.5 exceed the Indemnity Cap. No right to indemnity shall exist if the Adverse Consequence is the result of actions of the Acquirer or its Affiliates.
Section 7.6 Tax Indemnity Claims. The provisions of this Section 7.6 shall apply only to the indemnification provided for under Section 7.5. If a claim for Taxes is made against the Acquirer and if the Acquirer intends to seek indemnity with respect thereto under Section 7.5, the Acquirer shall promptly furnish written notice to the Contributor of such claim. Failure of the Acquirer to so notify the Contributor within sixty (60) days of the claim being made against the Acquirer shall terminate all rights of the Acquirer to indemnity by the Contributor as to such claim to the extent the Contributors position is prejudiced as a result thereof (whether due to an adverse affect on their ability to contest such claim or otherwise). The Contributor shall have thirty (30) days after receipt of such notice to undertake, conduct, and control (through counsel of its own choosing and at its own expense) the settlement or defense thereof, and the Acquirer shall cooperate with them in connection therewith. The Contributor shall permit the Acquirer to participate in such settlement or defense through counsel chosen by the Acquirer (but the fees and expenses of such counsel shall be paid by the Acquirer). So long as the Contributor, at the Contributors cost and expense, (i) have undertaken the defense of, and assumed full responsibility for all indemnified Adverse Consequences with respect to, such claim, (ii) are reasonably contesting such claim in good faith, by appropriate proceedings, and (iii) have taken such action (including the posting of a bond, deposit, or other security) as may be necessary to prevent any action to foreclose a lien against or attachment of the property of the Acquirer for payment of such claim, the Acquirer shall not pay or settle any such claim. Notwithstanding compliance by the Contributor with the preceding sentence, the Acquirer shall have the right to pay or settle any such claim, but in such event they shall waive any right to indemnity by the Contributor for such claim. If within thirty (30) days after the receipt of the Acquirers notice of a claim of indemnity hereunder, the Contributor does not notify the Acquirer that they elect (at the Contributors cost and expense) to undertake the defense thereof and assume full responsibility for all indemnified Adverse Consequences with respect thereto, or give such notice
29
and thereafter fail to contest such claim in good faith or to prevent action to foreclose a lien against or attachment of the Acquirers property as contemplated above, the Acquirer shall have the right to contest, settle, or compromise such claim and the Acquirer shall not thereby waive any right to indemnity for such claim under this Agreement.
Section 7.7 Tax Refunds. Refunds of Taxes paid or payable with respect to Taxes attributable to the Contributed Assets shall be promptly paid as follows (or to the extent payable but not paid due to offset against other Taxes shall be promptly paid by the Party receiving the benefit of the offset as follows): (i) to the Contributor if attributable to Taxes with respect to any Tax year ending on or before the Effective Date or for any Tax year beginning before and ending after the Effective Date to the extent allocable (determined in a manner consistent with Section 7.1) to the portion of such period beginning before and ending on the Effective Date; and (ii) to the Acquirers if attributable to Taxes with respect to any Tax year beginning after the Effective Date or for any Tax year beginning before and ending after the Effective Date to the extent allocable (determined in a manner consistent with Section 7.1) to the portion of such period ending after the Effective Date.
Section 7.8 Certification of Non-Foreign Status. On the Effective Date, the Contributor shall deliver to the Acquirer a certificate signed under penalties of perjury (i) stating that it is not a foreign corporation, foreign partnership, foreign trust or foreign estate, (ii) providing its U.S. Employer Identification Number, and (iii) providing its address, all pursuant to Section 1445 of the Code.
30
ARTICLE 8
MISCELLANEOUS
Section 8.1 Press Releases and Confidentiality. No Party shall issue any press release or make any public announcement relating to the subject matter of this Agreement without the prior written approval of the other Party, which approval shall not be unreasonably withheld; provided that any Party may make any public disclosure it believes in good faith is required by applicable Law or any listing or trading agreement concerning its publicly traded securities (in which case the disclosing Party will advise the other Party before making the disclosure). Each Party shall keep all information obtained from the other either before or after the date of this Agreement, or related to each Contribution described in Section 2.1, the contents of this Agreement or the negotiation of this Agreement confidential, and no Party shall reveal such information to, nor produce copies of any written information for, any Person outside its management group or its professional advisors (including lenders and prospective financing sources) without the prior written consent of the other Parties, unless such Party is compelled to disclose such information by judicial or administrative process or by any other requirements of Law or disclosure is reasonably necessary to obtain a license or a consent. Notwithstanding the foregoing, each Partys obligations under this Section shall not apply to any information or document which (i) is or becomes the subject of a subpoena or other legal process, (ii) is or becomes available to the public other than as a result of a disclosure by such Party or its Affiliates in violation of this Agreement or other obligation of confidentiality under which such information may be held, or (iii) was obtained or is or becomes available to such Party on a non-confidential basis from a source other than the other Party or its Representatives. Except as may be required by Law, the Parties shall seek appropriate protective orders or confidential treatment for the Schedules to this Agreement in connection with any filing with or disclosure to any Governmental Authority. The Parties obligations under this Section shall survive the Closing for a period of three (3) years.
Section 8.2 No Third Party Beneficiaries. This Agreement shall not confer any rights or remedies upon any Person other than the Parties and their respective successors and permitted assigns. Any Indemnified Party (other than the Parties and their respective successors and permitted assigns) shall not be a third party beneficiary of this Agreement and shall be defended, indemnified and held harmless under the terms of this Agreement only to the extent that a Party expressly elects to exercise such rights of defense, indemnity and hold harmless on behalf of such Indemnified Party pursuant to Article 6. Any claim for defense, indemnity or to be held harmless hereunder on behalf of an Indemnified Party (other than the Parties and their respective successors and permitted assigns) must be made and administered by a Party.
Section 8.3 Succession and Assignment. This Agreement shall be binding upon and inure to the benefit of the Parties named herein and their respective successors and permitted assigns. Neither the Contributor nor the Acquirer may assign either this Agreement or any of its rights, interests or obligations hereunder.
Section 8.4 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed an original but which together will constitute one and the same instrument.
31
Section 8.5 Notices. All notices, requests, demands, claims, and other communications hereunder will be in writing. Any notice, request, demand, claim, or other communication hereunder shall be deemed duly given two (2) Business Days after it is sent by registered or certified mail, return receipt requested, postage prepaid, and addressed to the intended recipient as set forth below:
If to the Contributor: |
Sunoco, Inc. (R&M) | |
1818 Market Street, 15th Floor | ||
Philadelphia, PA 19103 | ||
Attention: Brian P. MacDonald, Senior Vice President and CFO | ||
With a copy to: |
Sunoco, Inc. (R&M) | |
1818 Market Street, 15th Floor | ||
Philadelphia, PA 19103 | ||
Attention: Stacy L. Fox, Senior Vice President and General | ||
Counsel | ||
If to the Acquirer: | Sunoco Logistics Partners L.P. | |
c/o Sunoco Partners LLC | ||
1818 Market Street, 15th Floor | ||
Philadelphia, PA 19103 | ||
Attention: Michael J. Hennigan, President & COO | ||
With a copy to: |
Sunoco Logistics Partners L.P. | |
1818 Market Street, 15th Floor | ||
Philadelphia, PA 19103 | ||
Attention: Kathleen Shea-Ballay, Vice President and General | ||
Counsel |
Any Party may send any notice, request, demand, claim, or other communication hereunder to the intended recipient at the addresses set forth above using any other means (including personal delivery, expedited courier, messenger service, telecopy, ordinary mail, or electronic mail), but no such notice, request, demand, claim, or other communication shall be deemed to have been duly given unless and until it actually is received by the intended recipient. Any Party may change the address to which notices, requests, demands, claims, and other communications hereunder are to be delivered by giving notice in the manner herein set forth.
Section 8.6 Governing Law. This Agreement shall be governed by and construed in accordance with the domestic Laws of the state of New York without giving effect to any choice or conflict of law provision or rule (whether of the state of New York or any other jurisdiction) that would cause the application of the Laws of any jurisdiction other than the state of New York. The Parties hereby consent to the jurisdiction of any state or federal court located within New York County and irrevocably agree that all actions or proceedings related to this Agreement shall be litigated in such courts and each Party waives any defense of forum non conveniens and agrees to be bound by any judgment rendered thereby in connection with this Agreement. Each
32
Party agrees that service upon it by registered mail shall constitute sufficient notice; provided that nothing herein shall affect the right to serve process in any other manner permitted by law.
Section 8.7 Entire Agreement and Amendments. This Agreement constitutes the entire agreement among the Parties with respect to the subject matter of this Agreement and supersedes any prior understandings, agreements, or representations by or among the Parties, written or oral, to the extent they have related in any way to the subject matter of this Agreement. No amendment of any provision of this Agreement shall be valid unless the same shall be in writing and signed by the Parties hereto.
Section 8.8 Severability. Any term or provision of this Agreement that is invalid or unenforceable in any situation in any jurisdiction shall not affect the validity or enforceability of the remaining terms and provisions hereof or the validity or enforceability of the offending term or provision in any other situation or in any other jurisdiction.
Section 8.9 Transaction Expenses. The Parties will each bear their own costs and expenses (including legal fees and expenses) incurred in connection with this Agreement and the transactions contemplated hereby except as expressly provided otherwise herein. Except as this Agreement otherwise provides (including Section 5.5 hereof), the Contributor on the one hand and the Acquirer on the other shall each be responsible for 50% of the payment of the aggregate costs associated with obtaining the consents, approvals or authorizations necessary to effect the transfer of the Contributed Assets to the Acquirer as contemplated herein.
Section 8.10 Waiver of Bulk Sales Law Compliance. The Acquirer and Sunoco Logistics hereby waives compliance or its equivalent by the Contributor with the requirements, if any, of Article 6 of the Uniform Commercial Code as in force in any state in which Contributed Assets are located and all other similar laws applicable to bulk sales and transfers; provided, however, that, notwithstanding anything to the contrary in Article 6, the Contributor shall indemnify and hold the Acquirer and Sunoco Logistics harmless from any Adverse Consequences as a result of such waiver.
Section 8.11 Arbitration.
8.11.1 It is agreed by the Parties, as a severable and independent arbitration agreement separately enforceable from the remainder of this Agreement, that if the Parties hereto or the respective successors, assigns, heirs or legal representatives of any of the foregoing are unable to amicably resolve any dispute or difference arising under or out of, in relation to or in any way connected with this Agreement (whether contractual, tortious, equitable, statutory or otherwise), such matter shall be finally and exclusively referred to and settled by arbitration under the Commercial Arbitration Rules of the American Arbitration Association (the AAA); provided that, the foregoing shall not prevent any Party from seeking any court order in aid of arbitration. In the event of any conflict between the Commercial Arbitration Rules of the AAA and the provisions of this Section 8.11.1, the provisions of this Section 8.11.1 shall govern and control.
8.11.2 The arbitration shall be heard and determined by three (3) arbitrators. Each side shall appoint an arbitrator of its choice within fifteen (15) days of the submission of a
33
notice of arbitration. Such appointed arbitrators shall in turn appoint a presiding arbitrator of the tribunal within fifteen (15) days following their appointment. If such appointed arbitrators cannot reach agreement on a presiding arbitrator of the tribunal and/or one Party fails or refuses to appoint its appointed arbitrator within the prescribed period, the appointing authority for the presiding arbitrator and/or such Party-appointed arbitrator shall be the AAA, who, in each case, shall appoint an independent arbitrator who does not have any financial interest in the dispute, controversy or claim or bear any relationship to either Party. If an arbitrator should die, withdraw or otherwise become incapable of serving, or refuse to serve, a successor arbitrator shall be selected and appointed in the same manner as the original arbitrator.
8.11.3 Unless otherwise expressly agreed in writing by the parties to the arbitration proceedings:
8.11.3.1 The arbitration proceedings shall be held in Philadelphia, Pennsylvania;
8.11.3.2 The arbitrators shall be and remain at all times wholly independent and impartial;
8.11.3.3 The arbitration proceedings shall be conducted under the Commercial Arbitration Rules of the AAA, as amended from time to time;
8.11.3.4 Any procedural issues not determined under the arbitration rules selected pursuant to Section 8.11.3.3 shall be determined by the arbitration act and any other Laws of the State of New York, other than those laws which would refer the matter to another jurisdiction;
8.11.3.5 All decisions and awards by the arbitration tribunal shall be made by majority vote;
8.11.3.6 The decision of a majority of the arbitrators shall be reduced to writing; shall be final and binding without the right of appeal; and shall be the sole and exclusive remedy regarding any claims, counterclaims, issues or accountings presented to the arbitrators; any damage awards by the arbitrators shall be promptly paid free of any deduction or offset; and any costs or fees incident to enforcing the award shall to the maximum extent permitted by law be charged against the party resisting such enforcement;
8.11.3.7 Consequential, indirect, special, exemplary, punitive or other similar damages shall not be allowed except those payable to Third Parties for which Liability is allocated among the parties by the arbitration award;
8.11.3.8 Any award of damages shall include interest from the date of any breach or violation of this Agreement, as determined by the arbitration award, and from the date of the award until paid in full, at the Prime Rate;
8.11.3.9 The costs of the arbitration proceedings (including reasonable attorneys fees and costs) shall be borne in the manner determined by the arbitrator(s);
34
8.11.3.10 Judgment upon the award may be entered in any court having jurisdiction over the person or the assets of the party owing the judgment, or application may be made to such court for a judicial acceptance of the award and an order of enforcement, as the case may be; and
8.11.3.11 The arbitration shall proceed in the absence of a party who, after due notice, fails to answer or appear; an award shall not be made solely on the default of a party, but the arbitrator(s) shall require the party who is present to submit such evidence as the arbitrator(s) may determine is reasonably required to make an award.
8.11.3.12 Notwithstanding the foregoing provisions of this Section 8.11.3 of this Agreement, in the event of any dispute between the Parties with respect to their rights and obligations pursuant to Section 5.5.3.6 of this Agreement, the Parties shall resolve the dispute as follows: the Party seeking to initiate dispute resolution shall give written notice of the dispute to the other Party, which notice shall provide reasonable detail concerning the nature of the dispute. Such Party shall also propose an independent LSRP, which LSRP shall have at least ten (10) years of experience advising private clients with respect to site remediation matters and shall not have performed services, including services as a LSRP, for either Party, to participate in the resolution of the dispute. The responding Party shall, within ten (10) days of receipt of such notice, propose an independent LSRP with the qualifications specified in the preceding sentence. The two proposed LSRPs shall agree upon a third LSRP having the qualifications required hereunder and such LSRPs shall resolve the dispute by a majority vote (the three such LSRPs are hereinafter referred to as the Designated LSRPs). The Designated LSRPs shall have the right to require the Parties to submit such information as deemed necessary to resolve the dispute and the Parties shall promptly respond to any such request. The Designated LSRPs shall resolve the dispute in writing within sixty (60) days of retention by the Parties. The Parties agree to be bound by the decision of such Designated LSRPs and such decision shall be enforceable in a court of competent jurisdiction, which court shall have jurisdiction and authority to review the decision of the Designated LSRP in the event of any claim by a Party of legal error (including error or the interpretation or application of the terms of this Agreement) or manifest factual error. The substantially prevailing Party shall bear the cost of any dispute resolution undertaken pursuant to this Section.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
35
IN WITNESS WHEREOF, the Parties hereto have executed this Contribution Agreement as of the date first above written.
Contributor: | ||
SUNOCO, INC. (R&M), a Pennsylvania corporation | ||
By: | /s/ DAVID SEXTON | |
Name: | David Sexton | |
Title: | Vice President, Strategy & Portfolio | |
Acquirer: | ||
SUNOCO PARTNERS LLC, a | ||
Pennsylvania limited liability company | ||
By: | /s/ MICHAEL J. HENNIGAN | |
Name: | Michael J. Hennigan | |
Title: | President & Chief Operating Officer | |
SUNOCO LOGISTICS PARTNERS L.P., | ||
a Delaware limited partnership | ||
By: SUNOCO PARTNERS LLC, | ||
its general partner | ||
By: | /s/ MICHAEL J. HENNIGAN | |
Name: | Michael J. Hennigan | |
Title: | President & Chief Operating Officer | |
SUNOCO LOGISTICS PARTNERS GP LLC, | ||
a Delaware limited liability company | ||
By: | /s/ MICHAEL J. HENNIGAN | |
Name: | Michael J. Hennigan | |
Title: | President & Chief Operating Officer |
36
Signature Page for Contribution Agreement Continued
SUNOCO LOGISTICS PARTNERS OPERATIONS L.P., | ||
a Delaware limited partnership | ||
By: SUNOCO LOGISTICS PARTNERS GP LLC, its general partner | ||
By: | /s/ MICHAEL J. HENNIGAN | |
Name: | Michael J. Hennigan | |
Title: | President | |
SUNOCO LOGISTICS PARTNERS | ||
OPERATIONS GP LLC, a Delaware limited | ||
liability company | ||
By: | /s/ MICHAEL J. HENNIGAN | |
Name: | Michael J. Hennigan | |
Title: | President | |
SUNOCO PARTNERS MARKETING & | ||
TERMINALS L.P., a Texas limited partnership | ||
By: | SUNOCO LOGISTICS PARTNERS | |
OPERATIONS GP LLC, its general partner | ||
By: | /s/ MICHAEL J. HENNIGAN | |
Name: | Michael J. Hennigan | |
Title: | President |
37
SCHEDULE 1.1
Definitions and Interpretations
Section 1.1 Definitions. Unless otherwise provided to the contrary in this Agreement, capitalized terms in this Agreement shall have the following meanings:
2004 Lease and Access Agreement means the Lease and Access Agreement between the Contributor and SPMT (as successor by merger to Eagle Point Terminals LLC) made and entered into as of March 30, 2004.
2004 Site Services Agreement means the Site Services Agreement by and between the Contributor and SPMT (as successor by merger to Eagle Point Terminals LLC) entered into as of March 30, 2004.
2008 Dock and Throughput Agreement means the Amended and Restated Dock and Terminal Throughput Agreement (Eagle Point) between the Contributor and the Acquirer dated as of January 24, 2008 and effective January 1, 2008.
AAA has the meaning set forth in Section 8.11.1.
Access Agreements has the meaning set forth in the recitals hereto.
Adverse Consequences means all actions, suits, proceedings, hearings, investigations, charges, complaints, claims, demands, injunctions, judgments, orders, decrees, rulings, actual damages, dues, penalties, fines, costs, amounts paid in settlement, Liabilities, liens, actual losses, expenses, and fees, including court costs and reasonable attorneys fees and expenses, but excluding lost profits, diminution in value, punitive, exemplary, special, indirect or consequential damages, except those payable to Third Parties.
Affiliate means, as to the Person specified, any Person controlling, controlled by or under common control with such specified Person; provided, however, that (i) with respect to the Contributor, the term Affiliate shall exclude SPLLC, Sunoco Logistics, SLPOLP, SLPOGP and SPMT and each subsidiary thereof and (ii) with respect to the Acquirer, the term Affiliate shall exclude the Contributor, Sunoco, Inc. and each subsidiary of Sunoco, Inc. other than SPLLC, Sunoco Logistics, SLPOLP, SLPOGP and SPMT and each subsidiary thereof. The concept of control, controlling or controlled, as used in the aforesaid context, means the possession, directly or indirectly, of the power to direct or cause the direction of the management and policies of another, whether through the ownership of voting securities, by contract or otherwise. No Person shall be deemed an Affiliate of any Person solely by reason of the exercise or existence of rights, interests, or remedies under this Agreement.
Agreement has the meaning set forth in the preface.
Ancillary Agreements means the Tank Farm Agreement, the Ground Lease, the Access Agreements, the Utility Services Agreement, the Site Services Agreement, the Temporary Support Agreement and the Tenant-in-Common Agreement.
Assigned Contracts has the meaning set forth in Section 2.2.7.
Assumed Liabilities has the meaning set forth in Section 2.4.
Books and Records has the meaning set forth in Section 2.2.3.
Business Day means any day other than a Saturday, Sunday or other day on which commercial banks in New York, New York are authorized by law to close.
Acquirer Indemnified Parties has the meaning set forth in Section 6.2.1.
Acquirer has the meaning set forth in the preface.
CAA Consent Decree means the Consent Decree issued in the matter of United States of America & the State of New Jersey v. Eagle Point Oil Company, Civil Act. No. 03-4625 U.S. Dist. Ct. N.J. (2003).
Claim Notice has the meaning set forth in Section 6.5.
Claim Response has the meaning set forth in Section 6.5.
Closing has the meaning set forth in Section 2.7.
Effective Date has the meaning set forth in Section 2.7.
Code means the Internal Revenue Code of 1986, as amended, or any successor Law.
Cogeneration Plant means the natural gas cogeneration facility owned by Sunoco Power Generation, LLC, a wholly owned subsidiary of the Contributor, that currently operates as a merchant power producing facility and is located within the grounds of the Refinery Complex.
Compliance with ISRA means the receipt by Contributor of written evidence that Contributor has satisfied the requirements of ISRA in relation to the Refinery Complex in connection with the Existing ISRA Proceedings and any proceeding required to be initiated pursuant to ISRA in connection with the transactions contemplated by this Agreement, including without limitation, a site-wide Response Action Outcome, as defined and used in ISRA, N.J.S.A. 58:10C-1 et seq. and N.J.A.C. 7-26C-1.3, issued by a LSRP or a site-wide No Further Action Letter and Covenant Not To Sue, as defined and used in ISRA, N.J.S.A. 58:10B-1 and 13.1 and N.J.A.C. 7:26C-1.3, issued by the NJDEP, in each case applicable to the Existing ISRA Proceedings and any ISRA proceeding initiated in connection with the transactions contemplated by this Agreement.
Continuing Employees has the meaning set forth in Section 5.4.2.
Contract means any written, oral, implied or other promise, agreement, contract, understanding, arrangement, instrument, note guaranty, indemnity, representation, warranty, assignment, power of attorney, certificate, purchase order, work order, commitment, covenant, assurance or undertaking of any nature, excluding (i) deeds and (ii) Licenses.
Contributed Assets has the meaning set forth in Section 2.1.
Contributor has the meaning set forth in the preface.
Contributor Benefit Plans has the meaning set forth in Section 5.4.5.
Contributor Indemnified Parties has the meaning set forth in Section 6.3.1.
Costs of Compliance means all costs (including costs of Remedial Work), capital expenditures, fees and expenditures of any kind associated with attaining or maintaining compliance with any Environmental Law and all costs, fees and expenditures of any kind required to obtain, amend, renew or otherwise maintain any Environmental Permits.
Current Employees has the meaning set forth in Section 5.4.1.
Deferred Distribution Units shall mean the Class A units units having such relative rights, interests and entitlements as set forth in the Third Amended and Restated Agreement of Limited Partnership for Sunoco Logistics, as amended.
Default means (a) a breach, default or violation, (b) the occurrence of an event that with or without the passage of time or the giving of notice, or both, would constitute a breach, default or violation or cause an Encumbrance to arise or (c) with respect to any Contract, the occurrence of an event that with or without the passage of time or the giving of notice, or both, would give rise to a right of termination, cancellation, amendment, renegotiation or acceleration or a right to receive damages or a payment of penalties.
Docks mean the Acquirers or its Affiliates ship and barge docks and associated piping, manifolds, pumps, vapor combustion unit and other appurtenances located in, on or under the Refinery Complex.
Eagle Point Dock Agreement means the Eagle Point Dock Agreement between the Contributor and SPMT dated May 18, 2010.
Employment Date has the meaning set forth in Section 5.4.2.
Encumbrance means any mortgage, pledge, lien, encumbrance, encroachment, charge, other security interest or defect in title, other than those for (a) Taxes, the payment of which is not yet delinquent or which are being contested in good faith, (b) materialmens, warehousemens, mechanics or other liens arising by operation of Law in the ordinary course of business for sums not due and which do not materially detract from the value of the Contributed Assets, (c) statutory liens incurred in the ordinary course of business in connection with workers compensation, unemployment insurance, or other forms of Governmental insurance or benefits, and (d) liens or other encumbrances arising in connection with Contributors idling of the Refinery Complex.
Environmental Law or Environmental Laws means all Laws relating to the protection of natural resources, wildlife, or the environment or employee or public health or safety, including the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended, 42 U.S.C. Section 9601, et seq., the Resource Conservation and Recovery Act of 1976, as amended, 42 U.S.C. Section 6901, et seq., New Jersey Industrial Site Recovery Act,
N.J.S.A. 13:1K-6, et seq. and the regulations promulgated thereunder, N.J.A.C. 7:26B-1.1, et seq. (ISRA), the Site Remediation Reform Act, N.J.S.A. 58:10C-1, et seq. (SRRA), the Clean Air Act, as amended, 42 U.S.C. Section 7401, et seq., the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251, et seq., the Oil Pollution Act of 1990, as amended, 33 U.S.C. Section 2701, et seq. the Toxic Substances Control Act, as amended, 15 U.S.C. Section 2601, et. seq., the Safe Drinking Water Act, as amended, 42 U.S.C. Section 300f, et. seq., the Federal Hazardous Materials Transportation Law, as amended, 49 U.S.C. Section 5101, et. seq. and the Occupational Safety and Health Act of 1970, as amended, 29 U.S.C. Section 651, et. seq. and the regulations and Environmental Permits promulgated pursuant thereto, and any foreign, state or local counterparts.
Environmental Liabilities means any and all Liabilities, including costs of Remedial Work, assessments, liens, penalties, fines, prejudgment and post-judgment interest, and attorney fees incurred or imposed (a) to comply with or as a result of failure or alleged failure to comply with Environmental Law, (b) pursuant to any order, notice, injunction, judgment or similar ruling arising out of or in connection with any Environmental Law or (c) pursuant to any claim by a Governmental Authority or other Person for personal injury, death, property damage, damage to natural resources or Remedial Work to the extent arising out of a Release or migration of Hazardous Substances.
Environmental Permits means all permits, licenses, registrations, exemptions, authorizations, consents, orders, decrees, agreements and approvals (including those entered by consent or agreement) pursuant to Environmental Laws that are necessary for the operation of the Contributed Assets.
Equipment & Facilities has the meaning set forth in Section 2.2.1.
Excluded Assets has the meaning set forth in Section 2.3.
Excluded Liabilities has the meaning set forth in Section 2.5.
Exchange Act has the meaning set forth in Section 3.3.5.
Existing ISRA Proceedings means the regulatory proceedings pursuant to ISRA in progress as of the Effective Date of this Agreement and relating to the Refinery Complex, including, more specifically, the proceeding initiated in 1984 and bearing ISRA Case No. E 84158, the proceedings initiated in 2003 as a result of the transfer of the Refinery Complex from Coastal Eagle Point Oil Company to Contributor and bearing ISRA Case Nos. E 20030520 and E 20030521, all of which proceedings are being conducted under the aegis of the ISRA Remediation Agreement, and the proceeding initiated by the Contributor in 2010 as a result of the cessation of refining operations at the Refining Complex.
FMLA has the meaning set forth in Section 5.4.1.
Governmental Authority means the United States and any foreign, state, county, city or other political subdivision, agency, court or instrumentality and any self regulatory organization, such as a securities exchange.
Ground Lease has the meaning set forth in the recitals hereto.
Hazardous Substances means (i) any chemicals, materials, substances, pollutants, contaminants or items in any form, whether solid, liquid, gaseous, semisolid, or any combination thereof, whether waste materials, raw materials, chemicals, finished products, by-products, or any other materials or articles, which are listed, defined or otherwise designated as hazardous, toxic or dangerous under Environmental Law, including asbestos, polychlorinated biphenyls, radon, urea formaldehyde foam insulation, and lead-containing paints or coatings, (ii) any petroleum, petroleum hydrocarbons, crude oil petroleum derivatives, petroleum products, or by-products of petroleum refining, and (iii) any other chemical material, pollutant, contaminant, substance, waste or item that, by its nature or use, is regulated by Environmental Law or for which any Governmental Authority requires Remedial Work.
Indemnified Party has the meaning set forth in Section 6.5.
Indemnifying Party has the meaning set forth in Section 6.5.
Indemnity Cap means the Purchase Price.
Institutional and Engineering Controls shall have the meaning given to such terms in N.J.S.A. 58:10C-2 and N.J.A.C. 7:26E-1.8.
ISRA Approval means an authorization pursuant to ISRA to complete the transactions contemplated by this Agreement prior to the achievement of Compliance with ISRA and shall include, at Contributors sole option, (i) a Remediation Certification as defined in N.J.A.C. 7:26B-4.3 submitted to the NJDEP, together with the establishment of a remediation funding source in a form permitted by N.J.A.C 7:26C-5 and in an amount certified by a LSRP; (ii) an amendment to the ISRA Remediation Agreement executed by the NJDEP authorizing the completion of the transactions contemplated by this Agreement, together with the establishment of a remediation funding source in a form permitted by N.J.A.C. 7:26C-5 and an amount required by such agreement or amendment; (iii) a Remediation in Progress Waiver approved by the NJDEP pursuant to N.J.A.C. 7:26B-5.4; or (iv) any other written authorization of the NJDEP or a LSRP permitting Contributor to complete the transactions contemplated by this Agreement prior to achieving Compliance with ISRA, together with the establishment of a remediation funding source in a form permitted by N.J.A.C. 7:26C-5 and an amount required by such authorization.
ISRA Remediation Agreement means the Remediation Agreement between Contributor and the NJDEP dated as of January 13, 2004 and encompassing ISRA Case Nos. E 84158, E 20030526 and E 20030521.
ISRA Submission means any of a General Information Notice, Remediation Certification, Remediation in Progress Waiver Application, Preliminary Assessment Report, Receptor Evaluation, Site Investigation Report, Remedial Investigation Workplan, Remedial Investigation Report, Remedial Action Selection Report, Remedial Action Workplan, and Remedial Action Report (as such term is defined or used in N.J.A.C. 7:26B or 7:26E) or any other submission, certification or report required to achieve Compliance with ISRA.
Knowledge of a fact or matter with respect to an individual, means the actual awareness by such individual of such fact or matter.
Knowledge or knowledge (or phrases of similar import) of a fact or matter with respect to a Person, other than an individual, means the Knowledge of any individual who, at the time such representation, warranty or other statement is made, is then serving as a director or officer of that Person (or in any similar capacity if such Person is not a corporation), and, with respect to the Contributor, any other individual employed by the Contributor that was substantially involved in the review, negotiation or execution of, or due diligence associated with, this Agreement.
Laws means any law, statute, code, regulation, rule, injunction, judgment, ordinance, order, decree, ruling, directive, charge, or other restriction of any applicable Governmental Authority, including Environmental Laws.
Leased Real Property means the portion of the real property owned by the Contributor at the Refinery Complex that, as of the Effective Date, will be leased by SPMT from the Contributor under, and which is more particularly described in, the Ground Lease. The term Leased Real Property, as used herein, shall not include the Premises.
Liability or Liabilities means any direct or indirect liability, indebtedness, obligation, cost, expense, claim, loss, damage, deficiency, guaranty or endorsement of or by any Person, absolute or contingent, asserted or unasserted, accrued or unaccrued, due or to become due, liquidated or unliquidated.
Licenses has the meaning set forth in Section 2.2.2.
LSRP means a Licensed Site Remediation Professional as defined in N.J.S.A. 58:10C-2 and N.J.A.C 7:26C-1.3.
Master Tank Lease and Operating Agreement means that certain Master Tank Lease and Operating Agreement dated as of May 20, 2011 by and between SPMT and Sunoco, Inc. (R&M).
Material Adverse Effect means any change, development, effect, condition or occurrence that could reasonably be expected to (i) be material and adverse to (A) the assets, properties, business, results of operations, or financial condition, as a whole, when used with respect to a Person, or (B) the Contributed Assets, (ii) subject the Acquirer to any criminal or material civil liability or (iii) prevent a Party from performing any of its material obligations under this Agreement or consummation of the transactions contemplated hereby, it being understood that none of the following shall be deemed to constitute a Material Adverse Effect: (v) any effect resulting from entering into this Agreement or the announcement of the transactions contemplated by this Agreement; (w) any effect resulting from changes in the economy, as a whole, of the United States or the world; (x) any changes in commodity prices or refining margins; (y) any effect on the Contributed Assets resulting from changes in a financial rating published by a third party rating agency; and (z) any effect resulting from changes (including any change in Law or regulatory policy) that are the result of factors generally affecting the specific industry or any specific market in which the applicable Person competes and not affecting such Person or the Contributed Assets in any manner or degree significantly different than such industry or such market as a whole.
Natural Gas Line has the meaning set forth in Section 2.2.1.
NJDEP means the New Jersey Department of Environmental Protection, its departments, bureaus or subdivisions.
NJPDES DSW/DGW Permit means the Final Major Modification to NJPDES DSW/DGW Permit No. NJ 0005401 issued to CEPOC on June 30, 1989 and requiring closure, post-closure maintenance, soil monitoring and detection groundwater monitoring of a hazardous waste land treatment unit at the Refinery Complex.
Organizational Documents means the articles of incorporation, certificate of incorporation, charter, bylaws, articles or certificate of formation, regulations, operating agreement, certificate of limited partnership, partnership agreement, and all other similar documents, instruments or certificates executed, adopted, or filed in connection with the creation, formation, or organization of a Person, including any amendments thereto.
Party means each of the Contributor and any Acquirer.
Person means any individual, corporation (including any non profit corporation), general or limited partnership, limited liability company, joint venture, estate, trust, association, organization, labor union, or other entity or Governmental Authority.
Power & Boiler Houses mean the areas and facilities located at the Refinery Complex that house four boilers, three turbine generators and their associated equipment.
Premises has the meaning set forth in the 2004 Lease and Access Agreement.
PSE&G means the Public Service Electric and Gas Company.
Refinery Complex has the meaning set forth in the recitals.
Refinery Site-Wide Licenses has the meaning set forth in Section 5.5.
Related means used or held for use in connection with the ownership, operation or maintenance of, arising from, or related to.
Release shall have the meaning set forth in Environmental Laws, including the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended, 42 U.S.C. Section 9601 et. seq., and any analogous state Laws, but also shall include any threatened Release and the spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping or disposing of a Hazardous Substance into the environment, but does not include migration of Hazardous Substances already present in the environment.
Remedial Work means action of any kind to address a Release or the presence of Hazardous Substances at, on, in, upon, over, across, under, within or migrating from the Leased Real Property, including all investigative, site monitoring, restoration, abatement, detoxification, containment, handling, treatment, removal, storage, decontamination, clean-up, transport,
disposal or other ameliorative work, corrective action or response action required by (a) any Environmental Law, (b) any order or request of any Governmental Authority, or (c) any final judgment, consent decree, settlement or compromise with respect to any Environmental Law, excluding, however, (i) except for Environmental Permits required to implement and complete Remedial Work as described in this definition, the obtaining, amendment, renewal or maintenance of any Environmental Permits, including permits for any grand fathered units, and (ii) monetary fines or penalties for violations of Environmental Laws.
Representative means, with respect to any Party, such Party and its Affiliates and their directors, officers, agents, consultants, partners, members, managers, employees and advisors (including such Partys accountants, counsel, environmental consultants, financial advisors, investment bankers and other authorized representatives).
Response Period has the meaning set forth in Section 6.5.
Retained Employees has the meaning set forth in Section 5.4.3.
Site Services Agreement has the meaning set forth in the recitals hereto.
SPLLC Limited Liability Company Agreement shall mean the Second Amended and Restated Limited Liability Company Agreement of SPLLC dated as of April 30, 2002, as amended from time to time,
Subzone has the meaning set forth in Section 5.8.
Sunoco Logistics has the meaning set forth in the preface.
Tank Farm means the crude oil, refined products and intermediates storage tanks located at the Refinery Complex identified on Schedule 2.2.1 and all spheres, bullets, valves, pumps and other equipment Related to such storage tanks.
Tank Farm Agreement has the meaning set forth in the recitals hereto.
Tax or Taxes means all taxes, fees, duties and other assessments, however denominated, including any interest, penalties, or additions to tax that may become payable in respect thereof, imposed by any Taxing Authority, which taxes shall include any license or registration fees and all income, franchise, sales, use, excise, motor fuel, petroleum, environmental, gross receipts, occupation, stamp, import, export, real and personal property, transfer, workers compensation, payroll and wage withholding, unemployment insurance, social security taxes and any adjustment made by any Taxing Authority to a Tax Return.
Taxing Authority means any federal, state, or local government or any agency or political subdivision thereof in the United States or corresponding governmental unit in any foreign country responsible for the imposition of Taxes.
Tax Proceeding has the meaning set forth in Section 7.4.
Tax Return means all reports, estimates, information statements and returns relating to, or required to be filed in connection with, any Taxes pursuant to the statutes, rules and regulations of any Taxing Authority.
Third Parties means a Person which is not (a) a Contributor or an Affiliate of a Contributor, (b) a Acquirer or an Affiliate of a Acquirer or (c) a Person that, after the signing of this Agreement becomes a successor entity of a Contributor, a Acquirer or any of their respective Affiliates. An employee of a Contributor or a Acquirer shall not be deemed an Affiliate.
Transfer Taxes means all transfer Taxes (excluding Taxes measured by net income), including sales, realty transfer taxes (pursuant to N.J.S.A. 46:15-7), real property, use, excise, stock, stamp, documentary, filing, recording, permit, license, authorization and similar Taxes, filing fees and similar charges.
Utility Services Agreement has the meaning set forth in the recitals hereto.
Wastewater Treatment Plant means the wastewater treatment system and plant located at the Refinery Complex.
Section 1.2 Interpretations. Unless expressly provided for elsewhere in this Agreement, this Agreement shall be interpreted in accordance with the following provisions:
1. Whenever the context may require, any pronoun used in this Agreement shall include the corresponding masculine, feminine, or neuter forms, and the singular form of nouns, pronouns and verbs shall include the plural and vice versa;
2. If a word or phrase is defined, its other grammatical forms have a corresponding meaning;
3. A reference to a person, corporation, trust, estate, partnership, or other entity includes any of them;
4. The headings contained in this Agreement are for reference purposes only and shall not affect the meaning or interpretation of this Agreement;
5. All references in this Agreement to articles, sections or subdivisions thereof shall refer to the corresponding article, Section or subdivision thereof of this Agreement unless specific reference is made to such articles, sections, or subdivisions of another document or instrument;
6. A reference to any agreement or document (including a reference to this Agreement) is to the agreement or document as amended, varied, supplemented, novated or replaced, except to the extent prohibited by this Agreement or that other agreement or document;
7. No waiver by any Party of any default by any other Party in the performance of any provision, condition or requirement herein shall be deemed to be a waiver of, or in any manner release any other Party from, performance of any other provision, condition or requirement herein, nor shall such waiver be deemed to be a waiver of, or in any manner a
release of, any other Party from future performance of the same provision, condition or requirement. Any delay or omission of any Party to exercise any right hereunder shall not impair the exercise of any such right, or any like right, accruing to it thereafter. The failure of any Party to perform its obligations hereunder shall not release any other Party from the performance of its obligations, subject to a right of set-off;
8. A reference to any Party to this Agreement or another agreement or document includes the Partys successors and assigns;
9. A reference to legislation or to a provision of legislation includes a modification or reenactment of it, a legislative provision substituted for it and a regulation or statutory instrument issued under it;
10. A reference to a writing includes a facsimile transmission of it and any means of reproducing of its words in a tangible and permanently visible form;
11. The words hereof, herein and hereunder and words of similar import when used in this Agreement shall refer to this Agreement as a whole and not to any particular provision of this Agreement, and article, section, subsection, Schedule and exhibit references are to this Agreement unless otherwise specified;
12. The word including, include, includes and all variations thereof shall mean including without limitation;
13. The word or will have the inclusive meaning represented by the phrase and/or;
14. The phrase and/or when used in a conjunctive phrase, shall mean any one or more of the Persons specified in or the existence or occurrence of any one or more of the events, conditions or circumstances set forth in that phrase; provided, however, that when used to describe the obligation of one or more Persons to do any act, it shall mean that the obligation is the obligation of each of the Persons but that it may be satisfied by performance by any one or more of them;
15. Shall and will have equal force and effect;
16. The Exhibits and Schedules identified in this Agreement are incorporated herein by reference and made a part of this Agreement;
17. The Parties have participated jointly in the negotiation and drafting of this Agreement. In the event an ambiguity or question of intent or interpretation arises, this Agreement shall be construed as if drafted jointly by the Parties and no presumption or burden of proof shall arise favoring or disfavoring any Party by virtue of the authorship of any of the provisions of this Agreement;
18. Unless otherwise specified, all references to a specific time of day in this Agreement shall be based upon Eastern Standard Time or eastern Daylight Savings Time, as applicable on the date in question in New York, New York;
19. References to $ or to dollars shall mean the lawful currency of the United States of America; and
No action shall be required of the Parties except on a Business Day and in the event an action is required on a day which is not a Business Day, such action shall be required to be performed on the next succeeding day which is a Business Day. All references to day or days shall mean calendar days unless specified as a Business Day.
SCHEDULE 2.2.1
CONTRIBUTED ASSETS TANGIBLE ASSETS
See Attachment 1 to Schedule 2.2.1.
1
Attachment 1 to Schedule 2.2.1
8/11/2010 |
Assets WWTP | |||||
WWTP PUMPS |
I | |||||
P-3116 | PUMP | P-3116 WWT RIVER WEIR PNEUMATIC TRIDENT PISTON PUMP. MODEL DT01 SERIAL 276 | A | |||
P-1777 | PUMP | WWT API SLUDGE PUMP WWT-PQ03 P-1777 PID DWG WWT-16-14309-02 MIDDLE PUMP EAST SIDE OF API SEPERATOR | A | |||
P-1714 | PUMP | WWT API SLUDGE PUMP WWT-PQ06 P-1714 PID DWG WWT-16-14309-01 | A | |||
P-1732 | PUMP | WWT API SLUDGE PUMP WWT-PQ07 P-1732 PID DWG WWT-16-14309-02 | A | |||
P-1886 | PUMP | WWT API SLUDGE SUMP PUMP WWT-PQ04 P-l886 PJD DWG WWT-16-14309-01 SOUTH SIDE OF SEPERATOR | A | |||
P-2114 | PUMP | WWT BACKWASH RETURN TO AEREATION PUMP WWT-P12A P-2114 PID DWG WWT-16-14309-10 | A | |||
P-2113 | PUMP | WWT BACKWASH RETURN TO AEREATION PUMP WWT-P12B P-2113 PID DWG WWT-16-14309-10 | A | |||
P-3020 | PUMP | WWT CLARIFIER SCUM PUMP WWT-P04A P-3020 PID DWG WWT-16-14309-08 | A | |||
P-2112 | PUMP | WWT CLARIFIER SCUM PUMP WWT-P04B P-2112 PID DWG WWT-16-14309-08 | A | |||
P-2109 | PUMP | WWT CLARIFIER SLUDGE RECYCLE PUMP (MIDDLE) WWT-P03B P-2109 PID DWG WWT-16-14309-08 | A | |||
P-2110 | PUMP | WWT CLARIFIER SLUDGE RECYCLE PUMP (SOUTH) WWT-P03C P-2110 PID DWG WWT-16-14309-08 | A | |||
P-1746 | PUMP | WWT DOCK DRAIN TANK PUMP WWT-PN032 P-l746 PID DWG WWT-16-14309-04 SUBMERSIBLE PUMP | I | |||
P-3193 | PUMP | WWT DOCK DRAIN TANK PUMP WWT-PN032 P-3193 PID DWG WWT-16-14309-04 SUBMERSIBLE PUMP (NO PM REQUIRED) | A | |||
P-3109 | PUMP | WWT DOCK DRAIN TANK PUMP WWT-PN032, P-3109 PID DWG -16-14309-04 | I | |||
P-3146 | PUMP | WWT ECRA WELL PUMP WWT-TK-141CS P-3146 REMEDIAL SYSTEM 4 GRUNDFOS SUBMERSIBLE GROUNDWATER PUMP | A | |||
P-2802 | PUMP | WWT ECRA WELL PUMP WWT-143-2 P-2802 (N.E COPELANDS COVE) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2801 | PUMP | WWT ECRA WELL PUMP WWT-CCOl P-2801 (COPELANDS COVE) NOT ON PIDS | A | |||
P-2879 | PUMP | WWT ECRA WELL PUMP WWT-CC02 (COPELANDS COVE) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2799 | PUMP | WWT ECRA WELL PUMP WWT-D01 P-2799 (@ E. NO.2 PH OUTSIDE FENCE) NOT ON PIDS | A | |||
P-2857 | PUMP | WWT ECRA WELL PUMP WWT-D01A (@ E. NO.2 PH OUTSIDE FENCE) PUMP P-2857 NO PM REQUIRED AS OF 1-06 | A | |||
P-2809 | PUMP | WWT ECRA WELL PUMP WWT-F01 P-2809 (W. SIDE FURFURAL) NOT ON PIDS | A | |||
P-3139 | PUMP | WWT ECRA WELL PUMP WWT-GTA-1 P-3139 REMEDIAL SYSTEM | A | |||
P-2807 | PUMP | WWT ECRA WELL PUMP WWT-LF01 P-2807 (OUTSIDE EAST FENCE) NOT ON PIDS | A | |||
P-2800 | PUMP | WWT ECRA WELL PUMP WWT-LF02 P-2800 (NEAR COGEN RIVER P.H OUTSIDE FENCE) NOT ON PIDS | A | |||
P-2808 | PUMP | WWT ECRA WELL PUMP WWT-MW110 P-2808 (W. VPS CONTROL ROOM) NOT ON PIDS | A | |||
P-2795 | PUMP | WWT ECRA WELL PUMP WWT-RW01 P-2795 (@ RIVER WIER ) NOT ON PIDS SUBMERSIBLE | A | |||
P-2796 | PUMP | WWT ECRA WELL PUMP WWT-RW02 P-2796 (@ RIVER WIER ) NOT ON PIDS NO PM REQUIRED AS OF 1-06 SUBMERSIBLE/AIR | A | |||
P-2797 | PUMP | WWT ECRA WELL PUMP WWT-RW03 P-2797 (@ RIVER WIER ) NOT ON PIDS SUBMERSIBLE | A | |||
P-2798 | PUMP | WWT ECRA WELL PUMP WWT-RW04 P-2798 (@ RIVER WIER ) NOT ON PIDS SUBMERSIBLE / AIR | A | |||
P-3083 | PUMP | WWT ECRA WELL PUMP WWT-RW05 @ RIVER WEIR. NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2803 | PUMP | WWT ECRA WELL PUMP WWT-S01 P-2803 (EAST OF TANK NO. 118) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2804 | PUMP | WWT ECRA WELL PUMP WWT-S02 P-2804 (EAST OF TANK NO. 118) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2805 | PUMP | WWT ECRA WELL PUMP WWT-S03 P-2805 (EAST OF TANK NO. 119) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2806 | PUMP | WWT ECRA WELL PUMP WWT-S04 P-2806 (EAST OF TANK NO. 119) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2792 | PUMP | WWT ECRA WELL PUMP WWT-TF01 P-2792 (@ TANK NO. 26) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2793 | PUMP | WWT ECRA WELL PUMP WWT-TF02 P-2793 (@ TANK NO. 51) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-2794 | PUMP | WWT ECRA WELL PUMP WWT-TF03 P-2794 (@ NO.2 PUMPHOUSE) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | A | |||
P-3017 | PUMP | WWT ECRA WELL PUMP WWT-TF04 P-3017 NORTH OF TANK NO. 6 PID 15-1803-13 NO PM REQUIRED AS OF 1-06 | A | |||
P-3147 | PUMP | WWT ECRA WELL PUMP WWT-TK-14CS P-3147 REMEDIAL SYSTEM 4 GRUNDFOS SUBMERSIBLE GROUNDWATER PUMP | A | |||
P-3148 | PUMP | WWT ECRA WELL PUMP WWT-TK-14CS P-3148 REMEDIAL SYSTEM 2 GEOTECH/ORS GROUNDWATER PUMP | A | |||
P-3149 | PUMP | WWT ECRA WELL PUMP WWT-TK-14CS P-3149 REMEDIAL SYSTEM 2 GEOTECH/ORS GROUNDWATER PUMP | A | |||
P-3140 | PUMP | WWT ECRA WELL PUMP WWT-TK-47CS P-3140 REMEDIAL SYSTEM | A | |||
P-3142 | PUMP | WWT ECRA WELL PUMP WWT-TK-51CS P-3142 REMEDIAL SYSTEM | A | |||
P-3141 | PUMP | WWT ECRA WELL PUMP WWT-UPRM-24S P-3141 REMEDIAL SYSTEM | A | |||
P-2123 | PUMP | WWT EFFLUENT SAMPLE PUMP WWT-P13 P-2123 PID DWG WWT-16-14309-14 | A | |||
P-2057 | PUMP | WWT EMERGENCY LIFT PUMP WWT-P01E FLOW PUMP P-2057 PID DWG WWT-16-14309-02 | A |
Attachment 1 to Schedule 2.2.1
P-2117 | PUMP | WWT FILTER BACKWASH PUMP WWT-P06A P-2117 PID DWG WWT-16-14309-10 | A | |||
P-2118 | PUMP | WWT FILTER BACKWASH PUMP WWT-P06B P-2118 PID DWG WWT-16-14309-10 | A | |||
P-2115 | PUMP | WWT FILTER FEED PUMP WWT-P05A P-2115 PID DWG WWT-16-14309-10 | A | |||
P-2116 | PUMP | WWT FILTER FEED PUMP WWT-P05B P-2116 PID DWG WWT-16-14309-10 | A | |||
P-2119 | PUMP | WWT FILTER SURFACE WASH PUMP WWT-P09A P-2119 PID DWG WWT-16-14309-10 | A | |||
P-2120 | PUMP | WWT FILTER SURFACE WASH PUMP WWT-P09B P-2120 PID DWG WWT-16-14309-10 | A | |||
P-0443 | PUMP | WWT GAS OIL TRANSFER PUMP WWT-PN023 P-443 PID DWG WWT-16-14309-03 | A | |||
P-2762 | PUMP | WWT HYPOCHLORIDE INJECTION PUMP WWT-P16 P-2762 PID DWG WWT-16-14309-15 | I | |||
P-2835 | PUMP | WWT HYPOCHLORIDE INJECTION PUMP WWT-P17 PID DWG WWT-16-14309-15 | I | |||
P-2862 | PUMP | WWT LAB VACUUM TEST PUMP WWT-P19 P-2862 (LOCATED IN LAB TEST ROOM BEHIND DOOR) | A | |||
P-0679 | PUMP | WWT NO. 1 WATER WELL PUMP WWT-WELL01 P-0679 PID DWG POH-16-14287-01 | A | |||
P-0681 | PUMP | WWT NO. 3 WATER WELL PUMP WWT-WELL03 P-0681 PID DWG POH-16-14287-01 | A | |||
P-1281 | PUMP | WWT NO. 4 WATER WELL PUMP WWT-WELL04 P-1281 PID DWG POH-16-14287-01 | I | |||
P-l799 | PUMP | WWT NO. 5 WATER WELL PUMP WWT-WELL05 P-l799 PID DWG POH-18-3226-011 | A | |||
P-1287 | PUMP | WWT NO. 6 WATER WELL PUMP WWT-WELL06 PID DWG POH-16-14287-01 | I | |||
P-l692 | PUMP | WWT NO. 3 SERVICE WATER PUMP WWT-P3SW P-1692 PID DWG WWT-16-14309-15 NOTE: SEE PAGE 6 ,COKE BREAKER | A | |||
P-0670 | PUMP | WWT NO. 4 SERVICE WATER PUMP WWT-P4SW P-0670 PID DWG WWT-16-14309-15 | A | |||
P-2849 | PUMP | WWT NO. 8 SERVICE WATER PUMP WWT-P8SW PID DWG 14- | I | |||
P-2299 | PUMP | WWT OILY WATER CIRCULATING PUMP WWT-P15 P-2299 PID DWG WWT-16-14309-06 | A | |||
P-2851 | PUMP | WWT OILY WATER SEWER BOX PUMP WWT-P18 | A | |||
P-2100 | PUMP | WWT PRIMARY LIFT PUMP WWT P01A P-2100 PID DWG WWT-16-14309-02 | A | |||
P-2101 | PUMP | WWT PRIMARY LIFT PUMP WWT-P01B P-2101 PID DWG WWT-16-14309-02 | A | |||
P-2103 | PUMP | WWT PRIMARY LIFT PUMP WWT-P01C P-2103 PID DWG WWT-16-14309-02 | A | |||
P-2102 | PUMP | WWT PRIMARY LIFT PUMP WWT-P01D P-2102 PID DWG WWT-16-14309-02 | A | |||
P-2122 | PUMP | WWT PROCESSED WATER TO SCALTECH PUMP SPARE P-2122 PID DWG WWT-16-14309-10 | I | |||
P-2121 | PUMP | WWT PROCESSED WATER TO SCALTECH PUMP WWT-P07A P-2121 PID DWG WWT-16-14309-10 | I | |||
P-0447 | PUMP | WWT RGO PUMP WWT-PN027 P-0447 PID DWG WWT-16-14309-03 | A | |||
P-0667 | PUMP | WWT SERVICE WATER PUMP WWT-P5SW P-0667 PID DWG WWT-16-14309-15 | A | |||
P-1686 | PUMP | WWT SLOP OIL PUMP WWT-PQ08 P-1686 PID DWG WWT-16-14309-01 (API SEPARATOR SOUTHWEST SIDE) | A | |||
P-2108 | PUMP | WWT SLUDGE RECYCLE PUMP (NORTH) WWT-P03A P-2108 PID DWG WWT-16-14309-08 | A | |||
P-2125 | PUMP | WWT SLUDGE STORAGE PUMP WWT-P10A P-2125 (OUT OF SERVICE) | I | |||
P-2126 | PUMP | WWT SLUDGE STORAGE PUMP WWT-P10B P-2126 (OUT OF SERVICE) | I | |||
P-1786 | PUMP | WWT SLUDGE SUMP PUMP WWT-PQ02 P-1786 PID DWG WWT-16-14309-02 | A | |||
P-2130 | PUMP | WWT SLUDGE THICKENER PUMP WWT-P08A P-2130 PID DWG WWT-16-14309-09 | I | |||
P-2128 | PUMP | WWT SLUDGE THICKENER PUMP WWT-P08B P-2128 PID DWG WWT-16-14309-09 | I | |||
P-2131 | PUMP | WWT SLUDGE THICKENER PUMP WWT-PMC P-2131 PID DWG WWT-16-14309-09 | A | |||
P-2341 | PUMP | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15A P-2341 PID DWG WWT-16-14309-03 | A | |||
P-2342 | PUMP | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15B P-2342 PID DWG WWT-16-14309-03 | A | |||
P-2143 | PUMP | WWT TANK FARM SEPARATOR PUMP WWT-P14A P-2143 (NEAR TANK 117) NORTH PUMP NOT ON PID - NEED TO BE DRAWN IN | A | |||
P-2144 | PUMP | WWT TANK FARM SEPARATOR PUMP WWT-P14B P-2144 (NEAR TANK 117) SOUTH PUMP NOT ON PID - NEED TO BE DRAWN IN | A | |||
P-2058 | PUMP | WWT TRAP OIL TRANSFER PUMP WWT-PQ01 P-2058 (API SEPARATOR PUMP HOUSE) | A |
WWTP TANKS
TFA-TK 333 | 9370 | 40 | ||||
TFA-TK-342 | IFR WWTP LINES |
8700 | 40 | |||
N-142 (2) | SLOP OIL / WATER |
N-146 (2) or N-142 (1) | TKS-333 / 335 | |||
N-151 | WATER-OIL MIX (4 & 6) |
DOCKS & N142 | DOCK DRAIN SUMP | |||
N-149 | WATER-OIL MIX (6 & 8) | TKS-333 & 335 | PLANT TRAP (SEPERATOR) | |||
N-152 | WATER-OIL MIX | DOCK SUMP / PUMP PN-32 | 3 to TK-342 / N-150 / N-149 / TRAP | |||
N-146 (2) | SLOP OIL & WATER | PQ-6, PQ-7. & PQ-8 PUMPS | N-142 (2) to TKS-333 & 335 | |||
N-442 | Light Slop Oil Blowdown |
N-262, N-425, N335, N443, N-328 | TKS-335 & 342 | |||
N-143 (2) | SLOP OIL & WATER |
TK-342 & TK-348 | N-147 to PQ-1, PN-23, & PN-27 Suct Mnflds | |||
N-147 (2) | SLOP OIL WATER MIX |
N-143 (2) / TK-342 | PQ-1 PUMP SUCTION MANIFOLD | |||
N-148 | WATER-OIL MIX | TK333 | PQ-1 PUMP SUCTION MANIFOLD | |||
N-150 | WATER-OIL MIX | TK-331 | N-149 (BLINDED @ TK-331) | |||
N-150A | WATER OIL MIX | TK-332 | N-149 (BLINDED @ TK-332 ) | |||
N-154 | WATER-OIL MIX | TK335 | PQ-1 PUMP SUCTION MANIFOLD | |||
C-902 | SLOP OIL WATER MIX |
N-143 (2) | N-147 (2) TO PQ-1 SUCTION | |||
C-903 | SLOP OIL WATER MIX |
N-143 (2) | N-147 (2) TO PQ-1 SUCTION |
Attachment 1 to Schedule 2.2.1
N-204 (1) | UNLEADED GAS | TK54 | BOOSTER PUMP, PN 127 & 130 | |||
N-147 (1) | TRAP OIL | TKS 331 & 332 | PQ-1 Pump (Blinded at tks- 331 & 332) | |||
Separators | ||||||
ASSETS from Finance |
||||||
wwtp | 200442600031 | COVERS ON API SEPARATOR/JUNCTI | ON BOXES-REDUCE EMIS | |||
wwtp | 200642600040 | TANK 344 (T-1)-30 MANWAY/WATER | STOP/REINFORCEFLOOR | |||
wwtp | 200542600068 | DOCK SUMP (T-11) MODIF FOR BEN | ZENE NESHAP | |||
wwtp | 200942600030 | API-SEPARATOR HEATING - STEAM | INJECTION | |||
wwtp | 200542600020 | P-106 FIREWATER PUMP SWITCHGEA | R REPLACEMENT | |||
WWTP TOTAL ASSETS | ||||||
WWT | 583 | |||||
WWT-ME01E | AERATOR | WWT AERATOR MIXER WWT-ME01E AT T2A PID DWG 14-5117-07 | ||||
WWT-ME01F | AERATOR | WWT AERATOR MIXER WWT-ME01F AT T2A PID DWG 14-5117-07 | ||||
WWT-ME01G | AERATOR | WWT AERATOR MIXER WWT-ME01G AT T2B PID DWG 14-5117-07 | ||||
WWT-ME01H | AERATOR | WWT AERATOR MIXER WWT-ME01H AT T2B PID DWG 14-5117-07 | ||||
AR-2104 | AERATOR | WWT AERATOR WWT-ME01A AERATOR AR-2104 PID DWG WWT-16-14309-07 | ||||
WWT-ME01A | AERATOR | WWT AERATOR WWT-ME01A AT T2A PID DWG 14-5117-07 | ||||
AR-2105 | AERATOR | WWT AERATOR WWT-ME01B AERATOR AR-2105 PID DWG WWT-16-14309-07 | ||||
WWT-ME01B | AERATOR | WWT AERATOR WWT-ME01B AT T2A PID DWG 14-5117-07 | ||||
AR-2106 | AERATOR | WWT AERATOR WWT-ME01C AERATOR AR-2106 PID DWG WWT-16-14309-07 | ||||
WWT-ME01C | AERATOR | WWT AERATOR WWT-ME01C AT T2B PID DWG 14-5117-07 | ||||
AR-2107 | AERATOR | WWT AERATOR WWT-ME01D AERATOR AR-2107 PID DWG WWT-16-14309-07 | ||||
WWT-ME01D | AERATOR | WWT AERATOR WWT-ME01D AT T2B PID DWG 14-5117-07 | ||||
AR-2303 | AERATOR | WWT AERATOR WWT-ME01E AR-2303 PID DWG WWT-16-14309-07 | ||||
AR-1304 | AERATOR | WWT AERATOR WWT-ME01F AR-1304 PID DWG WWT-16-14309-07 | ||||
AR-2305 | AERATOR | WWT AERATOR WWT-ME01G AR-2305 PID DWG WWT-16-14309-07 | ||||
AR-2306 | AERATOR | WWT AERATOR WWT-ME01H AR-2306 PID DWG WWT-16-14309-07 | ||||
WWT-AR007B | ANALYZER LOOP | WWT ANALYZER RECORDER, DO PROBE P/I, TRANSMITTER PID-14-5117-07 (CRITICAL) | ||||
WWT-AR007A | ANALYZER LOOP | WWT ANALYZER RECORDER, DO PROBE P/I, TRANSMITTER, PID-14-5117-07 (CRITICAL) | ||||
WWT-AI01 | ANALYZER LOOP | WWT-AI01 CO ANALYSIS AT THE EXIT OF CANISTER 1, LOOP INCLUDES: AE, AI, XAA, XAH. DWG. NO. PID-14-5117-20 | ||||
WWT-AI02 | ANALYZER LOOP | WWT-AI02 CO ANALYSIS AT THE EXIT OF CANISTER 2, LOOP INCLUDES: AE, AI, XAA, XAH. DWG. NO. PID-14-5117-20 | ||||
WWT-AI03 | ANALYZER LOOP | WWT-AI03 CO ANALYSIS AT THE EXIT OF CANISTER 3, LOOP INCLUDES: AE, AI, XAA, XAH. DWG. NO. PID-14-5117-20 | ||||
WWT-AI04 | ANALYZER LOOP | WWT-AI04 CO ANALYSIS AT THE EXIT OF CANISTER 4, LOOP INCLUDES: AE, AI, XAA, XAH. DWG. NO. PID-14-5117-20 | ||||
WWT-AI05 | ANALYZER LOOP | WWT-AI05 CO ANALYSIS AT THE EXIT OF CANISTER 5, LOOP INCLUDES: AE, AI, XAA, XAH. DWG. NO. PID-14-5117-20 | ||||
WWT-AI06 | ANALYZER LOOP | WWT-AI06 CO ANALYSIS AT THE EXIT OF CANISTER 6, LOOP INCLUDES: AE, AI, XAA, XAH. DWG. NO. PID-14-5117-20 | ||||
WWT-AI16-1 | ANALYZER LOOP | WWT-AI16-1 O2 DEFFICIENCY MONITOR 1 AT EAST SUMP INLET | ||||
WWT-AI16-2 | ANALYZER LOOP | WWT-AI16-2 O2 DEFFICIENCY MONITOR 2 AT EAST SUMP INLET | ||||
WWT-AI17-1 | ANALYZER LOOP | WWT-AI17-1 O2 DEFFICIENCY MONITOR 1 AT EAST/WEST SUMP INLET | ||||
WWT-AI17-2 | ANALYZER LOOP | WWT-AI17-2 O2 DEFFICIENCY MONITOR 2 AT EAST/WEST SUMP INLET | ||||
WWT-AI18-1 | ANALYZER LOOP | WWT-AI18-1 O2 DEFFICIENCY MONITOR 1 AT WEST SUMP INLET | ||||
WWT-AI18-2 | ANALYZER LOOP | WWT-AI18-2 O2 DEFFICIENCY MONITOR 2 AT WEST SUMP INLET | ||||
WWT-AI19-1 | ANALYZER LOOP | WWT-AI19-1 O2 DEFFICIENCY MONITOR 1 AT EAST ACCESS OF THE CENTER BASIN | ||||
WWT-AI19-2 | ANALYZER LOOP | WWT-AI19-2 O2 DEFFICIENCY MONITOR 2 AT EAST ACCESS OF THE CENTER BASIN | ||||
WWT-AI20-1 | ANALYZER LOOP | WWT-AI20-1 SLOP OIL SUMP PQ9 OXYGEN, LOOP INCLUDES: AE, AI, XAA, XAL. DWG. NO. PID-14-5117-20 | ||||
WWT-AI20-2 | ANALYZER LOOP | WWT-AI20-2 SLOP OIL SUMP PQ9 OXYGEN, LOOP INCLUDES: AE, AI, XAA, XAL. DWG. NO. PID-14-5117-20 |
Attachment 1 to Schedule 2.2.1
WWT-AI21-1 | ANALYZER LOOP | WWT-AI21-1 O2 DEFFICIENCY MONITOR 1 AT SOUTH-WEST ENTRANCE | ||||
WWT-AI21-2 | ANALYZER LOOP | WWT-AI21-2 O2 DEFFICIENCY MONITOR 2 AT SOUTH-WEST ENTRANCE | ||||
WWT-AI22-1 | ANALYZER LOOP | WWT-AI22-1 O2 DEFFICIENCY MONITOR 1 AT WEST ACCESS OF CENTER BASINS | ||||
WWT-AI22-2 | ANALYZER LOOP | WWT-AI22-2 O2 DEFFICIENCY MONITOR 2 AT WEST ACCESS OF CENTER BASINS | ||||
WWT-AIC20 | ANALYZER LOOP | WWT-AIC20 CHANNEL GAS MONITOR ANALYZER LOOP LOOP INCLUDES TAG: AT20A COMBUSTIBLE GAS DETECTOR/TRANS. SCOTT MDL: 4688IR PART # 4688IR-1-1-1-1-1-2-5 | ||||
WWT-PH002 | ANALYZER LOOP | WWT-PH002 API SEPARATOR INLET pH METER, LOOP INCLUDES: PH, PHAL, PHAH. DWG. NO. PID-14-5103-06 | ||||
WWT-PH004 | ANALYZER LOOP | WWT-PH004 AERATION BASIN INLET pH METER AND RECORDER, LOOP INCLUDES: PH, PHAL, PHAH. DWG. NO. PID-14-5103-07 | ||||
WWT-PH006 | ANALYZER LOOP | WWT-PH006 WASTEWATER EFFLUENT pH METER AND RECORDER, PH, PHAL, PHAH. DWG. NO. SHOULD BE PID-14-5103-14 (NOT SHOWN) | ||||
WWT-API-01 | BASIN | WWT NO. 1 API SLUDGE BASIN WWT-API-01 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-02 | BASIN | WWT NO. 2 API SLUDGE BASIN WWT-API-02 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-03 | BASIN | WWT NO. 3 API SLUDGE BASIN WWT-API-03 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-04 | BASIN | WWT NO. 4 API SLUDGE BASIN WWT-API-04 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-05 | BASIN | WWT NO. 5 API SLUDGE BASIN WWT-API-05 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-06 | BASIN | WWT NO. 6 API SLUDGE BASIN WWT-API-06 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-07 | BASIN | WWT NO. 7 API SLUDGE BASIN WWT-API-07 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-08 | BASIN | WWT NO. 8 API SLUDGE BASIN WWT-API-08 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-API-09 | BASIN | WWT NO. 9 API SLUDGE BASIN WWT-API-09 (PRIMARY) PID DWG 14-5117-01 | ||||
WWT-BL201 | BLOWER | WWT UV LIGHT AIR BLOWER WWT-BL201 PID DWG 14-6317-14 | ||||
BLDG-148 | BUILDING | WWT WASTE WATER TREATING PLANT CONTROL ROOM BUILDING BLDG-148 | ||||
S2B4-2 | BUS | 100A 480V MOTOR STARTER RACK FOR SEPARATOR AT WWT AREA | ||||
S2B4-1 | BUS | 150A 480V MOTOR STARTER RACK FOR SEPARATOR AT WWT AREA | ||||
S2B4-23 | BUS | 225A 480V STARTER REACK FOR BENZENE NESHAP UNIT IN SLOP AREA | ||||
S2B4-22 | BUS | 900A 480V MCC FOR BENZENE NESHAP UNIT | ||||
WWT | CEPOC | TRANSITION WASTE WATER TREATMENT PLANT COST GATHERING ASSET | ||||
CR-138 | CRANE | WWT OZONE CRANE CR-138 | ||||
WWT-CT01 | CURRENT LOOP | WWT-CT01 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #1 | ||||
WWT-CT02 | CURRENT LOOP | WWT-CT02 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #2 | ||||
WWT-CT03 | CURRENT LOOP | WWT-CT03 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #3 | ||||
WWT-CT04 | CURRENT LOOP | WWT-CT04 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #4 | ||||
WWT-CT05 | CURRENT LOOP | WWT-CT05 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #5 | ||||
WWT-CT06 | CURRENT LOOP | WWT-CT06 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #6 | ||||
WWT-CT07 | CURRENT LOOP | WWT-CT07 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #7 | ||||
WWT-CT08 | CURRENT LOOP | WWT-CT08 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #8 | ||||
WWT-CT09 | CURRENT LOOP | WWT-CT09 FLIGHT BOARD MOTION DETECTION/MOTOR LOAD BASIN #9 | ||||
API-GRND | ELECT GENERAL | WWT API SEPERATOR GROUNDING GRID *****EHS***** 6 MO. INSPECTION | ||||
WWT-ELEC | ELECT GENERAL | WWT ELECTRICAL - PROJECT TRACKING | ||||
WWT-LIGHT | ELECT GENERAL | WWT EMERGENCY LIGHTING WWT-LIGHT ***EHS*** | ||||
WWT-GRND | ELECT GENERAL | WWT WASTE WATER TREATMENT PLANT GROUNDING GRID WWT-GRND *****EHS***** | ||||
ENG-1472 | ENGINE | WWT EMERGENCY LIFT PUMP WWT-P01E ENG-1472 PID DWG WWT-16-14309-02 | ||||
ENG-1980 | ENGINE | WWT NO.7 FIRE WATER PUMP WWT-P7FW DIESEL ENGINE ENG-1980 PID DWG WWT-16-14309-15 | ||||
BL-2876 | FAN | WWT THERMAL OXIDIZER STACK WWT-TOX BLOWER BL-2876 (SOUTH SIDE) | ||||
BL-2877 | FAN | WWT THERMAL OXIDIZER STACK WWT-TOX BLOWER BL-2877 (NORTH SIDE) | ||||
H-WWT105 | FIRE HYDRANT | H-105 HYDRANT, WWT, EAST OF C.R. |
Attachment 1 to Schedule 2.2.1
H-WWT021 | FIRE HYDRANT | H-21 HYDRANT, WWT, WEST OF TK-335 | ||||
FH-028 | FIRE HYDRANT | WWT FIRE HYDRANT | ||||
FH-065 | FIRE HYDRANT | WWT FIRE HYDRANT | ||||
FH-105 | FIRE HYDRANT | WWT FIRE HYDRANT | ||||
FH-029 | FIRE HYDRANT | WWT FIRE HYDRANT | ||||
FH-244 | FIRE HYDRANT | WWT FIRE HYDRANT | ||||
FH-030 | FIRE HYDRANT | WWT MARINE WAREHOUSE FIRE HYDRANT | ||||
FH-032 | FIRE HYDRANT | WWT MARINE WAREHOUSE FIRE HYDRANT | ||||
HM-WWT022 | FIRE MONITOR | H/M-22 HYDRANT MONITOR, WWT, SOUTH OF TK-342 | ||||
HM-WWT242 | FIRE MONITOR | H/M-242 HYDRANT MONITOR, WWT, BENZENE NESHAP WEST | ||||
HM-WWT243 | FIRE MONITOR | H/M-243 HYDRANT MONITOR, WWT, BENZENE NESHAP SOUTH | ||||
HM-WWT244 | FIRE MONITOR | H/M-244 HYDRANT MONITOR, WWT, SOUTH OF TK-344 | ||||
HM-WWT325 | FIRE MONITOR | H/M-325 HYDRANT MONITOR, WWT, SOUTH WEST OS SEPARATOR | ||||
HM-WWT041 | FIRE MONITOR | H/M-41 HYDRANT MONITOR, WWT, BENZENE NESHAP NORTH | ||||
P-2697 | FIRE PUMPS | WWT NO.1 FIRE WATER BOOSTER PUMP WWT-P1FW P-2697 PID DWG WWT-16-14309-15 | ||||
P-1893 | FIRE PUMPS | WWT NO.2 FIRE WATER PUMP WWT-P2FW P-1893 PID DWG WWT-16-14309-15 | ||||
P-1783 | FIRE PUMPS | WWT NO.6 FIRE WATER PUMP WWT-P6FW P-1783 PID DWG WWT-16-14309-15 | ||||
P-2657 | FIRE PUMPS | WWT NO.7 FIRE WATER PUMP WWT-P7FW P-2657 PID DWG WWT-16-14309-15 | ||||
POH-FT500N | FLOW LOOP | FCC FLOW TRANSMITTER, TRANSCO (WOODBURY HUT) (NORTH) (2X YEAR) THIS AREA UNDER DIRECTION WWT | ||||
POH-FT500S | FLOW LOOP | FCC FLOW TRANSMITTER, TRANSCO (WOODBURY HUT) (SOUTH) (2X YEAR) THIS AREA UNDER DIRECTION WWT | ||||
WWT-FR03 | FLOW LOOP | FLOW RECORDER FOR PUMPS P3SW AND P4SW PT03, PT04, PY PID-14-3117-15 | ||||
WWT-FT05 | FLOW LOOP | FLOW TRANSMITTER AT #5 WELL SOUTH OF TANK 102 PID 18-3226-01 | ||||
WWT-AR004 | FLOW LOOP | WWT ANALYZER RECORDER AERATOR PID-14-5117-07 (FREQUENCY: 2 YEARS) | ||||
WWT-FIP7FW | FLOW LOOP | WWT FLOW INDICATING TOTALIZER | ||||
WWT-FIP1FW | FLOW LOOP | WWT FLOW INDICATING TOTALIZER, P1FW FIRE WATER FT PID 14-3117-15 | ||||
WWT-FIC003 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER AERATORS RECORDER, I/P, TRANSMITTER, CONTROL VALVE PID-14-5117-07 (CASCADE TO LIC2) (CRITICAL) (FREQUENCY: 2 YEARS) | ||||
WWT-FIC014 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER CHLORINE CONTACT TK FV PID-14-6317-14 | ||||
WWT-FIC104 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER FILTER BACKWASH PMP I/P, FR, FT, FV PID-14-5117-10 (OUT OF SERVICE) (STORAGE) | ||||
WWT-FIC10A | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER T2A BASIN RECORDER, I/P, TRANSMITTER, CONTROL VALVE, FQ PID-14-5117-07 (CRITICAL) | ||||
WWT-FIC008 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER T2B AERATION BASIN I/P, FR, TRANSMITTER, CONTROL VALVE PID-14-5117-07 (CRITICAL) | ||||
WWT-FIC10B | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER T2B AERATION BASIN RECORDER, P/I, TRANSMITTER, FQ, CONTROL VALVE PID-14-5117-07 (FREQUENCY 2 YEARS) (CRITICAL) | ||||
WWT-FIC103 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER WATER FILTER P/I, FC, FT, SOVA,B,C,D, FV103A, B, C, D, E, PID-14-5117-13 (FREQUENCY: 4 YEARS) | ||||
WWT-FIC101 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER WATER FILTER P/I, FR, FT, SOVA, B, C, AND FV101A, B, C, D, E PID-14-5117-11 (FREQUENCY: 4 YEARS) | ||||
WWT-FIC102 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER WATER FILTER P/I, FR, FT, SOVA,B,C,D, FV102A, B,C, D PID-14-5117-12 (FREQUENCY: 4 YEARS) | ||||
WWT-FIC002 | FLOW LOOP | WWT FLOW INDICATOR CONTROLLER WWT-TK344 TANK I/P, TRANSMITTER, CONTROL VALVE PID-14-5103-06 (CRITICAL) 0-1000 GPM | ||||
WWT-FI03 | FLOW LOOP | WWT FLOW INDICATOR FOR #3 SERVICE WATER PUMP PID14-1203-03 | ||||
WWT-FR017 | FLOW LOOP | WWT FLOW RECORDER CHLORINE CONTACT TANK P/I, FQ, UV PID-14-6317-14 (SEE: CALIBRATION PROCEDURE, PAGE 6)+ | ||||
WWT-FR008 | FLOW LOOP | WWT FLOW RECORDER T2B BASIN PID 14-5117-07 FT,FR,I/P,FV (CRITICAL) (CONTROL RM PANEL 2) | ||||
WWT-FR009 | FLOW LOOP | WWT FLOW RECORDER, T02 AERATION BASIN PID 14-5117-07 FT,FR,I/P,FV (CRITICAL) (CONTROL RM PANEL 2) | ||||
WWT-FR8 | FLOW LOOP | WWT FLOW RECORDER, TOTAL SERVICE WATER FLOW PID 14-3117-15 FT,FR (INSIDE SW WALL OF RIVER PUMPHOUSE) VORTEX METER-INSERTION TYPE-EMCO MODEL V-BAR, - PN. D0 5295 | ||||
WWT-FIP2FW | FLOW LOOP | WWT FLOW TOTALIZER P2FW PUMP INDICATION LOCAL, ANNUAL BAR, DP CELL PID 14-3117-15 | ||||
WWT-FIP6FW | FLOW LOOP | WWT FLOW TOTALIZER P6FW PUMP INDICATION LOCAL, ANNUAL BAR, DP CELL PID 14-3117-15 | ||||
WWT-AS019 | FLOW LOOP | WWT TORQUE SWITCH PID-14-5117-09 (STORAGE) | ||||
WWT-AS011 | FLOW LOOP | WWT TORQUE SWITCH WWT-AHH011 ALARM PID-14-5117-08 (CRITICAL) |
Attachment 1 to Schedule 2.2.1
WWT-AS012 | FLOW LOOP | WWT TORQUE SWITCH WWT-AHH012 ALARM PID-14-5117-08 (CRITICAL) | ||||
WWT-FT15 | FLOW LOOP | WWT ULTRA SONIC FLOW METER FROM P15 LOCAL INDICATOR PID 14-1203-03 | ||||
WWT-FI04 | FLOW LOOP | WWT-F104 NEW FLOW METER FROM WWT-PN32 DOCK DRAIN TANK PUMP PID-14-4103-04 | ||||
WWT-F114 | FLOW LOOP | WWT-F114 NITROGEN FLOW TO API SEPARATOR | ||||
WWT-FT030 | FLOW LOOP | WWT-FT030 #1 FIREWATER PUMP FLOW INCLUDES: FQ-030 FLOW TOTALIZER - FOXBORO 030 FLOW RECORDER - FOXBORO | FR- | |||
WWT-FT031 | FLOW LOOP | WWT-FT031 #2 FIREWATER PUMP FLOW INCLUDES: FQ-031 FLOW TOTALIZER - FOXBORO 031 FLOW RECORDER-FOXBORO | FR- | |||
WWT-FT032 | FLOW LOOP | WWT-FT032 #6 FIREWATER PUMP FLOW INCLUDES: FQ-032 FLOW TOTALIZER - FOXBORO 032 FLOW RECORDER - FOXBORO | FR- | |||
WWT-FT033 | FLOW LOOP | WWT-FT033 #7 FIREWATER PUMP FLOW INCLUDES: FQ-033 FLOW TOTALIZER - FOXBORO 033 FLOW RECORDER - FOXBORO | FR- | |||
WWT-LEL | GAS DETECTOR | WWT LEL (6-SENSORS) API SEPERATOR | ||||
EG-11 | GATE | G-11, MANUAL DOUBLE SWING GATE. | ||||
GB-2753 | GEAR BOX | WWT NO. 1 FLITE BOARD GEARBOX WWT-API-01 GB-2753 PID DWG WWT-16-14309-01 | ||||
GB-2754 | GEAR BOX | WWT NO. 2 FLITE BOARD GEARBOX WWT-API-02 GB-2754 PID DWG WWT-16-14309-01 | ||||
GB-2755 | GEAR BOX | WWT NO. 3 FLITE BOARD GEARBOX WWT-API-03 GB-2755 PID DWG WWT-16-14309-01 | ||||
GB-2756 | GEAR BOX | WWT NO. 4 FLITE BOARD GEARBOX WWT-API-04 GB-2756 PID DWG WWT-16-14309-01 | ||||
GB-2757 | GEAR BOX | WWT NO. 5 FLITE BOARD GEARBOX WWT-API-05 GB-2757 PID DWG WWT-16-14309-01 | ||||
GB-2758 | GEAR BOX | WWT NO. 6 FLITE BOARD GEARBOX WWT-API-06 GB-2758 PID DWG WWT-16-14309-01 | ||||
GB-2759 | GEAR BOX | WWT NO. 7 FLITE BOARD GEARBOX WWT-API-07 GB-2759 PID DWG WWT-16-14309-01 | ||||
GB-2760 | GEAR BOX | WWT NO. 8 FLITE BOARD GEARBOX WWT-API-08 GB-2760 PID DWG WWT-16-14309-01 | ||||
GB-2761 | GEAR BOX | WWT NO. 9 FLITE BOARD GEARBOX WWT-API-09 GB-2761 PID DWG WWT-16-14309-01 | ||||
GB-2535 | GEAR BOX | WWT NO.5 SERVICE WATER PUMP WWT-P5SW GEAR BOX GB-2535 PID DWG WWT-16-14309-15 | ||||
GB-1747 | GEAR BOX | WWT NO.6 FIRE WATER PUMP WSY-P6FW GEAR BOX GB-1747 PID DWG WWT-16-14309-15 | ||||
GB-1981 | GEAR BOX | WWT NO. 7 FIRE WATER PUMP WWT-P7FW GEAR BOX GB-1981 PID DWG WWT-16-14309-15 | ||||
ECRA- GRNDS | GROUNDS | ECRA WELL MANAGEMENT GROUNDS WORK ONLY (ALL ECRA PUMPS HAVE NUMBERS - SEE EQUIP.TYPE ECRA WELL PUMP) |
||||
WSY-GRNDS | GROUNDS | WSY WATER SYSTEM MISCELLANEOUS GROUNDS WORK | ||||
WWT-GRNDS | GROUNDS | WWT MISCELLANEOUS GROUNDS WORK | ||||
WWT-HT010 | HEAT TRACE | WWT #5 WELL | ||||
WWT-HT016 | HEAT TRACE | WWT CARBON SKIDS 1-6 | ||||
WWT-HT007 | HEAT TRACE | WWT P03A, B & C @ TANKS 345/346 | ||||
WWT-HT008 | HEAT TRACE | WWT P04 PUMPS AT TANKS 345/346 | ||||
WWT-HT005 | HEAT TRACE | WWT P06A & P06B PUMPS | ||||
WWT-HT006 | HEAT TRACE | WWT P09A & P09B PUMPS | ||||
WWT-HT011 | HEAT TRACE | WWT P14A & B PUMPS | ||||
WWT-HT003 | HEAT TRACE | WWT PIPING ON P07 | ||||
WWT-HT004 | HEAT TRACE | WWT PIPING ON P12A & B | ||||
WWT-HT014 | HEAT TRACE | WWT POLYMER TO AERATOR BASIN OUTLET | ||||
WWT-HT009 | HEAT TRACE | WWT PQ03 PUMP | ||||
WWT-HT013 | HEAT TRACE | WWT RIVER WATER PUMPHOUSE - EAST SIDE | ||||
WWT-HT015 | HEAT TRACE | WWT SAFETY SHOWER @ TK 331 | ||||
WWT-HT002 | HEAT TRACE | WWT SLUDGE WASTE - WEST SIDE OF BACK ROOM | ||||
WWT-HT001 | HEAT TRACE | WWT TANK #9 & #10 SOUTH WALL - PANEL 2L2 | ||||
WWT-HT012 | HEAT TRACE | WWT TANK 342 - DOCK DRAIN | ||||
HTR-1057 | HEATER | WWT-H01 HEATER NATIONAL TANK CO. ASA B31.8 1963 COIL SIZE 4IN. STD. DWG A-25033 S/N 61511 BUILT 6-65 ITEM 1-5 | ||||
DOC VAH441 | INSTRUMENT GEN | DOC-VAHH441 HIGH VIBRATION ON BLOWER BL405 VSHH PID-1-13689-D (YEARLY) | ||||
BNS-SC101A | INSTRUMENT GEN | SPEED CONTROLLER FOR B101A VAPOR BLOWER PID DWG 31-1117-08 | ||||
WWT-UVSYST | INSTRUMENT GEN | ULTRA VIOLET TREATMENT OF FINAL EFFLUENT TO RIVER PID-14-6317-14 FINAL EFFLUENT TO RIVER |
Attachment 1 to Schedule 2.2.1
WWT- AAH014 | INSTRUMENT GEN | WWT API SLUDGE THICKENER TANK WWT-TKT10 HIGH TORQUE ALARM PID DWG 14-5117-09 (FREQUENCY:24 MONTHS) | ||||
WWT- AAH013 | INSTRUMENT GEN | WWT BIO THICKENER TANK WWT-TKT09 HIGH TORQUE ALARM PID DWG 14-5117-09 (FREQUENCY:24 MONTHS) | ||||
WWT- AAH012 | INSTRUMENT GEN | WWT CLARIFIER TANK WWT-TK346 (ALSO KNOWN AS T3A) TORQUE HIGH ALARM PID DWG 14-5117-08 (FREQUENCY:24 MONTHS) | ||||
WWT- INSTRU | INSTRUMENT GEN | WWT INSTRUMENTATION COST ROLL UP | ||||
WWT- AAH011 | INSTRUMENT GEN | WWT SECONDARY CLARIFIER TANK WWT-TK345 (T3B) TORQUE HIGH ALARM PID DWG 14-5117-08 (FREQUENCY:24 MONTHS) | ||||
WWT- AHH019 | INSTRUMENT GEN | WWT TORQUE ALARM FOR ME08 MIXER PID DWG 14-5117-09 | ||||
WWT- AHH018 | INSTRUMENT GEN | WWT TORQUE ALARM TO ME7 SUMP MIXER SWITCH TO ME7 BIO SLUDGE DRIVE PID DWG 14-5117-09 | ||||
WWT- LOOP | INSTRUMENT GEN | WWT UNTITLED MISCELLANEOUS PROCESS INSTRUMENTATION (DO NOT USE FOR ROUTINE WORK ORDERS. TAKE THE TIME TO FIND THE LOOP DESIGNATION YOU ARE TARGETING FOR SERVICE.) | ||||
WWT- LIC002 | LEVEL LOOP | WWT LEVEL INDICATOR CONTROLLER API SEP RECORDER, TRANSMITTER, LAL, LAH, LS, PS, CV PID-14-5117-02 (FREQUENCY: 2 YEARS) (CRITICAL) CASCADED WITH FIC003 | ||||
WWT- LIC014 | LEVEL LOOP | WWT LEVEL INDICATOR CONTROLLER FILTER FEED PUMP LR, LT, PS, LAH, LAL PID-14-5117-10 (FREQUENCY: 4 YEARS) | ||||
WWT- LR015 | LEVEL LOOP | WWT LEVEL RECORDER BACKWASH TANK TKT08 I/P, TRANSMITTER, LI, LAL, LAH, PS PID-14-5117-10 (CRITICAL) | ||||
WWT- LS020 | LEVEL LOOP | WWT LEVEL SWITCH HIGH/LOW TKT9 SLUDGE THICKNERS HIGH/LOW LEVEL TO CONTROL ROOM PID-14-5117-09 (THIS IS NOT A LOOP - SEE LAH/L 20) (STORAGE) | ||||
WWT- LS021 | LEVEL LOOP | WWT LEVEL SWITCH LAHL (THIS IS NOT A LOOP - SEE WWT-LAH/L 021) PID-14-5117-09 (STORAGE) | ||||
WWT- LT013B | LEVEL LOOP | WWT LEVEL TRANSMITTER INDICATOR TK345 CLARIFIER LI, PS, LAH, LAL, LS (PUMP ON AT 38%) INTERLOCK TO LT013A (NOT A LOOP-SEE ALARMS) PID-14-5117-08 (CRITICAL) | ||||
WWT- LT002B | LEVEL LOOP | WWT LEVEL TRANSMITTER TANK 344 I/P INDICATOR (FREQUENCY: 2 YEARS) PID-14-5103-06 (CRITICAL) | ||||
WWT- LT013A | LEVEL LOOP | WWT LEVEL TRANSMITTER, SECONDARY CLARIFIER TK-346 SCUM SUMP LEVEL LT.LI.PS PID-14-5117-08 (CRITICAL) | ||||
WWT-LI07 | LEVEL LOOP | WWT-LI07 PQ-6 SUMP LEVEL | ||||
WWT-LI08 | LEVEL LOOP | WWT-LI08 PQ-7 SUMP LEVEL | ||||
WWT-LI09 | LEVEL LOOP | WWT-LI09 PQ-8 SUMP LEVEL | ||||
WWT-LI10 | LEVEL LOOP | WWT-LI10 PQ-9 SUMP LEVEL | ||||
WWT-LI11 | LEVEL LOOP | WWT-LI11 PQ-10 SUMP LEVEL | ||||
WWT-LI12 | LEVEL LOOP | WWT-LI12 PQ-11 SUMP LEVEL | ||||
WWT-LSHL119 | LEVEL LOOP | WWT-LSHL119 BENZENE NESHAP, GAS/WATER PRESSURE TANK D-104 LEVEL ALARMS, LOOP INCLUDES: LSH, LAH, LSL (OPENS SOV TO TANK MANIFOLD HEADER) DWG, NO. PID-31-2528-05 | ||||
CH-183 | LIFTING DEVICE | SAF RIVER PUMPHOUSE BLDG-150 CHAIN HOIST CH-183 MANUAL | ||||
CH-213 | LIFTING DEVICE | SAF RIVER PUMPHOUSE BLDG-150 CHAIN HOIST CH-213 | ||||
TRL-496 | LIFTING DEVICE | SAF RIVER PUMPHOUSE MONORAIL SYSTEM TROLLEY TRL-496 | ||||
TRL-337 | LIFTING DEVICE | SAF SAFETY RIVER PUMP HOUSE BUILDING BLDG-150 MONORAIL SYSTEM TROLLEY TRL-337 | ||||
JIB-129 | LIFTING DEVICE | WWT OZONE JIB JIB-129 | ||||
TRL-519 | LIFTING DEVICE | WWT OZONE JIB TROLEY SYSTEM TRL-519 | ||||
CH-162 | LIFTING DEVICE | WWT WASTE WATER TREATING MAIN BUILDING LIFTING DEVICE CHAIN HOIST CH-162 ELECTRIC | ||||
TRL-228 | LIFTING DEVICE | WWT WASTE WATER TREATING MONORAIL SYSTEM TROLLEY TRL-228 | ||||
JIB-114 | LIFTING DEVICE | WWT WASTE WATER TREATING OUTSIDE BY BASINS JIB JIB-114 | ||||
CH-164 | LIFTING DEVICE | WWT WASTE WATER TREATING OUTSIDE BY BASINS LIFTING DEVICE CHAIN HOIST CH-164 AIR | ||||
MX-2124 | MIXER | WWT BACKWASH TANK MIXER WWT-ME06 MX-2124 PID DWG WWT-16-14309-10 | ||||
WWT-ME06 | MIXER | WWT BACKWASH TANK MIXER WWT-ME06 PID DWG 14-5117-10 PM BEING PERFORMED UNDER MX-2124 | ||||
WWT-ME02B | MIXER | WWT CLARIFIER MIXER AT TK345 (T3B) WWT-ME02B PID DWG 14-5117-08 PM BEING PERFORMED UNDER MX-2136 | ||||
WWT-ME02A | MIXER | WWT CLARIFIER MIXER AT TK346 (T3A) WWT-ME02A PID DWG 14-5117-08 PM BEING PERFORMED UNDER MX-2135 | ||||
MX-2135 | MIXER | WWT CLARIFIER MIXER WWT-ME02A (NORTHWEST) MIXER MX-2135 PID DWG WWT-16-14309-08 | ||||
MX-2136 | MIXER | WWT CLARIFIER MIXER WWT-ME02B MX-2136 PID DWG WWT-16-14309-08 |
Attachment 1 to Schedule 2.2.1
WWT-ME03 | MIXER | WWT SCUM SUMP MIXER WWT-ME03 AT TKT09 PID DWG 14-5117-09 | ||||
MX-2137 | MIXER | WWT SCUM SUMP MIXER WWT-ME03 MIXER MX-2137 PID DWG WWT-16-14309-09 | ||||
WWT-ME04 | MIXER | WWT SCUM SUMP MIXER WWT-ME04 AT TKT10 PID DWG 14-5117-09 | ||||
MX-2138 | MIXER | WWT SCUM SUMP MIXER WWT-ME04 MIXER MX-2138 PID DWG WWT-16-14309-09 | ||||
WWT-ME07 | MIXER | WWT SLUDGE THICKNER MIXER WWT-ME07 (WEST) AT TKT09 PID DWG 14-5117-09 PM BEING PERFORMED UNDER MX-2139 | ||||
MX-2139 | MIXER | WWT SLUDGE THICKNER MIXER WWT-ME07 (WEST) MIXER MX-2139 PID DWG WWT-16-14309-09 | ||||
WWT-ME08 | MIXER | WWT SLUDGE THICKNER MIXER WWT-ME08 (EAST) AT TKT10 PID DWG 14-5117-09 PM BEING PERFORMED UNDER MX-2140 | ||||
MX-2140 | MIXER | WWT SLUDGE THICKNER MIXER WWT-ME08 (EAST) MIXER MX-2140 PID DWG WWT-16-14309-09 | ||||
S4M4-MEI5 | MOTOR | 480V 1 HP MOTOR FOR SLUDGE CONVEYOR | ||||
S4M4-EF7 | MOTOR | 480V 3/4HP MOTOR FOR EXHAUST FAN #7 | ||||
S4M4-LP1D | MOTOR | NO DESC | ||||
M-1204 | MOTOR | WWT AERATOR WWT-ME01A MOTOR M-1204104 PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / EB365T FRAME | ||||
M-1205 | MOTOR | WWT AERATOR WWT-ME01B MOTOR M-1205 PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / 356T FRAME | ||||
M-1206 | MOTOR | WWT AERATOR WWT-ME01C MOTOR M-1206 PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / 356T FRAME | ||||
M-1207 | MOTOR | WWT AERATOR WWT-ME01D MOTOR M-1207 PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / 365T FRAME | ||||
M-1430 | MOTOR | WWT AERATOR WWT-ME01E MOTOR M-1430 50 HP / 1770 RPM / 326TC FRAME PID DWG WWT-16-14309-07 | ||||
M-1431 | MOTOR | WWT AERATOR WWT-ME01F MOTOR M-1431 50 HP / 1770 RPM / 326TC FRAME PID DWG WWT-16-14309-07 | ||||
M-1433 | MOTOR | WWT AERATOR WWT-ME01G MOTOR M-1433 50 HP / 1770 RPM / 326TC TE FRAME PID DWG WWT-16-14309-07 | ||||
M-1432 | MOTOR | WWT AERATOR WWT-ME01H MOTOR M-1432 50 HP / 1770 RPM / 326TC FRAME PID DWG WWT-16-14309-07 | ||||
M-1002 | MOTOR | WWT API SLUDGE PUMP WWT-PQ03 MOTOR M-1002 PID DWG WWT-16-14309-01 15HP / 1760RPM / 254T FRAME | ||||
M-0894 | MOTOR | WWT API SLUDGE PUMP WWT-PQ06 MOTOR M-0894 PID DWG WWT-16-14309-01 20HP / 1745RPM/ 256T FRAME | ||||
M-0941 | MOTOR | WWT API SLUDGE PUMP WWT-PQ07 MOTOR M-0941 PID DWG WWT-16-14309-02 15HP / 1745RPM / 284U FRAME | ||||
M-1058 | MOTOR | WWT API SLUDGE SUMP PUMP WWT-PQ04 MOTOR M-1058 PID DWG WWT-16-14309-02 15HP / 1765RPM / 254T FRAME | ||||
M-1555 | MOTOR | WWT BACKWASH RETURN TO AERATION PUMP WWT-P12A MOTOR M-1555 PID DWG WWT-16-14309-10 5 HP / 1750 RPM / 184TP FRAME | ||||
M-1213 | MOTOR | WWT BACKWASH RETURN TO AERATION PUMP WWT-P12B MOTOR M-1213 PID DWG WWT-16-14309-10 5 HP / 1750 RPM/ 184TP FRAME SINGLE LINE NO. 11-13911-D | ||||
M-2222 | MOTOR | WWT BACKWASH TANK MIXER WWT-ME06 MOTOR M-1224 PID DWG WWT-16-14309-10 15HP / 1800RPM / 254T FRAME | ||||
M-2068 | MOTOR | WWT CLARIFIER SCUM PUMP WWT-P04A MOTOR M-2068 PID DWG WWT-16-14309-08 1.5 HP / 1730 RPM/ 145T FRAME | ||||
M-1553 | MOTOR | WWT CLARIFIER SCUM PUMP WWT-P04B MOTOR STARTER M-1553 PID DWG WWT-16-14309-08 1 HP / 1735 RPM / 143T FRAME SINGLE LINE NO. 11-13911-D | ||||
M-1557 | MOTOR | WWT CLARIFIER TANK MIXER WWT-ME02A MOTOR M-1557 PID DWG WWT-16-14309-08 1HP / 1730RPM/ FRAME | ||||
M-1558 | MOTOR | WWT CLARIFIER TANK MIXER WWT-ME02B MOTOR M-1558 PID DWG WWT-16-14309-08 1HP / 1750RPM/ 143BC FRAME | ||||
M-1569 | MOTOR | WWT DOCK DRAIN TANK PUMP WWT-PN032 MOTOR M-1569 PID DWG WWT-16-14309-04 3HP / 1730 / 182T FRAME | ||||
M-1850 | MOTOR | WWT ECRA WELL PUMP WWT-143-2 MOTOR M-1850 (N.E COPELANDS COVE) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1849 | MOTOR | WWT ECRA WELL PUMP WWT-CC01 MOTOR M-1849 (COPELANDS COVE) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1847 | MOTOR | WWT ECRA WELL PUMP WWT-D01 MOTOR M-1847 (@ E. NO.2 PH OUTSIDE FENCE) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1890 | MOTOR | WWT ECRA WELL PUMP WWT-D01A (@ E. NO. 2 PH OUTSIDE FENCE) MOTOR M-1890 | ||||
M-1857 | MOTOR | WWT ECRA WELL PUMP WWT-F01 MOTOR M-1857 (W. SIDE FURFURAL) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1843 | MOTOR | WWT ECRA WELL PUMP WWT-LC01 MOTOR M-1843 (@ RIVER WIER N. WEST) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1844 | MOTOR | WWT ECRA WELL PUMP WWT-LC02 MOTOR M-1844 (@ RIVER WIER N EAST) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1845 | MOTOR | WWT ECRA WELL PUMP WWT-LC03 MOTOR M-1845 (@ RIVER WIER S EAST) NOT ON PIDS 1HP / 3450RPM K56Y FRAME | ||||
M-1846 | MOTOR | WWT ECRA WELL PUMP WWT-LC04 MOTOR M-1846 (@ RIVER WIER S. WEST) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1855 | MOTOR | WWT ECRA WELL PUMP WWT-LF01 MOTOR M-1855 (OUTSIDE EAST FENCE) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME |
Attachment 1 to Schedule 2.2.1
M-1848 | MOTOR | WWT ECRA WELL PUMP WWT-LF02 MOTOR M-1848 (NEAR COGEN RIVER P H OUTSIDE FENCE) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1856 | MOTOR | WWT ECRA WELL PUMP WWT-MW110 MOTOR M-1856 (W VPS CONTROL ROOM) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1851 | MOTOR | WWT ECRA WELL PUMP WWT-S01 MOTOR M-1851 (EAST OF TANK NO. 118) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1852 | MOTOR | WWT ECRA WELL PUMP WWT-S02 MOTOR M-1852 (EAST OF TANK NO. 118) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1853 | MOTOR | WWT ECRA WELL PUMP WWT-S03 MOTOR M-1853 (EAST OF TANK NO. 119) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1854 | MOTOR | WWT ECRA WELL PUMP WWT-S04 MOTOR M-1854 (EAST OF TANK NO. 119) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1840 | MOTOR | WWT ECRA WELL PUMP WWT-TF01 MOTOR M-1840 (@ TANK NO. 26) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1841 | MOTOR | WWT ECRA WELL PUMP WWT-TF02 MOTOR M-1841 (@ TANK NO. 51) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-1842 | MOTOR | WWT ECRA WELL PUMP WWT-TF03 MOTOR M-1842 (@ NO.2 PUMPHOUSE) NOT ON PIDS 1HP / 3450RPM / K56Y FRAME | ||||
M-2063 | MOTOR | WWT ECRA WELL PUMP WWT-TF04 MOTOR M-2063 NORTH OF TANK NO. 6 PID 15-1803-13 1HP / 3450RPM / K56Y FRAME | ||||
M-1218 | MOTOR | WWT FILTER BACKWASH PUMP WWT-P06A MOTOR M-1218 PID DWG WWT-16-14309-10 150HP / 1780RPM / 5006P FRAME | ||||
M-1217 | MOTOR | WWT FILTER BACKWASH PUMP WWT-P06B MOTOR M-1217 PID DWG WWT-16-14309-10 150HP / 1775RPM / 5006P FRAME SINGLE LINE DWG # 11-13912-D | ||||
M-1556 | MOTOR | WWT FILTER FEED PUMP WWT-P05A MOTOR M-1556 PID DWG WWT-16-14309-10 100HP / 1775RPM / 404TP | ||||
M-1215 | MOTOR | WWT FILTER FEED PUMP WWT-P05B MOTOR M-1215 PID DWG WWT-16-14309-10 100HP / 1775RPM / 404TP | ||||
FRAME SINGLE LINE NO. 11-13911-D | ||||||
M-1219 | MOTOR | WWT FILTER SURFACE WASH PUMP WWT-P09A MOTOR M-1219 PID DWG WWT-16-14309-10 30HP / 1750RPM / 286TP FRAME | ||||
M-1220 | MOTOR | WWT FILTER SURFACE WASH PUMP WWT-P09B MOTOR M-1220 PID DWG WWT-16-14309-10 30HP / 1750RPM / 286TP FRAME SINGLE LINE NO. 11-13911-D | ||||
M-0002 | MOTOR | WWT GAS OIL TRANSFER PUMP MOTOR M-0002 FOR PN-023 PID DWG WWT-16-14309-03 (40 HP / 3540 RPM / FRAME) | ||||
M-1474 | MOTOR | WWT NO. 1 FLIGHT BOARD GEARBOX WWT-API-01 MOTOR M-1474 PID DWG WWT-16-14309-01 .05HP / 1725 / 1425RPM / FRAME K56 | ||||
M-0214 | MOTOR | WWT NO. 1 WATER WELL PUMP WWT-WELL01 MOTOR M-0214 PID DWG POH-16-14287-01 100 HP / 1775 RPM / 404 TP WPI FRAME | ||||
M-0329 | MOTOR | WWT NO. 2 FLIGHT BOARD WWT-API-02 MOTOR M-0329 PID DWG WWT-16-14309-01 0.5HP / 1725/1425RPM / K56 FRAME | ||||
M-0567 | MOTOR | WWT NO. 3 FLIGHT BOARD GEARBOX WWT-API-03 MOTOR M-0567 PID DWG WWT-16-14309-01 .05HP / 1725 / 1425RPM / FRAME K56 | ||||
M-0207 | MOTOR | WWT NO. 3 SERVICE WATER PUMP WWT-P3SW MOTOR M-0207 PID DWG WWT-16-14309-15 125HP / 1770 RPM / 6323P FRAME | ||||
M-0216 | MOTOR | WWT NO. 3 WATER WELL PUMP WWT-WELL03 MOTOR M-0216 PID DWG POH-16-14287-01 (100HP/ | ||||
M-1568 | MOTOR | WWT NO. 4 FLIGHT BOARD WWT-API-04 MOTOR M-1568 PID DWG WWT-16-14309-01 0.5HP / 1725RPM / 56 FRAME | ||||
M-0328 | MOTOR | WWT NO. 5 FLIGHT BOARD WWT-API-05 MOTOR M-0328 PID DWG WWT-16-14309-01 0.5HP / 1725/1425RPM / K5 FRAME | ||||
M-1034 | MOTOR | WWT NO. 5 WELL PUMP MOTOR NUMBER M-1034 PID DWG POH-18-3226-01 125 H/P | ||||
M-0326 | MOTOR | WWT NO. 6 FLIGHT BOARD WWT-API-06 MOTOR M-0326 PID DWG WWT-16-14309-01 0.50HP / 1725/1425RPM / K56 FRAME SINGLE LINE DWG.11-13913-D | ||||
M-0579 | MOTOR | WWT NO. 6 WELL PUMP WWT-P-1287 MOTOR M-0579 PID DWG POH-16-14287-01 125 HP / 1770RPM / 405TP FRAME | ||||
M-1570 | MOTOR | WWT NO. 7 FLIGHT BOARD WWT-API-07 MOTOR M-1570 PID DWG WWT-16-14309-01 0.5HP / 1725RPM / HP56 FRAME | ||||
M-1906 | MOTOR | WWT NO. 7 WATER WELL PUMP MOTOR WWT-WELL07 M-1906 PID 18-3226-01 | ||||
M-1567 | MOTOR | WWT NO. 8 FLIGHT BOARD WWT-API-08 MOTOR M-1567 PID DWG WWT-16-14309-01 0.5HP / 1725RPM / HP56 FRAME | ||||
M-1566 | MOTOR | WWT NO. 9 FLIGHT BOARD WWT-API-09 MOTOR M-1566 PID DWG WWT-16-14309-01 0.5HP / 1725RPM / FRAME | ||||
M-1768 | MOTOR | WWT NO. 1 FIRE WATER BOOSTER PUMP MOTOR WWT-P1 FW M-l768 PID DWG WWT-16-14309-15 60 HP / 1775 RPM / 364TP FRAME | ||||
M-0245 | MOTOR | WWT NO. 2 FIRE WATER PUMP WWT-P2FW MOTOR M-0245 PID DWG WWT-16-14309-15 150HP / 1750RPM / 6324P FRAME | ||||
M-0208 | MOTOR | WWT NO. 4 SERVICE WATER PUMP WWT-P4SW MOTOR M-0208 PID DWG WWT-16-14309-15 125 HP / 1775 RPM / 6323P FRAME | ||||
M-0219 | MOTOR | WWT NO.4 WATER WELL PUMP MOTOR WWT-WELL04 M-0219 PID DWG POH-16-14287-01 100 HP / 1800 RPM / 445 FRAME | ||||
M-1884 | MOTOR | WWT NO.8 SERVICE WATER PUMP WWT-P8SW MOTOR M-1884 PID DWG 14- | ||||
M-1427 | MOTOR | WWT OILY WATER CIRCULATING PUMP WWT-P15 MOTOR M-1427 PID DWG WWT-16-14309-06 HP 7.5 / RPM 1750 / FRAME 213T SINGLE LINE NO. 11-13911-D | ||||
M-1203 | MOTOR | WWT PRIMARY LIFT PUMP (MIDDLE) WWT-P01B MOTOR M-1203 PID DWG WWT-16-14309-02 75HP / 1770RPM / 365TP FRAME | ||||
M-1202 | MOTOR | WWT PRIMARY LIFT PUMP WWT-P01A MOTOR M-1202 PID DWG WWT-16-14309-02 75HP / 1780RPM / 365TP FRAME | ||||
M-1200 | MOTOR | WWT PRIMARY LIFT PUMP WWT-P01C MOTOR M-1200 PID DWG WWT-16-14309-02 (75 HP / 1775 RPM / 365TP FRAME) P8 |
Attachment 1 to Schedule 2.2.1
M-1559 | MOTOR | WWT PRIMARY LIFT PUMP WWT-P01D MOTOR M-1559 PID DWG WWT-16-14309-02 75HP / 1780RPM/ 365TP-TE FRAME | ||||
M-1225 | MOTOR | WWT PRIMARY LIFT PUMP WWT-P10A MOTOR M-1225 7.5HP / 1155RPM / 44-256T-41 FRAME (OUT OF SERVICE) | ||||
M-1222 | MOTOR | WWT PROCESSED WATER TO SCALTECH PUMP SPARE MOTOR M-1222 PID DWG WWT-16-14309-10 10HP / 3500RPM / 215T FRAME SINGLE LINE NO. 11-13911-D | ||||
M-1221 | MOTOR | WWT PROCESSED WATER TO SCALTECH PUMP WWT-P07A MOTOR M-1221 PID DWG WWT-16-14309-10 10HP / 3500RPM / 215T FRAME | ||||
M-0066 | MOTOR | WWT RGO PUMP WWT-PN027 MOTOR M-0066 PID DWG WWT-16-14309-03 25 HP / 3555RPM / 365S FRAME | ||||
M-1564 | MOTOR | WWT SAMPLE PUMP WWT-P13 MOTOR M-1564 PID DWG WWT-16-14309-14 2HP / 1725RPM / 145T-4 FRAME | ||||
M-1237 | MOTOR | WWT SCUM SUMP MIXER WWT-ME03 MIXER MOTOR M-1237 PID DWG WWT-16-14309-09 | ||||
M-1820 | MOTOR | WWT SCUM SUMP MIXER WWT-ME04 MOTOR M-1820 PID DWG WWT-16-14309-09 | ||||
M-0915 | MOTOR | WWT SLOP OIL PUMP WWT-PQ08 MOTOR M-0915 PID DWG WWT-16-14309-01 20HP / 1755RPM / 256T FRAME | ||||
M-1208 | MOTOR | WWT SLUDGE RECYCLE PUMP (MIDDLE) WWT-P03B MOTOR M-1208 PID DWG WWT-16-14309-08 30HP / 1160RPM / 326TS FRAME SINGLE LINE NO. 11-13911-D | ||||
M-1210 | MOTOR | WWT SLUDGE RECYCLE PUMP (NORTH) WWT-P03A MOTOR M-1210 PID DWG WWT-16-14309-08 30HP / 1160RPM / 326TS FRAME | ||||
M-1209 | MOTOR | WWT SLUDGE RECYCLE PUMP (SOUTH) WWT-P03C MOTOR M-1209 PID DWG WWT-16-14309-08 30HP / 1160RPM / 326TS FRAME SINGLE LINE NO. 11-13911-D | ||||
M-1226 | MOTOR | WWT SLUDGE STORAGE PUMP WWT-P10B MOTOR M-1226 7.5HP / 1155RPM / 24-256T-41 FRAME (OUT OF SERVICE) | ||||
M-1059 | MOTOR | WWT SLUDGE SUMP PUMP WWT-PQ02 P-1059 PID DWG WWT-16-14309-02 15 HP / 1760 RPM / 254T FRAME | ||||
M-1572 | MOTOR | WWT SLUDGE THICKENER PUMP WWT-P08B MOTOR M-1572 PID DWG WWT-16-14309-09 3HP / 1725RPM / 23-215T-21 FRAME SINGLE LINE NO. 11-13911-D | ||||
M-1571 | MOTOR | WWT SLUDGE THICKENER PUMP WWT-P08C MOTOR M-1571 PID DWG WWT-16-14309-09 3HP / 1725 RPM / 23-215T-21 FRAME SINGLE LINE NO. 11-13911-D | ||||
M-1563 | MOTOR | WWT SLUDGE THICKNER MIXER WWT-ME08 MOTOR M-1563 PID DWG WWT-16-14309-09 0.75HP / 1740RPM / 143TC FRAME | ||||
M-1562 | MOTOR | WWT SLUDGE THINCKNER MIXER WWT-ME07 MOTOR M-1562 PID DWG WWT-16-14309-09 1HP / 1740RPM / 1143TC FRAME | ||||
M-1470 | MOTOR | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15A MOTOR M-1470 PID DWG WWT-16-14309-03 7.5 HP / 3520 RPM / X210LP FRAME SINGLE LINE NO. 11-13930-D | ||||
M-1471 | MOTOR | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15B MOTOR M-1471 PID DWG WWT-16-14309-03 7.55 HP / 3520 RPM / FRAME) SINGLE LINE NO. 11-13930-D | ||||
M-1248 | MOTOR | WWT TANK FARM SEPARATOR PUMP WWT-P14A MOTOR M-1248 (NEAR TANK 117) NORTH PUMP 20 HP / 1750 RPM / 256T FRAME NOT ON PID - NEED TO BE DRAWN IN | ||||
M-1249 | MOTOR | WWT TANK FARM SEPARATOR PUMP WWT-P14B MOTOR M-1249 (NEAR TANK 117) NORTH PUMP 20 HP / 1760 / 256T FRAME NOT ON PID - NEED TO BE DRAWN IN | ||||
M-1902 | MOTOR | WWT THERMAL OXIDIZER STACK WWT-TOX BLOWER MOTOR M-1902 (SOUTH SIDE) | ||||
M-1903 | MOTOR | WWT THERMAL OXIDIZER STACK WWT-TOX BLOWER MOTOR M-1903 (NORTH SIDE) | ||||
M-1573 | MOTOR | WWT THICKENER SLUDGE PUMP WWT-P08A MOTOR M-1573 PID DWG WWT-16-14309-09 1.5HP / 1725RPM / 23-215T-21 FRAME SINGLE LINE NO. 11-13912-D | ||||
M-2185 | MOTOR | WWT TRAP OIL TRANSFER PUMP WWT-PQ01 MOTOR M-1561 100 HP / 1180 RPM/Frame - 444T | ||||
M-1818 | MOTOR | WWT UV LIGHT AIR BLOWER WWT-BL201 MOTOR M-1818 PID DWG WWT-16-14309-14 | ||||
S4MS4-ME15 | MOTOR STARTER | 480V MOTOR STARTER FOR S4M4-ME15 | ||||
S4MS4-ME1A | MOTOR STARTER | WWT AERATOR WWT-ME01A MOTOR STARTER PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / EB365T FRAME | ||||
S4MS4-MEIB | MOTOR STARTER | WWT AERATOR WWT-ME01B MOTOR STARTER PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / 356T FRAME | ||||
S4MS4-ME1C | MOTOR STARTER | WWT AERATOR WWT-ME01C MOTOR STARTER PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / 356T FRAME | ||||
S4MS4-ME1D | MOTOR STARTER | WWT AERATOR WWT-ME01D MOTOR STARTER PID DWG WWT-16-14309-07 50/22HP / 1775/885RPM / 365T FRAME | ||||
S2MS4-PQ3 | MOTOR STARTER | WWT API SLUDGE PUMP WWT-PQ03 MOTOR STARTER PID DWG WWT-16-14309-01 15HP / 1760RPM / 254T FRAME | ||||
S2MS4-PQ06 | MOTOR STARTER | WWT API SLUDGE PUMP WWT-PQ06 MOTOR STARTER PID DWG WWT-16-14309-01 20HP / 1745RPM / 256T FRAME EOL DWG# 11-13913-D | ||||
S2MS4-PQ7 | MOTOR STARTER | WWT API SLUDGE PUMP WWT-PQ07 MOTOR STARTER PID DWG WWT-16-14309-02 15HP / 1745RPM / 284U FRAME | ||||
S2MS4-PQ4 | MOTOR STARTER | WWT API SLUDGE SUMP PUMP WWT-PQ04 MOTOR STARTER PID DWG WWT-16-14309-02 15HP / 1765RPM / 254T FRAME | ||||
S4MS4-P12A | MOTOR STARTER | WWT BACKWASH RETURN TO AERATION PUMP WWT-P12A MOTOR STARTER PID DWG WWT-16-14309-10 5 HP / 1750 RPM / 184TP FRAME | ||||
S4MS4-P12B | MOTOR STARTER | WWT BACKWASH RETURN TO AERATION PUMP WWT-P12B MOTOR STARTER PID DWG WWT-16-14309-10 5HP / 1750RPM / 184TP FRAME SINGLE LINE NO. 11-13911-D | ||||
S4MS4-ME6 | MOTOR STARTER | WWT BACKWASH TANK MIXER WWT-ME06 MOTOR STARTER PID DWG WWT-16-14309-10 15HP / 1765RPM / 254T FRAME | ||||
S4MS4-EF7 | MOTOR STARTER | WWT BLDG-148 EXHAUST FAN 480V MOTOR STARTER FOR S4M4-EF7 | ||||
S4MS4-P4A | MOTOR STARTER | WWT CLARIFIER SCUM PUMP WWT-P04A MOTOR STARTER PID DWG WWT-16-14309-08 1.5 HP / 1730 RPM / 145T FRAME | ||||
S4MS4-P4B | MOTOR STARTER | WWT CLARIFIER SCUM PUMP WWT-P04B MOTOR STARTER PID DWG WWT-16-14309-08 3 HP / 1735 RPM / 143T FRAME SINGLE LINE NO. 11-13911-D |
Attachment 1 to Schedule 2.2.1
S4MS4-ME2A | MOTOR STARTER | WWT CLARIFIER TANK MIXER WWT-ME02A MOTOR STARTER PID DWG WWT-16-14309-08 1HP/1730RPM/ FRAME | ||||
S4MS4-ME2B | MOTOR STARTER | WWT CLARIFIER TANK MIXER WWT-ME02B MOTOR STARTER PID DWG WWT-16-14309-08 1HP/1750RPM/143BC FRAME | ||||
S4MS5-P6A | MOTOR STARTER | WWT FILTER BACKWASH PUMP WWT-P06A MOTOR PID DWG WWT-16-14309-10 150HP/1780RPM/5006P FRAME | ||||
S4MS5-P6B | MOTOR STARTER | WWT FILTER BACKWASH PUMP WWT-P06B MOTOR STARTER PID DWG WWT-16-14309-10 150HP/ 1775RPM/ 5006P FRAME SINGLE LINE DWG # 11-13912-D | ||||
S4MS4-P5A | MOTOR STARTER | WWT FILTER FEED PUMP WWT-P05A MOTOR STARTER PID DWG WWT-16-14309-10 100HP /1775RPM / 404TP | ||||
S4MS4-P5B | MOTOR STARTER | WWT FILTER FEED PUMP WWT-P05B MOTOR STARTER PID DWG WWT-16-14309-10 100HP/ 1775RPM/404TP FRAME SINGLE LINE NO. 11-13911-D | ||||
S4MS4-P9A | MOTOR STARTER | WWT FILTER SURFACE WASH PUMP WWT-P09A MOTOR STARTER PID DWG WWT-16-14309-10 30HP/ 1750RPM / 286TP FRAME | ||||
S4MS4-P9B | MOTOR STARTER | WWT FILTER SURFACE WASH PUMP WWT-P09B MOTOR STARTER PID DWG WWT-16-14309-10 30HP / 1750RPM/386TP FRAME SINGLE LINE NO. 11-13911-D | ||||
S2MS4-PN23 | MOTOR STARTER | WWT GAS OIL TRANSFER PUMP MOTOR STARTER M-0002 FOR PID DWG WWT-16-14309-03 (40 HP / 3540 RPM / FRAME) | ||||
S2MS4-API1 | MOTOR STARTER | WWT NO. 1 FLIGHT BOARD GEARBOX WWT-API-01 MOTOR STARTER PID DWG WWT-16-14309-01 .05HP/ 1725 / 1425RPM/FRAME K56 | ||||
S3MS4-1WELL | MOTOR STARTER | WWT NO. 1 WATER WELL PUMP WWT-WELL01 MOTOR PID DWG POH-16-14287-01 100 HP/1775 RPM/404 TP WPI FRAME | ||||
S2MS4-API2 | MOTOR STARTER | WWT NO. 2 FLIGHT BOARD WWT-API-02 MOTOR STARTER PID DWG WWT-16-14309-01 0.5HP / 1725/1425RPM/ K56 FRAME | ||||
S2MS4-API3 | MOTOR STARTER | WWT NO. 3 FLIGHT BOARD GEARBOX WWT-AFI-03 MOTOR STARTER PID DWG WWT-16-14309-01 .05HP/ 1725/1425RPM/FRAME K56 | ||||
S2MS5-P3SW | MOTOR STARTER | WWT NO. 3 SERVICE WATER PUMP WWT-P3SW MOTOR STARTER PID DWG WWT-16-14309-15 125HP/1770 RPM/6323P FRAME | ||||
S2MS4-API4 | MOTOR STARTER | WWT NO. 4 FLIGHT BOARD WWT-API-04 MOTOR STARTER PID DWG WWT-16-14309-01 0.5HP / 1725RPM/ 56 FRAME | ||||
S2MS4-API5 | MOTOR STARTER | WWT NO. 5 FLIGHT BOARD WWT-API-05 MOTOR STARTER PID DWG WWT-16-14309-01 0.5HP / 1725/1425RPM/ K5 FRAME | ||||
S3MS4-WELL5 | MOTOR STARTER | WWT NO. 5 WELL PUMP MOTOR STARTER PID DWG POH-18-3226-01 125 H/P EOL DWG# 11-13914-D | ||||
S2MS4-API6 | MOTOR STARTER | WWT NO. 6 FLIGHT BOARD WWT-API-06 MOTOR STARTER PID DWG WWT-16-14309-01 0.50HP/ 1725/1425RPM / K56 FRAME SINGLE LINE DWG.11-13913-D | ||||
S2MS4-PQ6 | MOTOR STARTER | WWT NO. 6 WELL PUMP WWT-P-1287 MOTOR STARTER PID DWG POH-16-14287-01 125 HP/ 1770RPM / 405TP FRAME | ||||
S2MS4-API7 | MOTOR STARTER | WWT NO. 7 FLIGHT BOARD WWT-API-07 MOTOR STARTER PID DWG WWT-16-14309-01 0.5HP/1725RPM/HP56 FRAME | ||||
S2MS4-API8 | MOTOR STARTER | WWT NO 8 FLIGHT BOARD WWT-API-08 MOTOR STARTER PID DWG WWT-16-14309-01 0.5HP/1725RPM/HP56 FRAME | ||||
S2MS4-API9 | MOTOR STARTER | WWT NO. 9 FLIGHT BOARD WWT-API-09 MOTOR STARTER PID DWG WWT-16-14309-01 0.5HP/ 1725RPM/ FRAME | ||||
S3MS5-FP1A | MOTOR STARTER | WWT NO. 1 FIRE WATER BOOSTER PUMP MOTOR WWT-PIFW PID DWG WWT-16-14309-15 60 HP/ 1775 RPM / 364TP FRAME | ||||
S2MS5-P2FW | MOTOR STARTER | WWT NO.2 FIRE WATER PUMP WWT-P2FW MOTOR STARTER PID DWG WWT-16-14309-15 150HP/1750RPM/ 6324P FRAME | ||||
S2MS5-P4SW | MOTOR STARTER | WWT N0.4 SERVICE WATER PUMP WWT-P4SW MOTOR STARTER PID DWG WWT-16-14309-15 125 HP/ 1775 RPM / 6323P FRAME | ||||
S4MS4-PI5 | MOTOR STARTER | WWT OILY WATER CIRCULATING PUMP WWT-P15 MOTOR STARTER PID DWG WWT-16-14309-06 HP 7.5 / RPM 1750 / FRAME 213T SINGLE LINE NO. 11-13911-D | ||||
S4MS4-LP1B | MOTOR STARTER | WWT PRIMARY LIFT PUMP (MIDDLE) WWT-P01B MOTOR STARTER PID DWG WWT-16-14309-02 75HP / 1770RPM/365TP FRAME | ||||
S4MS4-LP1D | MOTOR STARTER | WWT PRIMARY LIFT PUMP WWT-LP1D MOTOR STARTER PID DWG WWT-16-14309-02 75HP / 1780RPM / 365TP-TE FRAME480V | ||||
S4MS4-LP1A | MOTOR STARTER | WWT PRIMARY LIFT PUMP WWT-P01A MOTOR STARTER PID DWG WWT-16-14309-02 75HP / 1780RPM / 365TP FRAME | ||||
S4MS4-LPIC | MOTOR STARTER | WWT PRIMARY LIFT PUMP WWT-P01C MOTOR STARTER PID DWG WWT-16-14309-02 (75 HP / 1775 RPM/ 365TP FRAME) | ||||
S4MS4-P10A | MOTOR STARTER | WWT PRIMARY LIFT PUMP WWT-P10A MOTOR STARTER 7.5HP /1155RPM / 44-256T-41 FRAME (OUT OF SERVICE) | ||||
S4MS4-P7B | MOTOR STARTER | WWT PROCESSED WATER TO SCALTECH PUMP SPARE MOTOR STARTER PID DWG WWT-16-14309-10 10HP / 3500RPM/ 215T FRAME SINGLE LINE NO. 11-13911-D | ||||
S4MS4-P7A | MOTOR STARTER | WWT PROCESSED WATER TO SCALTECH PUMP WWT-P07A MOTOR STARTER PID DWG WWT-16-14309-10 10HP / 3500RPM / 215T FRAME | ||||
S2MS4-PN27 | MOTOR STARTER | WWT RGO PUMP WWT-PN027 MOTOR STARTER PID DWG WWT-16-14309-03 25 HP / 3555RPM / 365S FRAME | ||||
S4MS4-P13 | MOTOR STARTER | WWT SAMPLE PUMP WWT-P13 MOTOR STARTER PID DWG WWT-16-14309-14 2HP/ 1725RPM / 145T-4 FRAME | ||||
S4MS4-ME3 | MOTOR STARTER | WWT SCUM SUMP MIXER WWT-ME03 MIXER MOTOR STARTER PID DWG WWT-16-14309-09 | ||||
S4MS4-ME4 | MOTOR STARTER | WWT SCUM SUMP MIXER WWT-ME04 MOTOR M-1820 PID DWG WWT-16-14309-09 | ||||
S2MS4-PQ8 | MOTOR STARTER | WWT SLOP OIL PUMP WWT-PQ08 MOTOR STARTER PID DWG WWT-16-14309-01 20HP/ 1755RPM/256T FRAME | ||||
S4MS4-P3B | MOTOR STARTER | WWT SLUDGE RECYCLE PUMP (MIDDLE) WWT-P03B MOTOR STARTER PID DWG WWT-16-14309-08 30HP 1160RPM/ 326TS FRAME SINGLE LINE NO. 11-13911-D |
Attachment 1 to Schedule 2.2.1
S4MS4-P3A | MOTOR STARTER | WWT SLUDGE RECYCLE PUMP (NORTH) WWT-P03A MOTOR STARTER PID DWG WWT-16-14309-08 30HP / 1160RPM / 326TS FRAME | ||||
S4MS4-P3C | MOTOR STARTER | WWT SLUDGE RECYCLE PUMP (SOUTH) WWT-P03C MOTOR STARTER PID DWG WWT-16-14309-08 30HP / 1160RPM / 326TS FRAME SINGLE LINE NO. 11-13911-D | ||||
S4MS4-P10B | MOTOR STARTER | WWT SLUDGE STORAGE PUMP WWT-P10B MOTOR STARTER 7.5HP / 1155RPM / 24-256T-41 FRAME (OUT OF SERVICE) | ||||
S2M4-PQ2 | MOTOR STARTER | WWT SLUDGE SUMP PUMP MOTOR STARTER WWT-PQ02 P-1059 PID DWG WWT-16-14309-02 15 HP/ 1760 RPM/ 254T FRAME | ||||
S4MS4-ME7 | MOTOR STARTER | WWT SLUDGE THICKENER MIXER WWT-ME07 MOTOR STARTER PID DWG WWT-16-14309-09 1 HP / 1740RPM/ J143TC FRAME | ||||
S4MS4-P8B | MOTOR STARTER | WWT SLUDGE THICKENER PUMP WWT-P08B MOTOR STARTER PID DWG WWT-16-14309-09 3HP / 1725RPM/ 23-215T-21 FRAME SINGLE LINE NO. 11-13911-D | ||||
S4MS4-P8C | MOTOR STARTER | WWT SLUDGE THICKENER PUMP WWT-P08C MOTOR STARTER PID DWG WWT-16-14309-09 3HP / 1725 RPM / 23-215T-21 FRAME SINGLE LINE NO. 11-13911-D | ||||
S4MS4-ME8 | MOTOR STARTER | WWT SLUDGE THICKNER MIXER WWT-ME08 MOTOR STARTER PID DWG WWT-16-14309-09 0.75HP / 1740RPM / 143TC FRAME | ||||
S2MS4-WWTP15A | MOTOR STARTER | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15A MOTOR STARTER PID DWG WWT-16-14309-03 7.5 HP / 3520 RPM/ X210LP FRAME SINGLE LINE NO. 11-13930-D | ||||
S2MS4-WWTP15B | MOTOR STARTER | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15B MOTOR STARTER PID DWG WWT-16-14309-03 7.55 HP / 3520 RPM / FRAME) SINGLE LINE NO. 11-13930-D | ||||
S3MS4-P14A | MOTOR STARTER | WWT TANK FARM SEPARATOR PUMP WWT-P14A MOTOR STARTER (NEAR TANK 117) NORTH PUMP 20 HP / 1750 RPM / 256T FRAME NOT ON PID - NEED TO BE DRAWN IN EOL DWG# 11-13923-D | ||||
S3MS4-P14B | MOTOR STARTER | WWT TANK FARM SEPARATOR PUMP WWT-P14B MOTOR STARTER (NEAR TANK 117) NORTH PUMP 20 HP / 1760 / 256T FRAME NOT ON PID - NEED TO BE DRAWN IN EOL DWG# 11-13923-D | ||||
S4MS4-P8A | MOTOR STARTER | WWT THICKENER SLUDGE PUMP WWT-P08A MOTOR STARTER PID DWG WWT-16-14309-09 1.5HP/1725RPM/ 23-215T-21 FRAME SINGLE LINE NO. 11-13912-D | ||||
S2MS4-PQ1 | MOTOR STARTER | WWT TRAP OIL TRANSFER PUMP WWT-PQ01 MOTOR STARTER 40HP / 885RPM / 365T FRAME | ||||
S4P3-2 | PANEL | 100A 12 POLE LIGHTING PANEL | ||||
S4P3-5 | PANEL | 100A 12 POLE LIGHTING PANEL | ||||
S4P3-4 | PANEL | 100A 36 POLE LIGHTING PANEL | ||||
S4P3-6 | PANEL | 225A 36 POLE 3 PHASE 4 WIRE LIGHTING PANEL | ||||
S4P3-3 | PANEL | 225A 42 POLE LIGHTING PANEL | ||||
S4P3-14 | PANEL | 24 POLE 120/240V 100A LIGHTING & POWER DISTR PNL | ||||
S4P3-15 | PANEL | HEAT TRACE PANEL MANIFOLD #1 | ||||
S2P3-14 | PANEL | LIGHTING PANEL D902 ON BENZENE NESHAP UNIT | ||||
S2P3-13 | PANEL | LIGHTING PANEL IN WWT SLOP AREA | ||||
WWT-PIPE | PIPING | PIPING WWT PROJECT TRACKING. | ||||
WSY-PIPE | PIPING | WSY WATER SYSTEM PIPING MISCELLANIOUS WSY-PIPE | ||||
POH-PT501 | PRESS LOOP | FCC PRESSURE TRANSMITTER, TRANSCO (WOODBURY HUT) (QUARTERLY) THIS AREA UNDER DIRECTION OF WWT | ||||
WWT-PT03 | PRESS LOOP | PRESSURE TRANSMITTER FOR P3 SERVICE WATER PUMP PID-14-3117-15 | ||||
WWT-PT04 | PRESS LOOP | PRESSURE TRANSMITTER FOR P4 SERVICE WATER PUMP PID-14-3117-15 | ||||
WWT- PIC06 | PRESS LOOP | WWT PRESSURE INDICATOR CONTROLLER FIRE WATER STAND-BY PT,PS,PV PID-14-3117-15 (FREQUENCY: 2 YEARS) | ||||
WWT-PIC05 | PRESS LOOP | WWT PRESSURE INDICATOR CONTROLLER, 5SW PUMP PID-14-3117-15 | ||||
WWT-PAL1 | PRESS LOOP | WWT-PAL1 PLC CABINET PURGE SYSTEM TROUBLE | ||||
WWT-PAL15 | PRESS LOOP | WWT-PAL15 NITROGEN PRESSURE AT API SEPARATOR | ||||
P-3116 | PUMP | P-3116 WWT RIVER WEIR PNEUMATIC TRIDENT PISTON PUMP, MODEL DT01 SERIAL 275 | ||||
P-1777 | PUMP | WWT API SLUDGE PUMP WWT-PQ03 P-1777 PID DWG WWT-16-14309-02 MIDDLE PUMP EAST SIDE OF API SEPERATOR | ||||
P-1714 | PUMP | WWT API SLUDGE PUMP WWT-PQ06 P-1714 PID DWG WWT-16-14309-01 | ||||
P-1732 | PUMP | WWT API SLUDGE PUMP WWT-PQ07 P-1732 PID DWG WWT-16-14309-02 | ||||
P-1886 | PUMP | WWT API SLUDGE SUMP PUMP WWT-PQ04 P-1886 PID DWG WWT-16-14309-01 SOUTH SIDE OF SEPERATOR | ||||
P-2114 | PUMP | WWT BACKWASH RETURN TO AEREATION PUMP WWT-P12A P-2114 PID DWG WWT-16-14309-10 | ||||
P-2113 | PUMP | WWT BACKWASH RETURN TO AEREATION PUMP WWT-P12B P-2113 PID DWG WWT-16-14309-10 | ||||
P-3020 | PUMP | WWT CLARIFIER SCUM PUMP WWT-P04A P-3020 PID DWG WWT-16-14309-08 | ||||
P-2112 | PUMP | WWT CLARIFIER SCUM PUMP WWT-P04B P-2112 PID DWG WWT-16-14309-08 | ||||
P-2109 | PUMP | WWT CLARIFIER SLUDGE RECYCLE PUMP (MIDDLE) WWT-P03B P-2109 PID DWG WWT-16-14309-08 | ||||
P-2110 | PUMP | WWT CLARIFIER SLUDGE RECYCLE PUMP (SOUTH) WWT-P03C P-2110 PID DWG WWT-16-14309-08 | ||||
P-1746 | PUMP | WWT DOCK DRAIN TANK PUMP WWT-PN032 P-1746 PID DWG WWT-16-14309-04 SUBMERSIBLE PUMP |
Attachment 1 to Schedule 2.2.1
P-3193 | PUMP | WWT DOCK DRAIN TANK PUMP WWT-PN032 P-3193 PID DWG WWT-16-14309-04 SUBMERSIBLE PUMP (NO PM REQUIRED) | ||||
P-3109 | PUMP | WWT DOCK DRAIN TANK PUMP WWT-PN032, P-3109 PID DWG -16-14309-04 | ||||
P-3146 | PUMP | WWT ECRA WELL PUMP WWT-TK-141CS P-3146 REMEDIAL SYSTEM 4 GRUNDFOS SUBMERSIBLE GROUNDWATER PUMP | ||||
P-2802 | PUMP | WWT ECRA WELL PUMP WWT-143-2 P-2802 (N.E COPELANDS COVE) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2801 | PUMP | WWT ECRA WELL PUMP WWT-CC01 P-2801 (COPELANDS COVE) NOT ON PIDS | ||||
P-2879 | PUMP | WWT ECRA WELL PUMP WWT-CC02 (COPELANDS COVE) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2799 | PUMP | WWT ECRA WELL PUMP WWT-D01 P-2799 (@ E. NO. 2 PH OUTSIDE FENCE) NOT ON PIDS | ||||
P-2857 | PUMP | WWT ECRA WELL PUMP WWT-D01A (@ E. NO.2 PH OUTSIDE FENCE) PUMP P-2857 NO PM REQUIRED AS OF 1-06 | ||||
P-2809 | PUMP | WWT ECRA WELL PUMP WWT-F01 P-2809 (W. SIDE FURFURAL) NOT ON PIDS | ||||
P-3139 | PUMP | WWT ECRA WELL PUMP WWT-GTA-1 P-3139 REMEDIAL SYSTEM | ||||
P-2807 | PUMP | WWT ECRA WELL PUMP WWT-LF01 P-2807 (OUTSIDE EAST FENCE) NOT ON PIDS | ||||
P-2800 | PUMP | WWT ECRA WELL PUMP WWT-LF02 P-2800 (NEAR COGEN RIVER P.H OUTSIDE FENCE) NOT ON PIDS | ||||
P-2808 | PUMP | WWT ECRA WELL PUMP WWT-MW110 P-2808 (W. VPS CONTROL ROOM) NOT ON PIDS | ||||
P-2795 | PUMP | WWT ECRA WELL PUMP WWT-RW01 P-2795 (@ RIVER WIER) NOT ON PIDS SUBMERSIBLE | ||||
P-2796 | PUMP | WWT ECRA WELL PUMP WWT-RW02 P-2796 (@ RIVER WIER ) NOT ON PIDS NO PM REQUIRED AS OF 1-06 SUBMERSIBLE / AIR | ||||
P-2797 | PUMP | WWT ECRA WELL PUMP WWT-RW03 P-2797 (@ RIVER WIER) NOT ON PIDS SUBMERSIBLE | ||||
P-2798 | PUMP | WWT ECRA WELL PUMP WWT-RW04 P-2798 (@ RIVER WIER ) NOT ON PIDS SUBMERSIBLE / AIR | ||||
P-3083 | PUMP | WWT ECRA WELL PUMP WWT-RW05 @ RIVER WEIR NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2803 | PUMP | WWT ECRA WELL PUMP WWT-S01 P-2803 (EAST OF TANK NO. 118) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2804 | PUMP | WWT ECRA WELL PUMP WWT-S02 P-2804 (EAST OF TANK NO. 118) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2805 | PUMP | WWT ECRA WELL PUMP WWT-S03 P-2805 (EAST OF TANK NO. 119) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2806 | PUMP | WWT ECRA WELL PUMP WWT-S04 P-2806 (EAST OF TANK NO. 119) NOT ON PIDS NO PM REQUIRED AS OF 1-106 | ||||
P-2792 | PUMP | WWT ECRA WELL PUMP WWT-TF01 P-2792 (@ TANK NO. 26) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2793 | PUMP | WWT ECRA WELL PUMP WWT-TF02 P-2793 (@ TANK NO. 51) NOT ON PIDS NO PM REQUIRED AS OF 1-06 | ||||
P-2794 | PUMP | WWT ECRA WELL PUMP WWT-TF03 P-2794 (@ NO.2 PUMPHOUSE) NOT ON PIDS NO PM REQUIRED AS OF 1-106 | ||||
P-3017 | PUMP | WWT ECRA WELL PUMP WWT-TF04 P-3017 NORTH OF TANK NO. 6 PID 15-1803-13 NO PM REQUIRED AS OF 1-06 | ||||
P-3147 | PUMP | WWT ECRA WELL PUMP WWT-TK-14CS P-3147 REMEDIAL SYSTEM 4 GRUNDFOS SUBMERSIBLE GROUNDWATER PUMP | ||||
P-3148 | PUMP | WWT ECRA WELL PUMP WWT-TK-14CS P-3148 REMEDIAL SYSTEM 2 GEOTECH/ORS GROUNDWATER PUMP | ||||
P-3149 | PUMP | WWT ECRA WELL PUMP WWT-TK-14CS P-3149 REMEDIAL SYSTEM 2 GEOTECH/ORS GROUNDWATER PUMP | ||||
P-3140 | PUMP | WWT ECRA WELL PUMP WWT-TK-47CS P-3140 REMEDIAL SYSTEM | ||||
P-3142 | PUMP | WWT ECRA WELL PUMP WWT-TK-51CS P-3142 REMEDIAL SYSTEM | ||||
P-3141 | PUMP | WWT ECRA WELL PUMP WWT-UPRM-24S P-3141 REMEDIAL SYSTEM | ||||
P-2123 | PUMP | WWT EFFLUENT SAMPLE PUMP WWT-P13 P-2123 PID DWG WWT-16-14309-14 | ||||
P-2057 | PUMP | WWT EMERGENCY LIFT PUMP WWT-P01E FLOW PUMP P-2057 PID DWG WWT-16-14309-02 | ||||
P-2117 | PUMP | WWT FILTER BACKWASH PUMP WWT-P06A P-2117 PID DWG WWT-16-14309-10 | ||||
P-2118 | PUMP | WWT FILTER BACKWASH PUMP WWT-P06B P-2118 PID DWG WWT-16-14309-10 | ||||
P-2115 | PUMP | WWT FILTER FEED PUMP WWT-P05A P-2115 PID DWG WWT-16-14309-10 | ||||
P-2116 | PUMP | WWT FILTER FEED PUMP WWT-P05B P-2116 PID DWG WWT-16-14309-10 | ||||
P-2119 | PUMP | WWT FILTER SURFACE WASH PUMP WWT-P09A P-2119 PID DWG WWT-16-14309-10 | ||||
P-2120 | PUMP | WWT FILTER SURFACE WASH PUMP WWT-P09B P-2120 PID DWG WWT-16-14309-10 | ||||
P-0443 | PUMP | WWT GAS OIL TRANSFER PUMP WWT-PN023 P-443 PID DWG WWT-16-14309-03 | ||||
P-2762 | PUMP | WWT HYPOCHLORIDE INJECTION PUMP WWT-P16 P-2762 PID DWG WWT-16-14309-15 | ||||
P-2835 | PUMP | WWT HYPOCHLORIDE INJECTION PUMP WWT-P17 PID DWG WWT-16-14309-15 | ||||
P-2862 | PUMP | WWT LAB VACUUM TEST PUMP WWT-P19 P-2862 (LOCATED IN LAB TEST ROOM BEHIND DOOR) | ||||
P-0679 | PUMP | WWT NO. 1 WATER WELL PUMP WWT-WELL01 P-0679 PID DWG POH-16-14287-01 | ||||
P-0681 | PUMP | WWT NO. 3 WATER WELL PUMP WWT-WELL03 P-0681 PID DWG POH-16-14287-01 | ||||
P-1281 | PUMP | WWT NO. 4 WATER WELL PUMP WWT-WELL04 P-1211 PID DWG POH-16-14287-01 | ||||
P-l799 | PUMP | WWT NO. 5 WATER WELL PUMP WWT-WELL05 P-1799 PID DWG POH-18-3226-011 | ||||
P-1287 | PUMP | WWT NO. 6 WATER WELL PUMP WWT-WELL06 PID DWG POH-16-14287-01 | ||||
P-1692 | PUMP | WWT NO.3 SERVICE WATER PUMP WWT-P35W P-1692 PID DWG WWT-16-14309-15 NOTE: SEE PAGE 6, COKE BREAKER | ||||
P-0670 | PUMP | WWT NO.4 SERVICE WATER PUMP WWT-P4SW P-0670 PID DWG WWT-16-14309-15 | ||||
P-2849 | PUMP | WWT NO.8 SERVICE WATER PUMP WWT-P8SW PID DWG 14. | ||||
P-2299 | PUMP | WWT OILY WATER CIRCULATING PUMP WWT-P15 P-2299 PID DWG WWT-16-14309-06 | ||||
P-2851 | PUMP | WWT OILY WATER SEWER BOX PUMP WWT-P18 | ||||
P-2100 | PUMP | WWT PRIMARY LIFT PUMP WWT-P01A P-2100 PID DWG WWT-16-14309-02 | ||||
P-2101 | PUMP | WWT PRIMARY LIFT PUMP WWT-P01B P-2101 PID DWG WWT-16-14309-02 | ||||
P-2103 | PUMP | WWT PRIMARY LIFT PUMP WWT-P01C P-2103 PID DWG WWT-16-14309-02 |
Attachment 1 to Schedule 2.2.1
P-2102 | PUMP | WWT PRIMARY LIFT PUMP WWT-P0ID P-2102 PID DWG WWT-16-14309-02 | ||||
P-2122 | PUMP | WWT PROCESSED WATER TO SCALTECH PUMP SPARE P-2122 PID DWG WWT-16-14309-10 | ||||
P-2121 | PUMP | WWT PROCESSED WATER TO SCALTECH PUMP WWT-P07A P-2121 PID DWG WWT-16-14309-10 | ||||
P-0447 | PUMP | WWT RGO PUMP WWT-PN027 P-0447 PID DWG WWT-16-14309-03 | ||||
P-0667 | PUMP | WWT SERVICE WATER PUMP WWT-P5SW P-0667 PID DWG WWT-16-14309-15 | ||||
P-1686 | PUMP | WWT SLOP OIL PUMP WWT-PQ08 P-1686 PID DWG WWT-16-14309-01 (API SEPARATOR SOUTHWEST SIDE) | ||||
P-2108 | PUMP | WWT SLUDGE RECYCLE PUMP (NORTH) WWT-P03A P-2108 PID DWG WWT-16-14309-08 | ||||
P-2125 | PUMP | WWT SLUDGE STORAGE PUMP WWT-P10A P-2125 (OUT OF SERVICE) | ||||
P-2126 | PUMP | WWT SLUDGE STORAGE PUMP WWT-P10B P-2126 (OUT OF SERVICE) | ||||
P-1786 | PUMP | WWT SLUDGE SUMP PUMP WWT-PQ02 P-1786 PID DWG WWT-16-14309-02 | ||||
P-2130 | PUMP | WWT SLUDGE THICKENER PUMP WWT-P08A P-2130 PID DWG WWT-16-14309-09 | ||||
P-2128 | PUMP | WWT SLUDGE THICKENER PUMP WWT-P08B P-2128 PID DWG WWT-16-14309-09 | ||||
P-2131 | PUMP | WWT SLUDGE THICKENER PUMP WWT-P08C P-2131 PID DWG WWT-16-14309-09 | ||||
P-2341 | PUMP | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15A P-2341 PID DWG WWT-16-14309-03 | ||||
P-2342 | PUMP | WWT SURGE TANK 333/335/342 WATER TRANSFER PUMP WWT-P15B P-2342 PID DWG WWT-16-14309-03 | ||||
P-2143 | PUMP | WWT TANK FARM SEPARATOR PUMP WWT-P14A P-2143 (NEAR TANK 117) NORTH PUMP NOT ON PID - NEED TO BE DRAWN IN | ||||
P-2144 | PUMP | WWT TANK FARM SEPARATOR PUMP WWT-P14B P-2144 (NEAR TANK 117) SOUTH PUMP NOT ON PID - NEED TO BE DRAWN IN | ||||
P-2058 | PUMP | WWT TRAP OIL TRANSFER PUMP WWT-PQ01 P-2058 (API SEPARATOR PUMP HOUSE) | ||||
RV-250177 | RELIEF VALVE | WWT BACK WASH FILTER NORTH WWT-D103 RELIEF VALVE (2 x 2-1/2 -SET @ 50 PSI) PID DWG WWT-16-14309-13 | ||||
RV-250175 | RELIEF VALVE | WWT BACK WASH FILTER SOUTH WWT-D101 RELIEF VALVE (2 x 3 SET @ 50PSI) PID DWG WWT-16-14309-11 | ||||
RV-250062 | RELIEF VALVE | WWT DIESEL EMERGENCY FIRE WATER PUMP WWT-P7FW RELIEF VALVE RV-250062 (6 x 8 - SET @ 150PSI) PID DWG WWT-16-14309-15 | ||||
RV-250143 | RELIEF VALVE | WWT FIRE WATER STANDBY PUMP WWT-P6FW RELIEF VALVE (6 x 8 - SET @ 150PSI) PID DWG WWT-16-14309-15 | ||||
RV-250063 | RELIEF VALVE | WWT FIRE WATER STANDBY PUMP WWT-F6FW TURBINE RELIEF VALVE RV-250063 (4 x 6 - SET @ 40PSI) PID DWG WWT-16-14309-15 | ||||
RV-250290 | RELIEF VALVE | WWT HOT WATER HEATER WWT-PIPE RELIEF VALVE (3/4 x 3/4 - SET @ 150PSI) NOT ON PIDS | ||||
RV-250450 | RELIEF VALVE | WWT HYPO-CHLORIDE INJECTION PUMP WWT-P16 INJECTION INTO NO. 3 SERVICE WATER PUMP (1/2 x 1/2 / SET @ 150PSI) PID DWG WWT-16-14309-15 | ||||
RV-250433 | RELIEF VALVE | WWT HYPO-CHLORIDE INJECTION PUMP WWT-P17 INJECTION INTO NO 3 SERVICE WATER PUMP (3/4 x 3/4 / SET @ 150PSI) PID DWG WWT-16-14309-15 | ||||
RV-250244 | RELIEF VALVE | WWT INSTRUMENT AIR HEADER WWT-PIPE RELIEF VALVE (3/4 x 1 - SET @ 30PSI) PID DWG WWT-16-14309-17 | ||||
RV-250243 | RELIEF VALVE | WWT INSTRUMENT AIR HEADER WWT-PIPE RELIEF VALVE (3/4 x 1 - SET @ 30PSI) PID DWG WWT-16-1430917 | ||||
RV-250408 | RELIEF VALVE | WWT NO. 1 FIRE WATER BOOSTER PUMP WWT-P1FW RELIEF VALVE RV-250408 (4 x 6 - SET @ 150 PSI) PID DWG WWT-14-3117-15 | ||||
RV-250055 | RELIEF VALVE | WWT NO 2 FIREWATER PUMP WWT-P2FW RELIEF VALVE (4 x 6 - SET @ 150 PSI) PID DWG 14-3117-15 | ||||
RV-250058 | RELIEF VALVE | WWT NO 5 SERVICE WATER STANDBY TURBINE WWT-P5SW RELIEF VALVE RV-250058 (3 x 4 - SET @ 40PSI) PID DWG WWT-14-3117-15 | ||||
RV-250057 | RELIEF VALVE | WWT NO.2 FIRE WATER PUMP WWT-P2FW RELIEF VALVE (3 x 4 - SET @ 150PSI) PID DWG WWT-16-14309-15 | ||||
RV-250517 | RELIEF VALVE | WWT SEWER BOX 25A - LOCATED AT THE SOUTHEAST CORNER OF THE VPS UNIT ALONG MAIN PLANT ROAD PRESSURE/VACUUM VENT (4x 6 - 2 0PSI OF WC / .05 0Z PER SQ.IN VACUUM) | ||||
RV-250516 | RELIEF VALVE | WWT SEWER JUNCTION BOX 14 - LOCATED AT THE SOUTHWEST CORNER OF THE API SEPARATOR ALONG WASTE WATER WAY PRESSURE/VACUUM VENT (4x 6 / 2.0PSI OF WC / .05 OZ PER SQ. IN VACUUM) | ||||
RV-250514 | RELIEF VALVE | WWT SEWER JUNCTION BOX 3W - LOCATED ON WEST ROAD ACROSS FROM CUMENE UNIT PRESSURE/ VACUUM VENT (4x 6 / 2.0PSI OF WC / 05 OZ PER SQ.IN VACUUM) | ||||
RV-250518 | RELIEF VALVE | WWT SEWER JUNCTION BOX 42 - LOCATED ON THE SOUTHEAST CORNER OF THE CRU ALONG CRU DRIVE PRESSURE/VACUUM VENT (4 x 6 / 2 0PSI OF WC / .05 OZ PER SQ.IN VACUUM) | ||||
RV-250515 | RELIEF VALVE | WWT SEWER JUNCTION BOX 9W - LOCATED ON WEST ROAD ACROSS FROM THE FCCU PRESSURE/VACUUM VENT (4x 6 / 2.0PSI OF WC / .05 OZ PER SQ.IN VACUUM) | ||||
RV-250519 | RELIEF VALVE | WWT SUMP SUV12 - LOCATED SOUTH OF CONTROL ROOM ALONG THE NORTH EDGE OF THE SULFOLANE UNIT (4x 6 / 2.0PSI OF WC / 05 OZ PER SQ.IN VACUUM) | ||||
RV-250390 | RELIEF VALVE | WWT TRANSCO PIPE LINE WEST DEPTFORD WWT-PIPE RELIEF VALVE RV-250390 (6 x 8- SET @ 275 PSI)OFF AND ON SEND OUT TO CRANE VALVE. *** DOT*** | ||||
RV-250489 | RELIEF VALVE | WWT TRANSCO PIPE LINE WEST DEPTFORD WWT-PIPE RELIEF VALVE RV-250489 (SPARE RELIEF VALVE) (6 x 8- SET @ 275 PSI)OFF AND ON SEND OUT TO CRANE VALVE. ***DOT*** | ||||
RV-250410 | RELIEF VALVE | WWT ULTRA VIOLET LIGHT BLOWER WWT-BL201 RELIEF VALVE (1 x 2 - SET @ 7PSI) PID DWG 16-14309-14 | ||||
RV-250176 | RELIEF VALVE | WWT WATER FILTER MIDDLE WWT-D102 RELIEV VALVE (2 x 3- SET @ 50 PSI) PID DWG 14-5117-12 | ||||
WWT-PQ6 | SHUTDOWN LOOP | WWT-PQ6 SUMP PUMP PQ-6 SHUTDOWN ON LAL-07 |
Attachment 1 to Schedule 2.2.1
WWT-PQ7 | SHUTDOWN LOOP | WWT-PQ7 SUMP PUMP PQ-7 SHUTDOWN ON LAL-12 | ||||
WWT-PQ8 | SHUTDOWN LOOP | WWT-PQ8 SUMP PUMP PQ-8 SHUTDOWN ON LAL-10 | ||||
WWT-FND | STRUCTURAL | WWT FOUNDATION - PROJECT TRACKING | ||||
WWT- STRUCT |
STRUCTURAL | WWT STRUCTURAL - PROJECT TRACKING | ||||
WWT-API | TANK | API SEPARATOR | ||||
WWT-TKT08 | TANK | BACKWASH EFFLUENT TANK WWT-TKT08 37L X 22W X 16H - 77,500 GAL. | ||||
WWT-TKT04 | TANK | FILTER FEED TANK WWT-TKT04 14L X 22W X 16H - 27,000 GAL. | ||||
WWT-TKT06 | TANK | FILTERED WATER TANK WWT-TKT06 27L X 22W X 16H - 52,000 GAL. | ||||
WWT-T2A | TANK | WWT AERATION BASIN WWT-T2A PID DWG 14-5117-07 | ||||
WWT-T2B | TANK | WWT AERATION BASIN WWT-T2A PID DWG 14-5117-07 | ||||
WWT-TKT10 | TANK | WWT API SLUDGE THICKENER TANK WWT-TKT10 PID DWG 14-5117-09 | ||||
WWT-TKT09 | TANK | WWT BIO THICKENER TANK WWT-TKT09 PID DWG 14-5117-09 | ||||
WWT-TK331 | TANK | WWT CAUSTIC SODIUM HYDROXIDE WATER TANK WWT-TK331 PID DWG 14-4103-05 | ||||
WWT-TK332 | TANK | WWT CAUSTIC SODIUM HYDROXIDE WATER TANK WWT-TK332 PID DWG 14-4103-05 | ||||
WWT-S2A | TANK | WWT CLARIFIER SCUM SUMP AT TX346 (T3A) WWT-S2A PID DWG 14-5117-08 | ||||
WWT-S2B | TANK | WWT CLARIFIER SCUM SUMP AT WWT-TK345 (T3B) WWT-S2B PID DWG 14-5117-08 | ||||
WWT-T11 | TANK | WWT DOCK DRAIN SUMP WWT-T11 PID-14-4103-04 | ||||
WWT-TK344 | TANK | WWT EMERGENCY STORAGE TANK WWT-TK344 (ALSO KNOWN AS T-1) PID DWG 14-5103-06 | ||||
WWT- TK345 | TANK | WWT SECONDARY CLARIFIER TANK WWT-TK345 (T3B) PID DWG 14-5117-08 | ||||
WWT-TK346 | TANK | WWT SECONDARY CLARIFIER TANK WWT TK346 (T3A) PID DWG 14-5117-08 | ||||
WWT- TK348 | TANK | WWT SLOP OIL MELT TANK WWT-TK348 PID DWG 14-4103-05 | ||||
WWT-TK333 | TANK | WWT SLOP OIL TANK WWT-TK333 INTERNAL FLOATING ROOF 40 FT. DIAMETER / 42.2 HEIGHT PID DWG 14-1203-03 | ||||
WWT- TK335 | TANK | WWT SLOP OIL TANK WWT-TK335 PID DWG 14-1203-03 | ||||
WWT- TK342 |
TANK | WWT SLOP OIL TANK WWT-TK342 INTERNAL FLOATING ROOF 40 FT. DIAMETER / 42 FT. HEIGHT PID DWG 14-4103-04 | ||||
WWT-S3 | TANK | WWT SLUDGE SCUM SUMP WWT-S3 AT TKT09 PID DWG 14-5117-09 | ||||
WWT-S4 | TANK | WWT SLUDGE SCUM SUMP WWT-S4 AT TKT10 PID DWG 14-5117-09 | ||||
WWT-TK602 | TANK | WWT SODIUM HYPOCHLORITE TANK PID | ||||
WWT-TKT07A | TANK | WWT WATER TANK WWT-TKT07A 49L X 9W X 16H - 42,000 GAL. | ||||
WWT-TKT07B | TANK | WWT WATER TANK WWT-TKT07B 49L X 9W X 16H - 42,000 GAL. | ||||
WWT- HLA335 |
TANK GAUGE | SLOP TANK WWT-TK335 ALARMS HIGH 462 HIGH HIGH 468 PID DWG WWT-16-14309-03 | ||||
WSY- ALARM6 |
TANK GAUGE | WSY WELL NO.6 ALARM SYSTEM TRANSMITTER,RECIEVER,LIGHTING AND SIREN, ALARM REPAIRS DONE BY OUTSIDE SERVICES. | ||||
WSY- ALARM7 |
TANK GAUGE | WSY WELL NO.7 ALARM SYSTEM TRANSMITTER,RECIEVER,LIGHTING AND SIREN ALARM REPAIRS DONE BY OUTSIDE SERVICES. | ||||
WWT- HLA331 |
TANK GAUGE | WWT CAUSTIC SODIUM HYDROXIDE WATER TANK 331 HIGH LEVEL ALARM HIGH 22 HIGH HIGH 23 PID DWG 14-4103-05 | ||||
WWT-HLA332 | TANK GAUGE | WWT CAUSTIC SODIUM HYDROXIDE WATER TANK 333 HIGH LEVEL ALARM HIGH 22 HIGH HIGH 23 PID DWG 14-4103-05 | ||||
WWT- HLA342 |
TANK GAUGE | WWT COLD SLOP TANK WWT-TK342 ALARMS HIGH 373 HIGH HIGH 378 PID DWG WWT-16-14309-04 | ||||
WWT- HLA344 |
TANK GAUGE | WWT EMERGENCY STORAGE TANK WWT-TK344 HIGH LEVEL ALARM (ALSO KNOWN AS WWT-T1HL) PID 14-5103-06 | ||||
WWT-HLA333 | TANK GAUGE | WWT SLOP OIL TANK TK333 ALARM HIGH 401/2 HIGH HIGH 409 1/2 PID DWG WWT-16-14309-03 | ||||
POH- TT502 | TEMP LOOP | FCC TEMPERATURE TRANSMITTER, TRANSCO (WOODBURY HUT) (QUARTERLY) THIS AREA UNDER DIRECTION WWT | ||||
WWT- TIT105 | TEMP LOOP | FINAL EFFLUENT WATER FLOW TEMPERATURE TRANSMITTER AND RECORDER | ||||
WWT-TI01A | TEMP LOOP | WWT-TI01A VAPOR TEMP. CARBON CANNISTER #1 INLET |
Attachment 1 to Schedule 2.2.1
WWT-T101B | TEMP LOOP | WWT-T101B VAPOR TEMP. CARBON CANNISTER #1 OUTLET | ||||
WWT-T102A | TEMP LOOP | WWT-T102A VAPOR TEMP. CARBON CANNISTER #2 INLET | ||||
WWT-T102B | TEMP LOOP | WWT-T102B VAPOR TEMP. CARBON CANNISTER #2 OUTLET | ||||
WWT-T103A | TEMP LOOP | WWT-T103A VAPOR TEMP. CARBON CANNISTER #3 INLET | ||||
WWT-T103B | TEMP LOOP | WWT-T103B VAPOR TEMP. CARBON CANNISTER #3 OUTLET | ||||
WWT-T104A | TEMP LOOP | WWT-T104A VAPOR TEMP. CARBON CANNISTER #4 INLET | ||||
WWT-T104B | TEMP LOOP | WWT-T104B VAPOR TEMP. CARBON CANNISTER #4 OUTLET | ||||
WWT-T106A | TEMP LOOP | WWT-T106A VAPOR TEMP. CARBON CANNISTER #6 INLET | ||||
WWT-T106B | TEMP LOOP | WWT-T106B VAPOR TEMP. CARBON CANNISTER #6 OUTLET | ||||
S2T53-101 | TRANSFORMER | 2.4KV-120/208 LIGHTING TRANSFORMER AT POLE 101 FOR RIVER WATER PUMPHOUSE AND DOCK 3 | ||||
S2T43-14 | TRANSFORMER | LIGHTING PANEL D902 ON BENZENE NESHAP UNIT | ||||
S2T43-10 | TRANSFORMER | LIGHTING PANEL IN WWT SLOP AREA | ||||
S4T53-208 | TRANSFORMER | TRANSFORMER 2400 X 120/240 POWER TRANSFORMER FOR 24 POLE DISTR PNL 25KVA | ||||
TF-0088 | TRANSFORMER | WSY TRANSFORMER 2400 X 480 POWER FOR NO. 7 WELL PAD MOUNT YES. | ||||
S2T54-141 | TRANSFORMER | WWT TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR WWTP BENZENE RECOVERY UNIT 750KVA | ||||
TF-0138 | TRANSFORMER | WWT TRANSFORMER 480 X 208/120 75KVA FOR WWTP CONTROLROOM AND RELATED EQUIP DRY TYPE | ||||
S2T53-15 | TRANSFORMER | WWT TRANSFORMER, SEPERATOR WWT 2400 X 240/120 50 KVA. LIGHTING PLANT SEPERATOR | ||||
S2T54-24 | TRANSFORMER | WWT TRANSFORMER, SEPERATOR WWT 2400 X 240/480 150 KVA POWER FOR PLAMNT SEPERATOR | ||||
TR-0668 | TURBINE | WWT NO.5 SERVICE WATER PUMP WWT-P5SW TURBINE TR-0668 PID DWG WWT-16-14309-15 121HP / 3500RPM | ||||
TR-2536 | TURBINE | WWT NO.6 FIRE WATER PUMP WWT-P6FW TURBINE TR-2536 155HP / 3500RPM PID DWG WWT-16-14309-15 | ||||
UPS-104A | UPS | WWT UNINTERUPTED POWER SUPPLY UPS 104A | ||||
UPS-104 | UPS | WWT UNINTERUPTED POWER SUPPLY UPS-104 | ||||
WSY-VALVE | VALVE | WSY VALVES DOES NOT INCLUDE CHECK, CONTROL VALVES, OR RELIEF VALVES - DO NOT WRITE WO FOR THOSE TO THIS EQUIP. | ||||
WWT-CHECK | VALVE | WWT CHECK VALVES DOES NOT INCLUDE CONTROL VALVES, RELIEF VALVES AND GATE, GLOBE, OR BALL VALVES - DO NOT WRITE WO FOR THOSE VALVES TO THIS EQUIP. | ||||
WWT-ESDV01 | VALVE | WWT EMERGENCY SHUT DOWN VALVE (WEST DEPTFORD) TRANSCO LINE @ WOODBURY STATION | ||||
WWT-VALVE | VALVE | WWT VALVES DOES NOT INCLUDE CHECK, CONTROL VALVES, OR RELIEF VALVES - DO NOT WRITE WO FOR THOSE TO THIS EQUIP. | ||||
VH-5394 | VEHICLE | OPR-AUTO (01 FORD F-150) VH-5394 | ||||
VH-4731 | VEHICLE | WWT LIFT PUMP (84 DETRIOT DIESEL) VH-4731 | ||||
DRM-1190 | VESSEL | WWT WATER FILTER (A) WWT-D101 DRM-1190 (T5A) PID DWG 14-5117-11 | ||||
DRM-1191 | VESSEL | WWT WATER FILTER (B) WWT-D102 DRM-1191 (T5B) PID DWG 14-5117-12 | ||||
DRM-1192 | VESSEL | WWT WATER FILTER (C) WWT-D103 DRM-1192 (T5C) PID DWG 14-5117-13 | ||||
Assets POWERHOUSE |
||||||
POWERHOUSE/BOILERHOUSE PUMPS | ||||||
P-2964 | PUMP | BOH2 AQUEOUS AMMONIA PUMP BOH2-P05 NORTH (NEW 2002) | A | |||
P-2965 | PUMP | BOH2 AQUEOUS AMMONIA PUMP BOH2-P05A SOUTH (NEW 2002) | A | |||
P-2968 | PUMP | BOH2 BOH2-P07 WET ESP FLUSH PUMP BLR 5 (NEW 2002) | I | |||
P-2969 | PUMP | BOH2 BOH2-P08 WET ESP FLUSH PUMP BLR 6 (NEW 2002) | A | |||
P-2970 | PUMP | BOH2 BOH2-P09 WET ESP FLUSH PUMP BLR 7 (NEW 2002) | I | |||
P-2971 | PUMP | BOH2 BOH2-P10 WET ESP FLUSH PUMP BLR 8 (NEW 2002) | A | |||
P-2972 | PUMP | BOH2 BOH2-P11 RECIRCULATION PUMP BLR 6 (NEW 2002) | A | |||
P-2973 | PUMP | BOH2 BOH2-P12 RECIRCULATION PUMP BLR 6 (NEW 2002) MAX PSI 150 | A | |||
P-2975 | PUMP | BOH2 BOH2-P14 RECIRCULATION PUMP BLR 8 (NEW 2002) | A | |||
P-3019 | PUMP | BOH2 CAUSTIC PUMP BOILER BOH2-P16 P-3019 (NEW 2002) | A | |||
P-2962 | PUMP | BOH2 CONDENSATE WATER CIRCULATION PUMP BOH2-P04 (NEW 2002) | A | |||
P-2963 | PUMP | BOH2 CONDENSATE WATER CIRCULATION PUMP BOH2-P04A (NEW 2002) | A | |||
P-2953 | PUMP | BOH2 DEAERATOR PUMP BOH2-P02 (NEW 2002) | A | |||
P-2954 | PUMP | BOH2 DEAERATOR PUMP BOH2-P02A (NEW 2002) | A | |||
P-2955 | PUMP | BOH2 DEAERATOR PUMP BOH2-P02B (NEW 2002) | I | |||
P-2956 | PUMP | BOH2 DEMINERALIZED WATER PUMP BOH2-P01 (NEW 2002) | A | |||
P-2957 | PUMP | BOH2 DEMINERALIZED WATER PUMP BOH2-P01A (NEW 2002) | A | |||
P-0553 | PUMP | BOH2 DESUPERHEATER WATER PUMP BOH2-P15A | A | |||
P-2960 | PUMP | BOH2 JET A FUEL OIL PUMP BOH2-P03 (NEW 2002) | A |
Attachment 1 to Schedule 2.2.1
P-2961 | PUMP | BOH2 JET A FUEL OIL PUMP BOH2-P03A (NEW 2002) - TURBINE DRIVEN TR-2966 | A | |||
P-2958 | PUMP | BOH2 NH40H CHEMICAL INJECTION BOH2-P06 (NEW 2002) | I | |||
P-2959 | PUMP | BOH2 NH40H CHEMICAL INJECTION BOH2-P06A (NEW 2002) | I | |||
P-2974 | PUMP | BOH2 RECIRCULATION PUMP 8LR 7 (NEW 2002) BOH2-P13 | I | |||
P-2976 | PUMP | BOH2-P15B DESUPERHEATER PUMP (NEW 2002) | I | |||
POWERHOUSE PUMPS |
||||||
P-0562 | PUMP | NO. 1 TURBINE GENERATOR EAST CONDENSATE WATER POH-P20G2 P-0562 PID DWG POH-16-14287-34 | I | |||
P-0561 | PUMP | NO. 1 TURBO GENERATOR WEST CONDENSATE WATER POH-P20G P-0561 PID DWG POH-16-14287-34 | ||||
PLANT AIR PUMP | PLANT AIR DRYER AND ASSOC EQUIP LOCATED SOUTH OF WATER TREATING. NO PM REQUIRED AS OF 1-06 | A | ||||
P-2784 | PUMP | POH ACID DILUTION PUMP POH-P27G P-2784 PID DWG POH-16-14287-11 | I | |||
P-2783 | PUMP | POH ACID DILUTION PUMP POH-P27G1 P-2783 PID DWG POH-16-14287-11 | I | |||
P-2187 | PUMP | POH BRINE PUMP POH-P29G P-2187 PID DWG POH-16-14287-13 | I | |||
P-2787 | PUMP | POH BRINE PUMP POH-P29G1 P-2787 PID DWG POH-16-14287-13 (OUT OF SERVICE) | I | |||
P-0953 | PUMP | POH CHELANT INJECTION PUMP POH-P30G1 P-0953 PID DWG POH-16-14287-15 (WEST PUMP) | A | |||
P-0954 | PUMP | POH CHELANT INJECTION PUMP POH-P30G2 P-0954 PID DWG POH-16-14287-15 (EAST PUMP) | I | |||
P-1909 | PUMP | POH CHLORINE SOLUTION PUMP POH-P03HC P-1909 PID DWG POH-16-14287-51 (OUT OF SERVICE) | I | |||
P-l741 | PUMP | POH CHLORINE SOLUTION PUMP POH-P04HC P-l741 PID DWG POH-16-14287-51 (OUT OF SERVICE) | I | |||
P-0948 | PUMP | POH CONDENSATE WATER PUMP POH-P05G P-0948 PID DWG POH-16-14287-05 | A | |||
P-0949 | PUMP | POH CONDENSATE WATER PUMP POH-P06G P-0949 PID DWG POH-16-14287-05 | A | |||
P-0769 | PUMP | POH COOLING WATER PUMP POH-P01H P-0769 PID DWG POH-16-14287-52 |
I | |||
P-0637 | PUMP | POH COOLING WATER PUMP POH-P02H P-0637 PID DWG POH-16-14287-52 | I | |||
P-0639 | PUMP | POH COOLING WATER PUMP POH-P03H P-0639 PID DWG POH-16-14287-52 | I | |||
P-2004 | PUMP | POH DESUPERHEATER CONDENSATE WATER BOOSTER PUMP POH-P18G3 P-2004 PID DWG POH-16-14287-391 | I | |||
P-0557 | PUMP | POH DESUPERHEATER CONDENSATE WATER PUMP POH-P18G1 P-0557 PID DWG POH-16-14287-39 | I | |||
P-0558 | PUMP | POH DESUPERHEATER CONDENSATE WATER PUMP POH-P18G2 P-0558 PID DWG POH-16-14287-39 | I | |||
P-1966 | PUMP | POH FILTER BACKWASH PUMP POH-P07G P-1966 PID DWG POH-16-14287-09 | A | |||
P-1902 | PUMP | POH IRON REMOVAL BACKWASH POH-P05HC P-1902 PID DWG POH-16-14287-51 | A | |||
P-1903 | PUMP | POH IRON REMOVAL INJECTION PUMP POH-P06HC P-1903 PID DWG POH-16-14287-51 | I | |||
P-1645 | PUMP | POH LIME EFFLUENT PUMP POH-P45G P-l645 | I | |||
P-2908 | PUMP | POH LIME SLUDGE FLOW TO PRESS PUMP P-2908 PID DWG (AIR PUMP) | I | |||
P-2002 | PUMP | POH LIME SLUDGE PUMP POH-P34G P-2002 PID DWG POH-16-14287-08 | I | |||
P-1618 | PUMP | POH LIME SLURRY DECANTING PUMP POH-P45G P-1618 | I | |||
P-0559 | PUMP | POH LUBE OIL FEED TO UPPER / LOWER SUMP POH-P19G1 PID DWG POH-16-14287-38 | A | |||
P-2775 | PUMP | POH LUBE OIL TRANSFER PUMP 1 / 2 GENER. POH-P19G PID DWG POH-16-14287-38 | I | |||
P-3028 | PUMP | POH NO.2 DRINKING WATER PUMP POH-P03G1 P-3028 (MIDDLE PUMP ) PID DWG POH-16-14287-50 | A | |||
P-3009 | PUMP | POH NO 1 BOILER FEED WATER PUMP POH-P14G AUXILIARY OIL PUMP P-0551 PID DWG POH-16-14287-19 | A | |||
P-0551 | PUMP | POH NO 1 BOILER FEED WATER PUMP POH-P14G P-0551 PID DWG POH-16-14287-19 | A | |||
P-3008 | PUMP | POH NO 1 PLANT AIR COMPRESSOR POH-C101 AUXILIARY LUBE OIL PUMP PID DWG POH-16-14287-45 | A | |||
P-2637 | PUMP | POH NO 1 PLANT AIR COMPRESSOR POH-C101 LUBE OIL PUMP PID DWG POH-16-14287-45 | A | |||
P-0554 | PUMP | POH NO 2 BOILER FEED WATER PUMP POH-P16G P-0554 PID DWG POH-16-14287-20 | A | |||
P-2785 | PUMP | POH NO. 1 COOLING TOWER POH-CWT01 ACID INJECTION PUMP POH-P07H PID DWG POH-16-14287-52 | A | |||
P-2941 | PUMP | POH NO. 1 RAW WATER PUMP POH-P02G PUMP P-2941 PID DWG POH-16-14287-03 | I | |||
P-2786 | PUMP | POH NO. 1A COOLING TOWER POH-CWT01A ACID INJECTION PUMP POH-P08H P-2786 PID DWG POH-16-14287-52 | I | |||
P-1484 | PUMP | POH NO. 1A COOLING TOWER POH-CWT01A P-1484 NO. 4 PUMP POH-P04H PID DWG POH-16-14287-53 | A | |||
P-l485 | PUMP | POH NO. 1A COOLING TOWER POH-CWT01A PUMP P-1485 NO. 5 PUMP POH-P05H PID DWG POH-16-14287-53 | A | |||
P-1486 | PUMP | POH NO. 1A COOLING TOWER POH-CWT01A PUMP POH-P06H P-1486 PID DWG POH-16-14287-53 | A | |||
P-2035 | PUMP | POH NO. 2 RAW WATER PUMP POH-P01G PUMP P-2035 PID DWG POH-16-14287-03 | I | |||
P-2829 | PUMP | POH NO. 3 BOILER OIL PUMP POH-P40G P-2829 PID DWG POH- | I | |||
P-2830 | PUMP | POH NO. 3 BOILER OIL PUMP POH-P40G1 P-2830 PID DWG POH- | I | |||
P-2831 | PUMP | POH NO. 4 BOILER OIL PUMP POH-P41G P-2831 PID DWG POH- | I | |||
P-2832 | PUMP | POH NO. 4 BOILER OIL PUMP POH-P41G1 P-2832 PID DWG POH- | I | |||
P-l982 | PUMP | POH NO.1 DEAREATION CHARGE PUMP POH-P09G P-1982 PID DWG POH-16-14287-11 | I | |||
P-3032 | PUMP | POH NO.1 DEAREATION CHARGE PUMP POH-P09G P-3032 PID DWG POH-16-14287-11 | I | |||
P-0536 | PUMP | POH NO.1 DRINKING WATER PUMP POH-P04G P-0536 (SOUTH PUMP) PID DWG POH-16-14287-50 | A | |||
P-0549 | PUMP | POH NO.1 FUEL OIL PUMP POH-P36G P-0549 PID DWG POH-16-14287-44 | I | |||
P-l895 | PUMP | POH NO.2 DEAREATION CHARGE PUMP POH-P08G g PID DWG POH-16-14287-11 | I | |||
P-3031 | PUMP | POH NO.2 DEAREATION CHARGE PUMP POH-P08G P-1895 PID DWG POH-16-14287-11 | I | |||
P-0534 | PUMP | POH NO.2 DRINKING WATER PUMP POH-P03G1 P-0534 (MIDDLE PUMP) PID DWG POH-16-14287-50 | I | |||
P-0565 | PUMP | POH NO.2 LIME SLURRY PUMP POH-P22G2 P-0565 PID DWG POH-16-14287-06 (SOUTH PUMP) | I | |||
P-2990 | PUMP | POH NO.2 PLANT AIR AUXILIARY OIL PUMP P-2990 PID DWG POH-16-14287-45 | A | |||
P-3004 | PUMP | POH NO.3 BOILER FEED WATER PUMP MAIN OIL PUMP P-3004 PID DWG 18-3726-19 | A |
Attachment 1 to Schedule 2.2.1
P-3005 | PUMP | POH N0.3 BOILER FEED WATER PUMP AXY. LUBE OIL PUMP P-3005 PID DWG 18-3726-19 | A | |||
P-2951 | PUMP | POH NO.3 BOILER FEED WATER PUMP POH-P15G P-2951 PID DWG 18-3726-19 | A | |||
P-0535 | PUMP | POH NO.3 DRINK WATER PUMP POH-P03G2 P-0535 (NORTH PUMP) PID DWG POH-16-14287-50 | I | |||
P-3027 | PUMP | POH NO.3 DRINK WATER PUMP POH-P03G2 P-3027 (NORTH PUMP) PID DWG POH-16-14287-50 | A | |||
P-2046 | PUMP | POH NO.3 LIME SLURRY PUMP POH-P22G3 P-2046 PID DWG POH-16-14287-06 (MIDDLE PUMP) | I | |||
P-1491 | PUMP | POH NO.3 TURBINE GENERATOR CONDENSATE PUMP POH-P31G1 P-1491 PID DWG POH-16-14287-37A | A | |||
P-1492 | PUMP | POH NO.3 TURBINE GENERATOR CONDENSATE PUMP POH-P31G1 P-1492 PID DWG POH-16-14287-37A | A | |||
P-1493 | PUMP | POH NO.3 TURBINE GENERATOR VACUUM GLAND PUMP POH-P32G P-1942 PID DWG POH-16-14287-37 | A | |||
P-1666 | PUMP | POH NO.3 TURBINE GENERATOR VAPOR EXTRACTOR PUMP POH-P33G P-1666 PID DWG POH-16-14287-38 | A | |||
P-0624 | PUMP | POH NO.4 BOILER FEED WATER PUMP POH-P17G P-0624 PID DWG POH-16-14287-20 | A | |||
P-2053 | PUMP | POH NO.4 LIME SLURRY PUMP POH-P22G4 P-2053 PID DWG POH-16-14287-06 | I | |||
P-0570 | PUMP | POH PHOSPHATE INJECTION PUMP POH-P24G1 P-0570 PID DWG POH-16-14287-54 (OUT OF SERVICE) | I | |||
P-0571 | PUMP | POH PHOSPHATE INJECTION PUMP POH-P24G2 P-0571 PID DWG POH-16-14287-54 (OUT OF SERVICE) | I | |||
P-0572 | PUMP | POH PHOSPHATE INJECTION PUMP POH-P24G3 P-0572 PID DWG POH-16-14287-54 (OUT OF SERVICE) | I | |||
P-2151 | PUMP | POH PORTABLE CENTRIFUGE PURIFIER POH-P38G P-2151 NOT ON PIOS NO PM REQUIRED AS OF 1-06 | A | |||
P-0750 | PUMP | POH SEWER LIFT PUMP POH-P11G PUMP P-0750 | A | |||
P-2909 | PUMP | POH SPARE LIME EFFLUENT AND SLURRY PUMP POH-P43G P-2909 PID DWG (AIR PUMP) | I | |||
P-2049 | PUMP | POH SULPHITE INJECTION PUMP POH-P26G1 P-2049 (NO.2 INJECTION PUMP, NORTH PUMP) PID DWG POH 16-14287-16 | I | |||
P-2050 | PUMP | POH SULPHITE INJECTION PUMP POH-P26G2 P-2050 (NO. 1 INJECTION PUMP, NORTH PUMP) PID DWG POH 16-14287-16 | I | |||
P-2025 | PUMP | POH SUMP PUMP POH-P35G P-2025 (NOT ON PID) OPERATIONS PM | I | |||
P-0563 | PUMP | POH TURBINE ROOM SUMP PUMP POH-P21G P-0563 (NOT ON PID) | A | |||
P-2776 | PUMP | POH TURBO GENERATOR NO. 1 POH-TG01 AUXILLIARY LUBE OIL PUMP P-2776 PID DWG POH-16-14287-35 | I | |||
P-2778 | PUMP | POH TURBO GENERATOR NO. 1 POH-TG01 ROTOCLONE P-2778 PID DWG POH-16-14287-35 | I | |||
P-2779 | PUMP | POH TURBO GENERATOR NO.2 POH-TG02 AUXILLIARY LUBE OIL PUMP P-2779 PID DWG POH-16-14287-36 | I | |||
P-2781 | PUMP | POH TURBO GENERATOR NO.2 POH-TG02 ROTOCLONE P-2781 PID DWG POH-16-14287-36 | I | |||
P-2774 | PUMP | POH TURBO GENERATOR NO.3 AUXILLIARY LUBE OIL POH-TG03 PUMP P-2774 PID DWG POH-16-14287-38 | A | |||
P-0560 | PUMP | POH VAPOR EXTRACTOR RESERVOIR TANK PUMP POH-P39G PID-18-3940-41 TOP OF TANK | I | |||
P-3184 | PUMP | POH-P50A #1 CWT HYPOCHLORITE INJECTION PUMP | A | |||
P-3185 | PUMP | POH-P50B #1 CWT HYPOCHLORITE INJECTION PUMP (SPARE) | A | |||
P-3186 | PUMP | POH-P50C #1A CWT HYPOCHLORITE INJECTION PUMP | A | |||
P-3235 | PUMP | POH-P51 #1 BOILER FEEDWATER PUMP (POH-P14G) LUBE OIL SKID PUMP MOTOR P&ID DWG #18-3726-19 | A | |||
P-3110 | PUMP | P-3110 GASOLINE RERUN PUMP FOR LSG OSBL P-006-01A | I | |||
P-3111 | PUMP | P-3111 RERUN TANK PUMP LSG OSBL P-006-01B | I | |||
P-3112 | PUMP | P-3112 THERMAL ETHANOL PROJECT | I | |||
P-3113 | PUMP | P-3113 THERMAL ETHANOL PROJECT | I | |||
P-3132 | PUMP | P-3132 WEST ETHANOL INJ. PUMP TFA-PN158 TK-51 PID DWG 15-1803-37 | A | |||
P-3133 | PUMP | P-3133 EAST ETHANOL INJ. PUMP TFA-PN159 TK-51 PID DWG 15-1803-37 | A | |||
POWERHOUSE TANKS |
||||||
CAPACITY | DIAMETER | |||||
TFA-TK201 | Cone Roof | 9400 | 40 | |||
TFA-TK202 | Cone Roof | 9400 | 40 | |||
POWERHOUSE LINES |
||||||
NONE LISTED | ||||||
ASSETS from Finance |
||||||
Plant Aircompressors and distribution equipment | ||||||
11 | 200642600061 | SUBSTATION #1 REPLACEMENT | ||||
13 | 200542600002 | ADDL 13.8KV SERVICE FROM 220K | V UTILITY FEEDERS | |||
33 | 200542600019 | #2 SUBSTATIONREPL-FEEDS SRU/HT | U/LSD/FLAREGASCOMP | |||
61 | 2004426EG022 | UTILITIES-BOILERS |
Attachment 1 to Schedule 2.2.1
76 | 200742600040 | PIG TRAPS 8 @TRANSCO CONNECTI | ON @WOODBURY STATION | |||
94 | 200442600060 | FEEDER NO. 6 REPLACEMENT | ||||
129 | 200842600034 | AIR COMPR CONTROLS UPGR-IR CEN | TAC MICROCONTROLLER | |||
137 | 200742600025 | BREAK ROOM-PREFAB ADDITION 21 | TO #1 PUMPHOUSE | |||
151 | 200542600009 | PLANT AIR COMPRESSORS #1 CO | NTROLS UPGRADE | |||
152 | 200642600023 | 900# STEAM SYSTEM INSULATION U | PGRADE | |||
154 | 200442600055 | POWER HOUSE VENT SILENCERS (4) | ||||
158 | 200442600033 | FEEDER 60/60A EXT TO #5 SUBSTA | TION (ADDL 2400V) | |||
207 | 200742600015 | UPS (5KVA/120V) ADDL FOR BOIL | ERS #7 & #8 | |||
218 | 200442600046 | BOILER SAFETY SHUTOFF VALVES R | EPL @ 4 BOILERS | |||
228 | 200642600060 | BOILERS #7/#8-ELECTRO EYE-HYE | LEVEL INDICATION SYS | |||
229 | 200742600014 | BATTERY TEST METER/ELECTRIC MO | TOR TEST METER | |||
240 | 200442600049 | FEEDER CABLE 60 A FROM 2400V S | WITCH RM-POWERHOUSE | |||
POWERHOUSE TOTAL ASSETS |
||||||
POH-FT500N | FLOW LOOP | FCC FLOW TRANSMITTER, TRANSCO (WOODBURY HUT) (NORTH) (2X YEAR) THIS AREA UNDER DIRECTION WWT | ||||
POH-FT500S | FLOW LOOP | FCC FLOW TRANSMITTER, TRANSCO (WOODBURY HUT) (SOUTH) (2X YEAR) THIS AREA UNDER DIRECTION WWT | ||||
BOH | 231 | |||||
BOH2-BL001 | BLOWER | AIR TO AMMONIA BLOWER BOILER 5 (NEW 2002) OPERATIONS PM | I | |||
BOH2-BL003 | BLOWER | AIR TO AMMONIA BLOWER BOILER 7 (NEW 2002) OPERATIONS PM | I | |||
BOH2-BL004 | BLOWER | AIR TO AMMONIA BLOWER BOILER 8 (NEW 2002) OPERATIONS PM | A | |||
BOH2-BL002 | BLOWER | BOH2 BOH2-BL002 AIR TO AMMONIA BLOWER BOILER 6 (NEW 2002) | A | |||
BOH2-BL009 | BLOWER | BOH2 WET ESP PURGE BLOWER 1 BOILER 5 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED) | I | |||
BOH2-BL013 | BLOWER | BOH2 WET ESP PURGE BLOWER 1 BOILER 6 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BOH2-BL017 | BLOWER | BOH2 WET ESP PURGE BLOWER 1 BOILER 7 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | I | |||
BOH2-BL021 | BLOWER | BOH2 WET ESP PURGE BLOWER 1 BOILER 8 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BOH2-BL010 | BLOWER | BOH2 WET ESP PURGE BLOWER 2 BOILER 5 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | I | |||
BOH2-BL014 | BLOWER | BOH2 WET ESP PURGE BLOWER 2 BOILER 6 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BOH2-BL018 | BLOWER | BOH2 WET ESP PURGE BLOWER 2 BOILER 7 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | I | |||
BOH2-BL022 | BLOWER | BOH2 WET ESP PURGE BLOWER 2 BOILER 8 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BOH2-BL011 | BLOWER | BOH2 WET ESP PURGE BLOWER 3 BOILER 5 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | I | |||
BOH2-BL015 | BLOWER | BOH2 WET ESP PURGE BLOWER 3 BOILER 6 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BOH2-BL019 | BLOWER | BOH2 WET ESP PURGE BLOWER 3 BOILER 7 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | I | |||
BOH2-BL023 | BLOWER | BOH2 WET ESP PURGE BLOWER 3 BOILER 8 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BOH2-BL012 | BLOWER | BOH2 WET ESP PURGE BLOWER 4 BOILER 5 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | I | |||
BOH2-BL016 | BLOWER | BOH2 WET ESP PURGE BLOWER 4 BOILER 6 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BOH2-BL020 | BLOWER | BOH2 WET ESP PURGE BLOWER 4 BOILER 7 (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | I | |||
BOH2-BL024 | BLOWER | BOH2 WET ESP PURGE BLOWER 4 BOILER 8 OPERATIONS PM (PER BILL GAYNER NO PM REQUIRED FOR THIS ASSET 7/17/07) | A | |||
BLR05 | BOILER | BOH NO.5 BOILER BOH2-BLR05 (UNIT SHUTDOWN REQUIRED) (NEW 2002) | I | |||
BLR06 | BOILER | BOH NO.6 BOILER BOH2-BLR06 (UNIT SHUTDOWN REQUIRED) (NEW 2002) | A | |||
BLR07 | BOILER | BOH NO.7 BOILER BOH2-BLR07 (UNIT SHUTDOWN REQUIRED) (NEW 2002) | I | |||
BLR08 | BOILER | BOH NO.8 BOILER BOH2-BLR08 (UNIT SHUTDOWN REQUIRED) (NEW 2002) | A | |||
BOH | CEPOC | TRANSITION BOILERHOUSE COST GATHERING ASSET | D | |||
BOH-GRND | ELECT GENERAL | BOH BOILER HOUSE GROUNDING BOH-GRND *****EHS***** | A | |||
EXC-0604 | EXCHANGER | BOH NO. 3 TEMPERATOR BOH-E103A PID DWG 18-3704-26 (UNIT SHUTDOWN REQUIRED) | A | |||
BOH2-BL006 | FAN | DO NOT USE... DUPLICATE OF ASSET FAN-2982 BOH2 NO.6 BOILER FORCE DRAFT AIR FAN (NEW 2002) NO PM REQUIRED AS OF 1-06 | I | |||
BOH2-BL005 | FAN | DO NOT USE.. DUPLICATE OF ASSET FAN-2981 BOH2 NO.5 BOILER FORCE DRAFT AIR FAN (NEW 2002) NO PM REQUIRED AS OF 1-06 | I | |||
BOH2-BL007 | FAN | DO NOT USE... DUPLICATE OF ASSET FAN-2983 BOH2 NO.7 BOILER FORCE DRAFT AIR FAN (NEW 2002) NO PM REQUIRED AS OF 1-06 | I | |||
BOH2-BL008 | FAN | DO NOT USE... DUPLICATE OF ASSET FAN-2984 BOH2 NO.8 BOILER FORCE DRAFT AIR FAN (NEW 2002) NO PM REQUIRED AS OF 1-06 | I |
Attachment 1 to Schedule 2.2.1
FAN-2981 | FAN | FAN-2981 BOH2-BL005 NO.5 BOILER FORCE DRAFT AIR FAN NO PM REQUIRED AS OF 1-06 | I | |||
FAN-2982 | FAN | FAN-2982 BOH2-BL006 NO.6 BOILER FORCE DRAFT AIR FAN (NEW 2002) NO PM REQUIRED AS OF 1-06 | A | |||
FAN-2983 | FAN | FAN-2983 BOH2 - BL007 NO.7 BOILER FORCE DRAFT AIR FAN (NEW 2002) NO PM REQUIRED AS OF 1-06 | I | |||
FAN-2984 | FAN | FAN-2984 BOH2 - BL008 NO.8 BOILER FORCE DRAFT AIR FAN (NEW 2002) NO PM REQUIRED AS OF 1-06 | A | |||
S2F5-1B | FEEDER | 150A 2.4KV FEEDER FROM POLE TO MCC IN RIVER WATER PUMPHOUSE FOR FIRE AND SERVICE WATER PUMPS | A | |||
S2F5-1A | FEEDER | 150A 2.4KV FEEDER FROM POLE TO MCC IN RIVER WATER PUMPHOUSE FOR RAW WATER PUMPS | A | |||
DRM-3610 | FILTER | BOH2 NO.7 BOILER FUEL GAS WASH FILTER NORTH (NEW 2002) | I | |||
DRM-3606 | FILTER | BOH2 NO.5 BOILER FUEL GAS WASH FILTER NORTH (NEW 2002) | I | |||
DRM-3607 | FILTER | BOH2 NO.5 BOILER FUEL GAS WASH FILTER SOUTH (NEW 2002) | I | |||
DRM-3608 | FILTER | BOH2 NO.6 BOILER FUEL GAS WASH FILTER NORTH (NEW 2002) | A | |||
DRM-3609 | FILTER | BOH2 NO.6 BOILER FUEL GAS WASH FILTER SOUTH (NEW 2002) | A | |||
DRM-3611 | FILTER | BOH2 NO.7 BOILER FUEL GAS WASH FILTER SOUTH (NEW 2002) | I | |||
DRM-3612 | FILTER | BOH2 NO 8 BOILER FUEL GAS WASH FILTER NORTH (NEW 2002) | A | |||
DRM-3613 | FILTER | BOH2 NO.8 BOILER FUEL GAS WASH FILTER SOUTH (NEW 2002) | A | |||
GB-0602 | GEAR BOX | BOH NO.1 BOILER BOH-BLR01 AIR PREHEATER AP-0599 GEAR BOX GB-0602 PID DWG POH-16-14287-22 | I | |||
GB-0604 | GEAR BOX | BOH NO.3 BOILER BOH-BLR03 AIR PREHEATER AP-0601 GEAR BOX GB-0604 PID DWG POH-16-14287-26 | I | |||
GB-0623 | GEAR BOX | BOH NO 4 BOILER BOH-BLR04 SOUTH DRAFT FAN GB-0623 PID DWG POH-16-14287-28 (REMOVED FROM SERVICE 5-14-97) | I | |||
GB-2055 | GEAR BOX | BOH NO. 4 BOILER BOH-BLR04 SOUTH DRAFT FAN GB-2055 PID DWG POH-16-14287-23 | I | |||
BOH-GRNDS | GROUNDS | BOH MISCELLANEOUS GROUNDS WORK | A | |||
BOH-INSTRU | INSTRUMENT GEN | BOH INSTRUMENTATION COST ROLL UP | A | |||
BOH2-MX004 | MIXER | AIR TO AMMONIA MIXER BOILER 8 (NEW 2002) NO PM REQUIRED AS OF 1-06 | A | |||
M-2020 | MOTOR | AIR TO AMMONIA BLOWER MOTOR BOILER 5 (NEW 2002) | I | |||
M-2021 | MOTOR | AIR TO AMMONIA BLOWER MOTOR BOILER 6 (NEW 2002) | A | |||
M-2022 | MOTOR | AIR TO AMMONIA BLOWER MOTOR BOILER 7 (NEW 2002) | I | |||
M-2023 | MOTOR | AIR TO AMMONIA BLOWER MOTOR BOILER 8 (NEW 2002) | A | |||
M-0490 | MOTOR | BOH NO. 4 BOILER BOH-BLR04 AIR PREHEATER MOTOR | A | |||
M-0182 | MOTOR | BOH NO.1 BOILER BOH-BLR01 NORTH DRAFT FAN MOTOR 450HP / 1200RPM / FRAME | A | |||
M-0190 | MOTOR | BOH NO.3 BOILER BOH-BLR03 AIR PREHEATER AP-0601 GEAR BOX MOTOR 5HP / 1750RPM / FRAME | A | |||
M-0185 | MOTOR | BOH NO.3 BOILER BOH-BLR03 MOTOR 450 HP / 1190 RPM / 574Z FRAME | A | |||
M-0187 | MOTOR | BOH NO.3 BOILER BOH-BLR03 MOTOR 450 HP / 1190RPM / 574Z FRAME | A | |||
M-0186 | MOTOR | BOH NO.4 BOILER BOH-BLR04 MOTOR (NORTH FAN) 450 HP / 1190 RPM / 574Z FRAME | A | |||
M-2008 | MOTOR | BOH2 - P15B DESUPERHEATER PUMP MOTOR BOH2-P15 (NEW 2002) | I | |||
M-1998 | MOTOR | BOH2 AQUEOUS AMMONIA PUMP BOH2-P05 MOTOR (NEW 2002) | A | |||
M-1999 | MOTOR | BOH2 AQUEOUS AMMONIA PUMP BOH2-P05A MOTOR (NEW 2002) | A | |||
M-2005 | MOTOR | BOH2 BOH2-P12 RECIRCULATION PUMP BLR 5 (NEW 2002) | A | |||
M-2228 | MOTOR | BOH2 BOILER FORCE DRAFT AIR FAN MOTOR | A | |||
M-2065 | MOTOR | BOH2 CAUSTIC PUMP BOILER BOH2-P16 M-2065 (NEW 2002) | A | |||
M-1996 | MOTOR | BOH2 CONDENSATE WATER CIRCULATION PUMP BOH2-P04 MOTOR (NEW 2002) | A | |||
M-1997 | MOTOR | BOH2 CONDENSATE WATER CIRCULATION PUMP BOH2-P04A MOTOR (NEW 2002) | A | |||
M-1987 | MOTOR | BOH2 DEAERATOR PUMP BOH2-P02 MOTOR (NEW 2002) | A | |||
M-1988 | MOTOR | BOH2 DEAERATOR PUMP BOH2-P02A MOTOR (NEW 2002) | A | |||
M-1990 | MOTOR | BOH2 DEMINERALIZED WATER PUMP BOH2-P01 MOTOR (NEW 2002) | A | |||
M-1991 | MOTOR | BOH2 DEMINERALIZED WATER PUMP BOH2-P01A MOTOR (NEW 2002) | A | |||
M-1904 | MOTOR | BOH2 DESUPERHEATER WATER PUMP MOTOR BOH2-P15A M-l904 (200 HP / 3350 RPM / 447TS FRAME) | A | |||
M-1994 | MOTOR | BOH2 JET A FUEL OIL PUMP BOH2-P03 MOTOR (NEW 2002) | A | |||
M-1993 | MOTOR | BOH2 NH40H CHEMICAL INJECTION BOH2-P06A MOTOR (NEW 2002) | A | |||
M-1992 | MOTOR | BOH2 NH40H CHEMICAL INJECTION BOH2-P06 (NEW 2002) | A | |||
M-2016 | MOTOR | BOH2 NO 5 BOILER FORCE DRAFT FAN MOTOR | I | |||
M-2017 | MOTOR | BOH2 NO 6 BOILER FORCE DRAFT AIR FAN MOTOR (NEW 2002) | A | |||
M-2018 | MOTOR | BOH2 NO.7 BOILER FORCE DRAFT AIR FAN MOTOR (NEW 2002) | I | |||
M-2019 | MOTOR | BOH2 NO.8 BOILER FORCE DRAFT AIR FAN MOTOR (NEW 2002)(STORED AT MTI - SPARE) (ROTOR REBARRED WITH COPPER BARS 2/08 MTI JOB# 136139) | I | |||
M-2004 | MOTOR | BOH2 RECIRCULATION PUMP BLR 6 BOH2-P11 (NEW 2002) | A | |||
M-2006 | MOTOR | BOH2 RECIRCULATION PUMP BLR 7 BOH2-P13 (NEW 2002) | I | |||
M-2007 | MOTOR | BOH2 RECIRCULATION PUMP BLR 8 BOH2-P14 (NEW 2002) | A | |||
M-2000 | MOTOR | BOH2 WET ESP FLUSH PUMP BLR 5 BOH2-P07 (NEW 2002) | I | |||
M-2001 | MOTOR | BOH2 WET ESP FLUSH PUMP BLR 6 BOH2-P08 (NEW 2002) | A |
Attachment 1 to Schedule 2.2.1
M-2002 | MOTOR | BOH2 WET ESP FLUSH PUMP BLR 7 BOH2-P09 (NEW 2002) | I | |||
M-2003 | MOTOR | BOH2 WET ESP FLUSH PUMP BLR 8 BOH2-P10 (NEW 2002) | A | |||
M-2030 | MOTOR | BOH2 WET ESP PIRGE BLOWER 2 MOTOR BOILER 6 | A | |||
M-2024 | MOTOR | BOH2 WET ESP PURGE BLOWER 1 BOILER 5 | I | |||
M-2029 | MOTOR | BOH2 WET ESP PURGE BLOWER 1 MOTOR BOILER 6 | A | |||
M-2033 | MOTOR | BOH2 WET ESP PURGE BLOWER 1 MOTOR BOILER 7 | I | |||
M-2037 | MOTOR | BOH2 WET ESP PURGE BLOWER 1 MOTOR BOILER 8 | A | |||
M-2026 | MOTOR | BOH2 WET ESP PURGE BLOWER 2 MOTOR BOILER 5 | I | |||
M-2034 | MOTOR | BOH2 WET ESP PURGE BLOWER 2 MOTOR BOILER 7 | I | |||
M-2038 | MOTOR | BOH2 WET ESP PURGE BLOWER 2 MOTOR BOILER 8 | A | |||
M-2027 | MOTOR | BOH2 WET ESP PURGE BLOWER 3 MOTOR BOILER 5 | I | |||
M-2031 | MOTOR | BOH2 WET ESP PURGE BLOWER 3 MOTOR BOILER 6 | A | |||
M-2035 | MOTOR | BOH2 WET ESP PURGE BLOWER 3 MOTOR BOILER 7 | I | |||
M-2039 | MOTOR | BOH2 WET ESP PURGE BLOWER 3 MOTOR BOILER 8 | A | |||
M-2028 | MOTOR | BOH2 WET ESP PURGE BLOWER 4 MOTOR BOILER 5 | I | |||
M-2032 | MOTOR | BOH2 WET ESP PURGE BLOWER 4 MOTOR BOILER 6 | A | |||
M-2036 | MOTOR | BOH2 WET ESP PURGE BLOWER 4 MOTOR BOILER 7 | I | |||
M-2040 | MOTOR | BOH2 WET ESP PURGE BLOWER 4 MOTOR BOILER 8 | A | |||
BHSSMS4-P04 | MOTOR STARTER | BOH2 CONDENSATE WATER CIRCULATION PUMP STARTER BOH2-P04 MOTOR (NEW 2002) EOL DWG# 13211.01-FE-01B | I | |||
BHSSMS4-P04A | MOTOR STARTER | BOH2 CONDENSATE WATER CIRCULATION PUMP STARTER BOH2-P04A MOTOR (NEW 2002) EOL DWG# 13211.01-FE-01B | I | |||
BHSSMS4-P02 | MOTOR STARTER | BOH2 DEAERATOR PUMP BOH2-P02 MOTOR STARTER (NEW 2002) EOL DWG# 13211.01-FE-01B | I | |||
BHSSMS4-P02A | MOTOR STARTER | BOH2 DEAERATOR PUMP BOH2-P02A MOTOR STARTER (NEW 2002) EOL DWG# 13211.01-FE-01B | I | |||
BHSSMS5-FD5 | MOTOR STARTER | BOH2 NO.5 BOILER FORCE DRAFT FAN MOTOR STARTER | I | |||
BHSSMS5- FD6 | MOTOR STARTER | BOH2 NO.6 BOILER FORCE DRAFT AIR FAN MOTOR STARTER (NEW 2002) | I | |||
BHSSMS5-FD7 | MOTOR STARTER | BOH2 NO.7 BOILER FORCE DRAFT AIR FAN MOTOR STARTER (NEW 2002) | I | |||
BHSSMS5-FD8 | MOTOR STARTER | BOH2 NO.8 BOILER FORCE DRAFT AIR FAN MOTOR STARTER (NEW 2002) | I | |||
MOV-615 | MOV | BOH2 BOILER 05, 250 LB STEAM TO FAN TURBINE. MOTOR OPERATED VALVE (NEW 2004) | I | |||
MOV-616 | MOV | BOH2 BOILER 06, 250 LB STEAM TO FAN TURBINE. MOTOR OPERATED VALVE (NEW 2004) | A | |||
MOV-617 | MOV | BOH2 BOILER 07, 250 LB STEAM TO FAN TURBINE. MOTOR OPERATED VALVE (NEW 2004) | I | |||
MOV-618 | MOV | BOH2 BOILER 08, 250 LB STEAM TO FAN TURBINE. MOTOR OPERATED VALVE (NEW 2004) | A | |||
MOV-164 | MOV | POH BOILER NO. 3 BOH-BLR03 OUTLET HEADER 900LB MOTOR OPERATED VALVE (NEW 1996) | A | |||
BOH-PIPE | PIPING | PIPING BOH PROJECT TRACKING. | A | |||
P-2964 | PUMP | BOH2 AQUEOUS AMMONIA PUMP BOH2-P05 NORTH (NEW 2002) | A | |||
P-2965 | PUMP | BOH2 AQUEOUS AMMONIA PUMP BOH2-P05A SOUTH (NEW 2002) | A | |||
P-2968 | PUMP | BOH2 BOH2-P07 WET ESP FLUSH PUMP BLR 5 (NEW 2002) | I | |||
P-2969 | PUMP | BOH2 BOH2-P08 WET ESP FLUSH PUMP BLR 6 (NEW 2002) | A | |||
P-2970 | PUMP | BOH2 BOH2-P09 WET ESP FLUSH PUMP BLR 7 (NEW 2002) | I | |||
P-2971 | PUMP | BOH2 BOH2-P10 WET ESP FLUSH PUMP BLR 8 (NEW 2002) | A | |||
P-2972 | PUMP | BOH2 BOH2-P11 RECIRCULATION PUMP BLR 6 (NEW 2002) | A | |||
P-2973 | PUMP | BOH2 BOH2-P12 RECIRCULATION PUMP BLR 6 (NEW 2002) MAX PSI 150 | A | |||
P-2975 | PUMP | BOH2 BOH2-P14 RECIRCULATION PUMP BLR 8 (NEW 2002) | A | |||
P-3019 | PUMP | BOH2 CAUSTIC PUMP BOILER BOH2-P16 P-3019 (NEW 2002) | A | |||
P-2962 | PUMP | BOH2 CONDENSATE WATER CIRCULATION PUMP BOH2-P04 (NEW 2002) | A | |||
P-2963 | PUMP | BOH2 CONDENSATE WATER CIRCULATION PUMP BOH2-P04A (NEW 2002) | A | |||
P-2953 | PUMP | BOH2 DEAERATOR PUMP BOH2-P02 (NEW 2002) | A | |||
P-2954 | PUMP | BOH2 DEAERATOR PUMP BOH2-P02A (NEW 2002) | A | |||
P-2955 | PUMP | BOH2 DEAERATOR PUMP BOH2-P02B (NEW 2002) | I | |||
P-2956 | PUMP | BOH2 DEMINERALIZED WATER PUMP BOH2-P01 (NEW 2002) | A | |||
P-2957 | PUMP | BOH2 DEMINERALIZED WATER PUMP BOH2-P01A (NEW 2002) | A | |||
P-0553 | PUMP | BOH2 DESUPERHEATER WATER PUMP BOH2-P15A | A | |||
P-2960 | PUMP | BOH2 JET A FUEL OIL PUMP BOH2-P03 (NEW 2002) | A | |||
P-2961 | PUMP | BOH2 JET A FUEL OIL PUMP BOH2-P03A (NEW 2002) - TURBINE DRIVEN TR-2966 | A | |||
P-2958 | PUMP | BOH2 NH40H CHEMICAL INJECTION BOH2-P06 (NEW 2002) | I | |||
P-2959 | PUMP | BOH2 NH40H CHEMICAL INJECTION BOH2-P06A (NEW 2002) | I | |||
P-2974 | PUMP | BOH2 RECIRCULATION PUMP BLR 7 (NEW 2002) BOH2-P13 | I | |||
P-2976 | PUMP | BOH2-P15B DESUPERHEATER PUMP (NEW 2002) | I | |||
RV-023024 | RELIEF VALVE | BOH-PIPE 15# LB STEAM OUTLET SIDE RELIEF VALVE ON JET A FUEL SYSTEM 3 X 4/ SET @ 50 PSI PID 18-2026-46.01 (NEW 2002) | A | |||
RV-023041 | RELIEF VALVE | BOH2 BOILERHOUSE TANK 1010 RELIEF VALVE RV-023041 (3 SET 50 PSI) (NEW 2002) | A | |||
RV-023018 | RELIEF VALVE | BOH2 FUEL GAS WASH SYSTEM RELIEF VALVE (1 X 2 / SET @ 150 PSI) PID-18-2002-43.02 (NEW 2002) | A | |||
RV-023046 | RELIEF VALVE | BOH2 RELIEF VALVE FOR 900 LB STEAM SPARE RELIEF VALVE (1-1/2 X 3 / SET @ 1050PSI) | A | |||
RV-023023 | RELIEF VALVE | BOH2 RELIEF VALVE FOR BOILER 5 TURBINE FAN 6 X 8 / SET @ 60 PSI PID - 18-2711-34.01 (NEW 2002) | I | |||
RV-023022 | RELIEF VALVE | BOH2 RELIEF VALVE FOR BOILER 6 TURBINE FAN 6 X8 / SET @ 60 PSI PID - 18-2711-34.01 (NEW 2002) | A |
Attachment 1 to Schedule 2.2.1
RV-023020 | RELIEF VALVE | BOH2 RELIEF VALVE FOR BOILER 7 TURBINE FAN 6 X 8 / SET @ 60 PSI PID - 18-2711.34.01 (NEW 2002) | I | |||
RV-023025 | RELIEF VALVE | BOH2 RELIEF VALVE FOR BOILER 8 TURBINE FAN 6 X 8 / SET @ 60 PSI PID - 18-2711-34.01 (NEW 2002) | A | |||
RV-023019 | RELIEF VALVE | BOH2 RELIEF VALVE FOR DESUPERHEATER PUMP (1-1/2 X 3 / SET @ 240 PSI) PID - 18-3711-17.02 (NEW 2002) | A | |||
RV-023048 | RELIEF VALVE | BOH2 RELIEF VALVE FOR STEAM DRUM SPARE RELIEF VALVE (3 X 6 / SET @ 1100 PSI) | A | |||
RV-023042 | RELIEF VALVE | BOH2-BL05 AIR DRUM RELIEF VALVE 1/2 X 1 / SET @ 150 PSI (NEW 2002) | I | |||
RV-023043 | RELIEF VALVE | BOH2-BLR06 AIR DRUM RELIEF VALVE 1/2 X 1 / SET @ 150 PSI (NEW 2002) | A | |||
RV-023044 | RELIEF VALVE | BOH2-BLR07 AIR DRUM RELIEF VALVE 1/2 X 1 / SET@ 150 PSI (NEW 2002) | I | |||
RV-023045 | RELIEF VALVE | BOH2-BLR08 AIR DRUM RELIEF VALVE 1/2 X 1 / SET @ 150 PSI (NEW 2002) | A | |||
RV-023021 | RELIEF VALVE | BOH2-P02B DEMINERALIZED WATER RELIEF VALVE (3 X 4 / SET @ 60 PSI) PID - 18-3726-02.01 (NEW 2002) | A | |||
RV-023029 | RELIEF VALVE | RELIEF VALVE FOR 900 LB STEAM FOR BOILER 6 1 1/2 X 3 / 1050 PSI PID - 18-3704-63 (NEW 2002) | A | |||
RV-023027 | RELIEF VALVE | RELIEF VALVE FOR 900 LB STEAM ON BOILER (1-1/2 X 3 / SET @ 1050 PSI) PID - 18-3704-61 (NEW 2002) | A | |||
RV-023033 | RELIEF VALVE | RELIEF VALVE FOR 900 LB STEAM ON BOILER 5 1 1/2 X 3 / SET @ 1050 PID - 18-3704-67 (SPARE) | A | |||
RV-023031 | RELIEF VALVE | RELIEF VALVE FOR 900 LB STEAM ON BOILER 6 1 1/2 X 3/ SET @ 1050 PSI PID - 18-3704-65 (SPARE) | A | |||
RV-023032 | RELIEF VALVE | RELIEF VALVE FOR AQUEOUS AMMONIA REGEN. TURBINE VANE PUMP 1/4 X 1/4 / SET @ 125 PSI PID - 18-5317-60 (NEW 2002) | A | |||
RV-023039 | RELIEF VALVE | RELIEF VALVE FOR AQUEOUS AMMONIA REGEN. TURBINE VANE PUMP (1/4 X 1/4 / SET @ 125 PSI) PID - 18-5317-60 (NEW 2002) | A | |||
RV-023026 | RELIEF VALVE | RELIEF VALVE FOR BOILER (3 X 6 / SET @ 1100 PSI) P&ID DWG 18-3704-67 (NEW 2002) | A | |||
RV-023035 | RELIEF VALVE | RELIEF VALVE FOR BOILER #7 (3 X 6 / SET @ 1075 PSI PID - 18-3704-65 (SPARE) | I | |||
RV-023036 | RELIEF VALVE | RELIEF VALVE FOR BOILER (3 X 6 / SET @ 1100 PSI PID - 18-3704-65 (SPARE) | A | |||
RV-023028 | RELIEF VALVE | RELIEF VALVE FOR BOILER (3 X 6 / SET @ 1075 PSI) PID DWG: 18-3704-67 (NEW 2002) | A | |||
RV-023047 | RELIEF VALVE | RELIEF VALVE FOR BOILER STEAM DRUM SPARE (3 X 6 / SET @ 1175 PSI) | A | |||
RV-023034 | RELIEF VALVE | RELIEF VALVE FOR STEAM DRUM ON No. 5 BOILER 3 X 6 / SET @ 1100 PSI PID - 18-3704-61 (NEW 2002) | I | |||
RV-023037 | RELIEF VALVE | RELIEF VALVE FOR STEAM DRUM ON No. 6 BOILER 3 X 6 / SET @ 1075 PSI PID - 18-3704-63 (NEW 2002) | A | |||
RV-023038 | RELIEF VALVE | RELIEF VALVE FOR STEAM DRUM ON No. 6 BOILER 3 X 6 / SET @ 1100 PSI PID - 18-3604-63 (NEW 2002) | A | |||
RV-023030 | RELIEF VALVE | RELIEF VALVE FOR STEAM DRUM ON No. 7 BOILER 3 X 6 / SET @ 1075 PSI PID - 18-3704-61 (NEW 2002) | A | |||
BOH2-SIL5 | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR05 (PM BOILER SHUTDOWN) | A | |||
BOH2-SIL5A | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR05 (PM BOILER SHUTDOWN) | A | |||
BOH2-SIL6 | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR06 (PM BOILER SHUTDOWN) | A | |||
BOH2-SIL6A | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR06 (PM BOILER SHUTDOWN) | A | |||
BOH2-SIL7 | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR07 (PM BOILER SHUTDOWN) | A | |||
BOH2-S1L7A | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR07 (PM BOILER SHUTDOWN) | A | |||
BOH2-SIL8 | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR08 (PM BOILER SHUTDOWN) | A | |||
BOH2-SIL8A | SILENCER | RELIEF VALVE SILENCER ON BOH2-BLR08 (PM BOILER SHUTDOWN) | A | |||
BOH2-STK05 | STACK | BOH2 NO.5 BOILER STACK (NEW 2002) | I | |||
BOH2-STK06 | STACK | BOH2 NO.6 BOILER STACK (NEW 2002) | A | |||
BOH2-STK07 | STACK | BOH2 NO.7 BOILER STACK (NEW 2002) | I | |||
BOH2-STK08 | STACK | BOH2 NO.8 BOILER STACK (NEW 2002) | A | |||
BOH-FND | STRUCTURAL | BOH FOUNDATION - PROJECT TRACKING | A | |||
BOH-STRUCT | STRUCTURAL | BOH STRUCTURAL - PROJECT TRACKING | A | |||
WSY-STRUCT | STRUCTURAL | WYS STRUCTURAL - PROJECT TRACKING | A |
Attachment 1 to Schedule 2.2.1
BOH2-TK505 | TANK | BOH2 WET ESP TANK BOILER 5 (NEW 2002) | I | |||
BOH2-TK506 | TANK | BOH2 WET ESP TANK BOILER 6 (NEW 2002) | A | |||
BOH2-TK507 | TANK | BOH2 WET ESP TANK BOILER 7 (NEW 2002) | I | |||
BOH2-TK508 | TANK | BOH2 WET ESP TANK BOILER 8 (NEW 2002) | A | |||
S2T54-68 | TRANSFORMER | WSY TRANSFORMER 2400 X 480 KVA150 POWER FOR RIVER PUMP HOUSE AND DOCK 3 POLE NUMBER 101 PAD MOUNT YES. | A | |||
TF-0033 | TRANSFORMER | WYS TRANSFORMER IS LOCATED ON THE WEST ROAD OUT SIDE THE REFINERY MAIN FENCED AREA 2400 X 240/480 PICK UP KEY AT THE MAIN GATE TO ENTER TRANSFORMER FENCED AREA POLE NUMBER 192 PAD MOUNT YES. | I | |||
TR-0616 | TURBINE | BOH NO.1 BOILER BOH-BLR01 SOUTH DRAFT FAN FAN-0587 TURBINE TR-0616 PID DWG POH-16-14287-23 | I | |||
TR-2967 | TURBINE | BOH2 DEAERATOR PUMP BOH2-P02B TURBINE (NEW 2002) | I | |||
TR-2966 | TURBINE | BOH2 JET A FUEL OIL PUMP BOH2-P03A TURBINE (NEW 2002) | A | |||
TR-2992 | TURBINE | BOH2 NO.5 BOILER FORCE DRAFT AIR FAN TURBINE (NEW 2002) | I | |||
TR-2993 | TURBINE | BOH2 NO.6 BOILER FORCE DRAFT AIR FAN TURBINE (NEW 2002) | A | |||
TR-2994 | TURBINE | BOH2 NO.7 BOILER FORCE DRAFT AIR FAN TURBINE (NEW 2002) | I | |||
TR-2995 | TURBINE | BOH2 NO.8 BOILER FORCE DRAFT AIR FAN TURBINE (NEW 2002) | A | |||
BOH-VALVE | VALVE | BOH VALVES DOES NOT INCLUDE CHECK, CONTROL VALVES, OR RELIEF VALVES - DO NOT WRITE WO FOR THOSE TO THIS EQUIP. | A | |||
BOH2-NRV01 | VALVE | BOH2-NRV01 NON RETURN VALVE ON BOILER STEAM HEADER ON BOILER NO.05 | A | |||
BOH2-NRV02 | VALVE | BOH2-NRV02 NON RETURN VALVE ON BOILER STEAM HEADER ON BOILER NO.06 | A | |||
BOH2-NRV03 | VALVE | BOH2-NRV03 NON RETURN VALVE ON BOILER STEAM HEADER ON BOILER NO.07 | A | |||
BOH2-NRV04 | VALVE | BOH2-NRV04 NON RETURN VALVE ON BOILER STEAM HEADER ON BOILER NO.08 | A | |||
DRM-1010 | VESSEL | AQUEOUS AMONIA DRUM BOH2-TK215 (NEW 2002) | A | |||
DRM-1530 | VESSEL | BOH BOILER NO. 1 BOH-BLR01 MUD DRUM PID DWG 18-3704-22 (UNIT SHUTDOWN REQUIRED) | A | |||
DRM-1531 | VESSEL | BOH BOILER NO. 1 BOH-BLR01 STEAM DRUM PID DWG 18-3704-22 (UNIT SHUTDOWN REQUIRED) | A | |||
DRM-1532 | VESSEL | BOH NO.2 BOILER BOH-BLR02 MUD DRUM PID DWG 18-3704-26 | A | |||
DRM-1533 | VESSEL | BOH NO.2 BOILER BOH-BLR02 STEAM DRUM PID DWG 18-3704-26 | A | |||
DRM-1534 | VESSEL | BOH NO.3 BOILER BOH-BLR03 MUD DRUM PID DWG 18-3704-26 | A | |||
DRM-1535 | VESSEL | BOH NO.3 BOILER BOH-BLR03 STEAM DRUM PID DWG 18-3704-26 | A | |||
DRM-1536 | VESSEL | BOH NO.4 BOILER BOH-BLR04 MUD DRUM PID DWG 18-3704-28 | A | |||
DRM-1537 | VESSEL | BOH NO.4 BOILER BOH-BLR04 STEAM DRUM PID DWG 18-3704-28 | A | |||
DRM-4008 | VESSEL | BOH2 NO.5 BOILER ECONOMIZER | I | |||
DRM-4004 | VESSEL | BOH2 NO.5 BOILER MUD DRUM | I | |||
DRM-4000 | VESSEL | BOH2 NO.5 BOILER STEAM DRUM | I | |||
DRM-4012 | VESSEL | BOH2 NO.5 BOILER WET ESP (NEW 2002) | I | |||
DRM-4009 | VESSEL | BOH2 NO.6 BOILER ECONOMIZER | A | |||
DRM-4005 | VESSEL | BOH2 NO.6 BOILER MUD DRUM | A | |||
DRM-4001 | VESSEL | BOH2 NO.6 BOILER STEAM DRUM | A | |||
DRM-4013 | VESSEL | BOH2 NO.6 BOILER WET ESP (NEW 2002) | A | |||
DRM-4010 | VESSEL | BOH2 NO.7 BOILER ECONOMIZER | I | |||
DRM-4006 | VESSEL | BOH2 NO.7 BOILER MUD DRUM | I | |||
DRM-4002 | VESSEL | BOH2 NO.7 BOILER STEAM DRUM | I | |||
DRM-4014 | VESSEL | BOH2 NO.7 BOILER WET ESP (NEW 2002) | I | |||
DRM-4011 | VESSEL | BOH2 NO.8 BOILER ECONOMIZER | A | |||
DRM-4007 | VESSEL | BOH2 NO.8 BOILER MUD DRUM | A | |||
DRM-4003 | VESSEL | BOH2 NO.8 BOILER STEAM DRUM | A |
Attachment 1 to Schedule 2.2.1
DRM-4015 | VESSEL | BOH2 NO.8 BOILER WET ESP (NEW 2002) | A | |||
UPS-106A | UPS | MOB UNINTERUPTED POWER SUPPLY UPS-106 (2ND FLOOR) | A | |||
VH-4864 | VEHICLE | MMR SECURITY (97 FORD F-150) VH-4864 | I | |||
SUB MAIN | 29 | |||||
SMN1B7-E | BUS | (MAIN) 1 13.8KV BUS EAST SIDE | A | |||
SMN1B7-W | BUS | (MAIN) 1 13.8KV BUS WEST SIDE | A | |||
SMN2B7-B | BUS | (MAIN) 2 SUB EAST BUS 13.8KV | A | |||
SMN2B7-A | BUS | (MAIN) 2 SUB WEST BUS 13.8KV | A | |||
COGENB6-A | BUS | COGEN STATION SERVICE 4.16KV BUS A | A | |||
COGENB6-B | BUS | COGEN STATION SERVICE 4.16KV BUS B | A | |||
COGENB7-A | BUS | REACTOR LIMITED 13.8KV BUS IN COGEN BUILDING FOR SS AND POH | A | |||
COGENB7-B | BUS | REACTOR LIMITED 13.8KV BUS IN COGEN BUILDING FOR SS AND POH | A | |||
SMN2F7-6A | FEEDER | 13.8 KV ELECTRICAL FEEDER FROM MAIN2 TO SUB 1 PDC BUS A | A | |||
SMN2F7-6B | FEEDER | 13.8 KV ELECTRICAL FEEDER FROM MAIN2 TO SUB 1 PDC BUS B | A | |||
SMN1F7-3 | FEEDER | 13.8KV FEEDER TO SUB 1 NORMAL NORTH SIDE | A | |||
SMN1F7-4 | FEEDER | 13.8KV FEEDER TO SUB 1 NORMAL SOUTH SIDE | A | |||
SMN1F7-1 | FEEDER | 13.8KV FEEDER TO SUB 2 AND 3 NORMAL 2N AND 3S | A | |||
SMN1F7-2 | FEEDER | 13.8KV FEEDER TO SUB 2 AND 3 NORMAL 2S AND 3N, AND ALSO TO FCC AIR BOLWER CAPTIVE TRANSFORMER | A | |||
SMN1F7-5 | FEEDER | 13.8KV FEEDER TO SUB 4 AND 5 NORMAL 4N | A | |||
SMN1F7-6 | FEEDER | 13.8KV FEEDER TO SUB 4 AND 5 NORMAL 4S | A | |||
SMN2F7-4B | FEEDER | 13.8KV FEEDER TO SUB 5 USAULLY 5N | A | |||
SMN2F7-3A | FEEDER | 13.8KV FEEDER TO SUB 5 USSUALLY 5S | A | |||
PSE&GF8 | FEEDER | UTILITY LINES TO PLANT | A | |||
COGENG7-ST1 | GENERATOR | COGEN STEAM TURBINE GENERATOR 1 | A | |||
COGENT76-4 | TRANSFORMER | COGEN STATION SERVICE TRANSFORMER 4 | A | |||
COGENT76-5 | TRANSFORMER | COGEN STATION SERVICE TRANSFORMER 5 | A | |||
SMN2T77-B | TRANSFORMER | ISOLATION TRANSFORMER FOR (MAIN) 2 SUB EAST SIDE | A | |||
SMN2T77-A | TRANSFORMER | ISOLATION TRANSFORMER FOR (MAIN) 2 SUB WEST SIDE | A | |||
SMN1T77-6 | TRANSFORMER | TF-0189 ISOLATION TRANSFORMER, POWERHOUSE, 13.8 KV X 13.8 KV WEST OF COGEN | A | |||
SMN1T77-7 | TRANSFORMER | TF-0190 ISOLATION TRANSFORMER, POWERHOUSE, 13.8 KV X 13.8 KV WEST OF COGEN | A | |||
COGENT87-1 | TRANSFORMER | TRANSFORMER FOR GT-A AND HALF OF REFINERY FEED FROM GLOUSTER PSE&G LINE P-2242 SIDE | A | |||
COGENT87-3 | TRANSFORMER | TRANSFORMER FOR GT-B AND HALF OF REFINERY FEED FROM DEPTFORD PSE&G LINE V-2274 SIDE | A | |||
COGENT87-2 | TRANSFORMER | TRANSFORMER FOR ST-1 STEAM TURBINE CAN BE CONNECTED TO EITHER PSE&G LINE | A | |||
SUB1 | 35 | |||||
S1B4-43 | BUS | - | A | |||
S1B4-7 | BUS | 100A MOTOR STARTER RACK AT WEST END OF UNIT (EXTENSION OF MAIN RACK) | A | |||
S1B5-N | BUS | 2.4KV 1200A SUB1 NORTH SIDE FCC FEEDERS 11,12,&13 POSSIBLE BACKFEED THROUGH FEEDER 11 VIA POLE SWITCH TO FEEDER 60A IN PLACE OF TRANSFORMER | A | |||
S1B5-S | BUS | 2.4KV 1200A SUB1 S FEEDER 14,15,16 | A | |||
S1B4-9 | BUS | 225A MOTOR STARTER RACK IN PLY | A | |||
S1B4-2 | BUS | 300A MOTOR STARTER RACK OUTSIDE CONTROL ROOM (EAST SIDE) | A | |||
S1B3-LP | BUS | 400A 4#500 | A | |||
S1B4-8 | BUS | 400A MOTOR STARTER RACK IN PLY | A | |||
S1B4-6 | BUS | MOTOR STARTER 400A MAIN FOR CUMENE | A |
Attachment 1 to Schedule 2.2.1
S1B4-5 | BUS | MOTOR STARTER 500A MAIN FOR CUMENE | A | |||
S1B4-10 | BUS | MOTOR STARTER RACK IN PLY | A | |||
S1B4-4 | BUS | SOUTH CUMENE MCC 07 | A | |||
S1F5-15 | FEEDER | 2.4 KV 400A SUB 1 TO CT2 FANS | A | |||
S1F5-16 | FEEDER | 2.4 KV 400A SUB 1 TO CUM, PLY, ADMIN | A | |||
S1F5-14 | FEEDER | 2.4KV 400A SUB 1 CT2 FANS ***OUT OF SERVICE*** | D | |||
S1F4-1 | FEEDER | 200A WELDING FEEDER #1 FROM MOTOR STARTER RACK OUTSIDE CONTROL ROOM (EAST SIDE) | A | |||
S1F4-2 | FEEDER | 50A WELDING FEEDER FROM MOTOR STARTER RACK OUTSIDE CONTROL ROOM (EAST SIDE) | A | |||
S1F5-11A | FEEDER | SUB 1 FEEDER 11A 2400v 600A TO FCC FEEDS FROM FEEDER 11 VIA POLE SWITCH, CAN BE SWITCHED TO FEEDER 60 | A | |||
S1F5-11 | FEEDER | SUB 1 FEEDER 11 - 2.4KV 600A TO FCC (VIA FEEDER 11A) MAY BE USED AS BACK FEED TO SUB 1 BUS VIA FEEDER 60A FROM POWERHOUSE | A | |||
S1F5-12 | FEEDER | SUB 1 FEEDER 12 - 2.4KV 400A TO CT#3 PUMPHOUSE | A | |||
S1F5-13 | FEEDER | SUB 1 FEEDER 13 - 2.4KV 400A TO CT#3 TRANSFORMERS FOR FANS ***OUT OF SERVICE*** | D | |||
S1T43-3 | TRANSFORMER | 480V X 120/240V 2KVA TRANSFORMER | A | |||
S1T54-62A | TRANSFORMER | CUM TRANSFORMER 2400 X 480 500KVA POWER FOR CUMENE UNIT. SOUTH MOST TRANSFORMER (PARALLELED WITH TF-0062) NORTH MOST TRANSFORMER. POLE NUMBER 136 PAD MOUNT YES. | I | |||
S1T53-19 | TRANSFORMER | CUM TRANSFORMER, TREATING UNIT LINDE 2400 X 208/120 45 KVA. LIGHTING LINDE UNIT POLE NUMBER 116 PAD MOUNT YES. | A | |||
S1T54-74 | TRANSFORMER | FCC TRANSFORMER 2400 X 480 FOR CWT 3 FANS FOR FCCU TF-0074. ***REMOVED FROM SERVICE*** | I | |||
S1T54-73 | TRANSFORMER | FCCU TRANSFORMER NUMBER TF-0073 FOR NUMBER THREE CWT EAST FAN BANK. ELECTRICAL SINGLE LINE DRAWING NUMBER 11-13926-D REV#2.0 PAD MOUNT YES. ***REMOVED FROM SERVICE*** | I | |||
S1T53-36 | TRANSFORMER | GPL TRANSFORMER GATEHOUSE TYPE HPJ 2400 X 208/120 45 KVA EASTERN MOST OF TWO TRANSFORMERS POLE NUMBER 230 PAD MOUNT YES. | A | |||
S1T54-185 | TRANSFORMER | PAD MOUNT FOR CUMENE 480 VOLT PUMP MOTORS 2400 X 480 500 KVA SINGLE LINE DWG.NO. 11-13898-D POLE NUMBER ST-10 PAD MOUNT YES. | A | |||
S3T54-178 | TRANSFORMER | PAD MOUNT FOR MIXERS AND MOTORS. 2400/480 500 KVA ***DEMOED*** | D | |||
S1T53-11 | TRANSFORMER | PLY TRANSFORMER 2400 X 208/120 TF-0011 LIGHTING TRANSFORMER FOR POLY AND CUMENE UNIT POLE NUMBER 135. | A | |||
S1T54-71 | TRANSFORMER | PLY TRANSFORMER 2400 X 480 KVA300 POWER FOR EAST LOAD CENTER FOR CWT FANS POLE NUMBER MANHOLE PAD MOUNT YES. ***REMOVED FROM SERVICE*** | I | |||
S1T54-72 | TRANSFORMER | PLY TRANSFORMER 2400 X 480 KVA300 POWER FOR WEST LOAD CENTER FOR CWT FANS POLE NUMBER MANHOLE PAD MOUNT YES. ***REMOVED FROM SERVICE*** | I | |||
S1T54-172 | TRANSFORMER | PLY TRANSFORMER NO. 172 500 KVA 2400 / 480 VOLTS CUMENE CHARGE PUMPS POLE NUMBER 135 PAD MOUNT YES. | I | |||
S1T75-N | TRANSFORMER | SUB 1 MAIN TRANSFORMER NORTH SIDE 13.8 TO 2.4 KV 3000KVA FEED FROM FEEDER 3 OR 4 | A | |||
S1T75-S | TRANSFORMER | SUB-1 TRANSFORMER, DISTRIBUTION, 13.8 KV SUB-01 SOUTH END OF SUB-1 POLE NUMBER S-17/S-18 PAD MOUNT YES. | A | |||
SUB2 | 28 | |||||
S2B4-4 | BUS | 100A 480V BUS FOR DOCK 3 | A | |||
S2B4-3 | BUS | 100A 480V FEEDER FOR CAPSTAN LOADS | A | |||
S2B5-201B | BUS | 1200A MCC IN 2 SUB | A | |||
S2B5-N | BUS | 2.4KV 1200A MAIN BUS FOR 2 SUBSTATION | A | |||
S2B5-S | BUS | 2.4KV 1200A MAIN BUS FOR 2 SUBSTATION | A | |||
S2B4-16 | BUS | 400A 480V RACK P5 IN ALKY | A | |||
S2B4-12 | BUS | 400A MOTOR STARTER RACK PI | A | |||
S2B4-MCCB | BUS | SRU 3 N MCC (NORTH) | A | |||
S2B7-N | BUS | SUB 2 13 8KV BUS | A | |||
S2B7-S | BUS | SUB 2 13.8KV BUS | A | |||
S2F5-6 | FEEDER | 2.4KV 400A FEEDER AREA LOOP TO SOUTH | A | |||
S2F5-5 | FEEDER | 2.4KV 400A FEEDER TO SOUTH OF SUBSTATION TO MCC FOR 4 PUMPS | A | |||
S2F5-1 | FEEDER | 2.4KV 600A AERIAL LOOP NORTH TO RIVER AND WWT | A | |||
S2F5-10 | FEEDER | BACK UP CONNECTION FOR FEEDER 5-2 | A | |||
S2F5-11 | FEEDER | BACK UP CONNECTION FOR FEEDER 5-3 | A | |||
S2F5-22 | FEEDER | DUPLICATE | D | |||
S2F5-24 | FEEDER | DUPLICATE | D | |||
S2T75-N | TRANSFORMER | 13.8- 2.4KV 7.5MVA BASE DELTA DELTA TRANSFORMER | A | |||
S2T75-S | TRANSFORMER | 13.8- 2.4KV 7.5MVA BASE DELTA DELTA TRANSFORMER | A | |||
S3T75-S | TRANSFORMER | 13.8- 2.4KV 7.5MVA BASE DELTA DELTA TRANSFORMER | A | |||
S3T75-N | TRANSFORMER | 13.8- 2.4KV 7.5MVA BASE DELTA DELTA TRANSFORMER | A | |||
S2T43-4 | TRANSFORMER | 15 KVA 480-120/208 TRANSFORMER FOR INST PANEL IN COMPRESSOR AREA | A | |||
S2T43-1 | TRANSFORMER | 480- 120/240 1 PHASE LIGHTING | A | |||
S2T43-7 | TRANSFORMER | 480-120/208 15KVA | A | |||
S2T43-8 | TRANSFORMER | 480-120/208 15KVA | A | |||
S2T43-12 | TRANSFORMER | 480-120/208 15KVA | A | |||
S2T43-01 | TRANSFORMER | LIGHTING TRANSFORMER FOR TRAILER AT RIVER WATER | A | |||
S2T54-168 | TRANSFORMER | PSM TRANSFORMER 2400 X 480 POWER FOR 3070 BUILDING (PROCESS SAFETY MANAGEMENT) | A | |||
SUB3 | 29 | |||||
S3B5-N | BUS | 2.4KV 1200A | A |
Attachment 1 to Schedule 2.2.1
S3B5-S | BUS | 2.4KV 1200A | A | |||
S3B4-6 | BUS | 300A BUS FOR MOTOR STARTER FOR STARTERS IN #2 PUMPHOUSE | A | |||
S3B4-2 | BUS | 480V STARTER RACK BUS AT TANK FARM TK 105 | A | |||
S3B4-MCCA | BUS | 5RU 3 5 MCC (SOUTH) | A | |||
S3B4-7 | BUS | STARTER RACK BUS FOR TRANSFORMER TF-135 | A | |||
S3F5-35 | FEEDER | SUB 3 2.400KV FEEDER TO NORTH TANK FARM/RIVER | A | |||
S3F5-37 | FEEDER | SUB 3 2.4KV 400A FEEDER TO SOUTH TANK FARM/SALES | A | |||
S3F5-32 | FEEDER | SUB 3 2.4KV 400A FEEDER TO TF PUMPHOUSE | A | |||
S3F5-33 | FEEDER | SUB 3 2.4KV 400A FEEDER TO TF PUMPHOUSE | A | |||
S3F5-34 | FEEDER | SUB 3 2.4KV 400A FEEDER TO TF PUMPHOUSE | A | |||
S3F5-36 | FEEDER | SUB 3 2.4KV FEEDER TO COLONIAL PUMPS | A | |||
S3F5-35A | FEEDER | SUB 3 2.4KV FEEDER TO 5RU 3 | A | |||
S3F5-31 | FEEDER | SUB3 2400V FEEDER TO CENTRAL TANK FARM | A | |||
S3T43-002 | TRANSFORMER | 120/208 LIGHTING TRANSFORMER IN #2 PUMPHOUSE | A | |||
S3T54-CW1 | TRANSFORMER | 2300/480 TRANSFORMER FOR #1 CWT FANS AND AREA | A | |||
S3T54-006 | TRANSFORMER | DUPLICATE | D | |||
S3T54-48 | TRANSFORMER | GPL TRANSFORMER 2400 X 480 300KVA TYPE WLLT6 WEST OF TK 117 EAST OF SRU POLE NUMBER 267P PAD MOUNT YES. | I | |||
S3T54-46 | TRANSFORMER | GPL TRANSFORMER SOUTHWEST OF TANK 102 2400 X 208/120 POLE NUMBER 286 PAD MOUNT YES. | A | |||
S3T43-001 | TRANSFORMER | HONEYWELL BLENDING SYSTEM DRY TRANSFORMER | A | |||
S3T54-182 | TRANSFORMER | PAD MOUNT FOR NEW TANK FARM BLENDING 480 VOLT MOTORS 2400 X 480 VOLT POLE NUMBER 35 PAD MOUNT YES. | A | |||
SS3T43-001 | TRANSFORMER | SS3T43-001 HONEYWELL BLENDING SYSTEM DRY TRANSFORMER | A | |||
S3T54-60 | TRANSFORMER | TFA TRANSFORMER 2400 X 240/480 300KVA TYPE AT POWER FOR PUMP MOTORS AND MOVS 120FT EAST OF TANK 51 POLE NUMBER 30 PAD MOUNT YES. | A | |||
S3T54-55 | TRANSFORMER | TFA TRANSFORMER 2400 X 240/480 TYPE HPZ 75KVA POWER FOR MOTORS AND MOV S POLE NUMBER 34 PAD MOUNT YES. | I | |||
S3T54-87 | TRANSFORMER | TFA TRANSFORMER 2400 X 480 POWER FOR TANK 105 AND RELATED EQUIPMENT TRANSFORMER ON MAIN TANK FARM ROAD POLE NUMBER 259 PAD MOUNT YES. | A | |||
S3T54-187 | TRANSFORMER | TFA TRANSFORMER NO. 56 500 KVA 2400 X 480 VOLTS USED FOR M.0 VS AND MIXERS POLE NUMBER 338 PAD MOUNT YES. | A | |||
S3T54-135 | TRANSFORMER | TFA TRANSFORMER TANK FARM 2400 X 480 300 KVA | A | |||
S3T54-34 | TRANSFORMER | TFA TRANSFORMER TANK FARM TYPE HPZ 2400 X 480 75 KVA WESTERN MOST OF TWO TRANSFORMERS POLE NUMBER 34 PAD MOUNT YES. | I | |||
S3TS4-3 | TRANSFORMER | TFA TRANSFORMER TANK FARM TYPE-AT 2400 / 240X480 / 200 KVA. SINGLE LINE DWG# 11-13914-D POLE NUMBER 254 PAD MOUNT YES. | A | |||
SUB4 | 30 | |||||
S4B5-WWT | BUS | 100A | A | |||
S4B4-1 | BUS | 1200A ALLEN BRADLEY MCC IN 5RU#2 | A | |||
S4B5-N | BUS | 2.4KV 1200A, NORTH BUS OF SUB 4 FEEDERS 402 TO 406 | A | |||
S4B5-S | BUS | 2.4KV 1200A, SOUTH BUS OF SUB 4 FEEDERS 407 TO 410 | A | |||
S4P3-10 | BUS | 225a 120/208 PANEL FOR CRITICAL 120V SERVICES BACKED UP BY GENERATOR VIA TRANSFER SWITCH CRU CONTROL ROOM | A | |||
S4B5-2 | BUS | 2400V MCC FOR CRU LARGE MOTORS | A | |||
S4B5-SG4 | BUS | 2400V SWITCHGEAR NUMBER 4 NEAR NUMBER SUBSTATION 4 | A | |||
S4B4-21 | BUS | 480 MCC 8 EAST RACK IN DELEX/CLAY TREATER UNIT | A | |||
S4B4-AER | BUS | 480V BUS WITH NE,NW,SE AND SW AERATOR MOTOR STARTERS | A | |||
S4B4-10 | BUS | 480V MOTOR STARTER FOR S4B4-11 | A | |||
S4B4-12 | BUS | 600A | A | |||
S4B4-14 | BUS | 600A | A | |||
S4B4-13 | BUS | 600A | A | |||
S4B4-17 | BUS | 800A | A | |||
S4B4-18 | BUS | 800A | A | |||
S4B4-22 | BUS | 800A | A | |||
S4B4-2 | BUS | 800A | A | |||
S4B4-19 | BUS | 800A | A | |||
S4B4-23 | BUS | 800A | A | |||
S4B4-25 | BUS | 800A | A | |||
S4B4-4 | BUS | 800A | A | |||
S4B4-5 | BUS | 800A | A | |||
S4B4-9 | BUS | 800A | A | |||
S4B4-8 | BUS | 800A | A | |||
S4B4-7 | BUS | 800A | A | |||
S4B4-6 | BUS | 800A | A | |||
S4B4-3 | BUS | 800A | A | |||
S4B4-24 | BUS | 800A | A | |||
S4B4-11 | BUS | 800A 480V MCC #10 for instrument air compressor, control room HVAC and critical bus main feed (generator backed up) | A |
Attachment 1 to Schedule 2.2.1
S4B4-26 | BUS | S4B4-26 BUS 480V/400A FLARE GAS RECOVERY | A | |||
S4F5-409 | FEEDER | 2.4 KV 400A DEALTEX AND CLAY TREATER UNITS 11-13907-D | A | |||
S4F5-404 | FEEDER | 2.4 KV 400A FEEDER 404 TO CRU 11-13900-D | A | |||
S4F5-405 | FEEDER | 2.4 KV 400A FEEDER 405 TO CRU 11-13900,906,17354-D | A | |||
S4F5-410 | FEEDER | 2.4 KV 400A FOR CRU UNIT 11-13899-D | A | |||
S4F5-406 | FEEDER | 2.4 KV 400A SPARE | A | |||
S4F5-408 | FEEDER | 2.4 KV 400A TO SULFOLATE UNIT LARGE MOTORS 350MCM 11-13908-D | A | |||
S4F5-407 | FEEDER | 2.4 KV 400A YARD LINE NORTH TO WWT AND SUB 2 | A | |||
S4F5-402 | FEEDER | 2.4KV 600A FEEDER 402 TO SRU#2 (OLD) | A | |||
S4F5-403 | FEEDER | 2.4KV 600A FEEDER 403 TO SULFOLANE UNIT DRAWING 11-13927&8-D, 500MCM | A | |||
S4F5-405A | FEEDER | 2400V WALK IN ISLE MCC FOR 3 MOTORS FOR CRU PP27A,25A,25B | A | |||
S4M4-BL201 | MOTOR | 480V 5HP BL201 MOTOR | I | |||
S4MS4-ME01E | MOTOR STARTER | WWT AERATOR WWT-ME01E MOTOR STARTER 50 HP / 1770 RPM / 326TC FRAME PID DWG WWT-16-14309-07 | I | |||
S4MS4-ME01F | MOTOR STARTER | WWT AERATOR WWT-ME01F MOTOR STARTER 50 HP / 1770 RPM / 326TC FRAME PID DWG WWT-16-14309-07 | I | |||
S4MS4-ME01G | MOTOR STARTER | WWT AERATOR WWT-ME01G MOTOR STARTER 50 HP / 1770 RPM / 326TC TE FRAME PID DWG WWT-16-14309-07 | I | |||
S4MS4-ME01H | MOTOR STARTER | WWT AERATOR WWT-ME01H MOTOR STARTER 50 HP / 1770 RPM / 326TC FRAME PID DWG WWT-16-14309-07 | I | |||
S4MS4-BL201 | MOTOR STARTER | WWT UV LIGHT AIR BLOWER WWT-BL201 MOTOR PID DWG WWT-16-14309-14 | I | |||
34P3-11 | PANEL | 120-208 PANEL 200A BUS 3 PHASE 4 WIRE | A | |||
S4P3-11 | PANEL | 120-208 PANEL 200A BUS 3 PHASE 4 WIRE 36CKT | A | |||
S4P3-LP1 | PANEL | 150A LIGTHING PANEL | A | |||
S4P3-LP2 | PANEL | 150A LIGTHING PANEL | A | |||
S4T43-11 | TRANSFORMER | 112.5KVA 480/120-208 TRANSFORMER FOR 120V AT COOLING TOWER #7 AREA | A | |||
S4T43-8 | TRANSFORMER | 15KVA TRANSFORMER | A | |||
S4T43-3 | TRANSFORMER | 30 KVA LIGHTING TRANSFORMER | A | |||
S4T43-5 | TRANSFORMER | 30KVA TRANSFORMER | A | |||
S4T43-7 | TRANSFORMER | 30KVA TRANSFORMER | A | |||
S4T43-UV2 | TRANSFORMER | 30KVA TRANSFORMER | A | |||
S4T43-UV1 | TRANSFORMER | 30KVA TRANSFORMER | A | |||
S4T43-10 | TRANSFORMER | 45KVA LIGHTING TRANSFORMER FOR CRITICAL LOADS CRU AREA | A | |||
S4T43-1 | TRANSFORMER | 45KVA LIGTHING TRANSFORMER | A | |||
S4T43-2 | TRANSFORMER | 75KVA LIGTHING TRANSFORMER | A | |||
S4T43-6 | TRANSFORMER | 75KVA TRANSFORMER | A | |||
S4T54-92 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.2 POLE NUMBER 167 PAD MOUNT YES | A | |||
S4T54-93 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.3 POLE NUMBER 167 PAD MOUNT YES | A | |||
S4T54-94 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.4 | A | |||
S4T54-95 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.5 | A | |||
S4T54-96 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.6 | A | |||
S4T54-97 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.7 | A | |||
S4T54-98 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.8 | A | |||
S4T54-99 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC NO.9 AND MCC NO. 10 | A | |||
S4T54-91 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR MCC-1 CRU-2 ( CLASSIFIED-PCBS ) POLE NUMBER 310-A PAD MOUNT YES | A | |||
S4T54-RAF | TRANSFORMER | CRU TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR RAFINATE PUMPS | A | |||
S4T54-127 | TRANSFORMER | CRU TRANSFORMER 2400 X 480 WEST OF CRU CONTROLROOM | I | |||
S4T43-9 | TRANSFORMER | LIGTHING TRANSFORMER | A | |||
S4T54-152 | TRANSFORMER | S4T54-152 TRANSFORMER FLARE GAS RECOVERY 2400V/480V 300KVA | A | |||
S4T54-151 | TRANSFORMER | SRU TRANSFORMER HOWARD INDUSTRIES LAUREL MS 39440. 1000 KVA 2400 / 480 WYE (Y) POWER FOR NEW SULFUR RECOVERY UNIT PAD MOUNT YES. | A | |||
S4T75-N | TRANSFORMER | SUB-4 TRANSFORMER, DISTRIBUTION, 13.8 KV SUB-04 NORTH END OF SUB-4 (CLASSIFIED PCBS) POLE NUMBER S-37/S-38 PAD MOUNT YES. | A | |||
S4T75-S | TRANSFORMER | SUB-4 TRANSFORMER, DISTRIBUTION, 13.8 KV SUB-04 SOUTH END OF SUB-4 | A | |||
S4T54-120 | TRANSFORMER | WWT TRANSFORMER 2400 X 480 (POWER FOR LOAD CENTER 1-P CAN NOT SAMPLE OIL NO VALVE | A | |||
S4T54-121 | TRANSFORMER | WWT TRANSFORMER 2400 X 480 (POWER FOR LOAD CENTER 2-P | A | |||
S4T54-137 | TRANSFORMER | WWTP POWER TRANSFORMER 2400 X 480 500 KVA POLE NUMBER 109 PAD MOUNT YES. | A | |||
SUBS | 45 | |||||
S5B5-20 | BUS | AERIAL TAP OFF OF FEEDER 58 THRU. FUSED CUTOUT ON POLE AND SOLID KNIFE BLADES AND 800A FUSE SERVING J62,J63, J16B AND PA16 | A | |||
S5B4-1 | BUS | MOTOR STARTER RACK AT NORTH END OF FCCU | A | |||
S5B4-5 | BUS | MOTOR STARTER RACK AT NORTH END OF UNIT NEAR COOLING TOWER | A | |||
S5B4-6 | BUS | MOTOR STARTER RACK IN FRONT (EAST SIDE) OF UNIT | A | |||
S5B4-4 | BUS | MOTOR STARTER RACK IN PUMPHOUSE | A |
Attachment 1 to Schedule 2.2.1
S5B5-N | BUS | SUB 5 N BUS 2.4 KV 1200A | A | |||
S5B5-S | BUS | SUB 5 S BUS 2.4 KV 1200A | A | |||
S5B4-7 | BUS | SWITCHRACK WEST OF H2S BUILDING SERVING FCC-127 AND 130 | A | |||
S5B4-2 | BUS | VPS AVJET COOLER MOTOR STARER RACK AT AVJET | A | |||
S5B4-3 | BUS | VPS BLACKWATER OVERHEAD COOLER MOTOR STARTER RACK LOCATED IMMEDIATELY BELLOW COOLER | A | |||
S5F5-52 | FEEDER | 2.4KV 500A 500MCM CU | A | |||
S5F5-51 | FEEDER | 2.4KV 500A 500MCM CU | A | |||
S5F5-54A | FEEDER | AERIAL TAP OF OF FEEDER 54 THRU. FUSED DISCONNECT SW. AT POLE 154 | A | |||
S5FS-51A | FEEDER | DUPLICATE | D | |||
S5F5-51B | FEEDER | DUPLICATE | D | |||
S5F5-58A | FEEDER | DUPLICATE | D | |||
S5F5-57A | FEEDER | DUPLICATE | D | |||
S5F5-51C | FEEDER | DUPLICATE | D | |||
S5F5-51D | FEEDER | DUPLICATE | D | |||
S5T54-SL3 | TRANSFORMER | 25 KVA LIGHTING TRANSFORMER | A | |||
S5T54-77 | TRANSFORMER | AKY TRANSFORMER 2400 X 480 POWER FOR 6 CWT FANS AND RELATED EQUIPMENT EAST LOAD CENTER POLE NUMBER 327 PAD MOUNT YES. | I | |||
S5T54-78 | TRANSFORMER | AKY TRANSFORMER 2400 X 480 POWER FOR 6 CWT FANS AND RELATED EQUIPMENT WEST LOAD CENTER POLE NUMBER 327 PAD MOUNT YES. | I | |||
S5T54-139 | TRANSFORMER | FCC TRANSFORMER NO. 139 500 KVA 2400 / 480 VOLTS POWER FOR FCCU WET GAS SCRUBBER POLE NUMBER 168 PAD MOUNT YES. | A | |||
S5T54-23 | TRANSFORMER | GPL TRANSFORMER N.SIDE OF STOREHOUSE 2400 X 208/120 TYPE HPZ 112.5KVA BETWEEN CARPENTER SHOP AND STOREHOUSE POLE NUMBER 254 PAD MOUNT YES. | A | |||
S5T54-07 | TRANSFORMER | GPL TRANSFORMER N.SIDE OF STOREHOUSE 2400 X 480 TYPE HPZ 112.5KVA BETWEEN CARPENTER SHOP AND STOREHOUSE POLE NUMBER 254 PAD MOUNT YES. | A | |||
S5T43-193 | TRANSFORMER | LIGHTING TRANSFORMER 30KVA 120/208 | A | |||
S5T54-152 | TRANSFORMER | MCH TRANSFORMER 2400 X 208/120 LIGHTING FOR THE MACHINE SHOP OFFICES AND LUNCH ROOMS. 112.5KVA (SOME SHOP EQUIPMENT) | A | |||
S5T54-28 | TRANSFORMER | MCH TRANSFORMER 2400 X 208/120 THIS IS THE EASTERN MOST OF TWO AT THIS LOCATION POLE NUMBER 180 PAD MOUNT YES. | A | |||
S5T54-18 | TRANSFORMER | MET TRANSFORMER 2400 X 208/120 TF-0018 LIGHTING TRANSFORMER FOR PIPE SHOP POLE NUMBER 254 PAD MOUNT YES. | A | |||
S5T54-122 | TRANSFORMER | MET TRANSFORMER 2400 X 480 (POWER FOR OLD TUBE AND BUNDLE SHOP) | A | |||
S5T54-17 | TRANSFORMER | MET TRANSFORMER, PIPE SHOP TYPE AT 2400 X 240/480 200 KVA POLE NUMBER 254 PAD MOUNT YES. | A | |||
S5T54-128 | TRANSFORMER | OVPS TRANSFORMER, VACUUM PIPE STILL, TYPE HPZ 2400/480 500-KVA POLE NUMBER 155 PAD MOUNT YES. | I | |||
S5T54-181 | TRANSFORMER | PAD MOUNT FOR NEW ACT UNIT 480 VOLT SWITCHGEAR 2400 X 480 750 KVA POLE NUMBER 168A PAD MOUNT YES. | A | |||
S5T75-N | TRANSFORMER | SUB-5 TRANSFORMER, DISTRIBUTION, 13.8 KV SUB-05 NORTH END OF SUB-5 POLE NUMBER S-37/S-38 PAD MOUNT YES. | A | |||
S5T75-S | TRANSFORMER | SUB-5 TRANSFORMER, DISTRIBUTION, 13.8 KV SUB-05 SOUTH END OF SUB-5 | A | |||
S5T54-50 | TRANSFORMER | VPS TRANSFORMER 2400 X 4160Y X 240/480 150 KVA BASE OF POLE 225 WEST OF GAS OILPUMP HOUSE POLE NUMBER 225 PAD MOUNT YES. | A | |||
S5T54-90 | TRANSFORMER | VPS TRANSFORMER 2400 X 480 POWER TRANSFORMER FOR DEPROP. AREA FCCU AND VPS AVJET COOLERS (CLASSIFIED-PCB) POLE NUMBER 167 PAD MOUNT YES. | I | |||
S5T54-131 | TRANSFORMER | VPS TRANSFORMER 2400 X 480 VPS WEST SIDE OF VPS PUMP ROOM TF-0130 | A | |||
S5T43-192 | TRANSFORMER | VPS TRANSFORMER, VACUUM PIPE STILL, 480 X 120/208 15KVA LIGHTING | A | |||
S5T43-191 | TRANSFORMER | VPS TRANSFORMER, VACUUM PIPE STILL, 480 X 120/208 30KVA | A | |||
S5T54-133 | TRANSFORMER | VPS TRANSFORMER, VACUUM PIPE STILL, GAS OIL SECTION 2400 X 480 500/560 KVA. PAD MOUNT YES. | A | |||
S5T54-1 | TRANSFORMER | VPS TRANSFORMER, VACUUM PIPE STILL, TYPE HPI 2400 / 240X480 / 500 KVA. POLE NUMBER 116 PAD MOUNT YES. | I | |||
S5T53-12 | TRANSFORMER | VPS TRANSFORMER, VACUUM PIPE STILL, TYPE HPI 2400 X 208/120 45 KVA POLE NUMBER 116 PAD MOUNT YES. | A | |||
S5T53-13 | TRANSFORMER | VPS TRANSFORMER, VACUUM PIPE STILL 2400 X 240/120 25 KVA. POLE NUMBER 116 PAD MOUNT YES. | A | |||
S5T54-173 | TRANSFORMER | WEST ROAD BY #6 CWT POLE TOP, POLE #329 WEST ROAD FLOOD LIGHTING. | A | |||
P-2979 | PUMP | TFA OIL CIRCULATION PUMP FOR P-2980 PID DWG 15-1026-55 | A | |||
P-0430 | PUMP | TFA #2 FUEL OIL TRANSFER PUMP TFA-PN011 P-0430 PID DWG TFA-16-14305-07 (OUT OF SERVICE 10/2008) | I | |||
P-1206 | PUMP | TFA AVIATION FUEL BLENDING TFA-PN040 P-1206 PID DWG TFA-16-14305-58 | I | |||
P-1214 | PUMP | TFA AVIATION FUEL BLENDING TFA-PN042 P-1214 PID DWG TFA-16-14305-58 | I | |||
P-0432 | PUMP | TFA AVIATION GASOLINE TFA-PN081 PID DWG TFA-16-14305-39 | I | |||
P-0449 | PUMP | TFA AVJET LOADING PUMP TFA-PN097 P-0449 (OUT OF SERVICE) | I | |||
P-0421 | PUMP | TFA AVJET TRANSFER PUMP TFA-PN003 P-0421 PID DWG TFA-16-14305-04 | A |
Attachment 1 to Schedule 2.2.1
P-0350 | PUMP | TFA AVJET TRANSFER PUMP TFA-PN049 P-0350 PID DWG TFA-16-14305-26 VOC TAG NO. 15892 | A | |||
P-0450 | PUMP | TFA AVJET TRANSFER PUMP TFA-PN098 P-0450 PID DWG TFA-16-14305-16 VOC TAG NO. 15031 (THIS PUMP TRAVELS BUT IS IN SERVICE - 08707) | I | |||
P-0437 | PUMP | TFA B.S.W. TRANSFER PUMP TFA-PN017 P-0437 PID DWG TFA-16-14305-13 | I | |||
P-1268 | PUMP | TFA BENZENE LOADING PUMP TFA-PN069 P-1268 PID DWG TFA-16-14305-51 | A | |||
P-2978 | PUMP | TFA BENZENE TRANSFER PUMP FROM TANK 22 TFA-PN045B PID NO. 15-1803-24 | A | |||
P-1292 | PUMP | TFA BENZENE TRANSFER PUMP PN106 P-1292 PID DWG TFA-16-14305-48 VOC TAG NO. 06033 | A | |||
P-2038 | PUMP | TFA BUNKER PUMP TFA-PN124 P-2038 PID DWG TFA-16-14305-49 | A | |||
P-1329 | PUMP | TFA BUTANE GAS BLENDING INJECTION PUMP TFA-PN012B P-1329 | A | |||
P-2980 | PUMP | TFA BUTANE TRANSFER PUMP P-2980 TFA-PN012A PID DWG 15-1026-55 | A | |||
P-0431 | PUMP | TFA BUTANE TRANSFER PUMP TFA-PN012 P-0431 PID DWG TFA-16-14305-55 | A | |||
P-2765 | PUMP | TFA BUTANE UNLOADING PUMP TFA-PN136 P-2765 PID DWG TFA-16-14305-68 | A | |||
P-2766 | PUMP | TFA BUTANE VAPOR PUMP TFA-PN137 P-2766 PID DWG TFA-16-14305-68 NO PM REQUIRED AS OF 1-06 | A | |||
P-2312 | PUMP | TFA CHEMICAL INJECTION PUMP TFA-PN133 P-2312 PID DWG TFA-16-14305-09 | A | |||
P-2910 | PUMP | TFA COLONIAL PIPELINE BOOSTER PUMP TFA-PN149 P-2910 ***** SEE NOTE ON PAGE 6 ***** | A | |||
P-2929 | PUMP | TFA COLONIAL PIPELINE FLUSHING PUMP TFA-PN150 P-2929 NEW PROJECT | A | |||
P-2145 | PUMP | TFA CRUDE BLENDING PUMP TFA-PN155 AT TANK #10 P-2145 | I | |||
P-1234 | PUMP | TFA CRUDE BOOSTER PUMP TFA-PN053 P-1234 PID DWG TFA-16-14305-03 | A | |||
P-1891 | PUMP | TFA CRUDE BOOSTER PUMP TFA-PN118 P-1891 PID DWG TFA-16-14305-14 | I | |||
P-1235 | PUMP | TFA CRUDE FLUSHING PUMP TFA-PN051 P-1235 PID DWG TFA-16-14305-03 VOC TAG NO. D14306 | A | |||
P-1275 | PUMP | TFA CRUDE INJECTION PUMP TFA-PN086 P-1275 PID DWG TFA-16-14305-11 VOC TAG NO. 14862 | A | |||
P-2157 | PUMP | TFA CRUDE INJECTION PUMP TFA-PN093 P-2157 PID DWG TFA-16-14305-01 VOC TAG NO. 14736 | A | |||
P-1863 | PUMP | TFA CRUDE INJECTION PUMP TFA-PN132 P-1863 PID DWG TFA-16-14305-01 VOC TAG NO. 14729 | A | |||
P-1267 | PUMP | TFA CUMENE LOADING PUMP TFA-PN068 P-1267 PID DWG TFA-16-14305-48 (REMOVED FROM SERVICE 1/98)(SEE W.O.98-00123-00) | A | |||
P-0218 | PUMP | TFA CUMENE LOADING PUMP TFA-PN092 P-0218 PID DWG TFA-16-14305-48 | I | |||
P-0423 | PUMP | TFA DIESEL OIL TRANSFER PUMP TFA-PN005 P-0423 PID DWG TFA-16-14305-05 | A | |||
P-0436 | PUMP | TFA DIESEL OIL TRANSFER PUMP TFA-PN016 P-0436 PID DWG TFA-16-14305-54A | I | |||
P-1273 | PUMP | TFA DIESEL TO SALES LOADING PUMP TFA-PN079 P-1273 PID DWG TFA-16-14305-18 VOC TAG NO. 15444 | A | |||
P-1274 | PUMP | TFA DIESEL TO SALES LOADING PUMP TFA-PN080 P-1274 PID DWG TFA-16-14305-18 VOC TAG NO. 15453 | A | |||
P-1892 | PUMP | TFA FLUSHING PUMP TFA-PN119 P-1892 PID DWG TFA-16-14305-01 VOC TAG NO. 14755 | A | |||
P-1693 | PUMP | TFA FUEL BLENDING PUMP TFA-PN018 P-1693 PID DWG TFA-16-14305-56 | A | |||
P-0439 | PUMP | TFA FUEL BLENDING PUMP TFA-PN019 P-0439 PID DWG TFA-16-14305-56 | A | |||
P-1744 | PUMP | TFA FUEL OIL-TO DOCK LOADING PUMP TFA-PN113 P-1744 PID DWG TFA-16-14305-50 | A | |||
P-1745 | PUMP | TFA FUEL OIL TO DOCKS TRANSFER PUMP TFA-PN113A P-1745 PID DWG TFA-16-14305-50 | A | |||
P-0426 | PUMP | TFA FUEL OIL TRANSFER PUMP TFA-PN008 P-0426 PID DWG TFA-16-14305-06 | A | |||
P-0427 | PUMP | TFA FUEL OIL TRANSFER PUMP TFA-PN008A PUMP P-0427 PID DWG TFA-16-14305-06 VOC TAG NO. 14456 | A | |||
P-1233 | PUMP | TFA FURNACE OIL BOOSTER PUMP TFA-PN050 P-1233 PID DWG TFA-16-14305-17 VOC TAG NO. 15165 | A | |||
P-1251 | PUMP | TFA FURNACE OIL BOOSTER PUMP TFA-PN057 P-1251 PID DWG TFA-16-14305-17 VOC TAG NO. 15206 | A | |||
P-1296 | PUMP | TFA FURNACE OIL PUMP TFA-PN096 P-1296 (OUT OF SERVICE) | I | |||
P-2078 | PUMP | TFA FURNACE OIL TRANSFER PUMP (COLONIAL) TFA-PN125 P-2078 PID DWG TFA-16-14305-17 | A | |||
P-2079 | PUMP | TFA FURNACE OIL TRANSFER PUMP (COLONIAL) TFA-PN126 P-2079 PID DWG TFA-16-14305-17 | A | |||
P-0424 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN006 P-0424 PID DWG TFA-16-14305-05 | A | |||
P-1278 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN089 P-1278 PID DWG TFA-16-14305-34 | A | |||
P-1279 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN090 P-1279 PID DWG TFA-16-14305-34 | A | |||
P-1428 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN104 P-1428 PID DWG TFA-16-14305-23 VOC TAG NO. 15299 | A | |||
P-1254 | PUMP | TFA GASOLINE AND FURNACE OIL (LAUREL) TRANSFER PUMP TFA-PN060 P-1254 PID DWG TFA-16-14305-08 | A | |||
P-2948 | PUMP | TFA GASOLINE BLEND HEADER SAMPLE RECOVERY PUMP P-2948 TFA-PN153 AT TANK NO. 31 PID DWG NO PM REQUIRED AS OF 1-06 | A | |||
P-2887 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN044 VOC TAG NO 15249 | A | |||
P-2632 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN105 P-2632 PID DWG TFA-15-1026-55 VOC TAG NO. 16657 | A | |||
P-2888 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN142 P-2888 VOC TAG NO. 15860 | A | |||
P-2889 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN143 VOC TAG NO. 15523 | A | |||
P-2890 | PUMP | TFA GASOLINE BLENDING TFA-PN144 PID DWG 15-1803-40 | I | |||
P-2891 | PUMP | TFA GASOLINE BLENDING TFA-PN145 PID DWG 15-1803-40 | A | |||
P-2892 | PUMP | TFA GASOLINE BLENDING TFA-PN146 PID DWG 15-1803-40 | A | |||
P-2893 | PUMP | TFA GASOLINE BLENDING TFA-PN147 PID DWG 15-1803-45 VOC TAG NO. 17009 | A | |||
P-1252 | PUMP | TFA GASOLINE BOOSTER PUMP TFA-PN148 P-1252 PID DWG TFA VOC TAG NO. 16988 | A | |||
P-1867 | PUMP | TFA GASOLINE LOADING PUMP TFA-PN114 P-1867 PID DWG TFA-16-14305-46 | A | |||
P-0419 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN001 P-0419 PID DWG TFA-16-14305-04 | A | |||
P-0420 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN002 P-0420 PID DWG TFA-16-14305-04 | A | |||
P-0422 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN004 P-0422 PID DWG TFA-16-14305-04 | A |
Attachment 1 to Schedule 2.2.1
P-0433 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN013 PUMP P-0433 PID DWG TFA-16-14305-55 | I | |||
P-0434 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN014 P-0434 PID DWG TFA-16-14305-54A | I | |||
P-1245 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN054 P-1245 PID DWG TFA-16-14305-35 VOC TAG NO. 06267 | A | |||
P-1249 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN055 P-1249 PID DWG TFA-16-14305-13 VOC TAG NO. 15293 | A | |||
P-1277 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN087 P-1277 PID DWG TFA-16-14305-31 | A | |||
P-1272 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN081 P-1272 PID DWG TFA-16-14305-26 VOC TAG NO. 15881 | A | |||
P-2630 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN127 P-2630 PID DWG TFA-16-14305-37 | A | |||
P-2631 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN130 P-2631 PID DWG TFA-16-14305-37 | A | |||
P-1253 | PUMP | TFA GASOLINE(LAUREL)BOOSTER PUMP TFA-PN059 P-1253 PID DWG TFA-16-14305-14 VOC TAG NO. 14968 | A | |||
P-2539 | PUMP | TFA HARBOR PIPELINE PRODUCTS PUMP TFA-PN007 P-2539 PID DWG TFA-16-14305-07 | A | |||
P-2602 | PUMP | TFA HEATING OIL TRANSFER PUMP TFA-PN052 P-2602 PID DWG TFA-16-14305-37 VOC TAG NO. 15930 | A | |||
P-1264 | PUMP | TFA INHIBITOR INJECTION PUMP TFA-PN129 P-1264 PID DWG TFA-16-14305-09 | A | |||
P-1265 | PUMP | TFA INHIBITOR UNLOADING PUMP TFA-PN066 P-1265 PID DWG TFA-16-14305-58 | I | |||
P-1208 | PUMP | TFA ISO BUTANE TRANSFER PUMP TFA-PN047 P-1208 PID DWG TFA-16-14305-61 VOC TAG NO. 16414 | A | |||
P-1276 | PUMP | TFA KEROSENE TRANSFER PUMP TFA-PN078 P-1276 PID DWG TFA-16-14305-31 | A | |||
P-1935 | PUMP | TFA LPG LOADING PUMP TFA-PN064 P-1935 PID DWG TFA-16-14305-63 | A | |||
P-2852 | PUMP | TFA LPG LOADING PUMP TFA-PN064 P-2852 (NEW) PID DWG 15-1026-63 (IN STORAGE SPARE - 5/08) | I | |||
P-2223 | PUMP | TFA LPG OFF TEST PUMP TFA-PN065 P-2223 PID DWG TFA-16-14305-63 | A | |||
P-2036 | PUMP | TFA LPG RETURN PUMP TFA-PN070 P-2036 PID DWG TFA-16-14305-60 | A | |||
P-3034 | PUMP | TFA N-14 CRUDE DEWATERING LINE BOOSTER PUMP TFA-PN157 (NEW INSTALLATION 07/2008) | A | |||
P-1651 | PUMP | TFA NAPHTHA TRANSFER PUMP TFA-PN151 P-1651 PID DWG TFA-16-14305-48 VOC TAG NO. 15826 | I | |||
P-1429 | PUMP | TFA NAPTHA TRANSFER PUMP TFA-PN108 P-1429 PID DWG TFA-15-1803-19 VOC TAG NO. 15320 | I | |||
P-3233 | PUMP | TFA NO. 1 PUMPHOUSE SEWAGE LIFT PUMP TFA-PN138 P-2817 PID DWG TFA- OPERATIONS PM | A | |||
P-2817 | PUMP | TFA NO. 1 PUMPHOUSE SEWAGE LIFT PUMP TFA-PN138 P-2817 PID DWG TFA- OPERATIONS PM | I | |||
P-0781 | PUMP | TFA NO.2 PUMP HOUSE PUMP TFA-PN035 PUMP P-0781 PID DWG TFA-16-14305-54A | A | |||
P-2864 | PUMP | TFA RAIN WATER DRAW OFF PUMP TFA-PN141 P-2864 | A | |||
P-2540 | PUMP | TFA RESID TO FCC UNIT FROM TANK 16 PUMP TFA-PN128 P-2540 PID DWG TFA-16-14305-21 | A | |||
P-0799 | PUMP | TFA S.C. BOOSTER (HARBOR) PUMP TFA-PN043 P-0799 PID DWG TFA-16-14305-38 | A | |||
P-2764 | PUMP | TFA SALES XERO FUEL PUMP TFA-PN152 P-2764 PID DWG TFA- | A | |||
P-0435 | PUMP | TFA SULFOLANE TRANSFER PUMP TFA-PN139 P-0435 PID DWG TFA-15-1803-46 | A | |||
P-0453 | PUMP | TFA SUMP PUMP TFA-PN033 P-0453 PID DWG TFA-16-14305-54A | A | |||
P-1219 | PUMP | TFA TANK TEST PUMP TFA-PN048 P-1219 NOT ON PID - PORTABLE PUMP | A | |||
P-1280 | PUMP | TFA TOLUENE TRANSFER PUMP TFA-PN091 P-1280 PID DWG TFA-16-14305-48 VOC TAG NO. 06154 | A | |||
P-3021 | PUMP | TFA TOLUENE GAS BLENDING PUMP P-3021 TFA-PN156 AT TANK NO.31 PID DWG | A | |||
P-1250 | PUMP | TFA TOLUENE TRANSFER PUMP TFA-PN056 P-1250 PID DWG TFA-16-14305-37 | A | |||
P-1431 | PUMP | TFA TOLUENE TRANSFER PUMP TFA-PN045 P-1431 PID DWG TFA-16-14305-62 | I | |||
P-2032 | PUMP | TFA TOLUENE TRANSFER PUMP TFA-PN045A P-2032 PID DWG TFA-16-14305-62 OPERATIONS PM | I | |||
P-0428 | PUMP | TFA TRANSFER BOOSTER PUMP TFA-PN009, PUMP P-0428 PID DWG TFA-16-14305-23 | A | |||
P-2267 | PUMP | TFA TRAVELLING MUD PUMP NOT ON PID | A | |||
P-1494 | PUMP | TFA TRUCK SCALE SUMP PUMP TFA-PN063 P-1494 NOT ON PID NO PM REQUIRED AS OF 1-06 | I | |||
P-1256 | PUMP | TFA WASTE OIL PUMP TFA-PN062 P-1256 (OUT OF SERVICE) NOT ON PID | I | |||
P-1426 | PUMP | TFA XYLENE TRANSFER PUMP TFA-PN103 P-1426 PID DWG TFA-16-14305-22 VOC TAG NO. 06154 | A | |||
PUMP | TFA XYLENETRANSFER PUMP TFA-PN117 P-1888 PID DWG TFA-16-14305-35 VOC TAG NO. 06291 |
TANKS Number |
Type |
Capacity |
Diameter | |||
TFA-TK001 | Cone Roof | 137000 | 144 | |||
TFA-TK002 | Cone Roof | 139390 | 144 | |||
TFA-TK003 | Cone Roof | 139390 | 144 | |||
TFA-TK004 | Cone Roof | 139390 | 144 | |||
TFA-TK016 | Cone Roof | 139390 | 144 | |||
TFA-TK009 | Cone Roof | 139390 | 144 | |||
TFA-TK118 | Cone Roof | 231400 | 170 | |||
TFA-TK119 | Cone Roof | 231400 | 170 |
Attachment 1 to Schedule 2.2.1
TFA-TK010 | EFR | 185000 | 168 | |||
TFA-TK011 | EFR | 185000 | 168 | |||
TFA-TK012 | EFR | 184605 | 168 | |||
TFA-TK013 | EFR | 185000 | 168 | |||
TFA-TK017 | EFR | 165085 | 144 | |||
TFA-TK027 | EFR | 136500 | 144 | |||
TFA-TK101 | EFR | 186300 | 168 | |||
TFA-TK102 | EFR | 186300 | 168 | |||
TFA-TK104 | EFR | 187400 | 180 | |||
TFA-TK105 | EFR | 548350 | 280 | |||
TFA-TK116 | EFR | 231400 | 170 | |||
TFA-TK117 | IFR | 210000 | 170 | |||
TFA-TK014 | IFR | 138700 | 144 | |||
TFA-TK021 | IFR | 139400 | 144 | |||
TFA-TK031 | IFR | 139400 | 144 | |||
TFA-TK046 | EFR | 116000 | 144 | |||
TFA-TK047 | IFR | 139400 | 144 | |||
TFA-TK049 | IFR | 56000 | 100 | |||
TFA-TK052 | EFR | 109840 | 140 | |||
TFA-TK053 | EFR | 109840 | 140 | |||
TFA-TK054 | EFR | 80600 | 120 | |||
TFA-TK018 | Cone Roof | 139400 | 144 | |||
TFA-TK028 | Cone Roof | 139400 | 144 | |||
TFA-TK044 | Cone Roof | 139400 | 144 | |||
TFA-TK401 | Cone Roof | 217700 | 180 | |||
TFA-TK402 | Cone Roof | 217700 | 180 | |||
TFA-TK403 | Cone Roof | 217700 | 180 | |||
TFA-TK404 | Cone Roof | 217700 | 180 | |||
TFA- TK060 | Cone Roof | 35840 | 80 | |||
TFA-TK061 | Cone Roof | 35840 | 80 | |||
TFA-TK019 | Cone Roof | 139400 | 144 | |||
TFA-TK020 | Cone Roof | 116160 | 144 | |||
TFA-TK030 | Cone Roof | 116160 | 144 | |||
TFA-TK026 | IFR | 139400 | 144 | |||
TFA-TK038 | IFR | 56000 | 100 | |||
TFA-TK042 | IFR | 139400 | 144 | |||
TFA-TK043 | IFR | 139400 | 144 | |||
TFA-TK023 | Cone Roof | 25400 | 70 | |||
TFA-TK024 | Cone Roof | 36000 | 80 |
Attachment 1 to Schedule 2.2.1
TFA-TK039 | Cone Roof | 25400 | 70 | |||
TFA-TK041 | Cone Roof | 56000 | 100 | |||
TFA-TK040 | IFR | 36000 | 80 | |||
TFA-TK050 | IFR | 56000 | 100 | |||
TFA-TK025 | IFR | 56000 | 100 | |||
TFA-TK029 | IFR | 139400 | 144 | |||
TFA-TK045 | IFR | 139408 | 144 | |||
TFA-TK055 | EFR | 181600 | 180 | |||
TFA-TK065 | EFR | 109800 | 140 | |||
TFA-TK066 | IFR | 109800 | 140 | |||
TFA-TK068 | IFR | 181450 | 180 | |||
TFA-TK069 | IFR | 217700 | 180 | |||
TFA-TK070 | EFR | 181450 | 180 | |||
TFA-TK067 | IFR | 109800 | 140 | |||
TFA-TK114 | IFR | 9170 | 37 | |||
TFA-TK115 | IFR | 9170 | 37 | |||
TFA-TK112 | IFR | 13600 | 45 | |||
TFA-TK113 | IFR | 13600 | 45 | |||
TFA-TK219 | IFR | 13600 | 45 | |||
TFA-TK006 | Cone Roof | 56000 | 100 | |||
TFA-TK048 | IFR | 56000 | 100 | |||
TFA-TK062 | Cone Roof | 181440 | 180 | |||
TFA-TK063 | Cone Roof | 181440 | 180 | |||
TFA-TK064 | IFR | 181500 | 180 | |||
TFA-TK110 | EFR | 67200 | 100 | |||
TFA-TK111 | EFR | 67200 | 100 | |||
TFA-TK120 | EFR | 83280 | 120 | |||
TFA-TK121 | EFR | 83280 | 120 | |||
TFA-TK022 | IFR | 55600 | 100 | |||
TFA-TK051 | IFR | 56000 | 100 | |||
TFA-TK005 | Cone Roof | 139390 | 144 | |||
TFA-TK032 | IFR | 1000 | 20 | |||
TFA-TK033 | Cone Roof | 600 | 15 | |||
TFA-TK034 | Cone Roof | 180 | 10 | |||
TFA-TK056 | Cone Roof | 14000 | 50 | |||
TFA-TK103 | Cone Roof | 7840 | 40 | |||
TFA-TK218 | Cone Roof | 250 | 10 | |||
TFA-TK340 | Cone Roof | 472 | 15 |
LINES
Attachment 1 to Schedule 2.2.1
LINE # |
SERVICE |
FROM |
TO | |||
N-14 | VPS DE- WATERING |
ALL CRUE TANKS | CRUDE LINE #02082C (PA-33 SUCTION) | |||
N-325(3) | RAFFINATE |
SLF UNIT / N-527 | N-163 (2 ) / N-325 (3) | |||
N-325 (4) | NAPHTHA TRANSFER | TK-28 AREA | N-423 | |||
N-01 | CRUDE (16 & 24) | DOCKS | TKS 101,102, 104,10 & 13 | |||
N-124(1) | WWTP SLOP | WWTP / PQ-1; wwwtp/tkfarm | NEW OH N-14 | |||
N-443 | Lght Slop Oil (4 & 6) | VPS & FCC | 12 N442, TK-342 or TK-335 | |||
N-01A | CRUDE (16 & 24) | DOCKS | TKS 101,102,104,10 & 13 | |||
N-76 | L.F. GAS (6, 8 10, 12) | TRANS PUMP PN2,3, & 4 | DOCKS | |||
N-78 | FURN OIL (6, 8 12, & 14) | TRANS PUMP PN5 & 6 | DOCKS | |||
N-74 | Lead Free Gas (6 8, 10, 12) | TRANS PUMP PN1 | DOCKS | |||
N-73 | KEROSENE (10 & 12) | TRANS PUMP PN3 | DOCKS | |||
N-75 | TOLUENE (10 & 12) | N-65 | N-75 | |||
N-77 | DIESEL (6, 8, & 10) | TRANS PUMP PN5 & 6 | DOCKS | |||
N-557 | RAFFINATE / GASOLINE | 20 N403 @ DOCK #2 | 10 N557A | |||
N-220(2) | NAPHTHA | 14 N-413 | TK-55, N- 434 | |||
N-02 | CRUDE | ALL CRUDE CHARGE TANKS | VPS, CRUDE LINE #03000C | |||
N-210 | BUTANE | N34 | TK-57 | |||
N-244 | AVIA, ALKY | LDE PUMP PN-4, N-387 | TKS 51,54,57,58 | |||
N-353 | LPG | PUMP PN64 | TANK CAR LOADINGRACK | |||
N-390 | FURN OIL | COLONIAL P. LINE | 10 N343 | |||
N-59 | F.C. CRKD DIST | TKS 24 & 41 | TK 9, PN11, N244,N164,N70,N60,N40 | |||
N-89 (1) | GASO. BLEND ( 4 & 6) |
10 N-541 | GASOLINE BLEND HDR | |||
N-164 | #2 OIL | N325 & N59 | TKS 16,17,26,27,42,43,62 & 63 | |||
N-343 | FURN OIL (16 & 20) | N70 | TKS 401 -404 | |||
N-352 |
LPG LIQ/VAPOR | PUMP PN65 | VAPORIZER / RAILRACK | |||
N-409 (2) | CUMENE | N-40 / PK-1A | N-421 / DOCK #2 | |||
N-430 | FURN OIL | 10 N164 | TKS 401 -404 | |||
N-555 | RAFFINATE | TK120 | RAFFINATE SHIPPING PUMP | |||
N-556 | RAFFINATE | TK 121 | RAFFINATE SHIPPING PUMP | |||
N-557A | RAFFINATE | 14 N567 | 16 N62 @ #1 P.H. | |||
N-163 (2) |
RAFFINATE | N325 (3) | N325 (3) | |||
N-304 | GAS BLEND STOCK | N29,N47,N52,N63.N34,N206 & N213 | TKS 65 & 67 | |||
N-305 | GAS BLEND STOCK | N29,N47,N52.N63,N34,N206 & N213 | TK66 | |||
N-357A | KEROSENE | N357 | SALES | |||
N-306 | F.O. RUNDOWN | LINES N53,N57,N60 &N219 | TK64 & N343 | |||
N-307 | F.O. SUCTION | TK64 & N343 | N69 | |||
N-558 | NUMBER NOT USED | |||||
0-905 | SLOP OIL | TK- 348 | N-143 (2) | |||
Dow-0001 | SLOP OIL WATER MIX | SCALTECH SKID | PQ-1 SUCTION / TKs- 333, 335, 342 | |||
N-204A | AVIA GAS (4 & 6) | N204 | PUMP PN-81 & SALES | |||
N-204B | AVIA GAS | TK51 | PN81, SALES | |||
N-30 | BUTANES | POLY LINE #0-78 N226 | N227 N34 & SPHERES | |||
N-214 | BUTANE | SPHERES 35,36, 37,58 | ALKY UNIT TKS 216 & 217 | |||
N-351 | LPG (OFFTEST) | N379 & TKS 90/91 | POLY | |||
N-377 | LPG VAPOR | SPHERES 35, 36, 37 | FCCU | |||
N-83 (2) | BLEND GAS | GAS BLENDER | GASOLINE TANKS | |||
N-88 | FURN OIL (4, 6, 8) | N-85 | SALES | |||
N-63 (1) | BLEND GAS | TRANS PUMPS. PN-1-4 | N- 260 |
Attachment 1 to Schedule 2.2.1
N-63A | BLEND GAS | N63 | PN54 SUCTION | |||
N-87 | FURN OIL (4, 6, 8) | N85 | SALES | |||
N-354 | LPG | PUMP PN64 | SALES | |||
N-382 | LSD | TKS 48 | PUMPS PN89 & PN90 | |||
N-382A | LSD | PUMPS PN89 & PN90 | N382B & N382C | |||
N-382B | LSD | N382A | SALES | |||
N-382C | LSD | N382A | SALES | |||
N-383 | GASOLINE | N83 | SALES | |||
N-384 | GASOLINE | TKS 14, 21, 31 & 47 | PN- 87 & PN- 88 | |||
N-386 | CRUDE | N1 & N1A, N-14 | TKS- 17 & 27 | |||
N-414 | XYLENE | TK 25 / PN- 103 | N220 | |||
N-600 | FURN OIL (18 & 24) | F.O. / LSD- TKS-401, 402, 403, 404, 64, 44, 28, 29, 19, 18 | DOCKS - 1A , 2 & 3 | |||
N-34 | BUTANES | PUMPS PN-12 & PN-12A | N30, N304, N305 & SC,FC,AV GAS TKS | |||
N-433 | #2 OIL | 12 N306 | TK 48 | |||
N-60 | #02 OIL | PN-11 | TKS 18,19,23,28,29,44,45 &N300,N306 | |||
N-62 (2) | LEAD FREE GAS | TK-54 | PN- 127 - 130 | |||
N-64 | GASOLINE (16 & 20) | TKS 48, 49, 50, 52 & 53 | TRANS. PUMPS 1-4 HPL. LPL. CPL | |||
N-65 | TOULENE | PN-56 | PN-1 HPS #1 PUMPHOUSE, N-75 | |||
N-66 | GASOLINE (16 & 20) | TKS 14,21,31,46,47, 66 | TRANS. PUMPS PN2,3,4 & HPL, CPL, LPL | |||
N-67 | GASOLINE (16 & 20) | TKS 14,21,31,46 & 47 | TRANS PUMPS PN2,3,4, & HPL, LPL, CPL | |||
N-82 (1) | GASOLINE | N-64 | 12 CPL XFR LINE (TK-31) | |||
N-85A | FURN OIL | TKS 18,19,28,29,44 & 45 | N85 | |||
N-89 (2) | GASO. BLEND ( 4 & 6) | N-349 | GASOLINE BLEND HDR | |||
N-90 | FURN OIL (4 & 6) | (TRANS PUMPS PN16 & 287) | CAR LDG. RACK & TK-56 | |||
N-167 | BUTANES | SPHERE 35 & 36 | NO. 2 T.P.H. | |||
N168 | VENT (2 & 3) | SPHERE 35, 36 & 37 | LOADING RACK | |||
N-200 | TOLUENE | PUMP PN45 | SALES | |||
N-201 | LEAD FREE GAS | N82 (FROM TK54) | PN52 & N65 | |||
N-220 (3) | NAPHTHA | 10 N-434 | TK-26 AREA | |||
N-341 | DISTILLATE | N300 & N301 | PN- 104 | |||
N-342 | DISTILLATE | N59 | NO. 1 T.P.H. PUMP PN6 | |||
N-348 | KEROSENE | N309 | NO. 1 T.P.H. & LPL | |||
N-349 | KEROSENE | N357 | SALES | |||
N-378 | LPG | 3 N380 & SPHERE 35, 36 & 37 | SPHERES 35, 36 & 37 & PUMP PN70 | |||
N-379 | LPG | PUMP PN70 | 2 N351 | |||
N-380 | LPG | N350 | N378 | |||
N-413 | NAPHTHA | DOCK #2 | 12 N414 | |||
N-431 | GASOLINE | TKS 68 & 69 | 8 N- 432 | |||
N-432 | GASOLINE | GASOLINE BLENDER | TK-69 VIA N- 431 | |||
N-526 | LOGO RUNDOWN | 6 N524 | N- 388 | |||
N-85 | FURN OIL | N69 & N85A | PN-79 & 80 | |||
N-361 (2) | XYLENE | N-220 | DOCK # 2 | |||
N-13 | TK 18 ECRA WELL | 2 @ TK-18 | N-163 TO N-13 @ TK-22 | |||
N15A | XYLENE | TKS 305, 308 | 8 N55A | |||
N-20 | RESID OVERHEAD | CRUDE LINE #04054C | TKS 1-5 | |||
N-33 | BUTANES | SPHERES 35, 36 & 37 | PUMPS PN-12 & PN-12A | |||
N-70 | FURN OIL (8, 10, 16) | tk- 9,18,19,28,29,44,45,N309,N343 | TRANS PUMPS PN5 & 6 & HPL | |||
N-71 | FUEL OIL | TKS 1-5 & LINE # N316 | TRANS PUMPS PN8 & 8A & N315 | |||
N-72 | FUEL OIL | TKS 1-5 & LINE # N86 | TRANS PUMPS PN7 & 8A | |||
N-101 | INHIBITOR | #2 T.P.H. | TKS 14,21,31,46-50,52,53 | |||
N-102 | INHIBITOR | TKS 14,21,31, 46-50,52,53 | ||||
N-52 (2) | FC GASOLINE | PN- 145 & 146 | GASOLINE BLENDING HDR | |||
N-62 (1) | UNBLEND GAS | PN- 2 & PN- 4 | TKS- 20, 30, 29, 45, 66, 61 | |||
N-69 | FURN OIL (12 & 16) | TKS, 18,19,28,29,44,45,N85, N307 | TRANS PUMPS PN5 & 6 & HPL | |||
N-82 (2) | GASOLINE | TK-31 AREA | #2 PUMPHOUSE | |||
N-83 | GASOLINE | PN-187 & 188 | SALES | |||
N-91 | FUEL OIL | TRANS PUMP PN17 | CAR LDG. RACK | |||
N-124 (2) | (REC G.O.) ECRA WELL | TK6 P.H. wwwtp/tkfarm | ECRA, P- 14s |
Attachment 1 to Schedule 2.2.1
N-130 | RECOVERED OIL ERCA | PUMP PN-21 ( or 3 N-162 ) | TKa-5 & 13 (or N-14 @ #6 PH ) | |||
N-134 | CRUDE B.S.W. | N-14 | TK-6 | |||
N-160 | ECRA GAS | (DYE POTS & TK 32) | PUMPS PN19 & 20 | |||
N-162 | (WASTE OIL) ECRA WTR. | PUMP PN35 | N130 | |||
N-163 (1) | ERCA WATER | N-339 | N-13 | |||
N-166 | AVIATION GAS | TKS 48 - 51 & N64 | N82 | |||
N-180 | B.B. LOADING | NO. 2 T.P.H. | TANK CAR RACK | |||
N-181 | NORMAL BUTANE | TANK CAR RACK | NO. 2 T.P.H. | |||
N-203 | INHIBITORS | NO. 2 T.P.H. | TAKS 51 & 59 | |||
N-204 (2) | AVIA GAS | TK 57.59 | N204A | |||
N-212 | LEAD FREE GAS | GASOLINE TANKS | INHIBITOR BLEND | |||
N-215 | BUTANE | TANK 58 | N33 | |||
N-216 | BUTANE | SPHERES 35,36,37,58 | PUMP PN47 | |||
N-218 | BUTANE | PUMP PN47 | N214 | |||
N-260 | MOTOR/ ALKY | UNBLENDED N-63 | ALL GASOLINE TANKS | |||
N-300 | AVJET | 6 N-325B | TKS 60 & 61 | |||
N-344 | GASOLINE (16 & 20) | TKS 53,52,47,31,21 & 14 | NO. 1 T.P.H. & LPL | |||
N-345 | FURN OIL | TKS 18 & 19 | NO. 1 T.P.H & LPL | |||
N-355 | LPG VAPOR | TRUCK LOADING RACK | TKS 90/91 | |||
N-357 | KEROSENE (8 & 14) | N309 | N349 & N357A | |||
N-361 (1) | BENZENE | TK-22 | N-420 | |||
N-388A | FURN OIL | 10 N388 | 12 N398 | |||
N-389 | KEROSINE | TK30 | KEROSINE / SALES | |||
N-391 | FURN OIL | TK64 | PUMP PN-56 | |||
N-543 | FIRE WATER | 10 F.W. | HYDRANT | |||
N-544 | FIRE WATER | 8 F.W. | HYDRANT | |||
N-83A | OOS | |||||
N-165 | Number Changed to N325A | |||||
N-356 | (OOS) | TK103 | TK323 | |||
NUMBER NOT | ||||||
N-559 | USED | |||||
NUMBER NOT | ||||||
N-560 | USED | |||||
NUMBER NOT | ||||||
N-561 | USED | |||||
N-131 | FUEL OIL CUTTER | N61 | N127 | |||
N-142 (1) | Ships Ballast (4, 6, 10, 12). | DOCKS & PN32 | TKS 333 &335 & PLANT TRAP | |||
N-308 | JET | N53,N57,N60 & N219 | TKS 20,30 & 48 | |||
N-309 | KERO | TKS 46, 30 & 20 | N69, N70, N348 & N357 | |||
N-311A | GAS SUCTION | TK45 | N62 | |||
N-312 | GASOLINE | TKS 68 & 69 | N309, N-344, N-64, N-47, N-63, N-66 | |||
N-315 (2) | VGO / RESID | N-222 | 6 INJECTION LINE TO MSCC | |||
N-316 | RESID / VGO | N-71, N- 72, N- 20 | TK-9,16, & 19 | |||
N-395 | AVJET | TK 30 | PN-29 LOCATION | |||
N-395A | JET / DIESEL | TK-20 | N-389 | |||
N-396 | AVJET | N393 | PUMP PN30 | |||
N-416 |
CLAYTREAT CHG. | 6 N412 | CLAYTREATER UNIT | |||
N-601 | To N-620 Reserved For MVRS | |||||
N-302 | (OOS) | |||||
02 | OOS | |||||
13 | OOS | |||||
N-53 | F.C. CRKD DIST | TREATING LINE #P-804? | TKS 18,19,23,28,29?,33,34 & 45 | |||
N-56 (2) | OFF TEST CUMENE | 6 N-222 @ TK-22 | N-411 @ TK-26 AREA | |||
N-56 (3) | DIESEL | TK-26 AREA | TKS-18,28, & 44 | |||
N-56A | F.C. CRKD DIST | N53 & N59 | TK24 | |||
N-84 | DIESEL | N68 | DIESEL P.H. | |||
N-127 | FUEL OIL | TRANS PUMPS PN8 & 8A | TKS 201 & 202, N126 & N131 | |||
N-155 | BSW DR CHEMICALS | PUMPS PN21 & 22 | TKS 6 & 7 | |||
N-269 | RICH LEAD | NO. 2 T.P.H. | TK57 | |||
N-270 | LEAD CIR. | TK 57,59 | NO. 2 T.P.H. |
Attachment 1 to Schedule 2.2.1
N-315 (1) | CUTTER STOCK | N61, N86 | & N71 | |||
N-346 | PLANT SLUDGE | N145 | DISPOSAL POND | |||
N-347 | PLANT SLUDGE | POND @ TK 104 | DISPOSAL POND | |||
N-381 | FURN OIL | TK 56 | ||||
N-114 | LINE REMOVED | |||||
N170 | LINE REMOVED | |||||
N-27 | LINE REMOVED | |||||
N-32 | OOS | |||||
N-310 | NOW THE N-63 | N29,N47,N52,N63,N206,N213,N360 | TK 29 | |||
N-311 | NOW THE N-62 | TK29 | N62 |
TFA | 1,593 | |||||
TFA-UA337A | ALARM LOOP | TFA-UA337A PUMP HOUSE 504 CONTROLLER COMMON TROUBLE ALARM, LOOP INCLUDES: US, UA. DWG. NO. PID-15-3103-74 | A | |||
TFA-UA337B | ALARM LOOP | TFA-UA337B PUMP HOUSE 505 CONTROLLER COMMON TROUBLE ALARM, LOOP INCLUDES: US, UA. DWG NO. PID-15-3103-74 | A | |||
TFA-UA337C | ALARM LOOP | TFA-UA337C PUMP HOUSE 506 CONTROLLER COMMON TROUBLE ALARM, LOOP INCLUDES: US, UA. DWG. NO. PID-15-3103-74 | A | |||
PLY-RVP001 | ANALYZER LOOP | POLY RVP ANALYZER MANUFACTURER ABBNG LOCATED IN FIREMANS SHED POLY UNIT EAST END | A | |||
TFA-AIC31 | ANALYZER LOOP | TANK 31 BLENDING SAMPLER LOCATED AT TANK 31 BLEND HEADER SHOULD BE ON PID-15-1011-31 NOT AS OF 9/6/02 | A | |||
TFA-FTIR31 | ANALYZER LOOP | TANK 31 GAS BLENDING ANALYZER LOCATED IN ANALYZER SHED AT TANK 31 SHOULD BE ON PID-15-1803-15 (NOT AS OF 9/6/02) | I | |||
TFA-RVP31 | ANALYZER LOOP | TANK 31 RVP ANALYZER ON GAS BLENDING LOCATED IN ANALYZER SHED AT TANK 31 SHOULD BE ON PID 15-1803-15 (NOT AS OF 9/6/02) | A | |||
SUB-003 | BATTERY | SUB-003 BATTERIES, EMERGENCY POWER SUPPLY FOR CONTROL CIRCUTS ON BREAKERS AT NO. 3 SUBSTATION. NO BATTERY INSPECTION, STATIC SWITCH |
I | |||
BLDG-504 | BUILDING | TFA FIREWATER PUMPHOUSE @ TANK #5 | I | |||
BLDG-505 | BUILDING | TFA FIREWATER PUMPHOUSE @ TANK #5 | I | |||
BLDG-506 | BUILDING | TFA FIREWATER PUMPHOUSE @ TANK #5 | I | |||
BLDG-507 | BUILDING | TFA INSTRUMENT HOUSE AT TANK 31 | I | |||
BLDG-159 | BUILDING | TFA TANK FARM M / S OFFICE TRAILER BLDG-159 | A | |||
BLDG-152 | BUILDING | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 | A | |||
BLDG-158 | BUILDING | TFA TANK FARM No. 2 PUMP HOUSE BUILDING BLDG-158 | A | |||
S3B4-4 | BUS | 225A, 480V BUS IN OLD SRU | A | |||
S3B4-5 | BUS | 400A FEEDER TO 1 DOCK FROM TK 117 | A | |||
S3B4-10 | BUS | 480V STARTER RACK BUS AT TANK FARM TK 001 | A | |||
S3B4-1 | BUS | 480V STARTER RACK BUS AT TANK FARM TK 105 | A | |||
S3B4-9 | BUS | 480V STARTER RACK BUS AT TANK FARM TK 118 | A | |||
S3B4-8 | BUS | 600A BUS FOR STARTERS AT SALES TF-194 | A | |||
S3B4-3 | BUS | S3B4-3 SWITCH RACK FOR TK 116 & 117 | A | |||
S3B4-51 | BUS | STARTER BUS AT TANK 51 | A | |||
S3B4-49 | BUS | STARTER BUS AT TANK49 | A | |||
C-2949 | COMPRESSOR | TFA GASOLINE BLENDING INSTRUMENT AIR COMPRESSOR C-2949 TFA-PN154 AT TANK NO. 31 PID DWG | I | |||
CR-108 | CRANE | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 CRANE CR-108 | A | |||
TFA-ELEC | ELECT GENERAL | TFA ELECTRICAL - PROJECT TRACKING | I | |||
TFA-GRND | ELECT GENERAL | TFA GROUNDING GRID TFA-GRND | A | |||
UTP-S-31 | ELECT GENERAL | UTP STEEL TOWER, NW CORNER OF STOREHOUSE | A | |||
UTP-352A | ELECT GENERAL | UTP UTILITY POLE EAST OF TANK 64 | A | |||
UTP-349 | ELECT GENERAL | UTP UTILITY POLE SOUTH OF PROPANE BULLETS MAIN TANK FARM | A | |||
UTP-350 | ELECT GENERAL | UTP UTILITY POLE SOUTH OF PROPANE BULLETS MAIN TANK FARM | A | |||
UTP-343 | ELECT GENERAL | UTP UTILITY POLE WEST OF TANK 44 | A | |||
UTP-090 | ELECT GENERAL | UTP UTILITY POLE WOOD GUY POLE TO SUPPORT UTP-090 EAST OF ASPHALT LOADING RACK TANK FARM | A | |||
UTP-165 | ELECT GENERAL | UTP UTILITY POLE WOOD NORTH OF PLANNING DEPT BLDG 500. | A | |||
UTP-227 | ELECT GENERAL | UTP UTILITY POLE WOOD WEST OF 4 & 5 COOLING WATER TOWER FEEDERS 52, AND 53. | A | |||
UTP-396 | ELECT GENERAL | UTP UTILITY POLE WOOD WEST OF TANK NUMBER 117 2400 VOLT POWER TO STARTERS, AND TRANSFORMER. | A |
Attachment 1 to Schedule 2.2.1
UTF-225 | ELECT GENERAL | UTP UTILITY POLE WOOD WEST OF THE GAS-OIL PUMP HOUSE. | A | |||
UTP-043 | ELECT GENERAL | UTP UTILITY POLE WOOD, NORTH OF TANK 17 | A | |||
UTP-043C | ELECT GENERAL | UTP UTILITY POLE WOOD, NORTH OF TANK 17 | A | |||
UTP-045 | ELECT GENERAL | UTP UTILITY POLE WOOD, BETWEEN TANK NO.9 AND TANK NO.10 | A | |||
UTP-051 | ELECT GENERAL | UTP UTILITY POLE WOOD, BETWEEN TANK NO.19 AND TANK NO.18 | A | |||
UTP-054 | ELECT GENERAL | UTP UTILITY POLE WOOD, BETWEEN TANKS NO.11 AND NO.12 | A | |||
UTP-059 | ELECT GENERAL | UTP UTILITY POLE WOOD, BETWEEN TANKS NO.20 AND 21 | A | |||
UTP-049 | ELECT GENERAL | UTP UTILITY POLE WOOD, BETWEEN TANKS NO.28 AND 29 | A | |||
UTP-057 | ELECT GENERAL | UTP UTILITY POLE WOOD, BETWEEN TANKS NO.30 AND 31 | A | |||
UTP-042 | ELECT GENERAL | UTP UTILITY POLE WOOD, EAST OF TANK NO. 16 | A | |||
UTP-041 | ELECT GENERAL | UTP UTILITY POLE WOOD, EAST OF TANK NO. 16 AND 26 BETWEEN TANKS. | A | |||
UTP-040 | ELECT GENERAL | UTP UTILITY POLE WOOD, EAST OF TANK NO. 26 | A | |||
UTP-348 | ELECT GENERAL | UTP UTILITY POLE WOOD, EAST OF TANK NO.64 MAIN TANK FARM | A | |||
UTP-001 | ELECT GENERAL | UTP UTILITY POLE WOOD, F1RST POLE IN SIDE FENCE EAST OF LINDE TANK FARM | A | |||
UTP-062 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED BETWEEN TANKS 13 AND 14 | A | |||
UTP-030 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED EAST OF TANK NO. 51 ELECTRICAL DRAWING NUMBER 11-1425-Z | A | |||
UTP-028 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED EAST OF TANK NO.47 | A | |||
UTP-292 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED NORTH EAST OF TANK NO.53 | A | |||
UTP-290 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED NORTH EAST OF TANK NO.65 | A | |||
UTP-291 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED NORTH WEST OF TANK NO.65 | A | |||
UTP-287 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED NORTH WEST OF TANK NO.66 | A | |||
UTP-299 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED NORTH WEST OF TANK NO.67 |
A | |||
UTP-012 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH BETWEEN TANK NO.26 AND NO.27 (THIS POLE HAS AN AIR SWITCH) |
A | |||
UTP-061 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.13 |
A | |||
UTP-005 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.22 | A | |||
UTP-009 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.25 | A | |||
UTP-018 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.28 | A | |||
UTP-021 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.29 (INSIDE EAST LEVY) | A | |||
UTP-027 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.31 | A | |||
UTP-029 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.47 | A | |||
UTP-038 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.48 | A | |||
UTP-033 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.50 | A | |||
UTP-031 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF TANK NO.51 | A | |||
UTP-015 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH EAST OF YANK NO.27 (NEXT TO LEVY) | A | |||
UTP-014 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO. 27 | A | |||
UTP-036 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO. 49 | A | |||
UTP-006 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.23 | A | |||
UTP-007 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.24 | A | |||
UTP-011 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.26 | A |
Attachment 1 to Schedule 2.2.1
UTP-017 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.28 | A | |||
UTP-020 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.29 | A | |||
UTP-023 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.30 | A | |||
UTP-026 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.31 | A | |||
UTP-034 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.50 | A | |||
UTP-032 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH OF TANK NO.51 | A | |||
UTP-371 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST O OF TANK NO.48 | A | |||
UTP-004 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.22 | A | |||
UTP-008 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.25 | A | |||
UTP-010 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.26 | A | |||
UTP-013 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.27 | A | |||
UTP-016 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.28 | A | |||
UTP-019 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.29 | A | |||
UTP-022 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.30 | A | |||
UTP-037 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.49 | A | |||
UTP-035 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.50 (INSIDE LEVY) | A | |||
UTP-292A | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.52 | A | |||
UTP-288 | ELECT GENERAL | UTP UTILITY POLE WOOD, LOCATED SOUTH WEST OF TANK NO.66 | A | |||
UTP-050 | ELECT GENERAL | UTP UTILITY POLE WOOD, NORTH EAST OF TANK NO. 28 | A | |||
UTP-055 | ELECT GENERAL | UTP UTILITY POLE WOOD, NORTH EAST OF TANK NO.11 | A | |||
UTP-052 | ELECT GENERAL | UTP UTILITY POLE WOOD, NORTH EAST OF TANK NO.18 | A | |||
UTP-060 | ELECT GENERAL | UTP UTILITY POLE WOOD, NORTH EAST OF TANK NO.20 POLE NO.060 ALSO HAS AN AIR SWITCH | A | |||
UTP-046 | ELECT GENERAL | UTP UTILITY POLE WOOD, NORTH WEST OF TANK NO.10 | A | |||
UTP-002 | ELECT GENERAL | UTP UTILITY POLE WOOD, SECOND POLE INSIDE FENCE EAST OF LINDE TANK FARM | A | |||
UTP-053 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTH EAST OF TANK NO.11 | A | |||
UTP-058 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTH EAST OF TANK NO.20 | A | |||
UTP-056 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTH EAST OF TANK NO.3 | A | |||
UTP-024 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTH EAST OF TANK NO.30 INSIDE LEVY | A | |||
UTP-044 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTH WEST OF TANK NO.10 BETWEEN TANK 9 AND 10 | A | |||
UTP-047 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTH WEST OF TANK NO.2 | A | |||
UTP-025 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTH WEST OF TANK NO.31 | A | |||
UTP-347 | ELECT GENERAL | UTP UTILITY POLE WOOD, SOUTHEAST OF TANK NO 63 MAIN TANK FARM | A | |||
UTP-003 | ELECT GENERAL | UTP UTILITY POLE WOOD, THIRD POLE INSIDE FENCE EAST OF LINDE TANK FARM | A | |||
UTP-063 | ELECT GENERAL | UTP WOOD UTILITY POLE LOCATED NORTHEAST OF TANK NUMBER 13. | A | |||
UTP-065 | ELECT GENERAL | UTP WOOD UTILITY POLE LOCATED NORTHEAST OF TANK NUMBER 5. | A | |||
UTP-064 | ELECT GENERAL | UTP WOOD UTILITY POLE LOCATED SOUTHEAST OF TANK NUMBER 5. | A | |||
UTP-066 | ELECT GENERAL | UTP WOOD UTILITY POLE LOCATED SOUTHWEST OF TANK NUMBER 21. | A | |||
UTP-099 | ELECT GENERAL | UTP WOOD UTILITY POLE, OUTSIDE WEST GATE | A | |||
UTP-092 | ELECT GENERAL | UTP-UTILITY POLE WOOD AT TRANSFORMER NUMBER 25 SOUTHWEST OF DOCK NUMBER TWO DOCKS | A |
Attachment 1 to Schedule 2.2.1
ENG-2254 | ENGINE | TFA #11 FIRE WATER PUMP TFA-FWP11 (194HP / 2600RPM) | A | |||
ENG-2209 | ENGINE | TFA #12 FIRE WATER PUMP ENGINE (NORTH) | A | |||
ENG-2210 | ENGINE | TFA #13 FIRE WATER PUMP TFA-FWP13 ENGINE AT TANK 5 (MIDDLE) | A | |||
ENG-2211 | ENGINE | TFA #14 FIRE WATER PUMP TFA-FWP14 ENGINE AT TANK 5 (SOUTH) | A | |||
S3F4-CWF | FEEDER | 480 V FEED FROM TRANSFORMER TO #1CWT FAN STARTER | A | |||
S3F4-3 | FEEDER | 480V FEEDER TO TK 116/117 SWITCH RACK | A | |||
S3F4-504 | FEEDER | BUILDING #504 FEED | A | |||
S3F4-505 | FEEDER | BUILDING #505 FEED | A | |||
S3F4-506 | FEEDER | BUILDING #506 FEED | A | |||
S3F4-1TFPH | FEEDER | FEEDER TO #1 TRANSFER PUMP HOUSE | A | |||
S3F4-5 | FEEDER | REMOVE | D | |||
S3F4-2 | FEEDER | REMOVE | D | |||
S3F5-38 | FEEDER | SUB 3 2.4KV FEEDER TO 900HP COLONIAL PUMP |
A | |||
S3F3-213 | FEEDER | TFA FEEDER 120V/30A, FEEDS PROPANE BULLETS FIRE PROTECTION PANEL | A | |||
H-TFA212 | FIRE HYDRANT | H-212 HYDRANT, TANK FARM, SOUTH EAST OF TK 121 | A | |||
H-TFA390 | FIRE HYDRANT | H-390 HYDRANT, SOUTH TANK FARM, NORTH OF ROUTE 130 | A | |||
H-TFA391 | FIRE HYDRANT | H-391 HYDRANT, SOUTH TANK FARM, MILTON AVE. | A | |||
H-TFA392 | FIRE HYDRANT | H-392 HYDRANT, SOUTH TANK FARM, NORTH WEST OF TK 404 | A | |||
H-TFA393 | FIRE HYDRANT | H-393 HYDRANT, SOUTH TANK FARM, SOUTH EAST OF TK 404 | A | |||
H-TFA394 | FIRE HYDRANT | H-394 HYDRANT, SOUTH TANK FARM, SOUTH EAST OF TK 403 | A | |||
H-TFA395 | FIRE HYDRANT | H-395 HYDRANT, SOUTH TANK FARM, NORTH WEST OF TK 402 | A | |||
H-TFA397 | FIRE HYDRANT | H-397 HYDRANT, TANK FARM, SOUTH EAST OF 1 PUMP HOUSE | A | |||
H-TFA398 | FIRE HYDRANT | H-398 HYDRANT, TANK FARM, SOUTH WEST OF TK 102 | A | |||
H-TFA399 | FIRE HYDRANT | H-399 HYDRANT, TANK FARM, SOUTH WEST OF TK 105 | A | |||
H-TFA400 | FIRE HYDRANT | H-400 HYDRANT, TANK FARM, SOUTH EAST OF TK 105 | A | |||
H-TFA401 | FIRE HYDRANT | H-401 HYDRANT, TANK FARM, EAST OF TK 105 | A | |||
H-TFA403 | FIRE HYDRANT | H-403 HYDRANT, TANK FARM, TK 116 | A | |||
H-TFA405 | FIRE HYDRANT | H-405 HYDRANT, TANK FARM, SOUTH EAST OF TK 118 | A | |||
H-TFA407 | FIRE HYDRANT | H-407 HYDRANT, TANK FARM, SOUTH EAST OF TK 116 | A | |||
H-TFA409 | FIRE HYDRANT | H-409 HYDRANT, TANK FARM, NORTH OF TK 102 | A | |||
H-TFA410 | FIRE HYDRANT | H-410 HYDRANT, TANK FARM, NORTH OF TK 104 | A | |||
H-TFA411 | FIRE HYDRANT | H-411 HYDRANT, TANK FARM, NORTH OF TK 105 | A | |||
H-TFA421 | FIRE HYDRANT | H-421 HYDRANT, TANK FARM, SPHERE 36 SOUTH WEST | A | |||
H-TFA434 | FIRE HYDRANT | H-434 HYDRANT, TANK FARM, TK 66 | A | |||
H-TFA435 | FIRE HYDRANT | H-435 HYDRANT, TANK FARM, TK 52 EAST | A | |||
H-TFA436 | FIRE HYDRANT | H-436 HYDRANT, TANK FARM, TK 52 WEST | A | |||
H-TFA437 | FIRE HYDRANT | H-437 HYDRANT, TANK FARM, TK 63 | A | |||
H-TFA438 | FIRE HYDRANT | H-438 HYDRANT, TANK FARM, TK 45 | A | |||
H-TFA439 | FIRE HYDRANT | H-439 HYDRANT, TANK FARM, TK 13 | A | |||
H-TFA440 | FIRE HYDRANT | H-440 HYDRANT, TANK FARM, TK 11 | A | |||
H-TFA441 | FIRE HYDRANT | H-441 HYDRANT, TANK FARM, TK 10 | A | |||
H-TFA442 | FIRE HYDRANT | H-442 HYDRANT, TANK FARM, TK 17 | A | |||
H-TFA443 | FIRE HYDRANT | H-443 HYDRANT, TANK FARM, TK 62 | A |
Attachment 1 to Schedule 2.2.1
H-TFA447 | FIRE HYDRANT | H-447 HYDRANT, TANK FARM, TK 70 WEST | A | |||
H-TFA448 | FIRE HYDRANT | H-448 HYDRANT, TANK FARM, TK 15 NORTH | A | |||
H-TFA449 | FIRE HYDRANT | H-449 HYDRANT, TANK FARM, TK 16 | A | |||
H-TFA450 | FIRE HYDRANT | H-450 HYDRANT, TANK FARM, TK 104 | A | |||
H-TFA451 | FIRE HYDRANT | H-451 HYDRANT, TANK FARM, TK 102 | A | |||
FH-003 | FIRE HYDRANT | MAIN PLANT ROAD FIRE HYDRANT | D | |||
FH-081 | FIRE HYDRANT | SOUTH TANK FARM FIRE HYDRANT | D | |||
FH-083 | FIRE HYDRANT | SOUTH TANK FARM FIRE HYDRANT | D | |||
FH-084 | FIRE HYDRANT | SOUTH TANK FARM FIRE HYDRANT | D | |||
FH-082 | FIRE HYDRANT | SOUTH TANK FARM FIRE HYDRANT | D | |||
FH-046 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-087 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-097 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-096 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-095 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-094 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-092 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-091 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-090 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-089 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-088 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-048 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-047 | FIRE HYDRANT | TANK FARM FIRE HYDRANT | D | |||
FH-098 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-106 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-164 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-165 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-168 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-170 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-179 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-178 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-177 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-176 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-l75 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-174 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-173 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-172 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-171 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-240 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-181 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-180 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-169 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-167 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-044 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-051 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-050 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-049 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-045 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-052 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-062 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-060 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-059 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-058 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-057 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-056 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-055 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-054 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-053 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-099 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-079 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-078 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-076 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-067 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
FH-063 | FIRE HYDRANT | TFA FIRE HYDRANT | D | |||
HM-TFA396 | FIRE MONITOR | H/M-396 HYDRANT MONITOR, TANK FARM, NORTH WEST OF 1 PUMP HOUSE | A | |||
HM-TFA402 | FIRE MONITOR | H/M-402 HYDRANT MONITOR, TANK FARM, EAST OF TK 340 SLOP TANK | A | |||
HM-TFA404 | FIRE MONITOR | H/M-404 HYDRANT MONITOR, TANK FARM, TK 119 | A | |||
HM-TFA406 | FIRE MONITOR | H/M-406 HYDRANT MONITOR, TANK FARM, SOUTH EAST OF TK 117 | A | |||
HM-TFA408 | FIRE MONITOR | H/M-408 HYDRANT MONITOR, TANK FARM, SOUTH OF HAZ-MAT PAD | A |
Attachment 1 to Schedule 2.2.1
HM-TFA412 | FIRE MONITOR | H/M-412 HYDRANT MONITOR, TANK FARM, NORTH OF #2 PUMP HOUSE | A | |||
HM-TFA413 | FIRE MONITOR |
H/M-413 HYDRANT MONITOR, TANK FARM, SOUTH OF #2 PUMP HOUSE | A | |||
HM-TFA433 | FIRE MONITOR | H/M-433 HYDRANT MONITOR, TANK FARM, EAST OF TK 68 | A | |||
HM-TFA444 | FIRE MONITOR | H/M-444 HYDRANT MONITOR, TANK FARM, TK 60 | A | |||
HM-TFA445 | FIRE MONITOR | H/M-445 HYDRANT MONITOR, TANK FARM, TK 70 EAST | A | |||
HM-TFA446 | FIRE MONITOR | H/M-446 HYDRANT MONITOR, TANK FARM, TK 39 | A | |||
HM-TFA069 | FIRE MONITOR | H/M-69 HYDRANT MONITOR, TANK FARM, NORTH WEST OF TK 69 | A | |||
SA-TFA414 | FIRE MONITOR | S/A-414 STAND ALONE MONITOR, TANK FARM, SPHERE 35 EAST | A | |||
SA-TFA415 | FIRE MONITOR | S/A-415 STAND ALONE MONITOR, TANK FARM, SPHERE 35 NORTH | A | |||
SA-TFA416 | FIRE MONITOR | S/A-416 STAND ALONE MONITOR, TANK FARM, SPHERE 35 WEST | A | |||
SA-TFA417 | FIRE MONITOR | S/A-417 STAND ALONE MONITOR, TANK FARM, SPHERE 35 SOUTH | A | |||
SA-TFA418 | FIRE MONITOR | S/A-418 STAND ALONE MONITOR, TANK FARM, SPHERE 36 NORTH | A | |||
SA-TFA419 | FIRE MONITOR | S/A-419 STAND ALONE MONITOR, TANK FARM, SPHERE 36 EAST | A | |||
SA-TFA420 | FIRE MONITOR | S/A-420 STAND ALONE MONITOR, TANK FARM, SPHERE 36 WEST | A | |||
SA-TFA422 | FIRE MONITOR | S/A-422 STAND ALONE MONITOR, TANK FARM, SPHERE 36 SOUTH | A | |||
SA-TFA423 | FIRE MONITOR | S/A-423 STAND ALONE MONITOR, TANK FARM, SPHERE 37 NORTH | A | |||
SA-TFA424 | FIRE MONITOR | S/A-424 STAND ALONE MONITOR, TANK FARM, SPHERE 37 EAST | A | |||
SA-TFA425 | FIRE MONITOR | S/A-425 STAND ALONE MONITOR, TANK FARM, SPHERE 37 SOUTH | A | |||
SA-TFA426 | FIRE MONITOR | S/A-426 STAND ALONE MONITOR, TANK FARM, SPHERE 37 WEST | A | |||
SA-TFA427 | FIRE MONITOR | S/A-427 STAND ALONE MONITOR, TANK FARM, BULLET 90 WEST | A | |||
SA-TFA428 | FIRE MONITOR | S/A-428 STAND ALONE MONITOR, TANK FARM, BULLET 92 WEST | A | |||
SA-TFA429 | FIRE MONITOR | S/A-429 STAND ALONE MONITOR, TANK FARM, BULLET 93 WEST | A | |||
SA-TFA430 | FIRE MONITOR | S/A-430 STAND ALONE MONITOR, TANK FARM, BULLET 93 EAST | A | |||
SA-TFA431 | FIRE MONITOR | S/A-43I STAND ALONE MONITOR, TANK FARM, BULLET 91 EAST | A | |||
SA-TFA432 | FIRE MONITOR | S/A-432 STAND ALONE MONITOR, TANK FARM, BULLET 90 EAST | A | |||
P-1968 | FIRE PUMPS | DOC P-106 #9 FIRE WATER BOOSTER PUMP. DOCK NO. 1A. PID DWG 30-1011-13 *****FWP***** | A | |||
P-3224 | FIRE PUMPS | GODWIN TANK #56 1700OPM FIRE PUMP | A | |||
P-3221 | FIRE PUMPS | TFA #12 FIRE WATER PUMP AT TANK #5 (NORTH) | A | |||
P-3222 | FIRE PUMPS | TFA #13 FIRE WATER PUMP TFA-FWP13 AT TANK 5 (MIDDLE) | A | |||
P-3223 | FIRE PUMPS | TFA #14 FIRE WATER PUMP TFA-FWP14 AT TANK 5 (SOUTH) | A | |||
P-1255 | FIRE PUMPS | TFA #8 FIRE WATER BOOSTER PUMP TFA-PN061 P-l255 PID DWG TFA-16-14305-42 | A | |||
TFA-FTMAS | FLOW LOOP | BLEN HEADER MASTER FLOW TRANSMITTER | A | |||
TFA-FTPH2 | FLOW LOOP | PUMP HOUSE 2 BUTANE FLOW TRANSMITTER | A | |||
TFA-FT029 | FLOW LOOP | TANK 29 FLOW TRANSMITTER | A | |||
TFA-FT001 | FLOW LOOP | TANK 31 RVP ANALYZER BYPASS FLOW BROOKS METER SHOULD BE ADDED TO PID-15-1803-15 | A | |||
TFA-FT040 | FLOW LOOP | TANK 40 FLOW TRANSMITTER | A | |||
TFA-FT045 | FLOW LOOP | TANK 45 FLOW TRANSMITTER | A | |||
TFA-FT065 | FLOW LOOP | TANK 65 FLOW TRANSMITTER | A | |||
TFA-FT066 | FLOW LOOP | TANK 66 FLOW TRANSMITTER | A | |||
TFA-FT068 | FLOW LOOP | TANK 68 FLOW TRANSMITTER | A | |||
TFA-FT070 | FLOW LOOP | TANK 70 FLOW TRANSMITTER | A | |||
TFA-FT149 | FLOW LOOP | TFA FLOW TRANSMITTER, (COLONIAL PIPELINE NOT ON PID) FT, FI (AREA EAST OF NO. 1 PUMPHOUSE, IN FIELD) | A |
Attachment 1 to Schedule 2.2.1
TFA-F0324 | FLOW LOOP | TFA-F0324 CUMENE RAILCAR LOADING, LOOP INCLUDES: FE, FC, FQ. DWG. NO. PID-15-5316-48.01 | A | |||
TFA-FC329 | FLOW LOOP | TFA-FC329 CRUDE INJECTION PUMP PN-86 DISCHARGE FLOW CONTROL, LOOP INCLUDES: FE, FT, FI, FCV. DWG. NO. PID-15-1803-11 | A | |||
TFA-FC330 | FLOW LOOP | TFA-FC330 CRUDE INJECTION PUMP PN-155 DISCHARGE FLOW CONTROL, LOOP INCLUDES: FE, FT, FI, FCV. DWG. NO. PID-15-1803-11 | A | |||
TFA-FC686 | FLOW LOOP | TFA-FC686 NAPHTHA DISCHARGE FLOW FROM LSG RERUN TANK PUMPS P-006-01 A&B, LOOP INCLUDES: FE, FT, FI, FC, FV. DWG. NO. PID-l5-1803-27 | A | |||
TFA-F311 | FLOW LOOP | TFA-FI311 TANK 51 ETHANOL PUMP PN 158/159 DISCHARGE FLOW TO SALES TERMINAL LOOP INCLUDES: FE-311, FT-311, FI-311 | A | |||
TFA-FI327 | FLOW LOOP | TFA-FI327 JET FUEL CLAY TREATER 1167 FLOW, LOOP INCLUDES: FE, FI. DWG. NO. PID-15-1803-16 | A | |||
TFA-FI328 | FLOW LOOP | TFA-FI328 JET FUEL CLAY TREATER 1168 FLOW, LOOP INCLUDES: FE, FI. DWG. NO. PID-15-1803-16 | A | |||
TFA-FI331 | FLOW LOOP | TFA-FI331 CRUDE INJECTION PUMPS PN-93 & 132 DISCHARGE FROM TK 105 FLOW, LOOP INCLUDES: FE, FT, FI. DWG. NO. PID-15-1803-01 | A | |||
TFA-H2S1 | GAS DETECTOR | TFA H2S (MSA) MONITOR NO.l PUMPHOUSE (I-SENSOR) ***EHS*** | I | |||
TFA-LEL1 | GAS DETECTOR | TFA LEL (MSA) MONITOR NO.1 PUMPHOUSE (I-SENSOR) | I | |||
TFA-AI341 | GAS DETECTOR | TFA-AI341 PROPANE TANK 90 HC GAS DETECTOR, LOOP INCLUDES: AE(A&B), AI(A&B), AAH(A&B), AAHH(A&B), HS(MAINT BYPASS), HA341(COMMON BYPASS ALARM), AAH346(COMMON 20%LEL), AAHH346(COMMON 40%LEL S/D). DWG. NO. PID-15-1002-64 | A | |||
TFA-AI342 | GAS DETECTOR | TFA-AI342 PROPANE TANK 91 HC GAS DETECTOR, LOOP INCLUDES: AE(A&B), AI(A&B), AAH(A&B), AAHH(A&B), HS(MAINT BYPASS), HA34l(COMMON BYPASS ALARM), AAH346(COMMON 20%LEL), AAHH346(COMMON 40%LEL S/D). DWG. NO. PID-15-1002-64 | A | |||
TFA-AI343 | GAS DETECTOR | TFA-AI343 PROPANE TANK 92 HC GAS DETECTOR, LOOP INCLUDES: AE(A&B), AI(A&B), AAH(A&B), AAHH(A&B), HS(MAINT BYPASS), HA341(COMMON BYPASS ALARM), AAH346(COMMON 20%LEL), AAHH346(COMMON 40%LEL S/D). DWG. NO. PID-15-1002-65 | A | |||
TFA-AI344 | GAS DETECTOR | TFA-AI344 PROPANE TANK 93 HC GAS DETECTOR, LOOP INCLUDES: AE(A&B), AI(A&B), AAH(A&B), AAHH(A&B), HS(MAINT BYPASS), HA341(COMMON BYPASS ALARM), AAH346(COMMON 20%LEL), AAHH346(COMMON 40%LEL S/D). DWG. NO. PID-15-1002-65 | A | |||
TFA-AI345 | GAS DETECTOR | TFA-AI345 LPG PUMPS PN64 & 65 HC GAS DETECTOR, LOOP INCLUDES: AE(A&B), AI(A&B), AAH(A&B), AAHH(A&B), HS(MAINT BYPASS), HA341(COMMON BYPASS ALARM), AAH346(COMMON 20%LEL), AAHH346(COMMON 40%LEL S/D). DWG. NO. PID-15-1002-63 | A | |||
EG-31 | GATE | G-31, MANUAL DOUBLE SWING GATE. | A | |||
EG-31A | GATE | G-31A, MANUAL SINGLE SWING GATE. | A | |||
GB-2160 | GEAR BOX | TFA FUEL OIL TANK TFA-TK001 MIXER MX-0500 GEARBOX GB-2160 PID DWG TFA-16-14305-10 (OUT OF SERVICE 11/2008) | I | |||
TFA-GIP10E | GROUNDING |
TFA-GIP10E BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GIP1E | GROUNDING | TFA-GIP1E BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GIP1W | GROUNDING | TFA-GIP1W BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GIP3E | GROUNDING | TFA-GIP3E BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GIP3W | GROUNDING | TFA-GIP3W BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GIP5W | GROUNDING | TFA-GIP5W BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GIP6E | GROUNDING | TFA-GIP6E BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GIP8E | GROUNDING | TFA-GIP8E BUTANE RAIL CAR LOADING GROUND INDICATION PANEL, | A | |||
TFA-GRNDS | GROUNDS | TFA MISCELLANEOUS GROUNDS WORK | A | |||
TFA-HL357 | HAND LOOP | TFA-HL357 PROPANE TANKS 90, 91, 92, & 93 GLOBAL MAINTENANCE OR SHUTDOWN BYPASS ALARM INDICATION, LOOP INCLUDES: HA. DWG. NO. PID-15-1002-65. | A | |||
TFA-HL358 | HAND LOOP | TFA-HL358 PROPANE TANKS 90, 91, 92, & 93 ACTIVE SHUTDOWN DEVICE ALARM INDICATION, LOOP INCLUDES: HA. DWG. NO. PID-15-1002-65. | A | |||
TFA-HS347 | HAND LOOP | TFA-HS347 PROPANE TANK 90 ISOLATION VALVES S/D & BYPASS, LOOP INCLUDES: UV(A,B,&C), UCS, HS(BYPASS), HS353(ESD), HA353(COMMON ALARM), HA356(COMMON BYPASS). DWG. NO. PID-15-1002-64 | A | |||
TFA-HS348 | HAND LOOP | TFA-HS348 PROPANE TANK 91 ISOLATION VALVES S/D & BYPASS, LOOP INCLUDES: UV(A,B,&C), UCS, HS(BYPASS), HS353(ESD), HA353(COMMON ALARM), HA356(COMMON BYPASS). DWG. NO. PID-15-1002-64 | A | |||
TFA-HS349 | HAND LOOP | TFA-HS349 PROPANE TANK 92 ISOLATION VALVES S/D & BYPASS, LOOP INCLUDES: UV(A,B,&C), UCS, HS(BYPASS), HS353(ESD), HA353(COMMON ALARM), HA356(COMMON BYPASS). DWG. NO. PID-15-1002-65 | A | |||
TFA-HS350 | HAND LOOP | TFA-HS350 PROPANE TANK 93 ISOLATION VALVES S/D & BYPASS, LOOP INCLUDES: UV(A,B,&C), UCS, HS(BYPASS), HS353(ESD), HA353(COMMON ALARM), HA356(COMMON BYPASS). DWG. NO. PID-15-1002-65 | A | |||
TFA-HS351 | HAND LOOP | TFA-HS351 PROPANE TANKS LINEAR HEAT DETECTION FIRE PANEL MAINTENANCE BYPASS, LOOP INCLUDES: XS, HS, XA(TROUBLE). DWG. NO. PID-15-1002-65 | A | |||
TFA-HS352 | HAND LOOP | TFA-HS352 LPG PUMPS PN64 & 65 MAINTENANCE BYPASS, LOOP INCLUDES: HS(BYPASS), HS353(ESD), HA353(COMMON ALARM), HA356(COMMON BYPASS). DWG. NO. PID-15-1002-63 | A | |||
TFA-HS353 | HAND LOOP | TFA-HS353 PROPANE TANKS 90, 91, 92, & 93 ESD, LOOP INCLUDES: HS, HS(A LOCAL), HA, HA(A LOCAL), UCV347, UCV348, UCV349, UCV350. DWG. NO. PID-15-1002-63, 64, & 65. | A |
Attachment 1 to Schedule 2.2.1
TFA-HT009 | HEAT TRACE | TFA #1 PUMPHOUSE DISCHARGE FROM PN29 | A | |||
TFA-HT010 | HEAT TRACE | TFA #1 PUMPHOUSE SAFETY SHOWER #51 | A | |||
TFA-HT008 | HEAT TRACE | TFA #2 PUMPHOUSE SS - CKT 19 | A | |||
TFA-HT022 | HEAT TRACE | TFA DIGITRACE HEAT TRACE PANEL FOR BENZENE WASTE NESHAPS (BWON) | A | |||
TFA-HT001 | HEAT TRACE | TFA EAST SIDE N309 VALVE -TANK 30 WKM MOV | A | |||
TFA-HT002 | HEAT TRACE | TFA ECRA WELL TANK 51 | A | |||
TFA-HT011 | HEAT TRACE | TFA H2O LINE FROM SS - CKT 27 IN CR | A | |||
TFA-HT021 | HEAT TRACE | TFA H20 LINE TO CUMENE RACK | A | |||
TFA-HT012 | HEAT TRACE | TFA LINE FROM H2O HEATER (INCOMPLETE) | A | |||
TFA-HT014 | HEAT TRACE | TFA LINE SOUTH OF TANK 14 | A | |||
TFA-HT005 | HEAT TRACE | TFA RACK @ TANK 115 BENZENE RACK | A | |||
TFA-HT020 | HEAT TRACE | TFA SAFETY SHOWER @ CUMENE RACK | A | |||
TFA-HT006 | HEAT TRACE | TFA SOUTHEAST OF EAST FLARE | A | |||
TFA-HT003 | HEAT TRACE | TFA SPHERE 37/36/35/58 | A | |||
TFA-HT004 | HEAT TRACE | TFA TANK 112/113 FROM CRU SUCTION OF PUMPS | A | |||
TFA-HT015 | HEAT TRACE | TFA TANK 22 | A | |||
TFA-HT016 | HEAT TRACE | TFA TANK 26 ECRA WELL | A | |||
TFA-HT017 | HEAT TRACE | TFA TANK 56 EAST LINE | A | |||
TFA-HT019 | HEAT TRACE | TFA TANK 56 INSTRUMENT TAP | A | |||
TFA-HT018 | HEAT TRACE | TFA TANK 56 NORTH LINE | A | |||
TFA-HT007 | HEAT TRACE | TFA TANK 69 SOUTH SIDE - PN141 SUMP PUMP - RACK @ TANK 68 | A | |||
TFA-HT013 | HEAT TRACE | TFA WELL AT TANK 47 | A | |||
TFA-HT023 | HEAT TRACE | TFA-HT023 HEAT TRACE FOR TFA-PN157 CRUDE DEWATERING BOOSTER PUMP ON N14 LINE | A | |||
TFA-HT024 | HEAT TRACE | TFA-HT024 HEAT TRACE FOR TFA-PN157 CRUDE DEWATERING BOOSTER PUMP ON N14 LINE | A | |||
TFA-DCS | INSTRUMENT GEN |
HONEYWELL DCS SYSTEM | A | |||
TFA INSTRU | INSTRUMENT GEN |
TFA INSTRUMENTATION COST ROLL UP | A | |||
TFA-LOOP | INSTRUMENT GEN | TFA UNTITLED MISCELLANEOUS PROCESS INSTRUMENTAION (-DO NOT USE FOR ROUTING WORK ORDERS. TAKE THE TIME TO FIND THE LOOP DESIGNATION YOU ARE TARGETING FOR SERVICE-) | A | |||
TFA-LT040 | LEVEL LOOP | TANK 40 LEVEL TRANSMITTER | A | |||
TFA-L051 | LEVEL LOOP | TANK 51, LS-051 (LEVEL SWITCH), LAH-051 (LEVEL ALARM HIGH), LAHH-015 (LEVEL ALARM HIGH HIGH) | A | |||
TFA-LT058 | LEVEL LOOP | TANK 58 SPHERE LEVEL TRANSMITTER WITH DIGITAL READOUT AT GRADE. | A | |||
TFA-LIC319 | LEVEL LOOP | TF-LIC3I9 FIRE WATER TANK #5 LEVEL CONTROL, LOOP INCLUDES: LT, LIC, LV. DWG, NO. PID-15-3103-74 | A | |||
TFA-L1005 | LEVEL LOOP | TFA-LI005 FIRE WATER TANK #5 LEVEL INDICATION, LOOP INCLUDES: LT, LI, LAH, LAHH, LAL. DWG. NO. PID-15-3103-74 | A | |||
TFA-L1022 | LEVEL LOOP | TFA-LI022 BENZENE TANK 22 LEVEL, LOOP INCLUDES: LT, LI. DWG. NO. PID-15-1803-24 | A | |||
TFA-L306 | LEVEL LOOP | TFA-LT-306 TANK 51 LEVEL TRANSMITTER WITH DIGITAL READOUT AT GRADE LOOP INCLUDES TFA- LI306, TFA-LT306, TFA-TW306, TFA-TI306. | A | |||
TFA-LT300 | LEVEL LOOP | TFA-LT-300 TANK SPHERE LEVEL TRANSMITTER WITH DIGITAL READOUT AT GRADE LOOP INCLUDES TFA- LI300, TFA-LT300 | A | |||
TFA-LT301 | LEVEL LOOP | TFA-LT301 TANK SPHERE LEVEL TRANSMITTER WITH DIGITAL READOUT AT GRADE, TFA-TK090. 24VDC, 2 WIRW, 4-20MA W/HART, COAX. PROBE, 3 300# FLANGE, 140 SST PROBE LOOP IONCLUDES TFA-LI301, TFAA LT301 | A | |||
TFA-LT302 | LEVEL LOOP | TFA-LT302 TANK SPHERE LEVEL TRANSMITTER WITH DIGITAL READOUT AT GRADE, TFA-TK091.24VDC, 2WIRW , 4-20MA W/HART, COAX. PROBE, 3 300# FLANGE, 140 SST PROBE LOOP 1ONCLUDES TFA-LI302, TFAA LT302 | A |
Attachment 1 to Schedule 2.2.1
TFA-LT303 | LEVEL LOOP | TFA-LT303 TANK SPHERE LEVEL TRANSMITTER WITH DIGITAL READOUT AT GRADE, TFA-TK092. 24VDC, 2 WIRE, 4-20MA W/HART, COAX. PROBE, 3 300# FLANGE, 140 SST PROBE LOOP IONCLUDES TFA-LI303, TFA-A LT303 | A | |||
TFA-LT304 | LEVEL LOOP | TFA-LT304 TANK SPHERE LEVEL TRANSMITTER WITH DIGITAL READOUT AT GRADE, TFA-TK093. 24VDC, 2 WIRE, 4-20MA W/HART, COAX. PROBE, 3 300# FLANGE, 140 SST PROBE LOOP INCLUDES TFA-LI304, TFA-A LT304 | A | |||
CH-161 | LIFTING DEVICE | TFA NO. 2 PUMPHOUSE BLDG-158 CHAIN HOIST CH-161 MANUAL | A | |||
TRL-227 | LIFTING DEVICE | TFA NO. 2 PUMPHOUSE BLDG-158 MONORAIL SYSTEM TROLLEY TRL-227 | A | |||
CH-160 | LIFTING DEVICE | TFA NO. 2 PUMPHOUSE CHAIN HOIST CH-160 MANUAL | A | |||
JIB-113 | LIFTING DEVICE | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 JIB JIB-113 | A | |||
JIB-121 | LIFTING DEVICE | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 JIB JIB-121 | A | |||
JIB-130 | LIFTING DEVICE | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 JIB JIB-130 | A | |||
TRL-225 | LIFTING DEVICE | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 TROLLEY TRL-225 | A | |||
TRL-387 | LIFTING DEVICE | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 TROLLEY TRL-387 | A | |||
TRL-520 | LIFTING DEVICE | TFA TANK FARM No. 1 PUMP HOUSE BUILDING BLDG-152 TROLLEY TRL-520 | A | |||
TRL-226 | LIFTING DEVICE | TFA TANK FARM No. 2 PUMP HOUSE BUILDING BLDG-158 MONORAIL SYSTEM TROLLEY TRL-226 | A | |||
MX-2531 | MIXER | TFA ASPHALT TANK TFA-TK117 MIXER MX-2531 PID DWG TFA-16-14305-49 | I | |||
MX-2532 | MIXER | TFA ASPHALT TFA-TK117 MIXER MX-2532 PID DWG TFA-16-14305-49 | I | |||
MX-1232 | MIXER | TFA AV JET TFA-TK061 TANK MIXER MX-1232 PID DWG TFA-16-14305-26 | A | |||
MX-0515 | MIXER | TFA AVGAS TANK TFA-TK051 MIXER MX-0515 PID DWG TFA-16-14305-37 | A | |||
MX-0516 | MIXER | TFA AVGAS TANK TFA-TK051 MIXER MX-0516 PID DWG TFA-16-14305-37 | A | |||
MX-0797 | MIXER | TFA AVIATION GASOLINE TFA-TK059 TANK MIXER MX-0797 PID DWG TFA-16-14305-39 | D | |||
MX-1218 | MIXER | TFA AVIATION GASOLINE TFA-TK059 TANK MIXER MX-1218 PID DWG TFA-16-14305-39 | D | |||
MX-1231 | MIXER | TFA AVJET TANK TFA-TK060 TANK MIXER MX-1231 PID DWG TFA-16-14305-26 | A | |||
MX-1283 | MIXER | TFA BOILER HOUSE FUEL TANK TFA-TK202 MIXER MX -1283 PID DWG POH-16-14287-43 | I | |||
MX-1723 | MIXER | TFA CRUDE OIL TANK TFA-TK116 TANK MIXER MX-1723 PID DWG TFA-16-14305-49 | A | |||
MX-0458 | MIXER | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0458 PID DWG TFA-16-14305-12 | A | |||
MX-0464 | MIXER | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0464 PID DWG TFA-16-14305-12 | A | |||
MX-0465 | MIXER | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0465 PID DWG TFA-16-14305-12 | A | |||
MX-0461 | MIXER | TFA CRUDE TANK TFA-TK012 TANK MIXER MX-0461 PID DWG TFA-16-14305-12 | I | |||
MX-0470 | MIXER | TFA CRUDE TANK TFA-TK012 TANK MIXER MX-0470 PID DWG TFA-16-14305-12 | I | |||
MX-0502 | MIXER | TFA CRUDE TANK TFA-TK012 TANK MIXER MX-0502 PID DWG TFA-16-14305-12 | A | |||
MX-0790 | MIXER | TFA CRUDE TANK TFA-TK012 TANK MIXER MX-0790 PID DWG TFA-16-14305-12 | I | |||
MX-0100 | MIXER | TFA CRUDE TANK TFA-TK013 TANK MIXER MX-0100 PID DWG TFA-16-14305-14 | I | |||
MX-0791 | MIXER | TFA CRUDE TANK TFA-TK013 TANK MIXER MX-0791 PID DWG TFA-16-14305-14 | I | |||
MX-0792 | MIXER | TFA CRUDE TANK TFA-TK013 TANK MIXER MX-0792 PID DWG TFA-16-14305-14 | I | |||
MX-0793 | MIXER | TFA CRUDE TANK TFA-TK013 TANK MIXER MX-0793 PID DWG TFA-16-14305-14 | I | |||
MX-0410 | MIXER | TFA CRUDE TANK TFA-TK017 MIXER MX-0410 PID DWG TFA-16-14305-21 144 FT DIAMETER 48 FT HEIGHT/139,200BBLS | I | |||
MX-0411 | MIXER | TFA CRUDE TANK TFA-TK017 MIXER MX-0411 PID DWG TFA-16-14305-21 144 FT DIAMETER 48 FT HEIGHT/139,200BBLS | I | |||
MX-0523 | MIXER | TFA CRUDE TANK TFA-TK101 MIXER MX-0523 PID DWG TFA-16-14305-02 | A | |||
MX-0524 | MIXER | TFA CRUDE TANK TFA-TK101 MIXER MX-0524 PID DWG TFA-16-14305-02 | A | |||
MX-0525 | MIXER | TFA CRUDE TANK TFA-TK101 MIXER MX-0525 PID DWG TFA-16-14305-02 | A | |||
MX-0526 | MIXER | TFA CRUDE TANK TFA-TK101 MIXER MX-0526 PID DWG TFA-16-14305-02 | A | |||
MX-0528 | MIXER | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-0528 PID DWG TFA-16-14305-02 | I | |||
MX-0529 | MIXER | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-0529 PID DWG TFA-16-14305-02 | A | |||
MX-0530 | MIXER | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-0530 PID DWG TFA-16-14305-02 | I | |||
MX-2159 | MIXER | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-2159 PID DWG TFA-16-14305-02 | A | |||
MX-1221 | MIXER | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1221 PID DWG TFA-16-14305-01 | I | |||
MX-1223 | MIXER | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1223 PID DWG TFA-16-14305-01 | A | |||
MX-1227 | MIXER | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1227 PID DWG TFA-16-14305-01 | I | |||
MX-1229 | MIXER | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1229 PID DWG TFA-16-14305-01 | I | |||
MX-1989 | MIXER | TFA CRUDE TANK TFA-TK105 MIXER MX-1989 PID DWG TFA-16-14305-01 | I | |||
MX-1990 | MIXER | TFA CRUDE TANK TFA-TK105 MIXER MX-1990 PID DWG TFA-16-14305-01 | I | |||
MX-1991 | MIXER | TFA CRUDE TANK TFA-TK105 MIXER MX-1991 PID DWG TFA-16-14305-01 | I | |||
MX-3219 | MIXER | TFA CRUDE TANK TFA-TK117 MIXER PID DWG TFA-16-14305-49 | A | |||
MX-3220 | MIXER | TFA CRUDE TANK TFA-TK117 MIXER PID DWG TFA-16-14305-49 | A | |||
MX-0519 | MIXER | TFA CRUDE TFA-TK010 TANK MIXER MX-0519 PID DWG TFA-16-14305-11 | I | |||
MX-0520 | MIXER | TFA CRUDE TFA-TK010 TANK MIXER MX-0520 (NO MOTOR) PID DWG TFA-16-14305-11 | I | |||
MX-0521 | MIXER | TFA CRUDE TFA-TK010 TANK MIXER MX-0521 (NO MOTOR) PID DWG TFA-16-14305-11 | I | |||
MX-0522 | MIXER | TFA CRUDE TFA-TK010 TANK MIXER MX-0522 PID DWG TFA-16-14305-11 | I | |||
MX-0518 | MIXER | TFA DIESEL TANK TFA-TK023 MIXER MX-0518 PID DWG TFA-16-14305-25 | I | |||
MX-0517 | MIXER | TFA DIESEL TANK TFA-TK039 MIXER MX-0517 PID DWG TFA-16-14305-25 | I | |||
MX-0466 | MIXER | TFA FCC CHARGE TANK TFA-TK009 MIXER MX-0466 PID DWG TFA-16-14305-10 (NO MOTOR) | I | |||
MX-0479 | MIXER | TFA FCC CHARGE TANK TFA-TK009 MIXER MX-0479 PID DWG TFA-16-14305-10 (NO MOTORS) (MIXER REMOVED FROM SERVICE 1/1/2007) | I | |||
MX-0476 | MIXER | TFA FCC CHARGE TANK TFA-TK016 MIXER MX-0476 PID DWG TFA-16-14305-21 | A | |||
MX-0477 | MIXER | TFA FCC CHARGE TANK TFA-TK016 MIXER MX-0477 PID DWG TFA-16-14305-21 | A |
Attachment 1 to Schedule 2.2.1
MX-1224 | MIXER | TFA FCC CHARGE TANK TFA-TK062 TANK MIXER MX-1224 PID DWG TFA-16-14305-42 | I | |||
MX-1236 | MIXER | TFA FCC CHARGE TANK TFA-TK062 TANK MIXER MX-1236 PID DWG TFA-16-14305-42 | I | |||
MX-1239 | MIXER | TFA FCC CHARGE TANK TFA-TK063 TANK MIXER MX-1239 PID DWG TFA-16-14305-42 | I | |||
MX-1240 | MIXER | TFA FCC CHARGE TANK TFA-TK063 TANK MIXER MX-1240 PID DWG TFA-16-14305-42 | I | |||
MX-1241 | MIXER | TFA FCC CHARGE TANK TFA-TK063 TANK MIXER MX-1241 PID DWG TFA-16-14305-42 | I | |||
MX-0472 | MIXER | TFA FUEL OIL STORAGE TFA-TK005 MIXER MX-0472 PID DWG TFA-16-14305-13 (OUT OF SERVICE) | I | |||
MX-3218 | MIXER | TFA FUEL OIL TANK TFA-TK001 MIXER (SOUTHWEST) MX-3218 PID DWG TFA-16-14305-10 | A | |||
MX-0471 | MIXER | TFA FUEL OIL TANK TFA-TK001 MIXER MX-0471 PID DWG TFA-16-14305-10 | I | |||
MX-0500 | MIXER | TFA FUEL OIL TANK TFA-TK001 MIXER MX-0500 PID DWG TFA-16-14305-10 | I | |||
MX-3217 | MIXER | TFA FUEL OIL TANK TFA-TK001 MIXER SOUTH MX-3217 PID DWG TFA-16-14305-10 | A | |||
MX-0457 | MIXER | TFA FUEL OIL TANK TFA-TK002 MIXER MX-0457 PID DWG TFA-16-14305-11 | A | |||
MX-0467 | MIXER | TFA FUEL OIL TANK TFA-TK002 MIXER MX-0467 PID DWG TFA-16-14305-11 | A | |||
MX-0482 | MIXER | TFA FUEL OIL TANK TFA-TK002 MIXER MX-0482 PID DWG TFA-16-14305-11 | A | |||
MX-0460 | MIXER | TFA FUEL OIL TANK TFA-TK003 TANK MIXER MX-0460 PID DWG TFA-16-14305-12 | I | |||
MX-0463 | MIXER | TFA FUEL OIL TANK TFA-TK003 TANK MIXER MX-0463 PID DWG TFA-16-14305-12 | I | |||
MX-0490 | MIXER | TFA FUEL OIL TANK TFA-TK003 TANK MIXER MX-0490 PID DWG TFA-16-14305-12 | I | |||
MX-3194 | MIXER | TFA FUEL OIL TANK TFA-TK118 MIXER | A | |||
MX-3195 | MIXER | TFA FUEL OIL TANK TFA-TK118 MIXER | A | |||
MX-1724 | MIXER | TFA FUEL OIL TANK TFA-TK118 MIXER MX-1724 PID DWG TFA-16-14305-50 | I | |||
MX-1725 | MIXER | TFA FUEL OIL TANK TFA-TK118 MIXER MX-1725 | I | |||
MX-2529 | MIXER | TFA FUEL OIL TANK TFA-TK119 MIXER MX-2529 PID DWG TFA-16-14305-50 | A | |||
MX-2530 | MIXER | TFA FUEL OIL TANK TFA-TK119 MIXER MX-2530 PID DWG TFA-16-14305-50 | A | |||
MX-0478 | MIXER | TFA FURNACE OIL TANK TFA-TK018 TANK MIXER MX-0478 PID DWG TFA-16-14305-17 | A | |||
MX-0503 | MIXER | TFA FURNACE OIL TANK TFA-TK018 TANK MIXER MX-0503 PID DWG TFA-16-14305-17 | A | |||
MX-3190 | MIXER | TFA FURNACE OIL TANK TFA-TK028 MIXER PID DWG TFA-16-14305-18 | A | |||
MX-0456 | MIXER | TFA FURNACE OIL TANK TFA-TK044 TANK MIXER MX-0456 PID DWG TFA-16-14305-29 | A | |||
MX-0484 | MIXER | TFA FURNACE OIL TANK TFA-TK044 TANK MIXER MX-0484 PID DWG TFA-16-14305-29 | A | |||
MX-2894 | MIXER | TFA FURNACE OIL TANK TFA-TK401 MIXER | A | |||
MX-2895 | MIXER | TFA FURNACE OIL TANK TFA-TK401 MIXER | A | |||
MX-2896 | MIXER | TFA FURNACE OIL TANK TFA-TK401 MIXER | A | |||
MX-3157 | MIXER | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0473 PID DWG TFA-16-14305-43 | A | |||
MX-0473 | MIXER | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0473 PID DWG TFA-16-14305-43 (OUT OF SERVICE) | I | |||
MX-3156 | MIXER | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0473 PID DWG TFA-16-14305-43 TFA-TK403 MIXER | A | |||
MX-0475 | MIXER | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0475 PID DWG TFA-16-14305-43 (OUT OF SERVICE) | I | |||
MX-0501 | MIXER | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0501 PID DWG TFA-16-14305-43 | I | |||
MX-0510 | MIXER | TFA GASOLINE TANK TFA-TK049 MIXER MX-0131 PID DWG TFA-16-14305-34 | A | |||
MX-0509 | MIXER | TFA GASOLINE TANK TFA-TK049 MIXER MX-0509 PID DWG TFA-16-14305-34 | A | |||
MX-0450 | MIXER | TFA GASOLINE TANK TFA-TK021 TANK MIXER MX-0450 PID DWG TFA-16-14305-15 | I | |||
MX-0480 | MIXER | TFA GASOLINE TANK TFA-TK021 TANK MIXER MX-0480 PID DWG TFA-16-14305-15 | I | |||
MX-0409 | MIXER | TFA GASOLINE TANK TFA-TK031 TANK MIXER MX-0409 PID DWG TFA- 16-14305-15 | A | |||
MX-0481 | MIXER | TFA GASOLINE TANK TFA-TK031 TANK MIXER MX-0481 PID DWG TFA-16-14305-15 | A | |||
MX-0485 | MIXER | TFA GASOLINE TANK TFA-TK045 TANK MIXER MX-0485 PID DWG TFA-16-14305-29 | D | |||
MX-0492 | MIXER | TFA GASOLINE TANK TFA-TK045 TANK MIXER MX-0492 PID DWG TFA-16-14305-29 | D | |||
MX-0798 | MIXER | TFA GASOLINE TANK TFA-TK046 TANK MIXER MX-0798 PID DWG TFA-16-14305-33 | A | |||
MX-1225 | MIXER | TFA GASOLINE TANK TFA-TK046 TANK MIXER MX-1225 PID DWG TFA-16-14305-33 | A | |||
MX-0483 | MIXER | TFA GASOLINE TANK TFA-TK047 TANK MIXER MX-0483 PID DWG TFA-16-14305-32 | A | |||
MX -0491 | MIXER | TFA GASOLINE TANK TFA-TK047 TANK MIXER MX-0491 PID DWG TFA-16-14305-32 | A | |||
MX-1200 | MIXER | TFA GASOLINE TANK TFA-TK052 TANK MIXER MX-1200 PID DWG TFA-16-14305-41 | A | |||
MX-1243 | MIXER | TFA GASOLINE TANK TFA-TK052 TANK MIXER MX-1243 PID DWG TFA-16-14305-41 | A | |||
MX-1201 | MIXER | TFA GASOLINE TANK TFA-TK053 TANK MIXER MX-1201 PID DWG TFA-16-14305-41 | A | |||
MX-1212 | MIXER | TFA GASOLINE TANK TFA-TK053 TANK MIXER MX-1212 PID DWG TFA-16-14305-41 | A | |||
MX-1209 | MIXER | TFA GASOLINE TANK TFA-TK054 MIXER MX-1209 PID DWG TFA-16-14305-40 SINGLE LINE #1l-13918-D | A | |||
MX-1211 | MIXER | TFA GASOLINE TANK TFA-TK054 MIXER MX-1211 PID DWG TFA-16-14305-40 | A | |||
MX-1238 | MIXER | TFA GASOLINE TANK TFA-TK068 TANK MIXER MX-1238 PID DWG | A | |||
MX-1242 | MIXER | TFA GASOLINE TANK TFA-TK068 TANK MIXER MX-1242 PID DWG TFA-16-14305-45 | I | |||
MX-1228 | MIXER | TFA GASOLINE TANK TFA-TK068TANK MIXER MX-1228 PID DWG | A | |||
MX-0474 | MIXER | TFA GASOLINE TFA-TK014 TANK MIXER MX-0474 PID DWG TFA-16-14305-14 | I | |||
MX-0486 | MIXER | TFA GASOLINE TFA-TK014 TANK MIXER MX-0486 PID DWG TFA-16-14305-14 | I | |||
MX-0462 | MIXER | TFA KEROSENE STORAGE TFA-TK019 NORTHWEST MIXER MX-0462 PID DWG | A | |||
MX-0468 | MIXER | TFA KEROSENE TANK TFA-TK019 SOUTHEAST MIXER | A | |||
MX-0511 | MIXER | TFA LOW SULFUR DIESEL TANK TFA-TK048 TANK MIXER MX-0511 PID DWG TFA-16-14305-30 | I | |||
MX-0512 | MIXER | TFA LOW SULFUR DIESEL TANK TFA-TK048 TANK MIXER MX-0512 PID DWG TFA-16-14305-30 | I | |||
MX-1220 | MIXER | TFA LOW SULFUR TANK TFA-TK064 MIXER MX-1220 PID DWG TFA-16-14305-42 | I | |||
MX-1226 | MIXER | TFA LOW SULFUR TANK TFA-TK064 MIXER MX-1226 PID DWG TFA-16-14305-42 | I | |||
MX-1237 | MIXER | TFA LOW SULFUR TANK TFA-TK064 MIXER MX-1237 PID DWG TFA-16-14305-42 | I | |||
MX-0459 | MIXER | TFA NO. 6 FUEL OIL TANK TFA-TK004 MIXER MX-0459 PID DWG TFA-16-14305-12 | I | |||
MX-0489 | MIXER | TFA NO 6 FUEL OIL TANK TFA-TK004 MIXER MX-0489 PID DWG TFA-16-14305-12 | I | |||
MX-0493 | MIXER | TFA NO 6 FUEL OIL TANK TFA-TK004 MIXER MX-0493 PID DWG TFA-16-14305-12 | I | |||
MX-1217 | MIXER | TFA-TK103 SLUDGE TANK MIXER MX-1217 (NO MOTOR) PID DWG TFA-16-14305-53A | I | |||
MX-3158 | MIXER | TFA-TK404 LSD STORAGE MIXER | A | |||
MX-3159 | MIXER | TFA-TK404 LSD STORAGE MIXER | A |
Attachment 1 to Schedule 2.2.1
S3M5-2PCWI | MOTOR | #2 PUMP MOTOR FOR #1 C.W T | I | |||
S3M5-3PCWI | MOTOR | #3 PUMP MOTOR FOR #1 C.W.T | I | |||
S3M4-PN116A | MOTOR | DUPLICATE | D | |||
S3M4-PN161 | MOTOR | FIRE WATER PMP | I | |||
M-2125 | MOTOR | M-2125 MOTOR FOR DOCK 1A FIRE WATER PUMP | A | |||
M-2165 | MOTOR | M-2165 RERUN TANK PUMP MOTOR LSG OSBL P-006-01A | I | |||
M-2166 | MOTOR | M-2166 RERUN PUMP MOTOR LSG OSBL P-006-01B | A | |||
S3M4-PN15 | MOTOR | MOTOR FOR starter for pump PN15 | I | |||
S3M4-P101 | MOTOR | NO DESC | I | |||
S3M4-P1B | MOTOR | NO DESC | I | |||
S3M4-P1A | MOTOR | NO DESC | I | |||
M-2014 | MOTOR | TFA OIL CIRCULATION PUMP FOR P-2980 MOTOR M-2014 HP/ RPM/ FRAME PID DWG 15-1026-55 | A | |||
M-0052 | MOTOR | TFA #2 FUEL OIL TRANSFER PUMP TFA-PN011 MOTOR M-0052 PID DWG TFA-16-14305-07 25HP / 3550RPM/ FRAME (OUT OF SERVICE 10/2008) | I | |||
M-1607 | MOTOR | TFA ASPHALT TANK TFA-TK117 MIXER MX-2531 MOTOR M-1607 PID DWG TFA-16-14305-49 50HP/ 1770RPM/ 326T FRAME | I | |||
M-1612 | MOTOR | TFA ASPHALT TANK TFA-TK117 MIXER MX-2532 MOTOR M-1612 PID DWG TFA-16-14305-49 50HP / 1770RPM/ 326T FRAME | I | |||
M-0596 | MOTOR | TFA AV JET TRANSFER PUMP TFA-PN078 MOTOR M-0596 PID DWG TFA-16-14305-26 60HP / 3560RPM / WPV405P FRAME SINGLE LINE NO.11-13916-D | A | |||
M-1621 | MOTOR | TFA AVGAS TANK TFA-TK051 MIXER MX-0515 MOTOR M-1621 PID DWG TFA-16-14305-37 15HP/ 1750RPM/ 254TC FRAME | A | |||
M-0130 | MOTOR | TFA AVGAS TANK TFA-TK051 MIXER MX-0516 MOTOR M-0130 PID DWG TFA-16-14305-37 HP/RPM/ FRAME | A | |||
M-0385 | MOTOR | TFA AVIATION FUEL BLENDING TFA-PN040 MOTOR M-0385 PID DWG TFA-16-14305-58 | A | |||
M-0426 | MOTOR | TFA AVIATION FUEL BLENDING TFA-PN042 MOTOR M-0426 PID DWG TFA-16-14305-58 | A | |||
M-0054 | MOTOR | TFA AVIATION GASOLINE TFA-PN081 PID DWG TFA-16-14305-39 20HP / 3500RPM / 326 FRAME SINGLE LINE NO 11-13916-D | I | |||
M-1632 | MOTOR | TFA AVIATION GASOLINE TFA-TK059 TANK MIXER MX-0797 MOTOR M-1632 PID DWG TFA-16-14305-39 HP /RPM/ FRAME | A | |||
M-0431 | MOTOR | TFA AVIATION GASOLINE TFA-TK059 TANK MIXER MX-1218 MOTOR M-0431 PID DWG TFA-16-14305-39 | A | |||
M-0464 | MOTOR | TFA AVJET TANK TFA-TK060 TANK MIXER MX-1231 MOTOR M-0464 PID DWG TFA-16-14305-26 25HP/ 1755RPM / 365 FRAME | A | |||
M-0465 | MOTOR | TFA AVJET TFA-TK061 TANK MIXER MX-1232 MOTOR M-0465 PID DWG TFA-16-14305-26 25HP / 1765RPM / FRAME | A | |||
M-0046 | MOTOR | TFA AVJET TRANSFER PUMP TFA-PN003 MOTOR M-0046 PID DWG TFA-16-14305-04 200HP / 1760RPM / FRAME | A | |||
M-0466 | MOTOR | TFA AVJET TRANSFER PUMP TFA-PN049 MOTOR M-0466 PID DWG TFA-16-14305-26 40HP / 3555RPM / 40SS FRAME | A | |||
M-1651 | MOTOR | TFA AVJET TRANSFER PUMP TFA-PN098 MOTOR M-1651 PID DWG TFA-16-14305-16 15HP / 3515RPM / 254LP FRAME | I | |||
M-0059 | MOTOR | TFA B.S.W. TRANSFER PUMP TFA-PN017 MOTOR M-0059 PID DWG TFA-16-14305-13 40HP/ 1765RPM/444Y FRAME SINGLE LINE NO. 11-13916-D | I | |||
M-0582 | MOTOR | TFA BENZENE LOADING PUMP TFA-PN069 MOTOR M-0582 PID DWG TFA-16-14305-51 10HP/ RPM / FRAME | A | |||
M-2013 | MOTOR | TFA BENZENE TRANSFER PUMP FROM TANK 22 TFA-PN045B 20HP / 3600 RPM / 256HP FRAME PID NO. 15-1803-24 | A | |||
M-0653 | MOTOR | TFA BENZENE TRANSFER PUMP TFA-PN106 MOTOR M-0653 PID DWG TFA-16-14305-48 HP 25 / RPM 3600 / FRAME 324 UPH | A | |||
M-1265 | MOTOR | TFA BUNKER PUMP TFA-PN124 MOTOR M-1265 PID DWG TFA-16-14305-49 600HP / 1780RPM/ 5008Z FRAME | A | |||
M-2047 | MOTOR | TFA BUTANE GAS BLENDING INJECTION PUMP MOTOR TFA-PN012B PID DWG 15-1026- 10HP / 3520RPM/ L215LPZ10 FRAME | A | |||
M-2015 | MOTOR | TFA BUTANE TRANSFER PUMP MOTOR M-2015 TFA-PN012A HP/ RPM/ FRAME PID DWG 15-1026-55 | A | |||
M-0053 | MOTOR | TFA BUTANE TRANSFER PUMP TFA-PN012 MOTOR M-0053 PID DWG TFA-16-14305-55 20HP / 3500RPM / 326 FRAME | A | |||
M-1822 | MOTOR | TFA BUTANE UNLOADING PUMP TFA-PN136 MOTOR M-1822 PID DWG TFA-16-14305-68 2HP / 1725RPM / 182T FRAME | A | |||
M-1823 | MOTOR | TFA BUTANE VAPOR PUMP TFA-PN137 MOTOR M-1823 PID DWG TFA-16-14306-68 2HP/ 1725 RPM/ 182T FRAME | A | |||
M-1439 | MOTOR | TFA CHEMICAL INJECTION PUMP TFA-PN133 MOTOR M-1439 PID DWG TFA-16-14305-09 5HP/1730RPM/ FRAME 184TDZ | A | |||
M-0573 | MOTOR | TFA CHEMICAL INJECTION PUMP TFA-PN134 MOTOR M-0573 PID DWG TFA-16-14305-09 3/4HP / RPM / FRAME | A | |||
M-1939 | MOTOR | TFA COLONIAL PIPELINE BOOSTER PUMP TFA-PN149 MOTOR M-1939 HP 900 / 3580 RPM/ 5810S FRAME NEW PROJECT 1999 | A | |||
M-1960 | MOTOR | TFA COLONIAL PIPELINE FLUSHING PUMP TFA-PN150 M-1960 75 HP / 3550 RPM / 365TS-TE FRAME NEW PROJECT | A |
Attachment 1 to Schedule 2.2.1
M-2012 | MOTOR | TFA CRUDE BLENDING PUMP TFA-PN155 AT TANK NO. 10 50HP / 3600RPM / 365VP FRAME PID DWG | I | |||
M-0790 | MOTOR | TFA CRUDE BOOSTER PUMP TFA-PN053 MOTOR M-0790 PID DWG TFA-16-14305-03 150HP / 1180RPM / FRAME | A | |||
M-1064 | MOTOR | TFA CRUDE BOOSTER PUMP TFA-PN118 MOTOR M-1064 PID DWG TFA-16-14305-14 7.5HP / 3470RPM / 213HP FRAME SINGLE LINE NO. 11-13916-D | I | |||
M-0443 | MOTOR | TFA CRUDE FLUSHING PUMP MOTOR TFA-PN051 M-0443 PID DWG TFA-16-14305-03 75HP/ 1185RPM SINGLE LINE DWG.NO.11-13920-D | A | |||
M-1638 | MOTOR | TFA CRUDE INJECTION PUMP TFA-PN086 MOTOR M-1683 PID DWG TFA-16-14305-11 50HP / 3535RPM / 320HP FRAME | A | |||
M-1277 | MOTOR | TFA CRUDE INJECTION PUMP TFA-PN093 MOTOR M-1277 PID DWG TFA-16-14305-01 25HP / 1770RPM/ 284LP FRAME | A | |||
M-1626 | MOTOR | TFA CRUDE INJECTION PUMP TFA-PN132 MOTOR M-1626 PID DWG TFA-16-14305-01 25HP / 3530RPM/ TFV284TPX FRAME | A | |||
M-1644 | MOTOR | TFA CRUDE OIL TANK TFA-TK116 MIXER MX-1723 MOTOR M-1644 PID DWG TFA-16-14305-49 50HP / 1770RPM / 326T FRAME | A | |||
M-0109 | MOTOR | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0455 MOTOR M-0109 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | A | |||
M-1655 | MOTOR | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0458 MOTOR M-1655 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | A | |||
M-1654 | MOTOR | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0464 MOTOR M-1654 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | A | |||
M-1653 | MOTOR | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0465 MOTOR M-1653 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | A | |||
M-1620 | MOTOR | TFA CRUDE TANK TFA-TK012 TANK MIXER MX-0470 MOTOR M-1620 PID DWG TFA-16-14305-12 25HP / 1770RPM / 284TZ FRAME | A | |||
M-0115 | MOTOR | TFA CRUDE TANK TFA-TKA012 TANK MIXER MX-0461 MOTOR M-0115 PID DWG TFA-16-14305-12 HP / RPM / FRAME | A | |||
M-0270 | MOTOR | TFA CRUDE TANK TFA-TKA012 TANK MIXER MX-0502 MOTOR M-0270 PID DWG TFA-16-14305-12 HP / RPM / FRAME | A | |||
M-0291 | MOTOR | TFA CRUDE TANK TFA-TKA012 TANK MIXER MX-0790 MOTOR M-0291 PID DWG TFA-16-14305-12 HP / RPM / FRAME | A | |||
M-0117 | MOTOR | TFA CRUDE TANK TFA-TKA013 TANK MIXER MX-0100 MOTOR M-0117 PID DWG TFA-16-14305-14 25HP / 1770RPM / 284TY FRAME | I | |||
M-0082 | MOTOR | TFA CRUDE TANK TFA-TKA013 TANK MIXER MX-0791 MOTOR M-0082 PID DWG TFA-16-14305-14 25HP / 1770RPM / 284TY FRAME | I | |||
M-0294 | MOTOR | TFA CRUDE TANK TFA-TK013 TANK MIXER MX-0792 MOTOR M-0294 PID DWG TFA-16-14305-14 25HP / 1770RPM / 284TY FRAME | I | |||
M-0292 | MOTOR | TFA CRUDE TANK TFA-TK013 TANK MIXER MX-0793 MOTOR M-0292 PID DWG TFA-16-14305-14 25HP / 1770RPM / 284TY FRAME | I | |||
M-0169 | MOTOR | TFA CRUDE TANK TFA-TK017 MIXER MX-0410 MOTOR M-0169 PID DWG TFA-16-14305-21 144 FT DIAMETER 48 FT HEIGHT / 139,200BBLS | A | |||
M-0168 | MOTOR | TFA CRUDE TANK TFA-TK017 MIXER MX-0411 MOTOR M-0168 PID DWG TFA-16-14305-21 144 FT DIAMETER 48 FT HEIGHT / 139,200BBLS | A | |||
M-0083 | MOTOR | TFA CRUDE TANK TFA-TK101 MIXER MX-0523 MOTOR STARTER M-0083 PID DWG TFA-16-14305-02 25HP / 1765RPM / 284TC FRAME | A | |||
M-0113 | MOTOR | TFA CRUDE TANK TFA-TK101 MIXER MX-0524 MOTOR M-0113 PID DWG TFA-16-14305-02-HP / 1750RPM / 365S FRAME | A | |||
M-0272 | MOTOR | TFA CRUDE TANK TFA-TK101 MIXER MX-0525 MOTOR M-0272 PID DWG TFA-16-14305-02 25HP / 1765RPM / 284TC FRAME | A | |||
M-1627 | MOTOR | TFA CRUDE TANK TFA-TK101 MIXER MX-0526 MOTOR M-1627 PID DWG TFA-16-14305-02 25HP / 1765RPM / 284TC FRAME | A | |||
M-1629 | MOTOR | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-0528 MOTOR M-1629 PID DWG TFA-16-14305-02 25HP / 3500RPM / FRAME | A | |||
M-0274 | MOTOR | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-0529 MOTOR M-0274 PID DWG TFA-16-14305-02 -HP / RPM / FRAME | A | |||
M-0100 | MOTOR | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-0530 MOTOR M-0100 PID DWG TFA-16-14305-02 -HP / RPM / FRAME | A | |||
M-1286 | MOTOR | TFA CRUDE TANK TFA-TK102 TANK MIXER MX-2159 MOTOR M-1286 PID DWG TFA-16-14305-02 25HP / 1765RPM / 284TC FRAME | A | |||
M-0455 | MOTOR | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1221 MOTOR M-0455 PID DWG TFA-16-14305-01 25HP / 1750RPM / 365 FRAME | A | |||
M-0447 | MOTOR | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1223 MOTOR M-0447 PID DWG TFA-16-14305-01 25HP / 1750RPM / 365 FRAME | A | |||
M-0453 | MOTOR | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1227 MOTOR M-0453 PID DWG TFA-16-14305-01 25HP / 1750RPM / 365 FRAME | A | |||
M-0449 | MOTOR | TFA CRUDE TANK TFA-TK104 TANK MIXER MX-1229 MOTOR M-0449 PID DWG TFA-16-14305-01 25HP / 1750RPM / 365 FRAME | A | |||
M-1115 | MOTOR | TFA CRUDE TANK TFA-TK105 MIXER MX-1989 MOTOR M-1115 PID DWG TFA-16-14305-01 75HP / 1780RPM / 365T FRAME | I | |||
M-1116 | MOTOR | TFA CRUDE TANK TFA-TK105 MIXER MX-1990 MOTOR M-1116 PID DWG TFA-16-14305-01 75HP / 1780RPM / 365T FRAME | I | |||
M-1117 | MOTOR | TFA CRUDE TANK TFA-TK105 MIXER MX-1991 MOTOR M-1117 PID DWG TFA-16-14305-01 75HP / 1780RPM / 365T FRAME | I | |||
M-2233 | MOTOR | TFA CRUDE TANK TFA-TK117 MIXER MX-3219 MOTOR PID DWG TFA-16-14305-49 40HP / RPM / FRAME | A | |||
M-2234 | MOTOR | TFA CRUDE TANK TFA-TK117 MIXER MX-3220 MOTOR PID DWG TFA-16-14305-49 40HP / RPM / FRAME | A |
Attachment 1 to Schedule 2.2.1
M-1639 | MOTOR | TFA CRUDE TFA-TK010 TANK MIXER MX-0519 MOTOR M-1639 PID DDWG TFA-16-14305-11 25HP / 1765RPM / 284T FRAME | I | |||
M-1640 | MOTOR | TFA CRUDE TFA-TK010 TANK MIXER MX-0522 MOTOR M-1640 PID DWG TFA-16-14305-11 25HP / 1765RPM / 284TY FRAME | I | |||
M-0581 | MOTOR | TFA CUMENE LOADING PUMP TFA-PN068 MOTOR M-0581 PID DWG TFA-16-14305-48 10HP / 1750RPM / 324Y FRAME | A | |||
M-0612 | MOTOR | TFA CUMENE LOADING PUMP TFA-PN092 MOTOR M-0612 PID DWG TFA-16-14305-48 20HP / 1175RPM/326U FRAME | A | |||
M-0058 | MOTOR | TFA DIESEL OIL TRANS. PUMP TFA-PN016 MOTOR M-0058 PID DWG TFA-16-14305-54A 20HP / 3500RPM / 326 FRAME | I | |||
M-0135 | MOTOR | TFA DIESEL TANK TFA-TK023 MIXER MX-0518 MOTOR M-0135 PID DWG TFA-16-14305-25 HP / RPM/ FRAME | A | |||
M-0615 | MOTOR | TFA DIESEL TANK TFA-TK039 MIXER MX-0517 MOTOR M-0615 PID DWG TFA-16-14305-25 HP / RPM / FRAME | A | |||
M-2178 | MOTOR | TFA DIESEL TO SALES LOADING PUMP MOTOR TFA-PN080 MOTOR M-2178 PID DWG TFA-16-14305-18 60HP / 3550RPM / 364LP FRAME SINGLE LINE NO. 11-13917-D (REPLACED M-0598) | A | |||
M-0597 | MOTOR | TFA DIESEL TO SALES LOADING PUMP TFA-PN079 MOTOR M-0597 PID DWG TFA-16-14305-18 60HP / 3560RPM / WPV405P FRAME SINGLE LINE NO. 11-13917-D | A | |||
M-0598 | MOTOR | TFA DIESEL TO SALES LOADING PUMP TFA-PN080 MOTOR M-0598 PID DWG TFA-16-14305-18 60HP / 3560RPM / WPV405P FRAME SINGLE LINE NO. 11-13917-D (REPLACED WITH M-2178) | I | |||
M-0048 | MOTOR | TFA DIESEL TRANSFER PUMP TFA-PN005 MOTOR M-0048 PID DWG TFA-16-14305-05 300HP / 1760RPM / FRAME | A | |||
M-0650 | MOTOR | TFA F.C. BOOSTER PUMP TFA-PN009 MOTOR M-0650 PID DWG TFA-16-14305-23 125HP / 1185RPM / FRAME SINGLE LINE NO. 11-13916-D | A | |||
M-0094 | MOTOR | TFA FCC CHARGE TANK TFA-TK016 TANK MIXER MX-0476 MOTOR M-0094 PID DWG TFA-16-14305-21 25HP / 1750RPM / 365S501 FRAME | A | |||
M-0096 | MOTOR | TFA FCC CHARGE TANK TFA-TK016 TANK MIXER MX-0477 MOTOR M-0096 PID DWG TFA-16-14305-21 25HP / 1750RPM / 365S501 FRAME | A | |||
M-0450 | MOTOR | TFA FCC CHARGE TANK TFA-TK062 MIXER MX-1224 MOTOR M-0450 PID DWG TFA-16-14305-42 25HP / 1750RPM / 365 FRAME | I | |||
M-0445 | MOTOR | TFA FCC CHARGE TANK TFA-TK062 MIXER MX-1236 MOTOR M-0445 PID DWG TFA-16-14305-42 25HP / 1750RPM / 365 FRAME | I | |||
M-0458 | MOTOR | TFA FCC CHARGE TANK TFA-TK063 MIXER MX-1239 MOTOR M-0458 PID DWG TFA-16-14305-42 25HP / 1750RPM / 324U FRAME | A | |||
M-0459 | MOTOR | TFA FCC CHARGE TANK TFA-TK063 MIXER MX-1240 MOTOR M-0459 PID DWG TFA-16-14305-42 25HP / 1750RPM / 324U FRAME | A | |||
M-0460 | MOTOR | TFA FCC CHARGE TANK TFA-TK063 MIXER MX-1241 MOTOR M-0460 PID DWG TFA-16-14305-42 25HP / 1750RPM / 324U FRAME | A | |||
M-0497 | MOTOR | TFA FIRE WATER BOOSTER PUMP TFA-PN061 MOTOR M-0497 PID DWG TFA-16-14305-42 75HP / 3570RPM / NFV504PX FRAME | A | |||
M-1983 | MOTOR | TFA FISHER CONTROL VALVE FOR THE GASOLINE MOTOR M-1983 PIPE-LINE | A | |||
M-1065 | MOTOR | TFA FLUSHING PUMP TFA-PN119 MOTOR M-1065 PID DWG TFA-16-14305-01 7.5HP / 3525 RPM / 213HP FRAME | A | |||
M-0902 | MOTOR | TFA FUEL BLENDING PUMP TFA-PN018 MOTOR M-0902 PID DWG TFA-16-14305-56 40HP / 3550RPM / 324TS FRAME | A | |||
M-0061 | MOTOR | TFA FUEL BLENDING PUMP TFA-PN019 MOTOR M-0061 PID DWG TFA-16-14305-56 7.5HP / 3470RPM / 254 FRAME | A | |||
M-2232 | MOTOR | TFA FUEL OIL TANK TFA-TK001 MIXER MOTOR (SOUTHWEST) PID DWG TFA-16-14503-10 30HP / RPM / FRAME | A | |||
M-2231 | MOTOR | TFA FUEL OIL TANK TFA-TK001 MIXER MOTOR (SOUTH) PID DWG TFA-16-14503-10 30HP / RPM / FRAME | A | |||
M-1641 | MOTOR | TFA FUEL OIL TANK TFA-TK001 MIXER MX-0471 MOTOR M-1641 PID DWG TFA-16-14305-10 25HP / 1770RPM / 284TZ FRAME | I | |||
M-1287 | MOTOR | TFA FUEL OIL TANK TFA-TK001 MIXER MX-0500 MOTOR M-1287 PID DWG TFA-16-14503-10 25HP / 175,65RPM / 284TC FRAME | I | |||
M-0352 | MOTOR | TFA FUEL OIL TANK TFA-TK002 MIXER MX-0457 MOTOR M-0352 PID DWG TFA-16-14305-11 25HP / 1770RPM / FRAME | A | |||
M-1636 | MOTOR | TFA FUEL OIL TANK TFA-TK002 MIXER MX-0467 MOTOR M-1636 PID DWG TFA-16-14305-11 25HP / 1765RPM / FRAME | A | |||
M-0095 | MOTOR | TFA FUEL OIL TANK TFA-TK003 TANK MIXER MX-0463 MOTOR M-0095 PID DWG TFA-16-14305-12 25HP / 1750RPM / 365S FRAME | I | |||
M-1628 | MOTOR | TFA FUEL OIL TANK TFA-TK003 TANK MIXER MX-0490 MOTOR M-1628 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | I | |||
M-1625 | MOTOR | TFA FUEL OIL TANK TFA-TK004 TANK MIXER MX-0459 MOTOR M-1625 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | I | |||
M-0097 | MOTOR | TFA FUEL OIL TANK TFA-TK004 TANK MIXER MX-0489 MOTOR M-0097 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | I | |||
M-0078 | MOTOR | TFA FUEL OIL TANK TFA-TK004 TANK MIXER MX-0493 MOTOR M-0078 PID DWG TFA-16-14305-12 25HP / 1765RPM / 284TC FRAME | I | |||
M-2207 | MOTOR | TFA FUEL OIL TANK TFA-TK118 MIXER MOTOR PID DWG TFA-16-14305-50 | A | |||
M-2208 | MOTOR | TFA FUEL OIL TANK TFA-TK118 MIXER MOTOR PID DWG TFA-16-14305-50 | A | |||
M-0932 | MOTOR | TFA FUEL OIL TANK TFA-TK118 MIXER MOTOR MX-1724 MOTOR M-0932 PID DWG TFA-16-14305-50 | I | |||
M-0933 | MOTOR | TFA FUEL OIL TANK TFA-TK118 MIXER MX-1725 MOTOR M-0933 PID DWG TFA-16-14305-50 | I | |||
M-1604 | MOTOR | TFA FUEL OIL TANK TFA-TK119 MIXER MX-2529 MOTOR M-1604 PID DWG TFA-16-14305-50 50HP / 1770RPM / 326T FRAME | A | |||
M-1603 | MOTOR | TFA FUEL OIL TANK TFA-TK119 MIXER MX-2530 MOTOR M-1603 PID DWG TFA-16-14305-50 50HP / 1770RPM / 326T FRAME | A | |||
M-0959 | MOTOR | TFA FUEL OIL TO DOCK LOADING PUMP TFA-PN113 MOTOR M-0959 PID DWG TFA-16-14305-50 300HP/ 1775RPM / 8188 FRAME | A |
Attachment 1 to Schedule 2.2.1
M-1289 | MOTOR | TFA FUEL OIL TO DOCKS TRANSFER PUMP TFA-PN113A MOTOR M-1289 PID DWG TFA-16-14305-50 350HP/1775RPM / 81888 FRAME | A | |||
M-0050 | MOTOR | TFA FUEL OIL TRANSFER PUMP TFA-PN008 MOTOR M-0050 PID DWG TFA-16-14305-06 450HP/1760RPM / FRAME | A | |||
M-0051 | MOTOR | TFA FUEL OIL TRANSFER PUMP TFA-PN008A MOTOR M-0051 PID DWG TFA-16-14305-06 450HP / 1760RPM / FRAME | A | |||
M-0648 | MOTOR | TFA FURNACE OIL BOOSTER PUMP TFA-PN050 MOTOR M-0648 PID DWG TFA-16-14305-17 150HP / 1180RPM / NPV586PX FRAME SINGLE LINE NO. 11-13917-D | A | |||
M-0791 | MOTOR | TFA FURNACE OIL BOOSTER PUMP TFA-PN057 MOTOR M-0791 PID DWG TFA-16-14305-17 150HP / 1180RPM / NPV586PX FRAME SINGLE LINE NO. 11-13916-D | A | |||
M-0658 | MOTOR | TFA FURNACE OIL PUMP TFA-PN096 MOTOR M-0658HP / RPM / FRAME (OUT OF SERVICE) | A | |||
M-0077 | MOTOR | TFA FURNACE OIL TANK TFA-TK018 TANK MIXER MX-0478 MOTOR M-0077 PID DWG TFA-16-14305-17HP /1750RPM / 365S FRAME | A | |||
M-0079 | MOTOR | TFA FURNACE OIL TANK TFA-TK018 TANK MIXER MX-0503 MOTOR M-0079 PID DWG TFA-16-14305-17HP/1750RPM / 365S FRAME | A | |||
M-2202 | MOTOR | TFA FURNACE OIL TANK TFA-TK028 MIXER PID DWG TFA-16-14305-18 (40HP / 1770RPM / 324T FRAME) | A | |||
M-1617 | MOTOR | TFA FURNACE OIL TANK TFA-TK044 TANK MIXER MX-0456 MOTOR M-1617 PID DWG TFA-16-14305-29 25HP / 1765RPM / 284TC FRAME | A | |||
M-1616 | MOTOR | TFA FURNACE OIL TANK TFA-TK044 TANK MIXER MX-0484 MOTOR M-1616 PID DWG TFA-16-14305-29 25HP / 1770RPM / 284TZ FRAME | A | |||
M-1915 | MOTOR | TFA FURNACE OIL TANK TFA-TK401 MIXER MOTOR | A | |||
M-1917 | MOTOR | TFA FURNACE OIL TANK TFA-TK401 MIXER MOTOR | A | |||
M-1916 | MOTOR | TFA FURNACE OIL TANK TFA-TK401 MIXER MOTOR | A | |||
M-2179 | MOTOR | TFA FURNACE OIL TANK TFA-TK403 MIXER MOTOR MX-2179 PID DWG TFA-16-14305-43 25HP/1800RPM/FRAME 284T | A | |||
M-2180 | MOTOR | TFA FURNACE OIL TANK TFA-TK403 MIXER MOTOR MX-3157 PID DWG TFA-16-14305-43 25HP/1800RPM/FRAME284T | A | |||
M-0342 | MOTOR | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0473 MOTOR M-0342 PID DWG TFA-16-14305-43 (OUT OF SERVICE) | I | |||
M-0448 | MOTOR | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0475 MOTOR M-0448 PID DWG TFA-16-14305-43 (OUT OF SERVICE) | I | |||
M-0107 | MOTOR | TFA FURNACE OIL TANK TFA-TK403 MIXER MX-0501 MOTOR M-0461 PID DWG TFA-16-14305-43 50 HP / 3550 RPM / FRAME (OUT OF SERVICE) | I | |||
M-0049 | MOTOR | TFA FURNANCE OIL TRANS. PUMP TFA-PN006 MOTOR M-0049 PID DWG TFA-16-14305-05 300HP / 1760RPM / FRAME | A | |||
M-1327 | MOTOR | TFA FURNANCE OIL TRANSFER PUMP (COLONIAL) TFA-PN125 MOTOR M-1327 PID DWG TFA-16-14305-17 600HP / 1185RPM / NJ686S FRAME | A | |||
M-1328 | MOTOR | TFA FURNANCE OIL TRANSFER PUMP (COLONIAL) TFA-PN126 P-2079 MOTOR M-1328 PID DWG TFA-16-14305-17 600HP / 1185RPM / NJ686S FRAME | A | |||
M-0602 | MOTOR | TFA FURNANCE OIL TRANSFER PUMP TFA-PN089 MOTOR M-0602 PID DWG TFA-16-14305-34 40HP / 3535RPM / 324VP FRAME | A | |||
M-0603 | MOTOR | TFA FURNANCE OIL TRANSFER PUMP TFA-PN090 MOTOR M-0603 PID DWG TFA-16-14305-34 40HP / 3560RPM / FRAME | A | |||
M-0305 | MOTOR | TFA FURNANCE OIL TRANSFER PUMP TFA-PN104 MOTOR M-0305 PID DWG TFA-16-14305-23 125HP / 1775RPM /WPV445UP FRAME | A | |||
M-0454 | MOTOR | TFA GASOLINE TANK TFA-TK068 MIXER MX-1228 MOTOR M-0454 25HP / 1775RPM / 365 FRAME | A | |||
M-0313 | MOTOR | TFA GASOLINE AND FURNACE OIL (LAUREL) TRANSFER PUMP TFA-PN060 MOTOR M-0313 PID DWG TFA-16-14305-08 1000HP / 3569/3572 S88S FRAME | A | |||
M-2213 | MOTOR | TFA GASOLINE AND FURNACE OIL (LAUREL) TRANSFER PUMP TFA-PN060 SPARE MOTOR PID DWG TFA-16-14305-08 1000HP / 3580RPM / 8875U FRAME (STORED AT MTI 02/08) | I | |||
M-1981 | MOTOR | TFA GASOLINE BLEND HEADER SAMPLE RECOVERY PUMP P-2948 TFA-PN153 AT TANK NO. 31 PID DWG | A | |||
M-1982 | MOTOR | TFA GASOLINE BLENDING INSTRUMENT AIR COMPRESSOR M-1982 TFA-PN154 AT TANK NO. 31 HP 15 / RPM1770 / FRAME 254T PID DWG | I | |||
M-1908 | MOTOR | TFA GASOLINE BLENDING PUMP TFA-PN044 MOTOR HP 100 / RPM 3560 / FRAME 405TS | A | |||
M-2214 | MOTOR | TFA GASOLINE BLENDING PUMP TFA-PN044 MOTOR HP 100 / RPM 3560 / FRAME 405TS | A | |||
M-1741 | MOTOR | TFA GASOLINE BLENDING PUMP TFA-PN105 MOTOR M-1741 PID DWG TFA-15-1026-55 75HP / 3540RPM / 365LP FRAME | A | |||
M-1995 | MOTOR | TFA GASOLINE BLENDING PUMP TFA-PN142 MOTOR M-1995 150 HP / 1730 RPM SINGLE LINE NO. 11-13915-D | A | |||
M-1910 | MOTOR | TFA GASOLINE BLENDING PUMP TFA-PN143 MOTOR 100 HP SINGLE LINE NO. 11-13917-D | A | |||
M-1911 | MOTOR | TFA GASOLINE BLENDING TFA-PN144 MOTOR 150 HP / 3550 RPM / 445TS FRAME PID DWG 15-1803-40 SINGLE LINE NO. 11-13916-D | I | |||
M-2010 | MOTOR | TFA GASOLINE BLENDING TFA-PN145 MOTOR M-2010 50HP / 3560 RPM / NV54 FRAME PID DWG 15-1803-40 SINGLE LINE NO. 11-13916-D | A | |||
M-2011 | MOTOR | TFA GASOLINE BLENDING TFA-PN146 MOTOR M-2011 50HP / 3560RPM / 325VP FRAME PID DWG 15-1803-40 SINGLE LINE NO. 11-13916-D | A | |||
M-1914 | MOTOR | TFA GASOLINE BLENDING TFA-PN147 MOTOR PID DWG 15-1803-45 | A | |||
M-0792 | MOTOR | TFA GASOLINE BOOSTER PUMP TFA-PN148 MOTOR M-0792 PID DWG TFA-150HP / 1180RPM / NPV586PX FRAME | A | |||
M-1021 | MOTOR | TFA GASOLINE LOADING PUMP TFA-PN114 MOTOR M-1021 PID DWG TFA-16-14305-46-300HP / 1175RPM / 500FS8 FRAME | A | |||
M-0131 | MOTOR | TFA GASOLINE TANK TFA-TK049 MIXER MX-0131 MOTOR M-0131 PID DWG TFA-16-14305-34 | A | |||
M-1633 | MOTOR | TFA GASOLINE TANK TFA-TK0421 MIXER MX-1459 MOTOR M-1633 PID DWG TFA-16-14305-15 25HP / 1770RPM / 284TZ FRAME | I |
Attachment 1 to Schedule 2.2.1
M-0121 | MOTOR | TFA GASOLINE TANK TFA-TK021 TANK MIXER MX-0480 MOTOR M-0121 PID DWG TFA-16-14305-15 25HP / 1770RPM / 284TZ FRAME | I | |||
M-1631 | MOTOR | TFA GASOLINE TANK TFA-TK031 TANK MIXER MX-0409 MOTOR M-1631 PID DWG TFA-16-14305-15 25HP / 1770RPM / 284TZ FRAME | A | |||
M-1630 | MOTOR | TFA GASOLINE TANK TFA-TK031 TANK MIXER MX-0481 MOTOR M-1630 PID DWG TFA-16-14305-15 25HP / 1765RPM / FRAME | A | |||
M-0343 | MOTOR | TFA GASOLINE TANK TFA-TK046 TANK MIXER MX-0798 MOTOR M-0343 PID DWG TFA-16-14305-33 25HP / - RPM / FRAME | A | |||
M-0451 | MOTOR | TFA GASOLINE TANK TFA-TK046 TANK MIXER MX-1225 MOTOR M-0451 PID DWG TFA-16-14305-33 25HP / - RPM / FRAME | A | |||
M-1623 | MOTOR | TFA GASOLINE TANK TFA-TK047 TANK MIXER MX-0483 MOTOR M-1623 PID DWG TFA-16-14305-32 25HP / 1770RPM / 284TZ FRAME | A | |||
M-1622 | MOTOR | TFA GASOLINE TANK TFA-TK047 TANK MIXER MX-0491 MOTOR M-1622 PID DWG TFA-16-14305-32 25HP / 1770RPM / 284TZ FRAME | A | |||
M-0132 | MOTOR | TFA GASOLINE TANK TFA-TK050 MIXER MOTOR M-0132 25HP / 1770 RPM / 284 TZ FRAME PID DWG TFA-16-14305-34 3 | A | |||
M-0379 | MOTOR | TFA GASOLINE TANK TFA-TK052 MIXER MX-1200 MOTOR M-0379 PID DWG TFA-16-14305-41 25HP / 1800RPM / FRAME | A | |||
M-0380 | MOTOR | TFA GASOLINE TANK TFA-TK052 MIXER MX-1243 MOTOR M-0380 PID DWG TFA-16-14305-41 25HP / 1800RPM / FRAME | A | |||
M-0293 | MOTOR | TFA GASOLINE TANK TFA-TK053 MIXER MX-1201 MOTOR M-0293 PID DWG TFA-16-14305-41 25HP/ 1800RPM / 365 FRAME | A | |||
M-0416 | MOTOR | TFA GASOLINE TANK TFA-TK053 MIXER MX-1212 MOTOR M-0416 PID DWG TFA-16-14305-41 25HP / 1755RPM / FRAME | A | |||
M-0413 | MOTOR | TFA GASOLINE TANK TFA-TK054 MIXER MX-1209 MOTOR M-0413 PID DWG TFA-16-14305-40 HP 20 / RPM / 1800 FRAME 364-4 | A | |||
M-0415 | MOTOR | TFA GASOLINE TANK TFA-TK054 MIXER MX-1211 MOTOR M-0415 PID DWG TFA-16-14305-40 HP 25 / FRAME 365Y / RPM 1755 | A | |||
M-0457 | MOTOR | TFA GASOLINE TANK TFA-TK068 MIXER MX-1238 MOTOR M-0457 PID DWG 25HP / 1750RPM / 324U FRAME | A | |||
M-1634 | MOTOR | TFA GASOLINE TANK TFA-TK068 MIXER MX-1242 MOTOR MOTOR M-1634 PID DWG TFA-16-14305-45 25HP / 1760RPM / 284T FRAME | A | |||
M-1624 | MOTOR | TFA GASOLINE TFA-TK014 TANK MIXER MX-0474 MOTOR M-1624 PID DWG TFA-16-14305-14 25HP / 1770RPM / 284TZ FRAME | A | |||
M-0133 | MOTOR | TFA GASOLINE TFA-TK014 TANK MIXER MX-0474 MOTOR PID DWG TFA-16-14305-14 25 HP / 1770RPM / 284 TZ FRAME | A | |||
M-0278 | MOTOR | TFA GASOLINE TFA-TK014 TANK MIXER MX-0486 MOTOR M-0278 PID DWG TFA-16-14305-14 25HP / 1770RPM / 284 TZ FRAME | A | |||
M-0044 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN001 MOTOR M-0044 PID DWG TFA-16-14305-04 200HP / 1760RPM / FRAME | A | |||
M-0045 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN002 MOTOR M-0045 PID DWG TFA-16-14305-04 200HP / 1760RPM / FRAME | A | |||
M-0047 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN004 MOTOR M-0047 PID DWG TFA-16-14305-04 200HP / 1760RPM / FRAME ELECTRICAL SINGLE LINE DIAGRAM NO.11-13920-D | A | |||
M-0055 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN013 MOTOR M-0055 PID DWG TFA-16-14305-55 15HP / 3490RPM / 324 FRAME | A | |||
M-0056 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN014 MOTOR M-0056 PID DWG TFA-16-14305-54A 15HP / 3490RPM / 324 FRAME | A | |||
M-0486 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN054 MOTOR M-0486 PID DWG TFA-16-14305-35 30HP / 1760RPM / NPV404PX FRAME SINGLE LINE NO. 11-13916-D | A | |||
M-0498 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN055 MOTOR M-0498 PID DWG TFA-16-14305-13 50HP / 890RPM / FRAME SINGLE LINE NO. 11-13915-D | A | |||
M-0600 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN087 MOTOR M-0600 PID DWG TFA-16-14305-31 50HP / 3560RPM / WPV365UP FRAME SINGLE LINE NO. 11-13916-D | A | |||
M-0601 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN088 MOTOR M-0601 PID DWG TFA-16-14305-31 50HP / 3560RPM / WPV365UP FRAME SINGLE LINE NO. 11-13915-D | A | |||
M-1739 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN127 MOTOR M-1739 PID DWG TFA-16-14305-37 75HP / 3560RPM / 360LP FRAME SINGLE LINE NO. 11-13915-D | A | |||
M-1740 | MOTOR | TFA GASOLINE TRANSFER PUMP TFA-PN130 MOTOR M-1740 PID DWG TFA-16-14305-37 75HP / 3560RPM / 365LP FRAME SINGLE LINE NO. 11-13915-D | A | |||
M-0793 | MOTOR | TFA GASOLINE(LAUREL)BOOSTER TFA-PN059 MOTOR M-0793 PID DWG TFA-16-14305-14 150HP / 1180RPM / NPV586PV FRAME | A | |||
M-1662 | MOTOR | TFA HARBOR PIPELINE PRODUCTS PUMP TFA-PN007 MOTOR M-1662 PID DWG TFA-16-14305-07 800HP / 3550RPM / FRAME (SPARE - STORED AT MTI 2/08) | A | |||
M-1989 | MOTOR | TFA HARBOR PIPELINE PRODUCTS PUMP TFA-PN007 MOTOR M-1889 PID DWG TFA-16-14305-07 800HP / 3579RPM / 5810H FRAME | A | |||
M-1720 | MOTOR | TFA HEATING OIL TRANSFER PUMP TFA-PN052 M-1720 PID DWG TFA-16-14305-37 150 HP / 1190 RPM / 447LP FRAME | A | |||
M-0574 | MOTOR | TFA INHIBITOR INJECTION PUMP TFA-PN129 MOTOR M-0574 PID DWG TFA-16-14305-09 3/4HP / RPM / FRAME | A | |||
M-0575 | MOTOR | TFA INHIBITOR UNLOAD PUMP TFA-PN066 MOTOR M-0575 PID DWG TFA-16-14305-58 | A | |||
M-0387 | MOTOR | TFA ISO BUTANE TRANSFER PUMP TFA-PN047 MOTOR M-0387 PID DWG TFA-16-14305-61 20HP / 3500RPM / 326 FRAME SINGLE LINE # 11-13916-D | A | |||
M-2241 | MOTOR | TFA KEROSENE TANK TFA-TK019 TANK MIXER MOTOR (NORTHWEST) M-2241 25HP / 1725RPM / 286TY FRAME | A | |||
M-0075 | MOTOR | TFA KEROSENE TANK TFA-TK019 TANK MIXER MOTOR M-0075 25HP / 1750RPM / 365YZ FRAME | A | |||
M-1251 | MOTOR | TFA LOW SULFUR DIESEL TANK TFA-TK048 TANK MIXER MX-0511 MOTOR M-1251 PID DWG TFA-16-14305-30 15HP / 1795RPM / FRAME | A |
Attachment 1 to Schedule 2.2.1
M-1652 | MOTOR | TFA LOW SULFUR DIESEL TANK TFA-TK048 TANK MIXER MX-0512 MOTOR M-1652 PID DWG TFA-16-14305-30 15HP/1795RPM/ FRAME | I | |||
M-0446 | MOTOR | TFA LOW SULFUR TANK TFA-TK064 MIXER MX-1220 MOTOR M-0446 PID DWG TFA-16-14305-42 | A | |||
M-0452 | MOTOR | TFA LOW SULFUR TANK TFA-TK064 MIXER MX-1226 MOTOR M-0452 PID DWG TFA-16-14305-42 | A | |||
M-0456 | MOTOR | TFA LOW SULFUR TANK TFA-TK064 MIXER MX-1237 MOTOR M-0456 PID DWG TFA-16-14305-42 | A | |||
M-1615 | MOTOR | TFA LPG LOADING PUMP TFA-PN064 MOTOR M-1615(NEW) 75HP/3550RPM/365LP-TE FRAME SINGLE LINE NO. 11-13915-D | A | |||
M-1353 | MOTOR | TFA LPG OFF TEST PUMP TFA-PN065 MOTOR M-1353 PID DWG TFA-16-14305-63 15HP/3505RPM/254TD FRAME | A | |||
M-1264 | MOTOR | TFA LPG RETURN PUMP TFA-PN070 MOTOR M-1264 PID DWG TFA-16-14305-60 60HP/3555RPM/364HPZ FRAME SINGLE LINE NO.11-13916-D | A | |||
M-2170 | MOTOR | TFA M-2170 MOTOR DRIVER FOR ETHANOL INJ.PUMP P-3132 TFA-PN158 TK-51 PID DWG 15-1803-37 HP 150/FRAME 445TS/3575RPM | A | |||
M-2171 | MOTOR | TFA M-2171 MOTOR DRIVER FOR ETHANOL INJ.P-3133 TFA-PN159 TK-51 PID DWG I5-1803-37 HP 150/FRAME 445TS/3575 RPM | A | |||
M-2083 | MOTOR | TFA N-14 CRUDE DEWATERING PUMP TFA-PN157 M-2083 | A | |||
M-2052 | MOTOR | TFA N344 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOTOR M-2052 | A | |||
M-2051 | MOTOR | TFA N64 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOTOR M-2051 | A | |||
M-2050 | MOTOR | TFA N66 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOTOR M-2050 | A | |||
M-2053 | MOTOR | TFA N66 LINE TO HARBOR PIPELINE SUCTION MOTORIZED VALVE MOTOR M-2053 | A | |||
M-2048 | MOTOR | TFA N66 LINE TO LAUREL PIPELINE SUCTION MOTORIZED VALVE MOTOR M-2048 | A | |||
M-2049 | MOTOR | TFA N67 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOTOR M-2049 | A | |||
M-0569 | MOTOR | TFA NAPHTHA TRANSFER PUMP TFA-PN151 MOTOR M-0569 PID DWG TFA-16-14305-48 20HP/3510RPM/ FRAME | A | |||
M-0306 | MOTOR | TFA NAPHTHA TRANSFER PUMP TFA-PN108 MOTOR M-0306 PID DWG TFA-15-1803-19 60HP/3570RPM/1364 VP16 FRAME | I | |||
M-1864 | MOTOR | TFA NO.1 PUMPHOUSE SEWAGE LIFT PUMP TFA-PN138 M-1864 PID DWG TFA-1/2HP/1750 RPM/HB56C FRAME | I | |||
M-2256 | MOTOR | TFA NO.1 PUMPHOUSE SEWAGE LIFT PUMP TFA-PN138 PID DWG TFA-2HP/ RPM/ FRAME | A | |||
M-0282 | MOTOR | TFA NO.2 PUMPHOUSE PUMP TFA-PN035 MOTOR M-0282 PID DWG TFA-16-14305-54A 3HP/ 3540RPM/ FRAME:182TC | A | |||
M-1895 | MOTOR | TFA RAIN WATER DRAW OFF PUMP TFA-PN141 M-1895 15HP/1170RPM/X284HP FRAME | A | |||
M-1663 | MOTOR | TFA RESID TO FCC UNIT FROM TANK 16 PUMP TFA-PN 128 MOTOR M-1663 PID DWG TFA-16-14305-21 125HP/3600RPM/444LP FRAME | I | |||
M-2190 | MOTOR | TFA RESID TO FCC UNIT FROM TANK 16 PUMP TFA-PN 128 MOTOR M-2190 PID DWG TFA-16-14305-21]125HP/3600RPM/444LP FRAME | A | |||
M-0649 | MOTOR | TFA S.C BOOSTER(HARBOR) PUMP TFA-PN043 MOTOR M-0649 PID DWG TFA-16-14305-38 125HP/1185RPM/NPV585PX FRAME SINGLE LINE NO.11-13916-D | A | |||
M-1821 | MOTOR | TFA SALES KERO FUEL PUMP TFA-PN152 MOTOR M-1821 PID DWG TFA-50HP/ 3550RPM/326LP FRAME | A | |||
M-0057 | MOTOR | TFA SULFOLANE TRANSFER PUMP TFA-PN139 MOTOR M-0057 25HP/3555RPM/365S FRAME PID DWG TFA-15-1803-46 | A | |||
M-0071 | MOTOR | TFA SUMP PUMP TFA-PN033 MOTOR M-0071 PID DWG TFA-16-14305-54A 3HP/1725RPM/215C FRAME | A | |||
M-0440 | MOTOR | TFA TANK TEST PUMP TFA-PN048 MOTOR M-0440 NOT ON PID-PORTABLE PUMP | A | |||
M-2067 | MOTOR | TFA TOLUENE GAS BLENDING PUMP M-2068 TFA-PN 156 AT TANK NO.31 HP 75/ FRAME 365TS/ RPM 3535 PID NO. | A | |||
M-0129 | MOTOR | TFA TOLUENE TANK TFA-TK050 MIXER MX-0509 MOTOR M-0129 PID DWG TFA-16-14305-35 |
A | |||
M-0308 | MOTOR | TFA TOLUENE TRANSFER PUMP TFA-PN045 P-1431 PID DWG TFA-16-14305-62 PID DWG 20HP/3520RPM/WPV256 UP FRAME | I | |||
M-1263 | MOTOR | TFA TOLUENE TRANSFER PUMP TFA-PN045 A MOTOR M-1263 PID DWG TFA-16-14305-62 100HP/3555RPM/445US FRAME | I | |||
M-0499 | MOTOR | TFA TOLUENE TRANSFER PUMP TFA-PN056 MOTOR M-0499 PID DWG TFA-16-14305-37 SINGLE LINE 11-13915-D | A | |||
M-0604 | MOTOR | TFA TOLUENE TRANSFER PUMP TFA-PN091MOTOR M-0604 PID DWG TFA-16-14305-48 20HP/3530RPM/ FRAME | A | |||
M-1887 | MOTOR | TFA TRAVELLING MUD PUMP MOTOR NOT ON PID | A | |||
M-0783 | MOTOR | TFA TRUCK SCALE SUMP PUMP TFA-PN063 MOTOR M-0783 NOT ON PID | A | |||
M-1061 | MOTOR | TFA UNLEADIED GASOLINE TRASFER PUMP MOTOR TFA-PN117 M-1061 PID DWG TFA-16-14305-35 60HP/1775RPM/ FRAME SINGLE LINE NO.11-13916-D | I | |||
M-0511 | MOTOR | TFA WASTE OIL PUMP TFA-PN062 P-1256 MOTOR M-0511(OUT OF SERVICE) NOT ON PID | I | |||
M-0303 | MOTOR | TFA XYLENE TRANSFER PUMP TFA-PN103 MOTOR M-0303 PID DWG TFA-16-14305-22 75HP/1185RPM/ FRAME | A | |||
M-2181 | MOTOR | TFA-TK404 LSD STORAGE MOTOR FOR MX-3158(50HP/1770RPM/326T FRAME) | A | |||
M-2182 | MOTOR | TFA-TK404 LSD STORAGE MOTOR FOR MX-3159 | A | |||
S3MS4- PN116A |
MOTOR STARTER | ALKY PUMP T40 MOTOR STARTER | A | |||
S3MS4- PN83 |
MOTOR STARTER | AVIATION GASOLINE TRANSFER PUMP PN083 STARTER | A | |||
MS-0499 | MOTOR STARTER | DUPLICATE | D | |||
S3MS4- PN331 |
MOTOR STARTER | MOTOR STARTER FOR PN331 ***OOS*** | I | |||
S3MS4- PN135 |
MOTOR STARTER | MOTOR STARTER FOR STARTER FOR PN-135 | A |
Attachment 1 to Schedule 2.2.1
S3MS4-PN15 | MOTOR STARTER | MOTOR STARTER FOR STARTER FOR PUMP PN15 | A | |||
S3MS4-P101 | MOTOR STARTER | PUMP P101 MOTOR STARTER FOR STARTER AT SALES | A | |||
S3MS4-P1A | MOTOR STARTER | PUMP P1A STARTER | A | |||
S3MS4-P1B | MOTOR STARTER | PUMP P1B STARTER | A | |||
S3MS4-PN161 | MOTOR STARTER | PUMP PN161 MOTOR STARTER FOR STARTER AT TANK 64 | A | |||
S1MS4-PN78 | MOTOR STARTER | S1MS4-PN78 150A RACK NORTH OF TANK 60 | I | |||
S3MS4-MX28 | MOTOR STARTER | S3MS4-MX28 FURNACE OIL TANK TFA-TK028 MIXER | A | |||
S3MS4-MX1723 | MOTOR STARTER | TANK TFA-TK116 MIXER MOTOR STARTER PID DWG TFA-16-14305-49 | A | |||
S3MS4-MX3219 | MOTOR STARTER | TANK TFA-TK117 MIXER MOTOR STARTER PID DWG TFA-16-14305-49 | A | |||
S3MS4-MX3220 | MOTOR STARTER | TANK TFA-TK117 MIXER MOTOR STARTER PID DWG TFA-16-14305-49 | A | |||
S3MS4-PN11 | MOTOR STARTER | TFA #2 FUEL OIL TRANSFER PUMP TFA-PN011 MOTOR STARTER PID DWG TFA-16-14305-07 25HP/3550RPM/FRAME (OUT OF SERVICE 10/2008) | I | |||
S3MS4-PN78 | MOTOR STARTER | TFA AV JET TRANSFER PUMP TFA-PN078 MOTOR STARTER PID DWG TFA-16-14305-26 60HP/3560RPM/WPV 405P FRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN40 | MOTOR STARTER | TFA AVIATION FUEL BLENDING TFA-PN040 MOTOR STARTER PID DWG TFA-16-14305-58 | A | |||
S3MS4-PN81 | MOTOR STARTER | TFA AVIATION GASOLINE TFA-PN081 PID DWG TFA-16-14305-39 20HP/3500RPM/326 FRAME SINGLE LINE NO. 11-13916-D | I | |||
S3MS5-PN3 | MOTOR STARTER | TFA AVJETTERANSFFER PUMP TFA-PN003 MOTOR STARTER PID DWG TFA-16-14305-04 200HP/1760RPM/FRAME | A | |||
S3MS4-PN17 | MOTOR STARTER | TFA B.S.W TRANSFER PUMP TFA-PN017 MOTOR STARTER PID DWG TFA-16-14305-31 40HP/ 1765RPM/444Y FRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN45B | MOTOR STARTER | TFA BENZENE TRANSFER PUMP FROM TANK 22 TFA-PN045B 20HP/3600RPM/256HP FRAME PID NO. 15-1803-24 EOL DWG# 11-13919-D | A | |||
S3MS4-PN106 | MOTOR STARTER | TFA BENZENE TRANSFER PUMP TFA-PN106 MOTOR STARTER PID DWG TFA-16-14305-48 HP 25/ RPM 3600/ FRAME 324 UPH*** OOS*** | A | |||
S3MS5-PN124 | MOTOR STARTER | TFA BUNKER PUMP TFA-PN124 MOTOR PID DWG TFA-16-14305-49 600HP/1780PM/500Z FRAME | A | |||
S3MS4-PN12B | MOTOR STARTER | TFA BUTANE GAS BLENDING INJECTION PUMP MOTOR STARTER TFA-PN012B PID DWG 15-1026- 10HP/ 3520RPM/ L215LPZ10 FRAME | A | |||
S3MS4-PN12A | MOTOR STARTER | TFA BUTANE TRANSFER PUMP MOTOR STARTER TFA-PN012A HP/ RPM/ FRAME PID DWG 15-1026-55 | A | |||
S3MS4-P12 | MOTOR STARTER | TFA BUTANE TRANSFER PUMP TFA-PN012 MOTOR STARTER PID DWG TFA-16-14305-55 20HP/ 3500RPM/326 FRAME | I | |||
S3MS5-PN149 | MOTOR STARTER | TFA COLONIAL PIPELINE BOOSTER PUMP TFA-PN149 MOTOR STARTER HP 900/3580RPM/ 5810S FRAME NEW PROJECT 1999 | A | |||
S3MS4-PN150 | MOTOR STARTER | TFA COLONIAL PIPELINE FLUSHING PUMP TFA-PN150 75HP/3550RPM/365TS-TE FRAME NEW PROJECT | A | |||
S3MS5-PN53 | MOTOR STARTER | TFA CRUDE BOOSTER PUMP TFA-PN053 MOTOR STARTER PID DWG TFA-16-14305-03 150HP/1180RPM/FRAME | A | |||
S3MS4-PN118 | MOTOR STARTER | TFA CRUDE BOOSTER PUMP TFA-PN118 MOTOR STARTER PID DWG TFA-16-14305-14 7.5HP/3470RPM/213HPFRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN51 | MOTOR STARTER | TFA CRUDE FLUSHING PUMP MOTOR STARTER FOR TFA-PN051 PID DWG TFA-16-14305-03 75HP/1185RPM/ SINGLE LINE DWG. NO. 11-13920-D | A | |||
S3MS4-PN132 | MOTOR STARTER | TFA CRUDE INJECTION PUMP TFA-PN132 MOTOR STARTER PID DWG TFA-16-14305-01 25HP/3530RPM/TFV284TPXFRAME | A | |||
S3MS4-PN86 | MOTOR STARTER | TFA CRUDE INJECTION PUMP TFA-PN086 MOTOR STARTER PID DWG TFA-16-14305-11 50HP/3535RPM/320HPFRAME | A | |||
S3MS4-PN93 | MOTOR STARTER | TFA CRUDE INJECTION PUMP TFA-PN093 MOTOR STARTER PID DWG TFA-16-14305-01 25HP/1770RPM/TFV284TPX FRAME | A | |||
S3MS4-MX11SW | MOTOR STARTER | TFA CRUDE TANK TFA-TK011 TANK MIXER MX-0455 MOTOR STARTER M-0109 PID DWG TFA-16-14305-12 5HP / 1765RPM / 284TC FRAME EOL DRAWING #11-16917-D | A | |||
S3MS4-MX101SW | MOTOR STARTER | TFA CRUDE TANK TFA-TK101 MIXER MOTOR STARTER PID DWG TFA-16-14305-02-HP / 1765RPM / 365S FRAME EOL DWG#11-13922-D | A | |||
S3MS4-MX105SW | MOTOR STARTER | TFA CRUDE TANK TFA-TK105 MIXER MOTOR STARTER PID DWG TFA-16-14305-01 75HP / 1780RPM / 365T FRAME EOL DWG#11-13922-D | A | |||
S3MS4-MX105SE | MOTOR STARTER | TFA CRUDE TANK TFA-TK105 MIXER MOTOR STARTER PID DWG TFA-16-14305-01 75HP/1780RPM/365T FRAME EOL DWG #11-13922-D | A | |||
S3MS4-PN92 | MOTOR STARTER | TFA CUMENE LOADING PUMP TFA-PN092 MOTOR STARTER PID DWG TFA-16-14305-48 20HP/ 1175RPM/326U FRAME EOL DWG# 11-13900-D | A | |||
S3MS4-PN16 | MOTOR STARTER | TFA DIESEL OIL TRANS. PUMP TFA-PN016 OTOR STARTER PID DWG TFA-16-14305-54A 20HP/3500RPM/326 FRAME | A | |||
S3MS4-PN79 | MOTOR STARTER | TFA DIESEL TO SALES LOADING PUMP TFA-PN079 MOTOR STARTER PID DWG TFA-16-14305-18 60HP/ 3560RPM/ WPV405P FRAME SINGLE LINE NO.11-13917-D | A |
Attachment 1 to Schedule 2.2.1
S3MS4-PN80 | MOTOR STARTER | TFA DIESEL TO SALES LOADING PUMP TFA-PN080 MOTOR STARTER PID DWG TFA-16-14305-18 60HP/3560RPM/WPV405P/FRAME SINGLE LINE NO.11-13917-D | A | |||
S3MS5-PN5 | MOTOR STARTER | TFA DIESEL TRANSFER PUMP TFA-PN005 MOTOR STARTER PID DWG TFA-16-14305-05 300HP/1760RPM/FRAME | A | |||
S3MS4-PN9 | MOTOR STARTER | TFA F.C. BOOSTER PUMP TFA-PN009 MOTOR STATER PID DWG TFA-PN009 MOTOR STARTER FOR M-650 PID DWG TFA-16-14305-23 12HP/1185RPM/-FRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN119 | MOTOR STARTER | TFA FLUSHING PUMP TFA-PN119 MOTOR STARTER PID DWG TFA-16-14305-01 7.5HP/RPM/FRAME | A | |||
S3MS4-MX3218 | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK001 MIXER (SOUTHWEST)MOTOR STARTER PID DWG TFA-16-14305-10 | A | |||
S3MS4-MX1SW | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK001 MIXER MOTOR STARTER PID DWG TFA-16-14305-10 25HP/1770RPM/284TZ FRAME | I | |||
S3MS4-MX1N | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK001 MIXER MOTOR STARTER PID DWG TFA-16-14503-10 25HP/175,65RPM/284TC FRAME | I | |||
S3MS4-MX3217 | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK001 MIXER (SOUTH) MOTOR STARTER PID DWG TFA-16-14305-10 | A | |||
S3MS4-MX2SE | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK002 MIXER MOTOR STARTER PID DWG TFA-16-14305-11 25HP/1765RPM/-FRAME EOL DRAWING #11-13922-D | A | |||
S3MS4-MX2N | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK002 MIXER MOTOR STARTER PID DWG TFA-16-14305-11 25HP /1770RPM/-FRAME EOL DRAWING #11-13922-D | A | |||
S3MS4-MX3S | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK003 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-12 25HP /1750RPM/ 365S FRAME OIL DRAWING #11-13922-D | I | |||
S3MS4-MX3N | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK003 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-12 25HP /1750RPM/FRAME EOL DRAWING #11-13922-D | I | |||
S3MS4-MX4N | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK004 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-12 25HP /1765RPM/ FRAME EOL DRAWING #11-13922-D | I | |||
S3MS4-MX4S | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK004 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-12 25HP /1765RPM/284TC FRAME EOL DRAWING #11-13922-D | I | |||
S3MS4-3195 | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK118 MIXER MOTOR PID DWG TFA-16-14305-50 | A | |||
S3MS4-3194 | MOTOR STARTER | TFA FUEL OIL TANK TFA-TK118 MIXER MOTORSTARTER PID DWG TFA-16-14305-50 | A | |||
S3MS5-PN113 | MOTOR STARTER | TFA FUEL OIL TO DOCK LOADING PUMP TFA-PN 113 MOTOR STARTER PID DWG TFA-16-14305-50 300HP/1775RMP/8188 FRAME | A | |||
S3MS5-PN113A | MOTOR STARTER | TFA FUEL OIL TO DOCKS TRANSFER PUMP TFA-PN113A MOTOR STARTER PID DWG TFA-16-14305-50 350HP/1775RPM/81888FRAME | A | |||
S3MS5-PN8 | MOTOR STARTER | TFA FUEL OIL TRANSFER PUMP TFA-PN008 MOTOR STARTER FOR PID DWG TFA-1614305-06 450HP 1760RPM/FRAME | A | |||
S3MS5-PN8A | MOTOR STARTER | TFA FUEL OIL TRANSFER PUMP TFA-PN008A MOTOR STARTER PID DWG TFA-16-14305-06 450HP/1760RPM/FRAME | A | |||
S3MS4-MX18E | MOTOR STARTER | TFA FURNACE OIL TANK TFA-TKO18 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-17 HP/ 1750RPM/365S FRAME EOL DWG# 11-13917-D | A | |||
S3MS4-MX18W | MOTOR STARTER | TFA FURNACE OIL TANK TFA-TK018 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-17 HP/ 1750RPM/ 365S FRAME EOL DWG #11-13917-D | A | |||
S3MS5-PN6 | MOTOR STARTER | TFA FURNACE OIL TRANS PUMP TFA-PN006 MOTOR STARTER PID DWG TFA-16-14305-05 300HP/1760RPM/FRAME | A | |||
S3MS4-PN89 | MOTOR STARTER | TFA FURNACE OIL TRANSFER PUMP TFA-PN089 MOTOR STARTERPID DWG TFA-16-14305-34 40HP/3535RPM/324VP FRAME | A | |||
S3MS4-PN90 | MOTOR STARTER | TFA FURNACE OIL TRANSFER PUMP TFA-PN090 MOTOR STARTER PID DWG TFA-16-14305-34 40HP/3560RPM/FRAME | A | |||
S3MS4-PN104 | MOTOR STARTER | TFA FURNACE OIL TRANSFER PUMP TFA-PN104 MOTOR PID DWG TFA-16-14305-23 125HP/1775RPM/WPV445UP FRAME | A | |||
S3MS5-PN125 | MOTOR STARTER | TFA FURNACE OIL TRANSFER PUMP(COLONIAL) TFA-PN125 MOTOR STARTER PID DWG TFA-16-14305-17 600HP/1185RPM/NJ686S | A | |||
S3MS4-PN50 | MOTOR STARTER | TFA FURNACE OIL BOOSTER PUMP TFA-PN050 MOTOR STARTER PID DWG TFA-16-14305-17 150HP/1180RPM/NPV586PX FRAME SINGLE LINE NO. 11-13917-D | A | |||
S3MS5-PN57 | MOTOR STARTER | TFA FURNACE OIL BOOSTER PUMP TFA-PN057 MOTOR STARTER PID DWG TFA-16-14305-17 150HP/1180RPM/NPV586PX FRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS5-PN126 | MOTOR STARTER | TFA FURNACE OIL TRANFER PUMP (COLONIAL) TFA-PN126 MOTOR STARTER FOR M-1328 PID DWG TFA-16-14305-17 600HP/1185RPM/NJ6865 FRAME | A | |||
S3MS5-PN60 | MOTOR STARTER | TFA GASOLINE AND FURNACE OIL (LAUREL) TRANSFER PUMP TFA-PN060 MOTOR STARTER PID DWG TFA-16 14305-08 1000 HP/ 3569/3572 S88S FRAME | A | |||
S3MS4-PN44A | MOTOR STARTER | TFA GASOLINE BLENDING PUMP TFA-PN044 MOTOR HP 100 / RPM 3560 / FRAME 40STS | A | |||
S3MS4-PN105 | MOTOR STARTER | TFA GASOLINE BLENDING PUMP TFA-PN105 MOTOR STARTER PID DWG TFA-15-1026-55 75HP / 3540RPM / 365LP FRAME | A | |||
S3MS5-PN142 | MOTOR STARTER | TFA GASOLINE BLENDING PUMP TFA-PN142 MOTOR STARTER 150 HP / 1730 RPM SINGLE LINE NO. 11-13915-D | A | |||
S3MS4-PN143 | MOTOR STARTER | TFA GASOLINE BLENDING PUMP TFA-PN143 MOTOR STARTER 100 HP SINGLE LINE NO. 11-13917-D | A | |||
S3MS4-PN144 | MOTOR STARTER | TFA GASOLINE BLENDING TFA-PN144 MOTOR 150 HP / 3550 RPM / 44STS FRAME PID DWG 15-1803-40 SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN145 | MOTOR STARTER | TFA GASOLINE BLENDING TFA-PN145 MOTOR STARTER 50HP / 3560 RPM / NV54 FRAME PID DWG 15-1803-40 SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN146 | MOTOR STARTER | TFA GASOLINE BLENDING TFA-PN146 MOTOR STARTER 50HP / 3560RPM / 325VP FRAME PID DWG 15-1803-40 SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN147 | MOTOR STARTER | TFA GASOLINE BLENDING TFA-PN147 MOTOR STARTER PID DWG 15-1803-45 | A |
Attachment 1 to Schedule 2.2.1
S3MS5-PN148 | MOTOR STARTER | TFA GASOLINE BOOSTER PUMP TFA-PN148 MOTOR STARTER PID DWG TFA-150HP/1180RPM/NPV586PX FRAME | A | |||
S3MS5-PN114 | MOTOR STARTER | TFA GASOLINE LOADING PUMP TFA-PN114 MOTOR STARTER PID DWG TFA-16-14305-46-46 300HP/1175RPM/500FSB FRAME | A | |||
S3MS4-MX46N | MOTOR STARTER | TFA GASOLINE TANK TFA-TK046 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-33 25HP /RPM/ FRAME EOL DWG# 11-13916-D | A | |||
S3MS4-MX53N | MOTOR STARTER | TFA GASOLINE TANK TFA-TK053 MIXER MOTOR STARTER PID DWG TFA-16-14305-41 25HP / 1775 RPM/ FRAME EOL DWG#11-13915-D | A | |||
S3MS4-MX14N | MOTOR STARTER | TFA GASOLINE TFA-TK014 TANK MIXER MOTOR STARTER PID DWG TFA-16-14305-14 25 HP / 1770RPM/284 TZ FRAME EOL DWG#11-13916-D | A | |||
S3MS5-PN1 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN001 MOTOR STARTER PID DWG TFA-16-14305-04 200HP/1760RPM/FRAME | A | |||
S3MS5-PN2 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN002 MOTOR STARTER PID DWG TFA-16-14305-04 200HP/ 1760RPM/FRAME | A | |||
S3MS5-PN4 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN004 MOTOR STARTER PID DWG TFA-16-14305-04 200HP/1760RPM/FRAME ELECTRICAL SINGLE LINE DIAGRAM NO.11-13920-D | A | |||
S3MS4-PN14 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN014 MOTOR STARTER PID DWG TFA-16-14305-54A 15HP/3490RPM/324 FRAME | A | |||
S3MS4-PN54 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN054 MOTOR STARTER PID DWG TFA-16-14305-35HP/1760RPM/NPV404PX FRAME SINGLE LINE NO. 11-13916-D | I | |||
S3MS4-PN55 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN055 MOTOR STARTER PID DWG TFA-16-14305-13 50HP /890RPM/FRAME SINGLE LINE NO. 11-13915-D | A | |||
S3MS4-PN87 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN087 MOTOR STARTER PID DWG TFA-16-14305-31 50HP/3560RPM/WPV365UP FRAME SINGLE LINE NO. 11-13915-D | A | |||
S3MS4-PN88 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN088 MOTOR STARTER PID DWG TFA-16-14305-31 50HP/3560RPM/WPV365UP FRAME SINGLE LINE NO. 11-31915-D | A | |||
S3MS4-PN127 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN127 MOTOR STARTER PID DWG TFA-16-14305-37 75HP/3560RPM/360LP FRAME SINGLE LINE NO. 11-13915-D | A | |||
S3MS4-PN130 | MOTOR STARTER | TFA GASOLINE TRANSFER PUMP TFA-PN130 MOTOR STARTER PID DWG TFA-16-14305-37 75HP/3560RPM/365LP FRAME SINGLE LINE NO. 11-31915-D | A | |||
S3MS5-PN59 | MOTOR STARTER | TFA GASOLINE(LAUREL) BOOSTER TFA-PN059 MOTOR STARTER FOR PID DWG TFA-16-14305-14 150HP/1180RPM/NPV586PV FRAME | A | |||
S3MS5-PN7 | MOTOR STARTER | TFA HARBOR PIPELINE PRODUCTS PUMP TFA-PN007 MOTOR STARTER PID DWG TFA-16-14305-07 800HP/ 3565RPM/3020SS6FRAME | A | |||
S3MS4-PN56 | MOTOR STARTER | TFA HEATING OIL TRANSFER PUMP TFA-PN052 PID DWG TFA-16-14305-37 150 HP/ 1190RPM/447LP FRAME | A | |||
S3MS4-PN52 | MOTOR STARTER | TFA HEATING OIL TRANSFER PUMP TFA-PN052 PID DWG TFA-16-14305-37 150 HP/1190RPM/447LP FRAME | A | |||
S3MS4-PN47 | MOTOR STARTER | TFA ISO BUTANE TRANSFER PUMP TFA-PN047 MOTOR STARTER PID DWG TFA-16-14305-61 20HP 3500RPM/326 FRAME SINGLE LINE # 11-13916-D | I | |||
S3MS4-PN107 | MOTOR STARTER | TFA KEROSENE TRANSFER PUMP TFA-PN107 MOTOR STARTER PID DWG TFA-16-14305-16 20HP/3520RPM/WPV256UP FRAME | A | |||
S3MS4-PN64 | MOTOR STARTER | TFA LPG LOADING PUMP TFA-PN064 MOTOR STARTER (NEW) 75HP/3600RPM/365LP-TE FRAME SINGLE LINE NO.11-13915-D | A | |||
S3MS4-PN65 | MOTOR STARTER | TFA LPG OFF TEST PUMP TFA-PN065 MOTOR STARTER PID DWG TFA-16-14305-63 15HP/3505RPM/254TD FRAME | A | |||
S3MS4-PN70 | MOTOR STARTER | TFA LPG RETURN PUMP TFA-PN070 MOTOR STARTER PID DWG TFA-16-14305-60 60HP/3555RPM/364HPZ FRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN157 | MOTOR STARTER | TFA N-14 CRUDE DEWATERING PUMP TFA-PN157 | A | |||
S3MS4-PN151 | MOTOR STARTER | TFA NAPTHA TRANSFER PUMP TFA-PN151 MOTOR PID DWG TFA-16-14305-48 20HP/3510RPM/ FRAME | A | |||
S3MS4-PN108 | MOTOR STARTER | TFA NAPTHA TRANSFER PUMP TFA-PN108 MOTOR STARTER PID DWG TFA-15-1803-19 60HP/3540RPM/ FRAME EOL DWG# 11-13919-D | A | |||
S3MS4-PN138 | MOTOR STARTER | TFA NO. 1 PUMPHOUSE SEWAGE LIFT PUMP TFA-PN 138 PID DWG TFA-2HP/RPM/FRAME | A | |||
S3MS4-PN35 | MOTOR STARTER | TFA NO.2 PUMP HOUSE PUMP TFA-PN035 MOTOR STARTER M-0282 PID DWG TFA-16-14305-54A BALDOR/3600RPM/FRAME: 114TC EOL DWG# 11-13924-D | A | |||
S3MS4-PN128 | MOTOR STARTER | TFA RESID TO FCC UNIT FROM TANK 16 PUMP TFA-PN128 MOTOR STARTER PID DWG TFA-16-14305-21 125HP/3600RPM/444LP FRAME | A | |||
S3MS4-PN43 | MOTOR STARTER | TFA S.C BOOSTER (HARBOR) PUMP TFA-PN043 MOTOR STARTER PID DWG TFA-16-14305-38 125HP/1185RPM/ NPV585PX FRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN139 | MOTOR STARTER | TFA SULFOLANE TRANSFER PUMP TFA-PN139 MOTOR STARTER 25HP/ 3555RPM/ 365S FRAME PID DWG TFA-15-1803-46 EOL DWG# 11-13922-D | A | |||
S3MS4-PN45 | MOTOR STARTER | TFA TOLUENE TRANSFER PUMP TFA-PN045 MOTOR STARTER PID DWG TFA-16-14305-62 25HP/3550RPM/365S FRAME SINGLE LINE NO.11-13915-D | A | |||
S3MS4-PN91 | MOTOR STARTER | TFA TOLUENE TRANSFER PUMP TFA-PN091 MOTOR STARTER PID DWG TFA-16-14305-48 20HP/ 3530RPM/ FRAME | A | |||
S3MS4-PN117 | MOTOR STARTER | TFA UNLEADED GASOLINE TRANSFER PUMP MOTOR STARTER FOR TFA-PN117 PID DWG TFA-16-14305-35 60HP/1775RPM/ FRAME SINGLE LINE NO. 11-13916-D | A | |||
S3MS4-PN158 | MOTOR STARTER | TFA-PN158 ETHANOL FROM TK51 TO SALES MOTOR STARTER PID DWG 15-1803-37 | A | |||
S3MS4-PN159 | MOTOR STARTER | TFA-PN159 ETHANOL FROM TK51 TO SALES MOTOR STARTER, PID DWG 15-1803-37 | A | |||
MOV-190 | MOV | MOV, TFA, MOV-190 DOC 1A BARGE/ SHIP LOADING/UNLOADING DOCK FIRE WATER PUMP MOV | A | |||
MOV-092 | MOV | MOV -092 FURNACE OIL TO HPL 16 N-600, TANKFARM EAST OF #1 PUMPHOUSE | A | |||
MOV-093 | MOV | MOV-093 KEROSENE TO HPL 16 N-345, TANKFARM EAST OF #1 PUMPHOUSE | A | |||
MOV-711 | MOV | ROTORK IQ ACTUATOR FOR THE COLONIAL PIPE-LINE | A |
Attachment 1 to Schedule 2.2.1
MOV-704 | MOV | ROTORK IQ ACTUATOR FOR THE COLONIAL PIPE-LINE TANK NUMBER 18 N-308 LINE | A | |||
MOV-148 | MOV | TFA ASPHALT TANK TFA-TK117 18 TANK GATE MOV-148 | A | |||
MOV-147 | MOV | TFA ASPHALT TANK TFA-TK117 30 TANK GATE MOV-147 | A | |||
MOV-149 | MOV | TFA ASPHALT TANK TFA-TK117 BLOCK GATE MOV-149 | A | |||
MOV-144 | MOV | TFA ASPHALT TANK TFA-TK117 P-13 DISCHARGE LINE VALUE MOV-144 | A | |||
MOV-143 | MOV | TFA ASPHALT TANK TFA-TK117 P-14 DISCHARGE LINE VALUE MOV-143 | A | |||
MOV-031 | MOV | TFA AV JET TANK TFA-TK030 16 N-309 LINE TO TANK 30-WKM MOV-031 | A | |||
MOV-064 | MOV | TFA AV JET TANK TFA-TK030 TANK GATE MOV-064 | A | |||
MOV-138 | MOV | TFA BENZENE TANK TFA-TK022 MOTOR OPERATED VALVE N-361 LINE TO DOCKS NORTH | A | |||
MOV-137 | MOV | TFA BENZENE TANK TFA-TK022 MOTOR OPERATED VALVE N-361 LINE TO DOCKS SOUTH | A | |||
MOV-026 | MOV | TFA BUTANE SPHERE TFA-TK036 16 N-312 LINE BLOCK GATE MOV-026 | A | |||
MOV-030 | MOV | TFA BUTANE SPHERE TFA-TK036 TANK 68 AND 69 BOOSTER PUMP DISCHARGE N-312 LINE MOV-030 | A | |||
MOV-710 | MOV | TFA COLONIAL PIPE LINE | A | |||
MOV-709 | MOV | TFA COLONIAL PUMP LINE MOV-709 | A | |||
MOV-113 | MOV | TFA CRUDE TANK TFA-TK010 20 CRUDE LINE BLOCK GATE TO TANKS 17-27 MOV-113 | A | |||
MOV-135 | MOV | TFA CRUDE TANK TFA-TK010 20 CRUDE LINE BLOCK VALVE N-IA MOV-135 | A | |||
MOV-116 | MOV | TFA CRUDE TANK TFA-TK010 20 CRUDE LINE TANK GATE N-1A MOV-116 | A | |||
MOV-104 | MOV | TFA CRUDE TANK TFA-TK010 20 VPS CHARGE LINE TANK GATE N-2 MOV-104 | A | |||
MOV-105 | MOV | TFA CRUDE TANK TFA-TK010 20 VPS CHARGE LINE TANK GATE N-2 MOV-105 | A | |||
MOV-107 | MOV | TFA CRUDE TANK TFA-TK010 24 CRUDE LINE BLOCK GATE TO TANKS 17-27 MOV-107 | A | |||
MOV-103 | MOV | TFA CRUDE TANK TFA-TK010 24 CRUDE LINE TANK GATE N-1 MOV-103 | A | |||
MOV-111 | MOV | TFA CRUDE TANK TFA-TK011 20 CRUDE LINE TANK GATE N-1A MOV-111 | A | |||
MOV-115 | MOV | TFA CRUDE TANK TFA-TK011 20 VPS CHARGE LINE TANK GATE N-2 MOV-115 | A | |||
MOV-109 | MOV | TFA CRUDE TANK TFA-TK011 24 CRUDE LINE TANK GATE N-1 MOV-109 | A | |||
MOV-121 | MOV | TFA CRUDE TANK TFA-TK012 20 CRUDE LINE TANK GATE N-1A MOV-121 | A | |||
MOV-125 | MOV | TFA CRUDE TANK TFA-TK012 20 VPS CHARGE LINE TANK GATE N-2 MOV-125 | A | |||
MOV-119 | MOV | TFA CRUDE TANK TFA-TK012 24 CRUDE LINE TANK GATE N-1 MOV-119 | A | |||
MOV-136 | MOV | TFA CRUDE TANK TFA-TK013 20 CRUDE LINE BLOCK VALVE N-1A MOV-136 | A | |||
MOV-128 | MOV | TFA CRUDE TANK TFA-TK013 20 CRUDE LINE TANK GATE N-1A MOV-128 | A | |||
MOV-134 | MOV | TFA CRUDE TANK TFA-TK013 20 VPS CHARGE LINE TANK GATE N-2 MOV-134 | A | |||
MOV-130 | MOV | TFA CRUDE TANK TFA-TK013 24 CRUDE LINE TANK GATE N-1 MOV-130 | A | |||
MOV-106 | MOV | TFA CRUDE TANK TFA-TK017 20 N-386 TANK GATE TANK GATE CRUDE SYSTEM MOV-106 | A | |||
MOV-112 | MOV | TFA CRUDE TANK TFA-TK027 20 N-386 TANK GATE CRUDE SYSTEM MOV-112 | A | |||
MOV-110 | MOV | TFA CRUDE TANK TFA-TK101 20 CRUDE LINE TANK GATE N-1A MOV-110 | A | |||
MOV-114 | MOV | TFA CRUDE TANK TFA-TK101 20 VPS CHARGE LINE TANK GATE N-2 MOV-114 | A | |||
MOV-108 | MOV | TFA CRUDE TANK TFA-TK101 24 CRUDE LINE TANK GATE N-1 MOV-108 | A | |||
MOV-120 | MOV | TFA CRUDE TANK TFA-TK102 20 CRUDE LINE TANK GATE N-1A MOV-120 | A | |||
MOV-124 | MOV | TFA CRUDE TANK TFA-TK102 20 VPS CHARGE LINE TANK GATE N-2 MOV-124 | A | |||
MOV-118 | MOV | TFA CRUDE TANK TFA-TK102 24 CRUDE LINE TANK GATE N-1 MOV-118 | A | |||
MOV-127 | MOV | TFA CRUDE TANK TFA-TK 104 20 CRUDE LINE TANK GATE N-1A MOV-127 | A | |||
MOV-133 | MOV | TFA CRUDE TANK TFA-TK 104 20 VSP CHARGE LINE TANK GATE N-2 MOV-133 | A | |||
MOV-129 | MOV | TFA CRUDE TANK TFA-TK 104 24 CRUDE LINE TANK GATE N-1 MOV-129 | A | |||
MOV-170 | MOV | TFA CRUDE TANK TFA-TK 105 EAST 20 CRUDE LINE TANK GATE N-1A | A | |||
MOV-171 | MOV | TFA CRUDE TANK TFA-TK 105 MIDDLE 24 CRUDE LINE TANK GATE N-1 | A | |||
MOV-172 | MOV | TFA CRUDE TANK TFA-TK 105 WEST 20 VPS CHARGE LINE TANK GATE N-2 | A | |||
MOV-001 | MOV | TFA FCCU FEED TANK TFA-TK 404 TANK TK-404 N-343 LINE VALVE MOV-001 | A | |||
MOV-614 | MOV | TFA FCCU FEED TANK TFA-TK 404 N-343 TO N-600 LINE MOV | A | |||
MOV-712 | MOV | TFA FISHER CONTROL VALVE FOR THE GASOLINE PIPE-LINE | A | |||
MOV-146 | MOV | TFA FUEL OIL TANK TFA-TK116 TANK 18 TANK GATE MOV-146 | A | |||
MOV-145 | MOV | TFA FUEL OIL TANK TFA-TK116 TANK 30 TANK GATE MOV-145 | A | |||
MOV-142 | MOV | TFA FUEL OIL TANK TFA-TK118 18 TANK GATE MOV-142 | A | |||
MOV-141 | MOV | TFA FUEL OIL TANK TFA-TK118 30 TANK GATE MOV-141 | A | |||
MOV-140 | MOV | TFA FUEL OIL TANK TFA-TK119 18 TANK GATE MOV-140 | A | |||
MOV-139 | MOV | TFA FUEL OIL TANK TFA-TK119 30 TANK GATE MOV-139 | A | |||
MOV-676 | MOV | TFA FULL RANGE NAPTHA TANK TFA-TK55 10 -CAF1508 TO/FROM TFA-TK39 | A | |||
MOV-607 | MOV | TFA FURNANCE OIL TANK TFA-TK018 MOTOR OPERATED VALVE | A | |||
MOV-610 | MOV | TFA FURNANCE OIL TANK TFA-TK018 MOTOR OPERATED VALVE | A | |||
MOV-611 | MOV | TFA FURNANCE OIL TANK TFA-TK018 MOTOR OPERATED VALVE | A | |||
MOV-612 | MOV | TFA FURNANCE OIL TANK TFA-TK018 MOTOR OPERATED VALVE | A | |||
MOV-609 | MOV | TFA FURNANCE OIL TANK TFA-TK018 MOTOR OPERATED VALVE | A | |||
MOV-067 | MOV | TFA FURNANCE OIL TANK TFA-TK018 SUCTION TO LAURAL LAURAL PIPE LINE BOOSTER PUMP FURNACE OIL MOV-067 | A | |||
MOV-073 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK 10 N-348 TO 16 N-309 MOV-073 | A | |||
MOV-155 | MOV | TFA FURNANCE OIL TANK 16 N-70 JUMP OVER TO N345 MOV-155 | A | |||
MOV-070 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK 16 N-70 TO 16 N-309 MOV-070 | A | |||
MOV-011 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK DISCHARGE FROM N-600 TO N-69 NO. 2 FURNANCE MOV-011 | A | |||
MOV-061 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK LAUREL PIPE LINE TANK GATE MOV-061 | A | |||
MOV-012 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK N-600 LINE DISCHARGE TO DOCKS MOV-012 | A | |||
MOV-007 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK N-600 LINE TO TANK 18 MOV-007 | A | |||
MOV-066 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK NO. 1 FURNANCE N-70 BLOCK GATE MOV-066 | A | |||
MOV-078 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK SUCTION TO HARBOR PIPE LINE BOOSTER KERO/AVJET MOV-078 | A | |||
MOV-074 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK SUCTION TO LAURAL PIPE LINE BOOSTER PUMP-KERO/AVJET MOV-074 | A | |||
MOV-009 | MOV | TFA FURNANCE OIL TANK TFA-TK018 TANK SUCTION TO PN-125 PUMP- EAST PUMP MOV-009 | A |
Attachment 1 to Schedule 2.2.1
MOV-010 | MOV | TFA FURNACE OIL TANK TFA-TK018 TANK SUCTION TO PN-126 PUMP = WEST PUMP MOV-010 | A | |||
MOV-608 | MOV | TFA FURNACE OIL TANK TFA-TK019 MOTOR OPERATED VALVE N-309 LINE TANK GATE MOV-059 | A | |||
MOV-059 | MOV | TFA FURNACE OIL TANK TFA-TK019 TANK N-309 LINE TANK GATE MOV-059 | A | |||
MOV-008 | MOV | TFA FURNACE OIL TANK TFA-TK019 TANK N-600 LINE TANK 19 MOV-008 | A | |||
MOV-605 | MOV | TFA FURNACE OIL TANK TFA-TK028 MOTOR OPERATED VALVE N-600 LINE TO TANK 28 | A | |||
MOV-606 | MOV | TFA FURNACE OIL TANK TFA-TK029 MOTOR OPERATED VALVE N-600 LINE TO TANK 29 | A | |||
MOV-006 | MOV | TFA FURNACE OIL TANK TFA-TK029 N-600 LINE TO TANK 29 MOV-006 | A | |||
MOV-052 | MOV | TFA FURNACE OIL TANK TFA-TK029 NO. 2 FURNACE LINE N-69 MOV-052 | A | |||
MOV-036 | MOV | TFA FURNACE OIL TANK TFA-TK044 TANK COLONIAL PIPE LINE TO N-390 LINE MOV-036 | A | |||
MOV-604 | MOV | TFA FURNACE OIL TANK TFA-TK044 TANK MOTOR OPERATED VALVE N-600 LINE TO TANK 44 | A | |||
MOV-004 | MOV | TFA FURNACE OIL TANK TFA-TK044 TANK N-600 LINE TO TANK 44 MOV-004 | A | |||
MOV-005 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK 10 N-390 LINE TO 20 N-343 MOV-005 | A | |||
MOV-014 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK 12 N-306 LINE TO 20 N-343 LINE MOV-014 | A | |||
MOV-013 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK DISCHARGE ON N-343 LINE MOV-013 | A | |||
MOV-016 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK N-343 LINE TO N-69 LINE NO. 2 FURNACE MOV-016 | A | |||
MOV-019 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK N-343 LINE TO N-70 LINE NO. 1 FURNACE MOV-019 | A | |||
MOV-602 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK N-600 BLOCK GATE MOV | A | |||
MOV-002 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK N-600 BLOCK GATE MOV-002 | ||||
MOV-603 |
MOV | TFA FURNACE OIL TANK TFA-TK064 TANK N-600 LINE TO TANK 64 MOV |
A | |||
MOV-003 | MOV | TFA FURNACE OIL TANK TFA-TK064 TANK N-600 LINE TO TANK 64 MOV-003 | A | |||
MOV-076 | MOV | TFA GASOLINE TANK TFA-TK014 N-344 LINE TANK GATE MOV-076 | A | |||
MOV-075 | MOV | TFA GASOLINE TANK TFA-TK014 SUCTION TO SALES N-384 LINE MOV-075 | A | |||
MOV-072 | MOV | TFA GASOLINE TANK TFA-TK021 16 NO.2 FIRE CHIEF LINE N-67 MOV-072 | A | |||
MOV-071 | MOV | TFA GASOLINE TANK TFA-TK021 N-344 LINE TANK GATE MOV-071 | A | |||
MOV-069 | MOV | TFA GASOLINE TANK TFA-TK021 SUCTION TO SALES N-384 LINE MOV-069 | A | |||
MOV-065 | MOV | TFA GASOLINE TANK TFA-TK031 N-344 LINE TANK GATE MOV-065 | A | |||
MOV-060 | MOV | TFA GASOLINE TANK TFA-TK031 SUCTION TO SALES N-384 LINE MOV-060 | A | |||
MOV-055 | MOV | TFA GASOLINE TANK TFA-TK047 TANK 16 N-344 LINE TANK GATE MOV-055 | A | |||
MOV-058 | MOV | TFA GASOLINE TANK TFA-TK047 16 NO.2 FIRE CHIEF N-67 MOV-058 | A | |||
MOV-156 | MOV | TFA GASOLINE TANK TFA-TK047 TANK N-204 LINE MOV-156 | A | |||
MOV-049 | MOV | TFA GASOLINE TANK TFA-TK047 TANK SUCTION TO SALES N-384 LINE MOV-049 | A | |||
MOV-038 | MOV | TFA GASOLINE TANK TFA-TK049 MOTOR OPERATED VALVE 12 N-382 LINE | A | |||
MOV-024 | MOV | TFA GASOLINE TANK TFA-TK052 TANK 16 N-344 LINE VALVE MOV-024 | A | |||
MOV-025 | MOV | TFA GASOLINE TANK TFA-TK053 TANK 16 N-344 LINE VALVE MOV-025 | A | |||
MOV-021 | MOV | TFA GASOLINE TANK TFA-TK053 TANK 16 N-64 LINE VALVE MOV-021 | A | |||
MOV-022 | MOV | TFA GASOLINE TANK TFA-TK069 TANK TK-069 16 TANK GATE N-312 LINE MOV-022 | A | |||
MOV-068 | MOV | TFA JET FUEL STORAGE TANK GATE MOV-068 TANK 20 | A | |||
MOV-175 | MOV | TFA JP-4 STORAGE TANK TFA-TK120 20 N-555 TANK GATE | A | |||
MOV-177 | MOV | TFA JP-4 STORAGE TANK TFA-TK121 14 N-557 DISCHARGE TO DOCKS FROM PN-116 | A | |||
MOV-176 | MOV | TFA JP-4 STORAGE TANK TFA-TK121 20 N-555 TANK GATE | A | |||
MOV-034 | MOV | TFA LOW SULFUR DIESEL TANK TFA-TK048 TANK 12 N-382 LINE VALVE MOV-034 | A | |||
MOV-153 | MOV | TFA LOW SULFUR DIESEL TANK TFA-TK048 TANK 16 N-64 BLOCK GATE TO TANKS 52 AND 53 MOV-153 | A | |||
MOV-151 | MOV | TFA LOW SULFUR DIESEL TANK TFA-TK048 TANK 16 N-64 TO N-382 LINE FROM TANKS 52 AND 53 MOV-151 | A | |||
MOV-102 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA LAUREL PIPE LINE PUMP DISCHARGE LINE VALVE WEST OF NO. 1 PUMP HOUSE MOV-102 | A | |||
MOV-100 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE LAUREL PIPE LINE GAS SUCTION LINE VALVE WEST OF NO. 1 PUMP HOUSE MOV-100 | A | |||
MOV-094 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 10 N-348 LINE KEROSENE EAST OF NO. 1 PUMP HOUSE MOV-094 | A | |||
MOV-096 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 10 N-63 LINE UNBLENDED TO LAUREL PIPE LINE EAST OF NO. 1 PUMP HOUSE MOV-096 | A | |||
MOV-097 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 16 N-344 LINE TO LAUREL PIPE LINE EAST OF NO. 1 PUMP HOUSE TFA-PIPE | A | |||
MOV-099 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 16 N-345 LINE FURNACE OIL TO LAUREL PIPE LINE EAST OF NO. 1 PUMP HOUSE MOV-099 | A | |||
MOV-098 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 16 N-64 LINE TO LAUREL PIPE LINE EAST OF NO. 1 PUMP HOUSE MOV-098 | A | |||
MOV-084 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 16 N-65 L/F GASOLINE WORM TYPE MOV | A | |||
MOV-095 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 16 N-65 LINE TO LAUREL PIPE LINE EAST OF NO. 1 PUMP HOUSE MOV-095 | A | |||
MOV-080 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 16 N-65 TO HARBOR PIPE LINE WORM TYPE EAST OF NO. 1 PUMP HOUSE MOV-080 | A | |||
MOV-082 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE FURNACE AND DIESEL HEADER TO HARBOR PIPE LINE EAST OF NO. 1 PUMP HOUSE MOV-082 | A | |||
MOV-101 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE LAUREL PIPE LINE DISTILLATE SUCTION LINE VALVE WEST OF NO. 1 PUMP HOUSE MOV-101 | A | |||
MOV-083 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE LEAD FREE TO HARBOR PIPE LINE EAST OF NO. 1 PUMP HOUSE MOV-083 | A | |||
MOV- 079 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE LEAD FREE TO HARBOR PIPE LINE EAST OF NO. 1 PUMP HOUSE MOV-079 | A |
Attachment 1 to Schedule 2.2.1
MOV-085 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE LEAD FREE TO HARBOR PIPE LINE WORM TYPE EAST OF NO.1 PUMP HOUSE MOV-085 | A | |||
MOV-077 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE NO.1 FURNACE LINE N-70 ON PN-6 | A | |||
MOV-081 | MOV | TFA MISCELLANEOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE NO.1 FURNACE N-70 LINE TO HARBOR PIPE LINE EAST OF NO.1 PUMP HOUSE MOV-081 | A | |||
MOV-503 | MOV | TFA MISCELLANIOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 20 CRUDE BLOCK(D) | A | |||
MOV-501 | MOV | TFA MISCELLANIOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 20 CRUDE DISCHARGE(B) | A | |||
MOV-502 | MOV | TFA MISCELLANIOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 24 CRUDE BLOCK(C) | A | |||
MOV-500 | MOV | TFA MISCELLANIOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE 24 CRUDE DISCHARGE(A) | A | |||
MOV-504 | MOV | TFA MISCELLANIOUS PIPING WITHIN THE TANK FARM AREA TFA-PIPE SUCTION TO FLUSHING PUMP ON PLATFORM(E) | A | |||
MOV-505 | MOV | TFA MISCELLANIOUS PIPING WIHIN THE TANK FARM AREA TFA-PIPE SUCTION TO FLUSHING PUMP ON PLATFORM(F) | A | |||
MOV-N309 | MOV | TFA MOV-N309 | A | |||
MOV-023 | MOV | TFA MTBE TANK TFA-TK068 TANK 16 TANK GATE N-312 LINE MOV-023 | A | |||
MOV-090 | MOV | TFA N344 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOV-090 | A | |||
MOV-089 | MOV | TFA N64 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOV-089 | A | |||
MOV-088 | MOV | TFA N66 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOV-088 | A | |||
MOV-091 | MOV | TFA N66 LINE TO HARBOR PIPELINE MOTORIZED VALVE MOV-091 | A | |||
MOV-086 | MOV | TFA N66 LINE TO LAUREL PIPELINE MOTORIZED VALVE MOV-086 | A | |||
MOV-087 | MOV | TFA N67 LINE SUCTION TO COLONIAL PIPELINE MOTORIZED VALVE MOV-087 | A | |||
MOV-403 | MOV | TFA NAPHTHA TANK TFA-TK403 N-343 TANK GATE LINE | A | |||
MOV-613 | MOV | TFA NAPHTHA TANK TFA-TK403 N-343 TO N-600 LINE MOV | A | |||
MOV-044 | MOV | TFA TOLUENE TANK TFA-TK050 TANK TK-050 12 N-382 LINE VALVE MOV-044 | A | |||
MOV-152 | MOV | TFA TOLUENE TANK TFA-TK050 TANK TK-050 16 N-64 LINE VALVE MOV-152 | A | |||
MOV-154 | MOV | TFA TOLUENE TANK TFA-TK050 TANK TK-050 N-64 LINE TO N-204 LINE MOV-154 | A | |||
S3P4-4 | PANEL | 200A 480V 2 POLE POWER CKT PANEL | A | |||
S3P4-001 | PANEL | 480 VAC POWER PANEL AT RACK WEST OF TK 5 | A | |||
S2P3-1 | PANEL | 50A 120/208V PANEL FOR DOCK 3 | A | |||
S2P3-3 | PANEL | 50A 120/208V PANEL FOR DOCK 3 | A | |||
S2P3-2 | PANEL | 50A 120/208V PANEL FOR DOCK 3 | A | |||
S3P3-IP2 | PANEL | INSTRUMENT POWER PANEL 120/240 VAC 12 POLE, N-14 POWER SWITCH RACK W, OF TK 118 | A | |||
S3P3-IP1 | PANEL | INSTRUMENT POWER PANEL 120/240 VAC 12 POLE, RACK WEST OF TK 5 | A | |||
S3P3-LP8 | PANEL | LIGHTING PANEL 120/240 VAC 10 CKT, AT TK 001 SWITCH RACK | A | |||
S3P3-LP7 | PANEL | LIGHTING PANEL 120/240 VAC 10 CKT, AT TK 116/117 SWITCH RACK | A | |||
S3P3-LP4 | PANEL | LIGHTING PANEL 120/240 VAC 10 POLE, AT TK 118 SWITCH RACK | A | |||
S3P3-LP5 | PANEL | LIGHTING PANEL 120/240 VAC 12 POLE, ATN-14 POWER SWITCH RACK W, OF TK 118 | A | |||
S3P3-LP3 | PANEL | LIGHTING PANEL 120/240 VAC 12 POLE, RACK WEST OF TK 5 | A | |||
S3P3-LP6 | PANEL | LIGHTING PANEL 120/240 VAC 24 POLE, AT PUMPHOUSE #1 BREAK ROOM | A | |||
S3P3-LP2 | PANEL | LIGHTING PANEL FOR 2 DOCK | A | |||
S3P3-LP1 | PANEL | LIGHTING PANEL FOR TRAILER WEST OF #1 PUMPHOUSE | A | |||
S3P3-213 | PANEL | POWER PANEL 120/240 VAC 20 POLE, PROPANE BULLETS FIRE PROTECTION PANEL | A | |||
PIP-11182 | PIPING | EAGLE POINT TO WOODBURY STATION (DISTILLATES/GASOLINE) P&ID DWG #:01068-C **DOT**(16 PIPE/40 MILES LENGTH/150F MAX TEMP LIMIT/250PSI OPERATING/346PSIG MAX OPERATING) | A | |||
ECRA-PIPE | PIPING | ECRA MISCELLANIOUS PIPING WITHIN THE TANK FARM AREA ECRA-PIPE | A | |||
TFA-PIPE | PIPING | PIPING TFA PROJECT TRACKING | A | |||
PIP-11183 | PIPING | TRANSCO M&R STATION TO EAGLE POINT PIPELINE (NATURAL GAS TO EP) P&ID DWG#9-5277-D **DOT** (8PIPE/4.01 MILES LENGTH/150F MAX TEMP LIMIT/200PSIG OPERATING/250PSIG MAX OPERATING) | A | |||
TFA-PTMAS | PRESS LOOP | BLEND HEADER MASTER PRESSURE TRANSMITTER | A | |||
TFA-PTPH2 | PRES LOOP | PUMP HOUSE 2 PRESSURE TRANSMITTER BUTANE | A | |||
TFA-PT029 | PRESS LOOP | TANK 29 PRESSURE TRANSMITTER | A | |||
TFA-PT040 | PRESS LOOP | TANK 40 PRESSURE TRANSMITTER | A | |||
TFA-PT045 | PRESS LOOP | TANK 45 PRESSURE TRANSMITTER | A | |||
TFA-P312 | PRESS LOOP | TANK 51 ETHANOL PUMP PN 158/159 DISCHARGE PRESSURE TO SALES LOOP INCLUDES, PT-312, PV-312, PC-312 | A | |||
TFA- P313 | PRESS LOOP | TANK 51 FILL LINE HIGH PRESSURE LOOP INCLUDES: PSH-313, PAH-313 | A | |||
TFA-PT065 | PRESS LOOP | TANK 65 PRESSURE TRANSMITTER | A | |||
TFA-PT066 | PRESS LOOP | TANK 66 PRESSURE TRANSMITTER | A | |||
TFA-PT068 | PRESS LOOP | TANK 68 PRESSURE TRANSMITTER | A |
Attachment 1 to Schedule 2.2.1
TFA-PT070 | PRESS LOOP | TANK 70 PRESSURE TRANSMITTER | A | |||
TFA-PT710 | PRESS LOOP | TFA PRESSURE TRANSMITTER, (COLONIAL PIPELINE NOT ON PID) PT,PI (AREA EAST OF COLONIAL PIPELINE BUILDING) | A | |||
TFA-PT149 | PRESS LOOP | TFA PRESSURE TRANSMITTER, (COLONIAL PIPELINE NOT ON PID) PT,PI (AREA EAST OF NO. 1 PUMPHOUSE, IN FIELD) | A | |||
TFA-PAL355 | PRESS LOOP | TFA-PAL355 PROPANE TANKS SHUTDOWN ISOLATION VALVES LOW SUPPLY PRESSURE, LOOP INCLUDES: PSL, PAL, (A LOCAL), PAL. DWG. NO. PID-15-1002-65 | A | |||
TFA-PDI325 | PRESS LOOP | TFA-PDI325 CLAY FILTER 1168 DIFFERENTIAL PRESSURE, LOOP INCLUDES: PDI. DWG. NO. PID-15-1002-16.0 | A | |||
TFA-PDI326 | PRESS LOOP | TFA-PDI326 CLAY FILTER 1167 DIFFERENTIAL PRESSURE, LOOP INCLUDES: PDI. DWG. NO. PID-15-1002-16.0 | A | |||
TFA-PI320 | PRESS LOOP | TFA-PI320 FIRE WATER HEADER PRESSURE, LOOP INCLUDES: PT, PI. DWG NO. PID-15-3103-74 | A | |||
P-3110 | PUMP | P-3110 GASOLINE RERUN PUMP FOR LSG OSBL P-006-01A | I | |||
P-3111 | PUMP | P-3111 RERUN TANK PUMP LSG OSBL P-006-01B | I | |||
P-3112 | PUMP | P-3112 THERMAL ETHANOL PROJECT | I | |||
P-3113 | PUMP | P-3113 THERMAL ETHANOL PROJECT | I | |||
P-3132 | PUMP | P-3132 WEST ETHANOL INJ. PUMP TFA-PNI58 TK-51 PID DWG 15-1803-37 | A | |||
P-3133 | PUMP | P-3133 EAST ETHANOL INJ. PUMP TFA-PN159 TK-51 PID DWG 15-1803-37 | A | |||
P-2979 | PUMP | TFA OIL CIRCULATION PUMP FOR P-2980 PID DWG 15-1026-55 | A | |||
P-0430 | PUMP | TFA #2 FUEL OIL TRANSFER PUMP TFA-PN011 P-0430 PID DWG TFA-16-14305-07 (OUT OF SERVICE 10/2008) | I | |||
P-1206 | PUMP | TFA AVIATION FUEL BLENDING TFA-PN040 P-1206 PID DWG TFA-16-14305-58 | I | |||
P-1214 | PUMP | TFA AVIATION FUEL BLENDING TFA-PN042 P-1214 PID DWG TFA-16-14305-58 | I | |||
P-0432 | PUMP | TFA AVIATION GASOLINE TFA-PN081 PID DWG TFA-16-14305-39 | I | |||
P-0449 | PUMP | TFA AVJET LOADING PUMP TFA-PN097 P-0449 (OUT OF SERVICE) | I | |||
P-0421 | PUMP | TFA AVJET TRANSFER PUMP TFA-PN003 P-0421 PID DWG TFA-16-14305-04 | A | |||
P-0350 | PUMP | TFA AVJET TRANSFER PUMP TFA-PN049 P-0350 PID DWG TFA-16-14305-26 VOC TAG NO. 15892 | A | |||
P-0450 | PUMP | TFA AVJET TRANSFER PUMP TFA-PN098 P-0450 PID DWG TFA-16-14305-16 VOC TAG NO. 15031 (THIS PUMP TRAVELS BUT IS IN SERVICE - 08/07) | I | |||
P-0437 | PUMP | TFA B.S.W. TRANSFER PUMP TFA-PN017 P-0437 PID DWG TFA-16-14305-13 | I | |||
P-1268 | PUMP | TFA BENZENE LOADING PUMP TFA-PN069 P-1268 PID DWG TFA-16-14305-51 | A | |||
P-2978 | PUMP | TFA BENZENE TRANSFER PUMP FROM TANK 22 TFA-PN045B PID NO. 15-1803-24 | A | |||
P-1292 | PUMP | TFA BENZENE TRANSFER PUMP PN106 P-1292 PID DWG TFA-16-14305-48 VOC TAG NO. 06033 | A | |||
P-2038 | PUMP | TFA BUNKER PUMP TFA-PN124 P-2038 PID DWG TFA-16-14305-49 | A | |||
P-1329 | PUMP | TFA BUTANE GAS BLENDING INJECTION PUMP TFA-PN012B P-1329 | A | |||
P-2980 | PUMP | TFA BUTANE TRANSFER PUMP P-2980 TFA-PN012A PID DWG 15-1026-55 | A | |||
P-0431 | PUMP | TFA BUTANE TRANSFER PUMP TFA-PN012 P-0431 PID DWG TFA-16-14305-55 | A | |||
P-2765 | PUMP | TFA BUTANE UNLOADING PUMP TFA-PN136 P-2765 PID DWG TFA-16-14305-68 | A | |||
P-2766 | PUMP | TFA BUTANE VAPOR PUMP TFA-PN137 P-2766 PID DWG TFA-16-14305-68 NO PM REQUIRED AS OF 1-06 | A | |||
P-2312 | PUMP | TFA CHEMICAL INJECTION PUMP TFA-PN133 P-2312 PID DWG TFA-16-14305-09 | A | |||
P-2910 | PUMP | TFA COLONIAL PIPELINE BOOSTER PUMP TFA-PN149 P-2910 ***** SEE NOTE ON PAGE 6 ***** | A | |||
P-2929 | PUMP | TFA COLONIAL PIPELINE FLUSHING PUMP TFA-PN150 P-2929 NEW PROJECT | A | |||
P-2145 | PUMP | TFA CRUDE BLENDING PUMP TFA-PN155 AT TANK #10 P-2145 | I | |||
P-1234 | PUMP | TFA CRUDE BOOSTER PUMP TFA-PN053 P-1234 PID DWG TFA-16-14305-03 | A | |||
P-1891 | PUMP | TFA CRUDE BOOSTER PUMP TFA-PN118 P-1891 PID DWG TFA-16-14305-14 | I | |||
P-1235 | PUMP | TFA CRUDE FLUSHING PUMP TFA-PN051 P-1235 PID DWG TFA-16-14305-03 VOC TAG NO. D14306 | A | |||
P-1275 | PUMP | TFA CRUDE INJECTION PUMP TFA-PN086 P-1275 PID DWG TFA-16-14305-11 VOC TAG NO. 14862 | A | |||
P-2157 | PUMP | TFA CRUDE INJECTION PUMP TFA-PN093 P-2157 PID DWG TFA-16-14305-01 VOC TAG NO. 14736 | A | |||
P-1863 | PUMP | TFA CRUDE INJECTION PUMP TFA-PN132 P-l863 PID DWG TFA-16-14305-01 VOC TAG NO. 14729 | A | |||
P-1267 | PUMP | TFA CUMENE LOADING PUMP TFA-PN068 P-1267 PID DWG TFA-16-14305-48 (REMOVED FROM SERVICE 1/98)(SEE W.O.98-00123-00) | A | |||
P-0218 | PUMP | TFA CUMENE LOADING PUMP TFA-PN092 P-0218 PID DWG TFA-16-14305-48 | I | |||
P-0423 | PUMP | TFA DIESEL OIL TRANSFER PUMP TFA-PN005 P-0423 PID DWG TFA-16-14305-05 | A | |||
P-0436 | PUMP | TFA DIESEL OIL TRANSFER PUMP TFA-PN016 P-0436 PID DWG TFA-16-14305-54A | I | |||
P-1273 | PUMP | TFA DIESEL TO SALES LOADING PUMP TFA-PN079 P-1273 PID DWG TFA-16-14305-18 VOC TAG NO. 15444 | A | |||
P-1274 | PUMP | TFA DIESEL TO SALES LOADING PUMP TFA-PN080 P-1274 PID DWG TFA-16-14305-18 VOC TAG NO. 15453 | A | |||
P-1892 | PUMP | TFA FLUSHING PUMP TFA-PN119 P-l892 PID DWG TFA-16-l4305-01 VOC TAG NO. 14755 | A | |||
P-1693 | PUMP | TFA FUEL BLENDING PUMP TFA-PN018 P-1693 PID DWG TFA-16-14305-56 | A | |||
P-0439 | PUMP | TFA FUEL BLENDING PUMP TFA-PN019 P-0439 PID DWG TFA-16-14305-56 | A | |||
P-1744 | PUMP | TFA FUEL OIL TO DOCK LOADING PUMP TFA-PN113 P-l744 PID DWG TFA-16-14305-50 | A | |||
P-1745 | PUMP | TFA FUEL OIL TO DOCKS TRANSFER PUMP TFA-PN113A P-1745 PID DWG TFA-16-14305-50 | A | |||
P-0426 | PUMP | TFA FUEL OIL TRANSFER PUMP TFA-PN008 P-0426 PID DWG TFA-16-14305-06 | A | |||
P-0427 | PUMP | TFA FUEL OIL TRANSFER PUMP TFA-PN008A PUMP P-0427 PID DWG TFA-16-14305-06 VOC TAG NO. 14456 | A | |||
P-1233 | PUMP | TFA FURNACE OIL BOOSTER PUMP TFA-PN050 P-1233 PID DWG TFA-16-14305-17 VOC TAG NO. 15165 | A | |||
P-1251 | PUMP | TFA FURNACE OIL BOOSTER PUMP TFA-PN057 P-1251 PID DWG TFA-16-14305-17 VOC TAG NO. 15206 | A |
Attachment 1 to Schedule 2.2.1
P-1296 | PUMP | TFA FURNACE OIL PUMP TFA-PN096 P-1296 (OUT OF SERVICE) | I | |||
P-2071 | PUMP | TFA FURNACE OIL TRANSFER PUMP (COLONIAL) TFA-PN125 P-2078 PID DWG TFA-16-14305-17 | A | |||
P-2079 | PUMP | TFA FURNACE OIL TRANSFER PUMP (COLONIAL) TFA-PN126 P-2079 PID DWG TFA-16-14305-17 | A | |||
P-0424 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN006 P-0424 PID DWG TFA-16-14305-05 | A | |||
P-1278 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN089 P-1278 PID DWG TFA-16-14305-34 | A | |||
P-1279 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN090 P-1279 PID DWG TFA-16-14305-34 | A | |||
P-1428 | PUMP | TFA FURNACE OIL TRANSFER PUMP TFA-PN104 P-1428 PID DWG TFA-16-14305-23 VOC TAG NO. 15299 | A | |||
P-1254 | PUMP | TFA GASOLINE AND FURNACE OIL (LAUREL) TRANSFER PUMP TFA-PN060 P-1254 PID DWG TFA-16-14305-08 | A | |||
P-2948 | PUMP | TFA GASOLINE BLEND HEADER SAMPLE RECOVERY PUMP P-2948 TFA-PN153 AT TANK NO. 31 PID DWG NO. PM REQUIRED AS OF 1-06 | A | |||
P-2887 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN044 VOC TAG NO. 15349 | A | |||
P-2632 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN105 P-2632 PID DWG TFA-15-1026-55 VOC TAG NO. 16657 | A | |||
P-2888 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN142 P-2888 VOC TAG NO. 15860 | A | |||
P-2889 | PUMP | TFA GASOLINE BLENDING PUMP TFA-PN143 VOC TAG NO. 15523 | A | |||
P-2890 | PUMP | TFA GASOLINE BLENDING TFA-PN144 PID DWG 15-1803-40 | I | |||
P-2891 | PUMP | TFA GASOLINE BLENDING TFA-PN145 PID DWG 15-1803-40 | A | |||
P-2892 | PUMP | TFA GASOLINE BLENDING TFA-PN146 PID DWG 15-1803-40 | A | |||
P-2893 | PUMP | TFA GASOLINE BLENDING TFA-PN147 PID DWG 15-1803-45 VOC TAG NO. 17009 | A | |||
P-1252 | PUMP | TFA GASOLINE BOOSTER PUMP TFA-PN148 P-1252 PID DWG TFA VOC TAG NO. 16988 | A | |||
P-1867 | PUMP | TFA GASOLINE LOADING PUMP TFA-PN114 P-1867 PID DWG TFA-16-14305-46 | A | |||
P-0419 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN001 P-0419 PID DWG TFA-16-14305-04 | A | |||
P-0420 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN002 P-0420 PID DWG TFA-16-14305-04 | A | |||
P-0422 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN004 P-0422 PID DWG TFA-16-14305-04 | A | |||
P-0433 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN013 PUMP P-0433 PID DWG TFA-16-14305-55 | I | |||
P-0434 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN014 P-0434 PID DWG TFA-16-14305-54A | I | |||
P-1245 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN054 P-1245 PID DWG TFA-16-14305-35 VOC TAG NO. 06267 | A | |||
P-1249 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN055 P-1249 PID DWG TFA-16-14305-13 VOC TAG NO. 15293 | A | |||
P-1277 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN087 P-1277 PID DWG TFA-16-14305-31 | A | |||
P-1272 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN088 P-1272 PID DWG TFA-16-14305-26 VOC TAG NO. 15881 | A | |||
P-2630 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN127 P-2630 PID DWG TFA-16-14305-37 | A | |||
P-2631 | PUMP | TFA GASOLINE TRANSFER PUMP TFA-PN130 P-2631 PID DWG TFA-16-14305-37 | A | |||
P-1253 | PUMP | TFA GASOLINE(LAUREL)BOOSTER PUMP TFA-PN059 P-1253 PID DWG TEA-16-14305-14 VOC TAG NO. 14968 | A | |||
P-2539 | PUMP | TFA HARBOR PIPELINE PRODUCTS PUMP TFA-PN007 P-2539 PID DWG TFA-16-14305-07 | A | |||
P-2602 | PUMP | TFA HEATING OIL TRANSFER PUMP TFA-PN052 P-2602 PID DWG TFA-16-14305-37 VOC TAG NO. 15930 | A | |||
P-1264 | PUMP | TFA INHIBITOR INJECTION PUMP TFA-PN129 P-1264 PID DWG TFA-16-14305-09 | A | |||
P-1265 | PUMP | TFA INHIBITOR UNLOADING PUMP TFA-PN066 P-1265 PID DWG TFA-16-14305-58 | I | |||
P-1208 | PUMP | TFA ISO BUTANE TRANSFER PUMP TFA-PN047 P-1208 PID DWG TFA-16-14305-61 VOC TAG NO. 16414 | A | |||
P-1276 | PUMP | TFA KEROSENE TRANSFER PUMP TFA-PN078 P-1276 PID DWG TFA-16-14305-31 | A | |||
P-1935 | PUMP | TFA LPG LOADING PUMP TFA-PN064 P-1935 PID DWG TFA-16-14305-63 | A | |||
P-2852 | PUMP | TFA LPG LOADING PUMP TFA-PN064 P-2852 (NEW) PID DWG 15-1026-63 (IN STORAGE SPARE - 5/08) | I | |||
P-2223 | PUMP | TFA LPG OFF TEST PUMP TFA-PN065 P-2223 PID DWG TFA-16-14305-63 | A | |||
P-2036 | PUMP | TFA LPG RETURN PUMP TFA-PN070 P-2036 PID DWG TFA-16-14305-60 | A | |||
P-3034 | PUMP | TFA N-14 CRUDE DEWATERING LINE BOOSTER PUMP TFA-PN157 (NEW INSTALLATION 07/2008) | A | |||
P-1651 | PUMP | TFA NAPHTHA TRANSFER PUMP TFA-PN151 P-1651 PID DWG TFA-16-14305-48 VOC TAG NO. 15826 | I | |||
P-1429 | PUMP | TFA NAPTHA TRANSFER PUMP TFA-PN108 P-1429 PID DWG TFA-15-1803-19 VOC TAG NO. 15320 | I | |||
P-3233 | PUMP | TFA NO. 1 PUMFHOUSE SEWAGE LIFT PUMP TFA-PN138 P-2817 PID DWG TFA- OPERATIONS PM | A | |||
P-2817 | PUMP | TFA NO. 1 PUMPHOUSE SEWAGE LIFT PUMP TFA-PN138 P-2817 PID DWG TFA- OPERATIONS PM | I | |||
P-0781 | PUMP | TFA NO.2 PUMP HOUSE PUMP TFA-PN035 PUMP P-0781 PID DWG TFA-16-14305-54A | A | |||
P-2864 | PUMP | TFA RAIN WATER DRAW OFF PUMP TFA-PN141 P-2864 | A | |||
P-2540 | PUMP | TFA RESID TO FCC UNIT FROM TANK 16 PUMP TFA-PN128 P-2540 PID DWG TFA-16-14305-21 | A | |||
P-0799 | PUMP | TFA S.C. BOOSTER (HARBOR) PUMP TFA-PN043 P-0799 PID DWG TFA-16-14305-38 | A | |||
P-2764 | PUMP | TFA SALES KERO FUEL PUMP TFA-PN152 P-2764 PID DWG TFA- | A | |||
P-0435 | PUMP | TFA SULFOLANE TRANSFER PUMP TFA-PN139 P-0435 PID DWG TFA-15-1803-46 | A | |||
P-0453 | PUMP | TFA SUMP PUMP TFA-PN033 P-0453 PID DWG TFA-16-14305-54A | A | |||
P-1219 | PUMP | TFA TANK TEST PUMP TFA-PN048 P-1219 NOT ON PID - PORTABLE PUMP | A | |||
P-1280 | PUMP | TFA TOLUENE TRANSFER PUMP TFA-PN091 P-1280 PID DWG TFA-16-14305-48 VOC TAG NO. 06154 | A | |||
P-3021 | PUMP | TFA TOLUENE GAS BLENDING PUMP P-3021 TFA-PN156 AT TANK N0.31 PID DWG | A | |||
P-1250 | PUMP | TFA TOLUENE TRANFER PUMP TFA-PN056 P-1250 PID DWG TFA-16-14305-37 | A | |||
P-1431 | PUMP | TFA TOLUENE TRANSFER PUMP TFA-PN045 P-1431 PID DWG TFA-16-14305-62 | I | |||
P-2032 | PUMP | TFA TOLUENE TRANSFER PUMP TFA-PN045A P-2032 PID DWG TFA-16-14305-62 OPERATIONS PM | I |
Attachment 1 to Schedule 2.2.1
P-0428 | PUMP | TFA TRANSFER BOOSTER PUMP TFA-PN009, PUMP P-0428 PID DWG TFA-16-14305-23 | A | |||
P-2267 | PUMP | TFA TRAVELLING MUD PUMP NOT ON PID | A | |||
P-1494 | PUMP | TFA TRUCK SCALE SUMP PUMP TFA-PN063 P-1494 NOT ON PID NO PM REQUIRED AS OF 1-06 | I | |||
P-1256 | PUMP | TFA WASTE OIL PUMP TFA-PN062 P-l256 (OUT OF SERVICE) NOT ON PID | I | |||
P-1426 | PUMP | TFA XYLENE TRANSFER PUMP TFA-PN103 P-1426 PID DWG TFA-16-14305-22 VOC TAG NO. 06154 | A | |||
P-1888 | PUMP | TFA XYLENETRANSFER PUMP TFA-PN117 P-1888 PID DWG TFA-16-14305-35 VOC TAG NO. 06291 | I | |||
RV-250272 | RELIEF VALVE | RV-250272 TFA STEAM STATION ( E-20 FRACT ) RELIEF VALVE ( 4x6 - SET@150PSI ) PID DWG ICP-16-14514-33 | A | |||
RV-250493 | RELIEF VALVE | RV-250493 RELIEF VALVE TFA #2 PUMP HOUSE BUTANE TRUCK LOADING. (3/4 x 1 / SET @ 350PSI) | A | |||
RV-250494 | RELIEF VALVE | RV-250494 RELIEF VALVE FOR BUTANE TRUCK LOADING #2 PUMP HOUSE TFA (3/4 X 1 / SET @ 350PSI) | A | |||
RV-250495 | RELIEF VALVE | RV-250495 THERMAL RELIEF VALVE FOR GASOLINE COMPONENT RECEIVING LINE | I | |||
RV-250496 | RELIEF VALVE | RV-250496 THERMAL RELIEF FOR GASOLINE COMPONENT RECEIVING LINE | I | |||
RV-250498 | RELIEF VALVE | RV-250498 PSV OFF LINE 8 INCH CAA-3340-NI. (3/4 x 1 /SET@150PSI) | A | |||
RV-250510 | RELIEF VALVE | TFA 0-114-24 FUEL OIL LINE TO TANK 118 RV-250510 (1x 1 / 150PSI) | A | |||
RV-250149 | RELIEF VALVE | TFA 10N403 LINE (NAPHTHA) AT TANK 22 RELIEF VALVE (l x 1- SET@ 150PSI) PID DWG TFA-I6-14305-24 | I | |||
RV-250150 | RELIEF VALVE | TFA 14-N361 LINE (BENZENE) AT TANK 22 RELIEF VALVE (1 x 1 - SET@ 150PSI) PID DWG TFA-I6-I4305-24 | A | |||
RV-250279 | RELIEF VALVE | TFA 18 FURNACE OIL LINE AT TANK 403 RELIEF VALVE (3/4 X 1- SET@ 70 PSI) PID DWG TFA-I6-14305-44 | A | |||
RV-250285 | RELIEF VALVE | TFA 24N600 LINE PUMP TFA-PN125 & PN126 (FURNACE OIL) RELIEF VALVE RV-250285 (3/4 x 1 - SET @ 150PSI) PID DWG TFA-16- 14305-17 | A | |||
RV-250286 | RELIEF VALVE | TFA 24-N6002 LINE (FURNACE OIL) TIE-IN AT TANK 44 (1 x 1 - SET @ 70PSI) PID DWG TFA-16-14305-29 | A | |||
RV-250164 | RELIEF VALVE | TFA 30 LINE F/C WEST OF PUMP AT TANK 117 ON WALKWAY NORTHWEST SIDE OF PLATFORM RELIEF VALVE PID DWG TFA-16- 14305-50 (3/4 x 1- SET @165PSI) | A | |||
RV-250509 | RELIEF VALVE | TFA BENZENE LINE (O-N364-6-J15C) TO TANK #22 TFA-TK022 P&ID DWG 15-24 (1 x 1/ I50PSI) | I | |||
RV-250118 | RELIEF VALVE | TFA BENZENE LINE NEAR TANK 113 RELIEF VALVE (3/4 x 1 - SET @ 25 PSI) PID DWG TFA-16-14305-47 | A | |||
RV-250173 | RELIEF VALVE | TFA BENZENE PUMP TFA-PN069 DISCHARGE RELIEF VALVE (3/4 x 1- SET@ I35PSI)PID DWG TFA-16-14305-51 | A | |||
RV-250312 | RELIEF VALVE | TFA BENZENE TANK TFA-TK112 N420 LINE RELIEF VALVE (3/4 x 1 - SET@115PSI) PlD DWG TFA-l6-14305-47 (OPERATIONS) | A | |||
RV-250252 | RELIEF VALVE | TFA BUNKER PUMP TFA-PN124 RELIEF VALVE RV-250252 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-49 | A | |||
RV-250253 | RELIEF VALVE | TFA BUNKER PUMP TFA-PN124 RELIEF VALVE RV-250253 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-49 | A | |||
RV-250424 | RELIEF VALVE | TFA BUTANE LOADING LINE TO DOCK NO.IA RELIEF VALVE PID DWG TFA- (3/4 x 1 - SET @ 25 PSI) PER COASTGUARD REG.33CFR127 | A | |||
RV-250420 | RELIEF VALVE | TFA BUTANE LOADING LINE TO DOCK NO. 1A RELIEF VALVE PID DWG TFA- 15-1803- 14 (3/4 x 1- SET@ 25 PSI) PER COASTGUARD REG.33CFR127 MAX. CYCLE | I | |||
RV-250418 | RELIEF VALVE | TFA BUTANE LOADING LINE TO DOCK NO.IA RELIEF VALVE RV-250418 PID DWG TFA-15-1803-14 (3/4 x 1 - SET @ 25 PSI) PER COASTGUARD REG. 33CFR127 | A | |||
RV-250014 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK035 RELIEF VALVE (4 x 6 - SET @ 75 PSI) PID DWG TFA-16-14305-60 | A | |||
RV-250306 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK035 RELIEF VALVE (4 x 6/ SET @ 75 PSI) PID DWG TFA-16-14305-60 | A | |||
RV-250020 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK035 RELIEF VALVE PID DWG TFA-16-14305-60 (6 x 8 - SET @ 0.1 VAC.) | A | |||
RV-250022 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK035 RELIEF VALVE PID DWG TFA-16-14305-60 (6 x 8 SET @ 0.1 VAC.) | A | |||
RV-250021 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK036 RELIEF VALVE RV-250021 (6 x 8 - SET @ 0.1 VAC.) PID DWG TFA-16-14305-61 | A | |||
RV-250023 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK036 RELIEF VALVE RV-250023 (6 X 8 - SET @ 0.1 VAC ) PID DWG TFA-16-14305-61 | A | |||
RV-250304 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK036 RELIEF VALVE RV-250304 (4 x 6 - SET @ 75 PSI) PID DWG TFA-16-14305-61 | A | |||
RV-250363 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK036 RELIEF VALVE RV-250363 (4 x 6 - SET @ 75PSI) PID DWG TFA-16- 14305-61 | A | |||
RV-250024 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK037 RELIEF VALVE RV-250024 (6 x 8 - SET @ 0.1 VAC.) PID DWG TFA-16-14305 -61 | A | |||
RV-250025 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK037 RELIEF VALVE RV-250025 PID DWG TFA-16-14305-61 (6 x 8 - SET @ 0. 1 VAC.) | A | |||
RV-250447 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK037 RELIEF VALVE RV-250447 (4 x 6 - SET @ 75 PSI) PID DWG TFA-16- 14305-61 | A | |||
RV-250471 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK037 RELIEF VALVE RV-250471 (4x6 - SET@75PSI) PID DWG TFA-16-14305-61 | A | |||
RV-250028 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK058 RELIEF VALVE RV-250028 PID DWG TFA-16-14305-59 (6 x 8 - SET @ 0.1 VAC.) | A |
Attachment 1 to Schedule 2.2.1
RV- 250029 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK058 RELIEF VALVE RV-250029 PID DWG TFA-16-14305-59 (6 x 8 - SET @ 0.1 VAC.) | A | |||
RV-250446 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK058 RELIEF VALVE RV-250446 (4 x 6 - @75PSI) PID DWG TFA-16-14305-59 (OFF/ON DO BOTH SAME TIME) | A | |||
RV-250477 | RELIEF VALVE | TFA BUTANE SPHERE TFA-TK058 RELIEF VALVE RV-250477 (4 x 6 - SET @ 75 PSI) PID DWG TFA-16-14305-59 (OFF/ON DO BOTH SAME TIME) | A | |||
RV-250512 | RELIEF VALVE | TFA BUTANE SPHERES ROTATIONAL VALVE FOR USE IN LOCATIONS: 15-086, 15-087, 15-100, 15-101, 15-102,15-103, 15-084, 15-085 (4 x 6 / SET @ 75 PSI) | A | |||
RV-250513 | RELIEF VALVE | TFA BUTANE SPHERES ROTATIONAL VALVE FOR USE IN LOCATIONS: 15-086, 15-087, 15-100, 15-101, 15-102, 15-103, 15-084, 15-085 (4 x 6 / SET @ 75PSI) | A | |||
RV-250067 | RELIEF VALVE | TFA BUTANE UNLOADING No. 2 PUMP HOUSE RELIEF VALVE (3 x 4 - SET @ 75PSI) PID DWG TFA-16-14305-68 | A | |||
RV-250027 | RELIEF VALVE | TFA CLAY FILTER TFA-D103 RELIEF VALVE RV-250027 (4 x 6 - SET @ 70 PSI) PID DWG TFA-16-14305-16 | A | |||
RV-250522 | RELIEF VALVE | TFA CRUDE STORAGE TANK TFA-TK117 RELIEF VALVE PID DWG 15-1803-49 (1 x 1 / SET @ 150PSIG) | A | |||
RV-250185 | RELIEF VALVE | TFA CRUDE TANK TFA-TK101 6 N14 LINE RELIEF VALVE (1/2 x 1 - SET @ 145PSI) PID DWG TFA 15-1803-02 | A | |||
RV-250183 | RELIEF VALVE | TFA CRUDE TANK TFA-TK105 20 N2 CHARGE LINE RELIEF VALVE RV-250183 (1/2 x 1- SET @145PSI) PID DWG TFA-16-14305-01 | A | |||
RV-250182 | RELIEF VALVE | TFA CRUDE TANK TFA-TK105 20 N2A LINE RELIEF VALVE (1/2 x 1 - SET @145 PSI) PID DWG TFA-16-14305-01 | A | |||
RV-250181 | RELIEF VALVE | TFA CRUDE TANK TFA-TK105 20 N2A LINE RELIEF VALVE (3/4 x 1 - SET @ 100PSI) PID DWG TFA-16-14305-01 | A | |||
RV-250184 | RELIEF VALVE | TFA CRUDE TANK TFA-TK105 24 N1 LINE RELIEF VALVE (1/2 x 1 - SET @ 145PSI) PID DWG TFA-16-14305-01 | A | |||
RV-250335 | RELIEF VALVE | TFA CRUDE TANK TFA-TK117 RELIEF VALVE RV-250335 PID DWG 15-1803-49 (1 x 1 / SET @150PSIG) | A | |||
RV-250521 | RELIEF VALVE | TFA CRUDE TANK TFA-TK117 RELIEF VALVE RV-250521 PID DWG 15-1803-49 (1 x 1 / SET @150PSIG) | A | |||
RV-250066 | RELIEF VALVE | TFA CUMENE PUMP TFA-PN092 DISCHARGE RELIEF VALVE (1/2 x 3/4) SET @125PSI) PID DWG TFA-15-1803-48 | A | |||
RV-250508 | RELIEF VALVE | TFA DISCHARGE TO TANK 112 RELIEF VALVE RV-250508 P&ID DWG #15-47 (3/4 x 1 / 115PSI) | I | |||
RV-250379 | RELIEF VALVE | TFA FCC FEED TANK 9 TFA-TK009 RELIEF VALVE PID DWG TFA-16-14305-10 (3/4 x 1 - SET @ 260PSI) | A | |||
RV-250533 | RELIEF VALVE | TFA FLARE SYSTEM NITROGEN SYSTEM FOR EP IDLING RELIEF VALVE (3/4 x 1 / SET@ 20PSI) | A | |||
RV-250534 | RELIEF VALVE | TFA FUEL GAS SYSTEM NITROGEN SYSTEM FOR EP IDLING RELIEF (3/4 x 1 / SET @ 20PSI) | A | |||
RV-250153 | RELIEF VALVE | TFA FUEL OIL PUMP TFA-PN113A RELIEF VALVE (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-50 | A | |||
RV-250156 | RELIEF VALVE | TFA FUEL OIL TANK TFA-TK116 TANK INLET LINE RELIEF VALVE RV-250156 (3/4 x 1 SET @ 165PSI) PID DWG TFA-16-14305-49 | A | |||
RV-250161 | RELIEF VALVE | TFA FUEL OIL TANK TFA-TK116 TANK OUTLET LINE RELIEF VALVE RV-250161 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-49 | A | |||
RV-250155 | RELIEF VALVE | TFA FUEL OIL TRANSFER LINE WEST OF TANK 117 TFA-PIPE RELIEF VALVE RV-250155 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-49 | A | |||
RV-250162 RV-250154 |
RELIEF VALVE RELIEF VALVE |
TFA FUEL OIL TRANSFER PUMP TFA-PN113 (NORTH) DISCHARGE LINE RELIEF VALVE RV-250162 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-50 TFA FUEL OIL TRANSFER PUMP TFA-PN113A (SOUTH) DISCHARGE LINE RELIEF VALVE RV-250154 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-50 |
A | |||
RV-250163 | RELIEF VALVE | TFA FUEL OIL TRANSFER PUMP TFA- PN113A DISCHARGE LINE AFTER BLOCK VALVE RELIEF VALVE RV-250163 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-143065-50 | A | |||
RV-250529 | RELIEF VALVE | TFA FUEL OIL TRANSFER PUMP TFA-PN113A SUCTION LINE RELIEF VALVE (3/4 x 1 - SET @ 165 PSI) PID DWG TFA-16-14305-50 | A | |||
RV-250157 | RELIEF VALVE | TFA FUEL OIL TRANSFER PUMP TFA-PN113A SECTION LINE RELIEF VALVE RV-250157 (3/4 x 1 - SET @ 165PSI) PID DWG TFA-16-14305-50 | I | |||
RV-250095 | RELIEF VALVE | TFA FURNACE OIL TANK TFA-TK401 RELIEF VALVE (1 X 1 - SET @ 150 PSI) PID DWG TFA-16-14305-43 | A | |||
RV-250070 | RELIEF VALVE | TFA GAS OIL LINE AT TANK 60 RELIEF VALVE RV-250070 (1 x 1 - SET @ 100 PSI) PID DWG TFA-16-14305-26 | A | |||
RV-250071 | RELIEF VALVE | TFA GAS OIL LINE AT TANK 60 RELIEF VALVE RV-250071 (1 x 1 - SET @ 100 PSI) PID DWG TFA-16-14305-26 | A | |||
RV-250072 | RELIEF VALVE | TFA GAS OIL LINE AT TANK 61 RELIEF VALVE RV-250072 (1 x 1 - SET @ 100PSI) PID DWG TFA-16-14305-26 | A | |||
RV-250073 | RELIEF VALVE | TFA GAS OIL LINE AT TANK 61 RELIEF VALVE RV-250073 (1 x 1 - SET @ 100PSI) PID DWG TFA-16-14305-26 | A | |||
RV-250423 | RELIEF VALVE | TFA GASOLINE COMP. LOADING LINE TO DOCK NO. 1A RELIEF VALVE PID DWG DOC-30-1011-13 (3/4 x 1- SET @25 PSI) PER COASTGUARD REG.33CFR1217 | A | |||
RV-250422 | RELIEF VALVE | TFA GASOLINE COMP. LOADING LINE TO DOCK NO. 1A RELIEF VALVE PID DWG DOC-30-1011-14 (3/4 x 1 - SET @ 25 PSI) PER COASTGUARD REG.33CFR127 | A | |||
RV-250374 | RELIEF VALVE | TFA GASOLINE TANK TFA-TK070 RELIEF VALVE PRODUCT PIPELINE (3/4 x 1 - SET @150PSI) PID DWG TFA 16-14305-27 (OPERATIONS) | A | |||
RV-250455 | RELIEF VALVE | TFA GASOLINE TO DOCK NO 2 N 76 LINE RV-250455 (3/4 x 1 SET @ 150 PSI) PID DWG DOC 15-1026-04 | A | |||
RV-250013 | RELIEF VALVE | TFA JET FUEL CLAY FILTER RELIEF VALVE TFA-D107 (3 x 4 - SET @ 100PSI) PID DWG TFA-16-14305-16 | A |
Attachment 1 to Schedule 2.2.1
RV-250172 | RELIEF VALVE | TFA JP-4 STORAGE TANK TFA-TK121 AND TFA-TK120 SUCTION TO PUMP LINE RELIEF VALVE RV-250172 (3/4 x 1)- SET @ 165PSI) PID DWG TFA-16-14305-46 | A | |||
RV-250171 | RELIEF VALVE | TFA JP-4 STORAGE TANK TFA-TK121 SUCTION LINE RELIEF VALVE RV-250171(3/4x1 - SET @ 75PSI) PID DWG TFA-16-14305-46 | A | |||
RV-250170 | RELIEF VALVE | TFA JP-4 TANK TFA-TK120 SUCTION LINE RELIEF VALVE RV-250170(3/4x1 - SET @ 75PSI) PID DWG TFA-16-14305-46 | A | |||
RV-250383 | RELIEF VALVE | TFA KEROSENE PUMP AROUND SYSTEM RELIEF VALVE (3/4x1 - SET @ 150PSI) PID DWG TFA-16-14305-05A | A | |||
RV-250108 | RELIEF VALVE | TFA LPG LINE (VENT LINE) NORTH VALVE NORTH OF TFA-TK090 TFA-PIPE RELIEF VALVE RV-250108(1x1-SET @ 500PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250105 | RELIEF VALVE | TFA LPG LOADING RACK AT No.2 PUMP HOUSE RELIEF (1x1 - SET @ 500PSI) PID DWG TFA-16-14305-67 | A | |||
RV-250431 | RELIEF VALVE | TFA LPG NORTH PUMP MANIFOLD EAST VALVE (WEST BANK) EAST OF BULLETS TFA-PIPE RELIEF VALVE RV-250431 (1x1- SET @ 525PSI) PID DWG TFA-16-14305-63 | A | |||
RV-250432 | RELIEF VALVE | TFA LPG NORTH PUMP MANIFOLD WEST VALVE (WEST BANK) EAST OF BULLETS TFA-PIPE RELIEF VALVE RV-250432 (1x1- SET @ 500PSI) PID DWG TFA-16-14305-63 | A | |||
RV-250098 | RELIEF VALVE | TFA LPG PROPANE VAPORIZER AT No. 2 PUMP HOUSE (2x3 - SET @ 250PSI) PID DWG TFA-16-14305-67 | A | |||
RV-250125 | RELIEF VALVE | TFA LPG RETURN PUMP TFA-PN070 DISCHARGE LINE NORTH RELEIF VALVE RV-250125 (3/4x1- SET @ 525PSI) PID DWG TFA-16-14305-60 | A | |||
RV-250124 | RELIEF VALVE | TFA LPG RETURN PUMP TFA-PN070 DISCHARGE LINE SOUTH RELEIF VALVE RV-250124 (3/4x1- SET @ 525PSI) PID TFA-16-14305-60 | A | |||
RV-250282 | RELIEF VALVE | TFA LPG RETURN PUMP TFA-PN070 DISCHARGE LINE WEST RELEIF VALVE RV-250282 (3/4x1- SET @ 500PSI) PID DWG TFA-16-14305-60 | A | |||
RV-250127 | RELIEF VALVE | TFA LPG RETURN PUMP TFA-PN070 DISCHARGE MANIFOLD (3/4x1 - SET @ 525PSI) PID DWG TFA-16-14305-60 OPERATIONS | A | |||
RV-250129 | RELIEF VALVE | TFA LPG RETURN PUMP TFA-PN070 DISCHARGE MANIFOLD NORTH RELIEF VALVE RV-250129 (3/4x1 - /SET @ 525PSI) PID DWG TFA-16-14305-60 | A | |||
RV-250128 | RELIEF VALVE | TFA LPG RETURN PUMP TFA-PN070 DISCHARGE MANIFOLD SOUTH RELIEF VALVE RV-250128 (3/4x1 - SET @ 525PSI) PID DWG TFA-16-14305-60 | A | |||
RV-250130 | RELIEF VALVE | TFA LPG SOUTH PUMP MANIFOLD EAST VALVE EAST OF BULLETS TFA-PIPE RELIEF VALVE RV-250130 (3/4x1- SET @ 500 PSI) PID DWG TFA-16-14305-63 | A | |||
RV-250132 | RELIEF VALVE | TFA LPG SOUTH PUMP MANIFOLD MIDDLE WEST VALVE EAST OF BULLETS TFA-PIPE RELIEF VALVE RV-250132 (1x1 - SET @ 500 PSI) PID DWG TFA-16-14305-63 | A | |||
RV-250139 | RELIEF VALVE | TFA LPG SOUTH PUMP MANIFOLD WEST VALVE EAST OF BULLETS TFA-PIPE RELIEF VALVE RV-250139 (1x1 - SET @ 500PSI) PID DWG TFA-16-14305-63 | A | |||
RV-250461 | RELIEF VALVE | TFA N-12 LINE TANK 28 RELIEF VALVE RV-25046 (3/4X1 SET @ 150 PSI ) PID DWG DOC 15-1803-18 NEW PROJECT | A | |||
RV-250523 | RELIEF VALVE | TFA N-14 LINE BOOSTER PUMP TFA-PN157 RELIEF VALVE RV-250523 P&ID DWG (3/4x1 / SET @ 150 PSIG) | A | |||
RV-250471 | RELIEF VALVE | TFA N-57 LINE DISCHARGE TO TANK 24 RELIEF VALVE RV-250478 (4x6 - SET @ 90 PSI) PID DWG TFA-15-1803-23 | A | |||
RV-250479 | RELIEF VALVE | TFA N57 LINE DISCHARGE TO TANK 24 RELIEF VALVE RV-250479 (4x6 - SET @ 90 PSI) PID DWG TFA-15-1803-23 | A | |||
RV-250459 | RELIEF VALVE | TFA N-12 SUCTION LINE TANK 28 RELIEF VALVE RV-250459(3/4x 1 SET @ 150 PSI) PID DWG DOC 15-1803-18 NEW PROJECT | A | |||
RV-250482 | RELIEF VALVE | TFA N12 SUCTION LINE TANK 31 RELIEF VALVE RV-250482 (3/4 x 1 SET @ 50 PSI) PID DWG DOC 15-1803-15 NEW PROJECT | A | |||
RV-250458 | RELIEF VALVE | TFA N6 SUCTION LINE TANK 19 RELIEF VALVE RV-250458 (3/4 x 1 SET @ 150 PSI) PID DWG DOC 15-1803-17 NEW PROJECT | A | |||
RV-250501 | RELIEF VALVE | TFA N600 LINE AT #1 PUMPHOUSE (3/4 x 1/SET @ 165PSI) 15-03 & 15-07 | A | |||
RV-250500 | RELIEF VALVE | TFA N600 LINE AT TANK #18 (3/4 x 1/SET @ 165PSI) P&ID #15-17 | A | |||
RV-250297 | RELIEF VALVE | TFA N71 LINE (No.2 FUEL OIL) NEAR TANK 4 RELIEF VALVE (3/4 x 1 - SET @ 100 PSI) PID DWG TFA-16-14305-12 | A | |||
RV-250296 | RELIEF VALVE | TFA N72 LINE (No.2 FUEL OIL) NEAR TANK 3 RELIEF VALVE (3/4 x 1 - SET @ 100 PSI) PID DWG TFA-16-14305-12 | A | |||
RV-250094 | RELIEF VALVE | TFA NO.1 PUMPHOUSE INHIBITOR LINE TANK 33 (3/4 x 1 - SET @ 125PSI) PID DWG TFA-16-14305-09 | A | |||
RV-250407 | RELIEF VALVE | TFA NO.2 PUMPHOUSE HOT WATER HEATER RELIEF VALVE (3/4 x 3/4 - SET @ 85PSI) NOT ON PID | A | |||
RV-250214 | RELIEF VALVE | TFA No.1 PUMP HOUSE HOT WATER HEATER RELIEF VALVE (3/4 X 3/4-SET @ 65PSI) NOT ON PID | ||||
RV-250145 | RELIEF VALVE | TFA No.2 PUMP HOUSE PETROX TANK CAR UNLOADING RELIEF VALVE RV-250145 (1-1/2 x 1-1/2 - SET @ 45PSI) NOT ON PID | A | |||
RV-250317 | RELIEF VALVE | TFA No.2 PUMPHOUSE REDUCING STEAM RELIEF VALVE (2 x 3 - SET @ 50 PSI) PID DWG TFA-16-14305-70 | A | |||
RV-250012 | RELIEF VALVE | TFA No.2 SALT FILTER AT TANK 41 RELIEF VALVE (3x 4 - SET @ 100 PSI) PID DWG TFA-16-14305-26 | A | |||
RV-250511 | RELIEF VALVE | TFA 0-111-16 FUEL OIL LINE TO TANK 118 RV-250511 (1 x 1 / 150PSI) | A | |||
RV-250530 | RELIEF VALVE | TFA PN149 COLONIAL PIPELINE PUMP BLOCK VALVE RELIEF VALVE (3/4 x 1 SET @ 150 PSI ) PID DWG DOC 15-1026-17 (FLUSHING LINE) | A | |||
RV-250460 | RELIEF VALVE | TFA PN149 COLONIAL PIPELINE PUMP BLOCK VALVE RELIEF VALVE (3/4 x 1 SET @ 150 PSI ) PID DWG DOC 15-1026-17 (FLUSHING LINE) NEW PROJECT | A | |||
RV-250462 | RELIEF VALVE | TFA PN149 COLONIAL PIPELINE PUMP BLOCK VALVE RELIEF VALVE RV-250462 (3/4 x 1 SET @800 PSI) PID DWG DOC 15-1026-07 NEW PROJECT | A |
Attachment 1 to Schedule 2.2.1
RV-250532 | RELIEF VALVE | TFA PN149 COLONIAL PIPELINE PUMP BLOCK VALVE RELIEF VALVE RV-250532 (3/4 x 1 SET @800 PSI) PID DWG DOC 15-1026-07 | A | |||
RV-250457 | RELIEF VALVE | TFA PN149 COLONIAL PIPELINE PUMP DISCHARGE RELIEF VALVE RV-250457 (1 x 1 SET @ 800 PSI) PID DWG DOC 15-1026-07 | A | |||
RV-250531 | RELIEF VALVE | TFA PN149 COLONIAL PIPELINE PUMP DISCHARGE RELIEF VALVE RV-250531 (1 x 1 SET @ 800 PST) PID DWG DOC 15-1026-07 | A | |||
RV-250481 | RELIEF VALVE | TFA PN149 COLONIAL PIPELINE PUMP SUCTION LOOP LINE RELIEF VALVE RV-250481 (1 x 1-1/2 SET @ 100 PSI) PID DWG DOC 15-1026-07 NEW PROJECT | A | |||
RV-250137 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TANK RELIEF VALVE (1 x 1 - SET @ 500PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250035 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK090 MANIFOLD NORTH RELIEF VALVE RV-250035 (4 x 6 - SET @ 250PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250034 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK090 MANIFOLD SOUTH RELIEF VALVE RV-250034 (4 x 6 - SET @ 250PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250140 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK090 MANIFOLD SOUTH RELIEF VALVE RV-250140 (VENT LINE) (1 x 1 - SET @ 500PSI) PID DWG TFA-16-14305-64 | I | |||
RV-250141 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK090 MANIFOLD WEST RELIEF VALVE RV-250141 (1 x 1 - SET @ 500PSI) PID DWG TFA-16-14305-64 | I | |||
RV-250135 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 EAST END RELIEF VALVE RV-250135 (1 x 1 - SET @ 500PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250136 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 EAST END SALES SUCTION LINE RELIEF VALVE RV-250136 (1 x 1 - SET @ 500PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250101 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 MANIFOLD EAST BANK NORTH VALVE RELIEF VALVE RV-250101 (1 x 1 - SET @ 500 PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250100 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 MANIFOLD EAST RELIEF VALVE RV-250100 (1 x 1 - SET @ 500PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250032 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 MANIFOLD NORTH VALVE RELIEF VALVE RV-250032 (4 x 6 - SET @ 250PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250451 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 MANIFOLD SOUTH VALVE RELIEF VALVE RV-250451 (4 x 6 - SET @ 250PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250103 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 MANIFOLD WEST BANK NORTH VALVE RELIEF VALVE RV-250103 (1 x 1 - SET @ 500 PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250102 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 MANIFOLD WEST BANK SOUTH VALVE RELIEF VALVE RV-250102 (1 x 1 - SET @ 500PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250134 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK091 WEST END EAST BANK SOUTH RELIEF VALVE RV-250134 (1 x 1 - SET @ 500 PSI) PID DWG TFA-16-14305-64 | A | |||
RV-250505 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK093 MANIFOLD RELIEF VALVE RV-250505 (4 x 6 - SET @ 250PSI) PID DWG 15-65 | A | |||
RV-250504 | RELIEF VALVE | TFA PROPANE STORAGE BULLET TFA-TK093 MANIFOLD VALVE RELIEF VALVE RV-250504 (4 x 6 - SET @ 250PSI) PID DWG 15-65 | A | |||
RV-250506 | RELIEF VALVE | TFA RELIEF HEADER TO TANK #219 RELIEF VALVE RV-250506 PID DWG 15-51 (3/4 x 1 / 135PSI) | A | |||
RV-250507 | RELIEF VALVE | TFA RELIEF HEADER TO TANK #219 RELIEF VALVE RV-250507 PID DWG #15-51 (3/4 x 1 / 135PSI) | A | |||
RV-250426 | RELIEF VALVE | TFA SALT FILTER TFA-D105 RELIEF VALVE (6 x 8 / SET @ 100 PSI) PID DWG TFA-16-14305-26 | A | |||
RV-250168 | RELIEF VALVE | TFA SLOP OIL TANK TFA-TK340 FILL LINE RELIEF VALVE (3/4 x 1 - SET @ 150PSI) PID-14-4103-19 | A | |||
RV-250271 | RELIEF VALVE | TFA STEAM TRACING WEST OF TK-118 RELIEF VALVE (3 x 4 - SET @ 150 PSI) PID DWG TFA-16-14305-69 | A | |||
RV-250526 | RELIEF VALVE | TFA TANK #5 FIRE WATER TANK | A | |||
RV-250527 | RELIEF VALVE | TFA TANK #5 FIRE WATER TANK RV-250527 | A | |||
RV-250528 | RELIEF VALVE | TFA TANK #5 FIRE WATER TANK RV-250528 | A | |||
RV-250099 | RELIEF VALVE | TFA TANK CAR LOADING RACK RELIEF VALVE RV-250099 (1 x 1) SET @ 500PSI) PID DWG TFA-16-14305-67 | A | |||
RV-250298 | RELIEF VALVE | TFA TANK FARM NO.1 PUMP HOUSE BUILDING BLDG-152 HOT WATER HEATER (3/4 x 3/4- SET @ 150 PSI) NOT ON PID | A | |||
RV-250490 | RELIEF VALVE | TFA TK116 30 FUEL OIL LINE TO DOCS (1X 2 - / SET @ 130 PSI) PID DWG TFA-15-1803-49 | A | |||
RV-250064 | RELIEF VALVE | TFA TOULENE / BENZENE MANIFOLD TFA-PIPE RELIEF VALVE (3/4 x 3/4 - SET @ 125 PSI) PID DWG TFA-16-14305-51 | A | |||
RV-250313 | RELIEF VALVE | TFA TRV 8724 AT TANK 90 (PROPANE) RELIEF VALVE (1/4 X 1/4 - SET @ 34 PSI) PID DWG TFA-16-14305-64 | I | |||
RV-250314 | RELIEF VALVE | TFA TRV 8722 AT TANK 91 (PROPANE) RELIEF VALVE (1/4 x 1/4 - SET @ 36 PSI DWG TFA-16-14305-64 | I | |||
RV-250315 | RELIEF VALVE | TFA TRV 8723 AT TANK 92 (PROPANE) RELIEF VALVE (1/4 x 1/4 - SET @ 37 PSI) PID DWG TFA-16-14305-65 | I | |||
RV-250316 | RELIEF VALVE | TFA TRV 8724 AT TANK 93 (PROPANE) RELIEF VALVE (1/4 x 1/4 - SET @ 37 PSI) PID DWG TFA-16-14305-65 | I | |||
RV-250109 | RELIEF VALVE | TFA VAPORIZER STEAM LINE RELIEF VALVE (1-1/2 x 3 - SET @ 50PSI) PID DWG TFA-16-14305-67 | A | |||
RV-250503 | RELIEF VALVE | TFA-TK092 PROPANE BULLET RELIEF VALVE (4 x 6 / SET @ 250PSI) PID DWG 15-65 | A | |||
RV-250502 | RELIEF VALVE | TFA-TK092 PROPANE SPHERE RELIEF VALVE (4 x 6 / SET @ 250PSI) PID DWG 16-14305-65 | A |
Attachment 1 to Schedule 2.2.1
TFA-NL335A | SPECIALTY INST | TFA-NL335A FIRE WATER PUMP PN-166A ENGINE RUNNING, LOOP INCLUDING: NL. DWG. NO. PID-15-3103-74 | A | |||
TFA-NL335B | SPECIALTY INST | TFA-NL335B FIRE WATER PUMP PN-166B ENGINE RUNNING, LOOP INCLUDES: NL. DWG. NO. PID-15-3103-74 | A | |||
TFA-NL335C | SPECIALTY INST | TFA-NL335C FIRE WATER PUMP PN-166C ENGINE RUNNING, LOOP INCLUDES: NL. DWG. NO. PID-15-3103-74 | A | |||
TFA-UA354 | SPECIALTY INST | TFA-UA354 LOCAL PLC/LEL DETECTION TROUBLE ALARM, LOOP INCLUDES: US, UA. DWG. NO. PID-15-1002-65 | A | |||
TFA-UA356 | SPECIALTY INST | TFA-UA356 PROPANE TANKS 90, 91, 92, & 93 SHUTDOWN SYSTEM UPS TROUBLE, LOOP INCLUDES: US, UA. DWG. NO. PID-15-1002-65 | A | |||
TFA-FND | STRUCTURAL | TFA FOUNDATION - PROJECT TRACKING | A | |||
TFA- STRUCT | STRUCTURAL | TFA STRUCTURAL - PROJECT TRACKING | A | |||
TFA-TK111 | TANK | TFA #2 FUEL OIL STORAGE TANK TK-111 EXTERNAL FLOATING ROOF 100 FT DIAMETER / 48 FT HEIGHT / 62,247 BBLS PID DWG 15-1803-48 | A | |||
TFA-TK028 | TANK | TFA #2 OIL / DIESEL FUEL TANK TFA-TK028 144 FT DIAMETER / 48 FT HEIGHT / 136,354 BBLS PID DWG 15-1803-18 | A | |||
TFA-TK018 | TANK | TFA #2 OIL / DIESEL FUEL TANK TFA-TK018 044 FT DIAMETER / 47 FT HEIGHT/135,243 BBLS PID DWG 15-1803-17 | A | |||
TFA-TK044 | TANK | TFA #2 OIL / DIESEL TANK TFA-TK044 TANK 144 FT DIAMETER / 48 FT HEIGHT / 136,368 BBLS PID DWG 15-1803-29 | A | |||
TFA-TK030 | TANK | TFA AV JET TANK TFA-TK030 144 FT DIAMETER / 40 FT HEIGHT / 113,160 BBLS PID DWG 15-1803-16 | A | |||
TFA-TK050 | TANK | TFA AVIATION GAS / TOLUENE/XYLENE TFA-TK050 TANK TK-050 INTERNAL FLOATING ROOF 100 FT DIAMETER / 40 FT HEIGHT / 51,450 BBLS PID DWG 15-1803-35 | A | |||
TFA-TK060 | TANK | TFA AVJET TANK TFA-TK 060 TANK 80 FT DIAMETER / 40 FT HEIGHT / 34,941 BBLS PID DWG 15-1803-26 | A | |||
TFA-TK110 | TANK | TFA AVJET TANK TFA-TK110 EXTERNAL FLOATING ROOF 100 FT DIAMETER/ 48 FT HEIGHT / 62,193 BBLS PID DWG 15-1803-47 | A | |||
TFA-TK061 | TANK | TFA AVJET TFA-TK061 TANK 80 FT DIAMETER/ 40 FT HEIGHT / 34,943 BBLS PID DWG 15-1803-25 | A | |||
TFA-TK219 | TANK | TFA BENZENE TANK CR2-TK219 INTERNAL FLOATING ROOF 45 FT. DIAMETER / 48 FT. HEIGHT / 12,508 BBLS PID 15-1803-51 | A | |||
TFA-TK022 | TANK | TFA BENZENE TANK TFA-TKA022 EXTERNAL FLOATING ROOF TANK 100 FT DIAMETER / 40 FT HEIGHT / 49,070 BBLS PID DWG 15-1803-24 | A | |||
TFA-TK112 | TANK | TFA BENZENE TANK TFA-TK112 INTERNAL FLOATING ROOF 45 FT DIAMETER / 48 FT HEIGHT / 12,822 BBLS PID DWG 15-1803-47 | A | |||
TFA-TK113 | TANK | TFA BENZENE TANK TFA-TK113 INTERNAL FLOATING ROOF 45 FT DIAMETER / 48 FT HEIGHT / 12,905 BBLS PID DWG 15-1803-47 | A | |||
TFA-TK339 | TANK | TFA BLOWDOWN TANK TFA-TK339 TANK TK-339 48 FT DIAMETER / 24 FT HEIGHT / 7700BBLS | A | |||
TFA-TK201 | TANK | TFA BOILER HOUSE FUEL TANK TFA-TK201 40 FT DIAMETER / 42 FT HEIGHT / 8,727 BBLS PID DWG POH-16-14287-43 | A | |||
TFA-TK121 | TANK | TFA BTX TANK TFA-TK121 EXTERNAL FLOATING ROOF 120 FT DIAMETER / 40 FT HEIGHT / 73,859 BBLS PID DWG 15-1803-46 | A | |||
TFA-TK116 | TANK | TFA CRUDE OIL TANK TFA-TK116 TANK 170 FT DIAMETER / 56 FT HEIGHT / 203,904 BBLS PID DWG 15-1803-49 | A | |||
TFA-TK010 | TANK | TFA CRUDE TANK TFA-TK010 EXTENAL FLOATING ROOF 168 FT. DIAMETER / 46 FT. HEIGHT / 161,259 BBLS PID DWG 15-1803-11 | A | |||
TFA-TK011 | TANK | TFA CRUDE TANK TFA-TK011 EXTERNAL FLOATING ROOF 168 FT. DIAMETER / 46 FT. HEIGHT / 163,092 BBLS PID DWG 15-1803-12 | A | |||
TFA-TK012 | TANK | TFA CRUDE TANK TFA-TK012 EXTERNAL FLOATING ROOF 168 FT. DIAMETER/ 46 FT. HEIGHT / 157,885 BBLS PID DWG 15-1803-12 | A | |||
TFA-TK013 | TANK | TFA CRUDE TANK TFA-TK013 EXTERNAL FLOATING ROOF 168 FT. DIAMETER / 46 FT. HEIGHT / 162,459 BBLS PID DWG 15-1803-14 | A | |||
TFA-TK017 | TANK | TFA CRUDE TANK TFA-TK017 TANK EXTERNAL FLOATING ROOF 144 FT DIAMETER / 55 FT HEIGHT / 148,900 BBLS PID DWG 15-1803-21 | A | |||
TFA-TK027 | TANK | TFA CRUDE TANK TFA-TK027 EXTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 124,732 BBLS PID DWG 15-1803-19 | A | |||
TFA-TK101 | TANK | TFA CRUDE TANK TFA-TK101 EXTERNAL FLOATING ROOF 168 FT. DIAMETER / 46.5 FT. HEIGHT / 164,004 BBLS PID DWG 15-1803-02 | A | |||
TFA-TK102 | TANK | TFA CRUDE TANK TFA-TK102 EXTERNAL FLOATING ROOF 168 FT DIAMETER / 46.5 FT HEIGHT / 165,746 BBLS PID DWG 15-1803-02 | A | |||
TFA-TK104 | TANK | TFA CRUDE TANK TFA-TK104 EXTERNAL FLOATING ROOF 180 FT DIAMETER / 40 FT HEIGHT / 162,599 BBLS PID DWG 15-1803-01 | A | |||
TFA-TK105 | TANK | TFA CRUDE TANK TFA-TK105 EXTERNAL FLOATING ROOF 280 FT DIAMETER / 48 FT HEIGHT / 474,184 BBLS PID DWG 15-1803-01 | A | |||
TFA-TK117 | TANK | TFA CRUDE TANK TFA-TK117 170 FT DIAMETER / 56 FT HEIGHT / 224,172 BBLS PID DWG 15-1803-49 | A | |||
TFA-TK006 | TANK | TFA CUTTER STORAGE TANK TFA-TK006 100 FT. DIAMETER / 40 FT. HEIGHT / 54,479 BBLS | A | |||
TFA-TK033 | TANK | TFA DEICER TFA-TK033 15 FT DIAMETER/ 18 FT HEIGHT / 551 BBLS | A | |||
TFA-TK064 | TANK | TFA DIESEL TANK TFA-TK064 INTERNAL FLOATING ROOF 180 FT DIAMETER / 40 FT HEIGHT / 163,328 BBLS PID DWG 15-1803-42 | A | |||
TFA-TK051 | TANK | TFA ETHANOL TANK TFA-TK051 TANK INTERNAL FLOATING ROOF 100 FT DIAMETER / 40 FT HEIGHT / 51,450 BBLS PID DWG 15-1803-37 | A | |||
TFA-TK016 | TANK | TFA FCC CHARGE TANK TFA-TK016 144 FT DIAMETER / 48 FT HEIGHT / 136,375 BBLS PID DWG 15-1803-21 | A |
Attachment 1 to Schedule 2.2.1
TFA-TK009 | TANK | TFA FCC FEED TANK TFA-TK009 144 FT. DIAMETER / 48 FT. HEIGHT / 136,354 BBLS PID DWG 15-1803-10 | A | |||
TFA-TK005 | TANK | TFA FIRE WATER TANK TFA-TK005 144 FT. DIAMETER / 48 FT. HEIGHT / 136,375 BBLS PID DWG 15-1803-13 | A | |||
TFA-TK056 | TANK | TFA FIRE WATER TANK TFA-TK056 TANK 50 FT. DIAMETER / 40 FT HEIGHT / 13,651 BBLS PID DWG 15-1803-62 (IN SERVICE) | A | |||
TFA-TK213 | TANK | TFA FRESH ACID TANK TFA-TK213 25 FT DIAMETER / 15 FT D | A | |||
TFA-TK118 | TANK | TFA FUEL OIL TANK TFA-TK118 170 FT DIAMETER / 56 FT HEIGHT / 203,734 BBLS PID DWG 15-1803-50 | A | |||
TFA-TK119 | TANK | TFA FUEL OIL TANK TFA-TK119 170 FT DIAMETER / 56 FT HEIGHT / 203,732 BBLS PID DWG 15-1803-50 | A | |||
TFA-TK324 | TANK | TFA FUEL OIL TANK TFA-TK324 TANK TK-324 24 FT DIAMETER / 18 FT HEIGHT / 1450BBLS | A | |||
TFA-TK402 | TANK | TFA FURNACE OIL TANK TFA-TK402 TANK TK-402 180 FT DIAMETER / 48 FT HEIGHT / 227500BBLS PID DWG 15-1803-43 | A | |||
TFA-TK313 | TANK | TFA GASOLINE BASE STOCKS TANK TFA-TK313 TK-313 48 FT DIAMETER / 40.7FT HEIGHT / 13100BBLS | A | |||
TFA-TK316 | TANK | TFA GASOLINE BASE STOCKS TANK TFA-TK316 TK-316 48 FT DIAMETER / 40.7 FT HEIGHT / 13100BBLS | A | |||
TFA-TK314 | TANK | TFA GASOLINE BASE STOCKS TFA-TK314 TANK TK-314 48 FT DIAMETER / 40.7 FT HEIGHT / 13100BBLS | A | |||
TFA-TK053 | TANK | TFA GASOLINE STORAGE TANK TFA TK-053 TANK EXTERNAL FLOATING ROOF 140 FT DIAMETER / 40 FT HEIGHT / 97,041BBLS PID DWG 15-1803-41 | A | |||
TFA-TK068 | TANK | TFA GASOLINE STORAGE TANK TFA-TK068 TANK INTERNAL FLOATING ROOF 180 FT DIAMETER / 40 FT HEIGHT / 163,590 BBLS PID DWG 15-1803-45 | A | |||
TFA-TK049 | TANK | TFA GASOLINE TANK TFA-TK049 TANK TK-049 INTERNAL FLOATING ROOF 100 FT DIAMETER / 40 FT HEIGHT / 50,076 BBLS PID DWG 15-1803-34 | A | |||
TFA-TK014 | TANK | TFA GASOLINE TANK TFA-TK014 INTERNAL FLOATING ROOF 144 FT. DIAMETER / 48 FT. HEIGHT / 129,048 BBLS PID DWG 15-1803-14 | A | |||
TFA-TK032 | TANK | TFA GASOLINE TANK TFA-TK032 20 FT DIAMETER / 18 FT HEIGHT / 1005BBLS | A | |||
TFA-TK040 | TANK | TFA GASOLINE TANK TFA-TK040 INTERNAL FLOATING ROOF 80 FT DIAMETER / 40 FT HEIGHT / 32,948 BBLS PID DWG 15-1803-26 | A | |||
TFA-TK045 | TANK | TFA GASOLINE TANK TFA-TK045 INTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 127,989 BBLS PID DWG 15-1803-29 | A | |||
TFA-TK046 | TANK | TFA GASOLINE TANK TFA-TK046 TANK EXTERNAL FLOATING ROOF 144 FT DIAMETER / 40 FT HEIGHT / 105,270 BBLS PID DWG 15-1803-33 | A | |||
TFA-TK047 | TANK | TFA GASOLINE TANK TFA-TK047 TANK INTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 128,652 BBLS PID DWG 15-1803-32 | A | |||
TFA-TK052 | TANK | TFA GASOLINE TANK TFA-TK052 TANK EXTERNAL FLOATING ROOF 140 FT DIAMETER / 40 FT HEIGHT / 97,041 BBLS PID DWG 15-1803-41 | A | |||
TFA-TK054 | TANK | TFA GASOLINE TANK TFA-TK054 TANK TK-054 EXTERNAL FLOATING ROOF (OUT OF SERVICE) 120 FT DIAMETER / 40 FT HEIGHT / 70,979 BBLS PID DWG 15-1803-40 | A | |||
TFA-TK055 | TANK | TFA GASOLINE TANK TFA-TK055 TANK TK-055 EXTERNAL FLOATING ROOF TANK 180 FT DIAMETER / 40 FT HEIGHT / 161,954 BBLS PID DWG 15-1803-27 | A | |||
TFA-TK065 | TANK | TFA GASOLINE TANK TFA-TK065 TANK TK-065 EXTERNAL FLOATING ROOF 140 FT DIAMETER / 40 FT HEIGHT / 101,585 BBLS PID DWG 15-1803-40 | A | |||
TFA-TK069 | TANK | TFA GASOLINE TANK TFA-TK069 INTERNAL FLOATING ROOF 180 FT DIAMETER / 48 FT HEIGHT / 204,927 BBLS PID DWG 15-1803-45 | A | |||
TFA-TK070 | TANK | TFA GASOLINE TANK TFA-TK070 EXTERNAL FLOATING ROOF 180 FT. DIA. / 40 FT. HEIGHT / 164,120 BBLS PID DWG 15-1803-27 | A | |||
TFA-TK120 | TANK | TFA GASOLINE TANK TFA-TK120 EXTERNAL FLOATING ROOF 120 FT DIAMETER / 40 FT HEIGHT / 73,842 BBLS PID DWG 15-1803-46 | A | |||
TFA-TK034 | TANK | TFA INHIBITOR TANK TFA-TK-034 10 FT DIAMETER / 12 FT HEIGHT / 162 BBLS PID DWG 15-5311-09 | A | |||
TFA-TK323 | TANK | TFA INHIBITOR TANK TFA-TK323 24 FT DIAMETER / 18 FT HEIGHT / 1450BBLS | A | |||
TFA-TK066 | TANK | TFA ISOMERATE TANK TFA-TK066 TK066 INTERNAL FLOATING ROOF 140 FT DIAMETER / 40 FT HEIGHT 100,200 BBLS PID DWG 15-1803-40 | A | |||
TFA-TK020 | TANK | TFA JET FUEL STORAGE TANK TFA-TK020 144 FT DIAMETER / 40 FT HEIGHT / 133,111 BBLS PID DWG 15-1803-16 | A | |||
TFA-TK031 | TANK | TFA LEAD FREE GASOLINE TANK TFA-TK031 INTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 129,066 BBLS PID DWG 15-1803-15 | A | |||
TFA-TK024 | TANK | TFA LIGHT CYCLE GAS OIL TANK TFA-TK024 80 FT DIAMETER / 40 HEIGHT / 34,952 BBLS | A | |||
TFA-TK041 | TANK | TFA LIGHT CYCLE GAS OIL TANK TFA-TK041 TANK TK-041 100 FT DIAMETER / 40 FT HEIGHT / 54,594 BBLS PID DWG 15-1803-26 | A | |||
TFA-TK023 | TANK | TFA LIGHT CYCLE OIL TANK TFA- TK023 70 FT DIAMETER / 36.5 FT HEIGHT / 24,326 BBLS PID DWG 15-1803-2 | A | |||
TFA-TK039 | TANK | TFA LIGHT CYCLE OIL TFA-TK039 70 FT DIAMETER / 36.5 FT HEIGHT / 24,326 BBLS PID DWG 15-1803-25 | A | |||
TFA-TK048 | TANK | TFA LOW SULPUR DIESEL TANK TFA-TK048 INTERNAL FLOATING ROOF 100 FT DIAMETER / 40 FT HEIGHT 51,012 BBLS PID DWG 15-1803-30 | A | |||
TFA-TK403 | TANK | TFA LSD TANK TFA-TK043 TANK TK-403 144 FT DIAMETER / 48 FT HEIGHT / 139,200BBLS | A | |||
TFA-TK401 | TANK | TFA LSD TANK TFA-TK401 FT DIAMETER / 48 FT HEIGHT / 217500BBLS PID-15-1803-43 | A |
Attachment 1 to Schedule 2.2.1
TFA-TK404 | TANK | TFA LSD TANK TFA-TK404 TANK TK-404 180 FT DIAMETER / 48 FT HEIGHT /217500BBLS | A | |||
TFA-TK026 | TANK | TFA NAPHTHA TANK TFA-TK026 INTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 129,987 BBLS PID DWG 15-1803-19 | A | |||
TFA-TK038 | TANK | TFA NAPHTHA TANK TFA-TK038 INTERNAL FLOATING ROOF 100 FT DIAMETER / 40 FT HEIGHT / 51,037 BBLS | A | |||
TFA-TK042 | TANK | TFA NAPHTHA TANK TFA-TK042 TANK TK-042 INTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 130,469 BBLS PID DWG 15-1803-28 | A | |||
TFA-TK043 | TANK | TFA NAPHTHA TANK TFA-TK043 TANK TK-043 INTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 130,467 BBLS PID DWG 15-1803-28 | A | |||
TFA-TK001 | TANK | TFA NO. 6 FUEL OIL TANK TFA-TK001 144 FT. DIAMETER / 48 FT. HEIGHT / 136,353 BBLS PID DWG 15-1803-10 | A | |||
TFA-TK002 | TANK | TFA NO. 6 FUEL OIL TANK TFA-TK002 144 FT. DIAMETER / 48 FT. HEIGHT / 136,363 BBLS PID DWG 15-1803-11 | A | |||
TFA-TK003 | TANK | TFA NO. 6 FUEL OIL TANK TFA-TK003 144 FT. DIAMETER / 47.9 FT. HEIGHT / 135,600 BBLS PID DWG 15-1803 (ILLEGIBLE) | A | |||
TFA-TK004 | TANK | TFA NO. 6 FUEL OIL TANK TFA-TK004 144 FT. DIAMETER / 47.9 FT. HEIGHT / 135,600 BBLS PID DWG 15-1803 (ILLEGIBLE) | A | |||
TFA-TK218 | TANK | TFA FOUR DEPRESSANT TANK TFA-TK218 10 FT DIA / 18 FT HEIGHT / 243 BBLS PID-15-5311-09 | A | |||
TFA-TK029 | TANK | TFA RAFFINATE TANK TFA-TK029 INTERNAL FLOATING ROOF 144 FT DIAMETER / 47.9 FT HEIGHT / 128,859 BBLS PID DWG 15-1803-18 | A | |||
TFA-TK340 | TANK | TFA SLOP OIL TANK WWT-TK340 PID-14-4103-19 | A | |||
TFA-TK319 | TANK | TFA SLOP TANK TFA-TK319 30 DIAMETER / 30 HEIGHT / 3370BBLS | A | |||
TFA-TK326 | TANK | TFA SLOP TANK TFA-TK326 TANK TK-326 48 FT DIAMETER / 24 FT HEIGHT / 7700BBLS | A | |||
TFA-TK334 | TANK | TFA SLOP TANK TFA-TK334 TANK TK-334 40 FT DIAMETER / 42 FT HEIGHT / 9400BBLS | A | |||
TFA-TK103 | TANK | TFA SLUDGE TANK TFA-TK 103 PID DWG 15-1803-53.01 40 FT DIAMETER / 35 FT HEIGHT / 7,601 BBLS | A | |||
TFA-TK214 | TANK | TFA SPENT ACID TANK TFA-TK214 TANK 25 FT DIAMETER / 16 FT HEIGHT / 1400BBLS | A | |||
TFA-TK338 | TANK | TFA STORAGE TANK TFA-TK338 TANK TK-338 152 DIAMETER / 180 HEIGHT / 565BBLS | A | |||
TFA-TK067 | TANK | TFA TOLUENE TANK TFA-TK067 TANK TK-067 INTERNAL FLOATING ROOF 140 FT DIAMETER / 40 FT HEIGHT 100,200 BBLS PID-15-1803-40 | A | |||
TFA-TK114 | TANK | TFA TOLUENE TANK TFA-TK114 37 FT DIAMETER / 48 FT HEIGHT 9,084 BBLS INTERNAL FLOATING ROOF PID DWG 15-1803-48 | A | |||
TFA-TK115 | TANK | TFA TOLUENE TFA-TK115 37 FT DIAMETER / 48 FT HEIGHT 9,085 BBLS PID DWG 15-1803-48 INTERNAL FLOATING ROOF | A | |||
TFA-TK317 | TANK | TFA TREATED LT. FC TANK TFA-TK317 TK-317 48 FT DIAMETER / 40.7 FT HEIGHT / 13100BBLS | A | |||
TFA-TK209 | TANK | TFA TREATED WATER TANK TFA-TK209 60 FT DIAMETER / 40 FT HEIGHT / 20,145 BBLS | A | |||
TFA-TK019 | TANK | TFA UNDYED HEATING OIL TFA-TK019 144 FT DIAMETER / 48 FT HEIGHT / 136,343 BBLS ELECTRICAL SINGLE DRAWING 11-13917-D | A | |||
TFA-TK021 | TANK | TFA UNLEADED GASOLINE TANK TFA-TK021 INTERNAL FLOATING ROOF 144 FT DIAMETER / 48 FT HEIGHT / 127,232 BBLS PID DWG 15-1803-15 | I | |||
TFA-TK025 | TANK | TFA XYLENE TANK TFA-TK025 INTERNAL FLOATING ROOF 100 FT DIAMETER / 40 FT HEIGHT / 51,414 BBLS PID DWG 15-1803-22 | A | |||
TK-232 | TANK | TFA-TK232 SOUTH PROPANE STORAGE FOR FIRE TRAINING P&ID DWG NO 15-74 | A | |||
TK-233 | TANK | TFA-TK233 NORTH PROPANE STORAGE FOR FIRE TRAINING P&ID DWG NO 15-74 | A | |||
TK-23281 | TANK | TRK COMINGLE GASOLINE STORAGE TANK TK-23281 PID DWG TRK-16-14307-07 | D | |||
TFA-HLA138 | TANK GAUGE | HIGH LEVEL ALARM FOR NO. 1 PUMPHOUSE LIFT PUMP (PUMP NO. TFA-PN138) | A | |||
TFA-HLA117 | TANK GAUGE | TFA ASPHALT TANK 117 HIGH LEVEL HIGH 59 1 HIGH HIGH 59 6 SP. GRAVITY 1.037 PID DWG 15-1803-49 | A | |||
TFA-HLA030 | TANK GAUGE | TFA AV JET TANK 30 HIGH LEVEL ALARM HIGH 39 1 HIGH HIGH 396 SP. GRAVITY 80 PID DWG 15-1803-(ILLEGIBLE) | A | |||
TFA-HLA90 | TANK GAUGE | TFA BULLET 90 LOCAL LEVEL ALARM HIGH 911 | A | |||
TFA-HLA91 | TANK GAUGE | TFA BULLET 91 LOCAL LEVEL ALARM HIGH 911 | A | |||
TFA-HLA92 | TANK GAUGE | TFA BULLET 92 LOCAL LEVEL ALARM HIGH 910 | A | |||
TFA-HLA93 | TANK GAUGE | TFA BULLET 93 LOCAL LEVEL ALARM HIGH 92 1/2 | A | |||
TFA-HLA05 | TANK GAUGE | TFA BUNKER/FUEL OIL TANK TFA-TK005 LEVEL ALARM HIGH 4611 HIGH HIGH 475 SPEC. WT .92 PID DWG TFA-16-14305-13 | A | |||
TFA-HLA06 | TANK GAUGE | TFA CUTTER STORAGE TANK TFA-TK006 LEVEL ALARM HIGH 391 HIGH HIGH 397 SPEC. WT .95 | A | |||
TFA-HLA039 | TANK GAUGE | TFA DIESEL TANK 39 HIGH LEVEL ALARM HIGH 357 HIGH HIGH 36 0 SP. GRAVITY .80 PID DWG 15-1803-25 | A | |||
TFA-HLA064 | TANK GAUGE | TFA DIESEL TANK 64 ALARMS HIGH 361 HIGH HIGH 370 PID DWG TFA-16-14305-42 | A |
Attachment 1 to Schedule 2.2.1
TFA-HLA3 | TANK GAUGE | TFA DK 3 SUMP LEVEL ALARM 2 FROM OVERFLOW | A | |||
TFA-HLA2 | TANK GAUGE | TFA DK2 SUMP LEVEL ALARM 3 FROM OVERFLOW | A | |||
TFA-HLA062 | TANK GAUGE | TFA FCC CHARGE TANK 62 HIGH LEVEL ALARM HIGH 391 HIGH 396 SP. GRAVITY .97 PID DWG 15-1803-4 | A | |||
TFA-HLA063 | TANK GAUGE | TFA FCC CHARGE TANK 63 HIGH LEVEL, HIGH 391 HIGH HIGH 396 SP. GRAVITY .97 PID DWG 15-1803-42 | A | |||
TFA-HLA116 | TANK GAUGE | TFA FUEL OIL TANK 116 HIGH LEVEL ALARM HIGH 541 HIGH HIGH 551 SP. GRAVITY .99 PID DWG 15-1803-49 (OUT OF SERVICE) | A | |||
TFA-HLA01 | TANK GAUGE | TFA FUEL OIL TANK TFA-TK001 LEVEL ALARM HIGH 4611 HIGH HIGH 475 SPEC. WT .92 PID DWG TFA-16-14305-10 | A | |||
TFA-HLA02 | TANK GAUGE | TFA FUEL OIL TANK TFA-TK002 LEVEL HIGH 471 HIGH HIGH 477 SPEC. WT .92 PID DWG TFA-16-14305-11 | A | |||
TFA-HLA03 | TANK GAUGE | TFA FUEL OIL TANK TFA-TK003 LEVEL ALARM HIGH 4611 HIGH HIGH 475 SPEC. WT .92 PID DWG TFA-16-14305-12 | A | |||
TFA-HLA04 | TANK GAUGE | TFA FUEL OIL TANK TFA-TK004 LEVEL ALARMS HIGH 4611 HIGH HIGH 475 SPEC. WT .92 PID DWG TFA-16-14305-12 | A | |||
TFA-HLA028 | TANK GAUGE | TFA FURNACE OIL TANK 28 HIGH LEVEL ALARM HIGH 471 HIGH HIGH 476 SP. GRAVITY .85 PID DWG 15-1803-18 | A | |||
TFA-HLA044 | TANK GAUGE | TFA FURNACE OIL TANK 44 HIGH LEVEL ALARM HIGH 467 HIGH HIGH 472 SP. GRAVITY .87 PID DWG 15-1803-29 | A | |||
TFA-HLA056 | TANK GAUGE | TFA FURNACE OIL TANK 56 HIGH LEVEL ALARM HIGH 391 HIGH HIGH 396 SP. GRAVITY .86 PID DWG 15-1803-62 (OUT OF SERVICE) | A | |||
TFA-HLA041 | TANK GAUGE | TFA LIGHT CYCLE GAS OIL 41 HIGH LEVEL ALARM HIGH 387 HIGH HIGH 390 97 SP. GRAVITY .89 PID DWG 15-1803-26 | A | |||
TFA-HLA15 | TANK GAUGE | TFA LIGHT CYCLE GAS OIL TANK TK015 LEVEL ALARM HIGH 391 HIGH HIGH 397 SPEC. WT .85 PID DWG TFA-16-14305-22 | A | |||
TFA-HLA068 | TANK GAUGE | TFA MTBE TANK 68 ALARMS HIGH 361 HIGH HIGH 366 PID DWG TFA-16-14305-45 | A | |||
TFA-HLA069 | TANK GAUGE | TFA MTBE TANK 69 ALARMS HIGH 437 HIGH HIGH 445 PID-15-1803-45 | A | |||
TFA-HLA340 | TANK GAUGE | TFA SLOP OIL TANK 340 HIGH LEVEL ALARM HIGH 140 HIGH HIGH 146 SP. GRAVITY .99 | A | |||
TFA-HLA1A | TANK GAUGE | TFA SUMP DK-1A LEVEL ALARM 90% ON | A | |||
TFA-HLA025 | TANK GAUGE | TFA TK 025 (XYLENE) TANK ALARMS HIGH 367 HIGH HIGH 371 | A | |||
TFA-HLA16 | TANK GAUGE | TFA TK-016 (PCC FEED) TANK LEVEL ALARM HIGH 464 HIGH HIGH 4610 SPEC. WT .92 (LOCATED AT FCC CONROL ROOM) | A | |||
TFA-HLA18 | TANK GAUGE | TFA TK-018 (DIESEL) TANK LEVEL ALARM HIGH 467 HIGH HIGH 471 | A | |||
TFA-HLA19 | TANK GAUGE | TFA TK-019 (AVJET)TANK ALARMS HIGH 471 HIGH HIGH 476 | A | |||
TFA-HLA20 | TANK GAUGE | TFA TK-020 (TURBINE JET) TANK LEVEL ALARM HIGH 391 HIGH HIGH 397 SPEC. WT .82 | A | |||
TFA-HLA23 | TANK GAUGE | TFA TK-023 (DIESEL TANK LEVEL ALARM HIGH 357 HIGH HIGH 361 | A | |||
TFA-HLA24 | TANK GAUGE | TFA TK-024 (DIESEL) TANK LEVEL ALARM HIGH 391 HIGH HIGH 397 SPEC. WT .82 | A | |||
TFA-HLA29 | TANK GAUGE | TFA TK-029 (RAFFINATE) TANK ALARMS HIGH 437 HIGH HIGH 440 | A | |||
TFA-HLA60 | TANK GAUGE | TFA TK-060 (KEROSENE) TANK LEVEL ALARMS HIGH 391 HIGH HIGH 397 SPEC .WT .78 | A | |||
TFA-HLA61 | TANK GAUGE | TFA TK-061 (KEROSENE) TANK LEVEL ALARMS HIGH 391 HIGH HIGH 397 SPEC .WT .78 | A | |||
TFA-HLA010 | TANK GAUGE | TFA TK-010 (CRUDE) TANK ALARMS HIGH 443 HIGH HIGH 453 PID 15-1803-11 | A | |||
TFA-HLA101 | TANK GAUGE | TFA TK-101 (CRUDE) TANK ALARMS HIGH 437 HIGH HIGH 447 | A | |||
TFA-HLA102 | TANK GAUGE | TFA TK-102 (CRUDE) TANK ALARMS HIGH 451 HIGH HIGH 461 | A | |||
TFA-HLA104 | TANK GAUGE | TFA TK-104 (CRUDE) TANK ALARMS HIGH 478 1/2 HIGH HIGH 4411 1/2 | A | |||
TFA-HLA105 | TANK GAUGE | TFA TK-105 (CRUDE) TANK ALARMS HIGH 478 1/2 HIGH HIGH 4711 1/2 | A | |||
TFA-HLA011 | TANK GAUGE | TFA TK-11 (CRUDE) TANK ALARMS HIGH 448 HIGH HIGH 454 | A | |||
TFA-HLA110 | TANK GAUGE | TFA TK-110 (AVJET) TANK ALARMS HIGH 447 HIGH HIGH 451 | A | |||
TFA-HLA111 | TANK GAUGE | TFA TK-111 (RAFFINATE/KERO)TANK ALARMS HIGH 447 HIGH HIGH 451 | A | |||
TFA-HLA112 | TANK GAUGE | TFA TK-112 (BENZENE)TANK ALARMS HIGH 441 HIGH HIGH 447 | A | |||
TFA-HLA113 | TANK GAUGE | TFA TK-113 (BENZENE)TANK ALARMS HIGH 441 HIGH HIGH 447 | A | |||
TFA-HLA114 | TANK GAUGE | TFA TK-114 (CUMENE)TANK ALARMS HIGH 447 HIGH HIGH 449 | A |
Attachment 1 to Schedule 2.2.1
TFA-HLA115 | TANK GAUGE | TFA TK-115 (TOLUENE) TANK ALARMS HIGH 449 HIGH HIGH 4411 | A | |||
TFA-HLA118 | TANK GAUGE | TFA TK-118 (FCC FEED) TANK LEVEL ALARM HIGH 591 HIGH HIGH 597 SPEC. WT.90 | A | |||
TFA-HLA119 | TANK GAUGE | TFA TK-119 (NO 6 FUEL OIL) TANK LEVEL ALARM HIGH 591 HIGH HIGH 597 SPEC. WT.90 | A | |||
TFA-HLA012 | TANK GAUGE | TFA TK-12(CRUDE) TANK ALARMS HIGH 441 HIGH HIGH 451 | A | |||
TFA-HLA120 | TANK GAUGE | TFA TK-120(MTBE) TANK ALARMS HIGH 401 HIGH HIGH 407 | A | |||
TFA-HLA121 | TANK GAUGE | TFA TK-121(MTBE) TANK ALARMS HIGH 401 HIGH HIGH 407 | A | |||
TFA-HLA013 | TANK GAUGE | TFA TK-13(CRUDE) TANK ALARMS HIGH 449 HIGH HIGH 461 | A | |||
TFA-HLA014 | TANK GAUGE | TFA TK-14(GASOLINE) TANK ALARMS HIGH 446 HIGH HIGH 450 | A | |||
TFA-HLA017 | TANK GAUGE | TFA TK-17(CRUDE) TANK ALARMS HIGH 434 HIGH HIGH 444 | A | |||
TFA-HLA201 | TANK GAUGE | TFA TK-201(BOILER HOUSE FUEL) HIGH LEVEL ALARM | A | |||
TFA-HLA021 | TANK GAUGE | TFA TK-21(GASOLINE) TANK ALARMS HIGH 441 HIGH HIGH 447 | A | |||
TFA-HLA218 | TANK GAUGE | TFA TK-218(POR DEPRESSANT) HIGH LEVEL ALARM HIGH 1616 HIGH HIGH 168 | A | |||
CR2-HLA219 | TANK GAUGE | TFA TK-219(BENZENE) TANK ALARMS HIGH 441 HIGH HIGH 451 | A | |||
TFA-HLA022 | TANK GAUGE | TFA TK-22(BENZENE) TANK ALARMS HIGH 355 HIGH HIGH 3511 | A | |||
TFA-HLA026 | TANK GAUGE | TFA TK-26(NAPHTHA) TANK ALARMS HIGH 4410 HIGH HIGH 454 | A | |||
TFA-HLA027 | TANK GAUGE | TFA TK-27(CRUDE) TANK ALARMS HIGH 449 HIGH HIGH 459 OUT OF SERVICE - PLEASE NOTIFY WHEN PUT BACK INTO SERVICE - S. THOM | A | |||
TFA-HLA031 | TANK GAUGE | TFA TK-31(GASOLINE) TANK ALARMS HIGH 449 HIGH HIGH 453 | A | |||
VPS-HLA328 | TANK GAUGE | TFA TK-328 REFLUX TANK ALARM | A | |||
TFA-HLA038 | TANK GAUGE | TFA TK-38(NAPHTHA) TANK ALARMS HIGH 367 HIGH HIGH 371 | ||||
TFA-HLA040 | TANK GAUGE | TFA TK-40(ALKYLATE) TANK ALARMS HIGH 387 HIGH HIGH 390 | A | |||
TFA-HLA401 | TANK GAUGE | TFA TK-401(CRUDE) TANK ALARMS HIGH 471 HIGH HIGH 477 | A | |||
TFA-HLA402 | TANK GAUGE | TFA TK-402(CRUDE) TANK ALARMS HIGH 471 HIGH HIGH 477 | A | |||
TFA-HLA403 | TANK GAUGE | TFA TK-403(CRUDE) TANK ALARMS TANK FARM HIGH 471 HIGH HIGH 477 | A | |||
TFA-HLA404 | TANK GAUGE | TFA TK-404(CRUDE) TANK ALARMS TANK FARM HIGH 467 HIGH HIGH 492 | A | |||
TFA-HLA042 | TANK GAUGE | TFA TK-42(NAPHTHA) TANK ALARM HIGH 451 HIGH HIGH 457 | A | |||
TFA-HLA043 | TANK GAUGE | TFA TK-43(NAPHTHA) TANK ALARMS HIGH 451 HIGH HIGH 477 | A | |||
TFA-HLA045 | TANK GAUGE | TFA TK-45(CAT GAS) TANK ALARMS HIGH 444 HIGH HIGH 4410 | A | |||
TFA-HLA046 | TANK GAUGE | TFA TK-46(GASOLINE) TANK ALARMS HIGH 356 HIGH HIGH 360 | A | |||
TFA-HLA047 | TANK GAUGE | TFA TK-47(GASOLINE) TANK ALARMS HIGH 447 HIGH HIGH 451 | A | |||
TFA-HLA048 | TANK GAUGE | TFA TK-48(DIESEL) TANK ALARMS HIGH 3611 HIGH HIGH 375 | A | |||
TFA-HLA049 | TANK GAUGE | TFA TK-49(GASOLINE) TANK ALARMS HIGH 357 HIGH HIGH 361 | A | |||
TFA-HLA050 | TANK GAUGE | TFA TK-50(TOLUENE) TANK ALARMS HIGH 3610 HIGH HIGH 374 | A | |||
TFA-HLA051 | TANK GAUGE | TFA TK-51(AVGAS) TANK ALARMS HIGH 3610 HIGH HIGH 374 | A | |||
TFA-HLA052 | TANK GAUGE | TFA TK-52(CRUDE) TANK ALARMS HIGH 356 HIGH HIGH 360 | A | |||
TFA-HLA053 | TANK GAUGE | TFA TK-53(GASOLINE) TANK ALARMS HIGH 357 HIGH HIGH 361 | A | |||
TFA-HLA054 | TANK GAUGE | TFA TK-54(GASOLINE0) TANK ALARMS HIGH 3410 HIGH HIGH 354 OUT OF SERVICE NOTIFY WHEN BACK IN SERVICE S.THOM | A | |||
TFA-HLA055 | TANK GAUGE | TFA TK-55(REFORMATE) TANK ALARMS HIGH 351 HIGH HIGH 357 | A | |||
TFA-HLA067 | TANK GAUGE | TFA TK-67(TOLUENE) TANK ALARMS HIGH 367 HIGH HIGH 371 | A | |||
TFA-HLA070 | TANK GAUGE | TFA TK-70(GASOLINE) TANK ALARMS HIGH 395 HIGH HIGH 398 | A |
Attachment 1 to Schedule 2.2.1
TFA-HLA32 | TANK GAUGE | TFA TK032 (GASOLINE) TANK HIGH LEVEL ALARM | A | |||
TFA-HLA34 | TANK GAUGE | TFA TK034 (INHIBITOR) HIGH LEVEL ALARMS SET AT HIGH 116 HIGH HIGH 118 | A | |||
TFA-HLA09 | TANK GAUGE | TFA-FCC FEED TANK TFA-TK009 LEVEL ALARM 4611 HIGH HIGH 475 SPEC WT 90 PID DWG TFA-16-14305-10 | A | |||
TFA-HLA065 | TANK GAUGE | TFA-TK-65(REFORMATE) TANK ALARMS HIGH 371 HIGH HIGH 375 | A | |||
TFA-HLA066 | TANK GAUGE | TFA-TK66(MTBE) TANK ALARMS HIGH 371 HIGH HIGH 375 | A | |||
TFA-TDC300 | TDC | TFA DISTRIBUTIVE CONTROL SYSTEM (HARDWARE AND SOFTWARE) | A | |||
TFA-T1149 | TEMP LOOP | TFA TEMPERATURE INDICATOR, (COLONIAL PIPELINE NOT ON PID) TT,TI (AREA EAST OF NO.1 PUMPHOUSE, IN FIELD) | A | |||
TFA-T315 | TEMP LOOP | TFA-T315 TANK 13 TEMPERATURE CONTROL, LOOP INCLUDE: TE-315, TW-315, TCV-315 | A | |||
TFA-T316 | TEMP LOOP | TFA-T316 TANK 9 TEMPERATURE CONTROL, LOOP INCLUDED: TE-316, TW-316, TCV-316 DWG NO. PID-15-1803-10 | A | |||
TFA-T322 | TEMP LOOP | TFA-T322 TANK 118 TEMPERATURE CONTROL, LOOP INCLUDED: TE-322, TW-322, TCV-322, DWG NO. PID-15-1803-50 | A | |||
TFA-T323 | TEMP LOOP | TFA-T323 TANK 119 TEMPERATURE CONTROL, LOOP INCLUDED: TE-323, TW-323, TCV-323, DWG NO. PID-15-1803-50 | A | |||
TFA-T368 | TEMP LOOP | TFA-T322 TANK 001 TEMPERATURE CONTROL, LOOP INCLUDED: TE-368, TW-368,TCV-368, DWG NO. PID-15-1803-10 | A | |||
TFA-T370 | TEMP LOOP | TFA-T370 TANK 117 TEMPERATURE CONTROL, LOOP INCLUDED: TE-370, TW-370,TCV-370, DWG NO. PID-15-1803-49 | A | |||
TFA-TAL336A | TEMP LOOP | TFA-TAL336A PUMP HOUSE BUILDING 504 (PN166A) LOW TEMP, LOOP INCLUDES: TE, TAL. DWG. NO. PID-15-3103-74 | A | |||
TFA-TAL336B | TEMP LOOP | TFA-TAL336B PUMP HOUSE BUILDING 505 (PN166B) LOW TEMP, LOOP INCLUDES: TE, TAL. DWG. NO. PID-15-3103-74 | A | |||
TFA-TAL336C | TEMP LOOP | TFA-TAL336C PUMP HOUSE BUILDING 506 (PN166C) LOW TEMP, LOOP INCLUDES: TE, TAL. DWG. NO. PID-15-3103-74 | A | |||
TFA-T306 | TEMP LOOP | TFA-T1306 TANK 51 TEMPERATURE, LOOP INCLUDES: TW-306, TE-306, TI-306 | A | |||
TFA-T1319 | TEMP LOOP | TFA-T1319 FIRE WATER TANK #5 TEMPERATURE, LOOP INCLUDES: TE, TI, TAH, TAL, DWG. NO. PID-15-3103-74 | ||||
TFA-TSH295 | TEMP LOOP | TFA-TSH295 TFA GASOLINE AND FURNACE OIL (LAUREL) TRANSFER PUMP TFA-PN060 HIGH PUMP CASE TEMP, LOOP INCLUDES: TSH ***INTERLOCK***. DWG. NO. PID-15-1026-08 | A | |||
S3T54-25 | TRANSFORMER | 150KVA 2400/480 FOR 2 DOCK | A | |||
S3T54-191 | TRANSFORMER | 3 SINGLE POLE TOP TRANSFORMERS 2300V TO 480 | A | |||
S3T54-401 | TRANSFORMER | 300 KVA PAD MOUNT ADDED FOR LSG PROJECT | A | |||
S3T54-196 | TRANSFORMER | 480V PAD TYPE TRANSFORMER | A | |||
S3T54-177 | TRANSFORMER | 480V PAD TYPE TRANSFORMER AND DISTRIBUTION RACK | A | |||
S3T43-004 | TRANSFORMER | CONTROL POWER TRANSFORMER | A | |||
S3T5-4-69 | TRANSFORMER | DUPLICATE | D | |||
S3TF54-183 | TRANSFORMER | DUPLICATE | D | |||
TF-0044 | TRANSFORMER | GPL TRANSFORMER POLE TOP 2400 X 240/120 SOUTH FOF TANK 26 3KVA PAD MOUNT YES. | A | |||
TF-0043 | TRANSFORMER | GPL TRANSFORMER POLE TOP AT TANK 26 2400 X 240/120 3 KVA. POLE NUMBER 11 PAD MOUNT YES. | A | |||
S3T53-42 | TRANSFORMER | GPL TRANSFORMER POLE TOP BY DOCK 2 2400 X 240/120 25 KVA. POLE NUMBER 114 PAD MOUNT YES. | A | |||
S3T43-006 | TRANSFORMER | HEAT TRACE TRANSFORMER AT 1A DOCK | A | |||
S3T43-139 | TRANSFORMER | LIGHTING TRANSFORMER FOR TRAILER | A | |||
S3T43-003 | TRANSFORMER | LIGHTING TRANSFORMER ON DISTRIBUTION RACK | A | |||
S3T54-179 | TRANSFORMER | PAD MOUNT FOR MIXERS, AND MOTORS. 2400/480 300 KVA. POLE NUMBER 267-S PAD MOUNT YES. | A | |||
S3T54-183 | TRANSFORMER | PAD MOUNT FOR NEW MOVS, AND POWER FOR NEW 480 VOLT MOTORS 2400 X 480. POLE NUMBER 263-A PAD MOUNT YES. | A | |||
S3T54-193 | TRANSFORMER | SALES TERMINAL POWER TRANSFORMER | A | |||
S3T54-194 | TRANSFORMER | SALES TERMINAL POWER TRANSFORMER | A | |||
S3T54-110 | TRANSFORMER | SRU TRANSFORMER 2400 X 480 POLE TOP 278 (1 OF 3) POLE NUMBER 278 PAD MOUNT YES. | A | |||
TF-0115 | TRANSFORMER | TFA TRANSFORMER 2400 X 120/208 POLE TOP OIL CHECK MUST BE COMPL. DURING UNIT SHUTDOWN | A | |||
S3T53-67 | TRANSFORMER | TFA TRANSFORMER 2400 X 208/120 KVA 150 LIGHTING FOR SALES AND WHAREHOUSE AND LOADING RACK POLE NUMBER 283 PAD MOUNT YES. LK | A |
Attachment 1 to Schedule 2.2.1
S3T54-61 | TRANSFORMER | TFA TRANSFORMER 2400 X 240/480 225KVA TYPE WT POWER FOR PUMP MOTORS AND MOVS POLE NUMBER 26 PAD MOUNT YES. | I | |||
S4T54-65 | TRANSFORMER | TFA TRANSFORMER 2400 X 240/480 POWER FOR ASPHALT LOADING RACK OPEN FACE CUTOUTS ON POLE 88 POLE NUMBER 35 PAD MOUNT YES | I | |||
S3T54-69 | TRANSFORMER | TFA TRANSFORMER 2400 X 480 KVA300 POWER FOR TANK MIXER MOTORS AND MOVS. ELECTRICAL SINGLE DRAWING NUMBER 11-13917-D POLE NUMBER 51 PAD MOUNT YES. | A | |||
S3T54-109 | TRANSFORMER | TFA TRANSFORMER 2400 X 480 POWER FOR SOUTH TANK FARM (OTHER SIDE OF RT.130) PAD MOUNT YES. | A | |||
TF-0113 | TRANSFORMER | TFA TRANSFORMER 2400 X 480 POLE TOP POLE NUMBER 278 PAD MOUNT YES. | A | |||
TF-0114 | TRANSFORMER | TFA TRANSFORMER 2400 X 480 POLE TOP POLE NUMBER 278 PAD MOUNT YES. | A | |||
TF-0157 | TRANSFORMER | TFA TRANSFORMER 2400 X 480 POWER FOR TANK FARM EQUIPMENT (MOVS MIXER MOTORS ECT.) | A | |||
S3T54-64 | TRANSFORMER | TFA TRANSFORMER 300KVA 2400V-480V DELTA-DELTA TRANSFORMER AND FUSED DISCONNECT POWER FOR TANK MIXERS AND MOVS ELECTRICAL SINGLE LINE DRAWING 11-13818-D PAD MOUNT YES. | I | |||
S3T43-212 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 15KVA, FEEDS FLOW METER PT-106 AND HEAT TRACE | A | |||
S3T43-211 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 50KVA SINGLE PHASE AT PH#1 BREAK ROOM | A | |||
S3T43-207 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 5KVA AT TK 118 SWITCH RACK POWER FOR AREA LIGHTING | A | |||
S3T43-210 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 7.5KVA AT N-14 POWER SWITCH RACK W. OF TK 118 | A | |||
S3T43-005 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 7.5KVA FEEDS LP & LP AT RACK WEST OF TK5 | A | |||
S3T43-213 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 7.5KVA, FEEDS PROPANE BULLETS FIRE PROTECTION | A | |||
S3T43-008 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 SINGLE PHASE 7.5KVA AT TK 001 SWITCH RACK POWER FOR AREA LIGHTING | A | |||
S3T43-007 | TRANSFORMER | TFA TRANSFORMER 480 X 120/240 SINGLE PHASE 7.5KVA, AT TK 116/117 SWITCH RACK POWER FOR AREA LIGHTING | A | |||
S3T54-140 | TRANSFORMER | TFA TRANSFORMER NO.21 225 KVN 2400/ 480 VOLTS CRUDE SAMPLE TRANSFORMER POLE NUMBER 421 PAD MOUNT YES. | A | |||
TF-0134 | TRANSFORMER | TFA TRANSFORMER TANK FARM (COLONIAL PIPE LINE BUILDING 240/480 10 KVA ONE OF THREE A-B-C | A | |||
TF-0016 | TRANSFORMER | TFA TRANSFORMER TANK FARM 2400 X 240/120 25 KVA POWER FOR LIGHTING AND RELATED EQUIPMENT | A | |||
S3T54-9 | TRANSFORMER | TFA TRANSFORMER TANK FARM 2400 X 480 500 KVA CLASS ON POLE NUMBER UTP-004 PAD MOUNT YES. | I | |||
S3T54-30 | TRANSFORMER | TFA TRANSFORMER TANK FARM 2400 X 240/480 200 KVA POLE NUMBER 43 PAD MOUNT YES. | A | |||
S3T54-8 | TRANSFORMER | TFA TRANSFORMER TANK FARM 2400 X 240/480 300 KVA POLE NUMBER 254 PAD MOUNT YES. | I | |||
S3T54-6 | TRANSFORMER | TFA TRANSFORMER TANK FARM TYPE HPZ 2400 X 480 200 KVA POLE NUMBER 254 PAD MOUNT YES. | A | |||
UPS-112 | UPS | TFA UNINTERUPTED POWER SUPPLY UPS-112 | A | |||
MLV-11182A | VALVE | EAGLE POINT TO WOODBURY STATION (DISTILLATES/GASOLINE) MAIN LINE VALVE PAID DWG # 01068-C **DOT** | A | |||
MLV-11182C | VALVE | EAGLE POINT TO WOODBURY STATION (DISTILLATES/GASOLINE) TRAP KICKER PAID DWG # 01068-C **DOT** | A | |||
MLV-11182B | VALVE | EAGLE POINT TO WOODBURY STATION (DISTILLATES/GASOLINE) TRAP OUTLET PAID DWG # 01068-C **DOT** | A | |||
MLV-11183G | VALVE | NATURAL GAS TO EAGLE POINT DELIVERY STATION MAIN LINE VALVE PIP-11183 ***DOT**** | A | |||
TFA-CHECK | VALVE | TFA CHECK VALVES DOES NOT INCLUDE CONTROL VALVES, RELIEF VALVES AND GATE, GLOBE, OR BALL VALVE - DO NOT WRITE WO FOR THOSE VALVES TO THIS EQUIP. | A | |||
TFA-VALVE | VALVE | TFA VALVES DOES NOT INCLUDE CHECK, CONTROL, VALVES, OR RELIEF VALVES-DO NOT WRITE WO FOR THOSE TO THIS EQUIP. | A | |||
MLV-11183E | VALVE | TRANSCO MAR STATION TO EAGLE POINT (NATURAL GAS TO EP) MANUAL VALVE PAID DWG #9-5277-D **DOT** | A | |||
MLV-11183B | VALVE | TRANSCO MAR STATION TO EAGLE POINT (NATURAL GAS TO EP) MANUAL VALVE PAID DWG #9-5277-D **DOT** | A | |||
MLV-11183D | VALVE | TRANSCO MAR STATION TO EAGLE POINT (NATURAL GAS TO EP) MANUAL VALVE PAID DWG #9-5277-D **DOT** | A | |||
MLV-11183F | VALVE | TRANSCO MAR STATION TO EAGLE POINT (NATURAL GAS TO EP) MANUAL VALVE PAID DWG #9-5277-D **DOT** | A | |||
MLV-11183C | VALVE | TRANSCO MAR STATION TO EAGLE POINT (NATURAL GAS TO EP) PID DWG #9-5227-D **DOT** | A | |||
MLV-11183A | VALVE | TRANSCO MAR STATION TO EP (NATURAL GAS TO EP) MANUAL VALVE PAID DWG# 9-5277-D **DOT** | A | |||
VH-5423 | VEHICLE | TFA TANK FARM VEHICLE (TRACKMOBILE)VH-5423 | I | |||
DRM-0035 | VESSEL | TFA BUTANE SPHERE TFA-TK035 TK-035 51 FT DIAMETER/ 12,220 BBL PID DWG 15-1803-60 | A | |||
DRM-0036 | VESSEL | TFA BUTANE SPHERE TFA-TK036 51 FT DIAMETER / 12,220 BBL PID DWG 15-1803-61 | A | |||
DRM-0037 | VESSEL | TFA BUTANE SPHERE TFA-TK037 TK-037 51 FT DIAMETER/ 12,220 BBL CAS 75-28-5 PID DWG 15-1803-61 | A | |||
DRM-0058 | VESSEL | TFA BUTANE SPHERE TFA-TK058 51 FT DIAMETER / 12,220 BBL PID DWG 15-1803-59 | A |
Attachment 1 to Schedule 2.2.1
DRM-1507 | VESSEL | TFA BUTANE VAPORIZER DRUM DRUM D113 OLD E.P.# 1144 DRUM #2 PUMP HOUSE | A | |||
DRM-1167 | VESSEL | TFA CLAY FILTER AT TANK No.20 TFA-D103 (DRM-1167) PID DWG 15-1803-16 | A | |||
DRM-1502 | VESSEL | TFA CUMENE FILTER TFA-D108 PID DWG 15-5316-48.01 | A | |||
DRM-1506 | VESSEL | TFA CUMENE VAPOR VENT DRUM D112 PID DWG 15-5316-48.01 | A | |||
DRM-1505 | VESSEL | TFA DIESEL FUEL FILTER TFA-D111 PID DWG 15-1803-26 | I | |||
DRM-1200 | VESSEL | TFA DIESEL SALT FILTER TFA-D105 PID DWG 15-1803-26 | A | |||
DRM-2714 | VESSEL | TFA HIGH SULFUR No.2 FUEL OIL AIR ELIMINATOR PID DWG 20-2036-05 | I | |||
DRM-1168 | VESSEL | TFA JET FUEL CLAY FILTER TFA-D107 (DRM-1168) PID DWG 15-1803-16 | A | |||
DRM-0090 | VESSEL | TFA PROPANE STORAGE BULLET TFA-TK090 PID DWG 15-1002-64 13 FT. DIA. / 79.5 HEIGHT / 1,362 BBLS | A | |||
DRM-0091 | VESSEL | TFA PROPANE STORAGE BULLET TFA-TK091 13 FT. DIAMETER / 79.5 FT. HEIGHT / 1,362 BBLS PID DWG 15-1002-64 | A | |||
DRM-0092 | VESSEL | TFA PROPANE STORAGE BULLET TFA-TK092 13 FT. DIAMETER / 79.5 FT. HEIGHT / 1,362 BBLS PID DWG 15-1002-65 | A | |||
DRM-0093 | VESSEL | TFA PROPANE STORAGE BULLET TFA-TK093 13 FT. DIAMETER / 79.5 FT. HEIGHT / 1,362 BBLS PID DWG 15-1002-65 | A | |||
DRM-1166 | VESSEL | TFA SALT FILTER TFA-D102 (DRM-1166) PID DWG 15-1803-26 | A | |||
DRM-1172 | VESSEL | TFA-D130 TETRAETHYL LEAD DRUM (OUT OF SERVICE - DUPONT RESPONSIBILITY DUE TO LEAD) PID DWG 15-5302-57 | I | |||
Columbia to Transco Natural Gas Line | ||||||
Nitrogen Generator |
Attachment 1 to Schedule 2.2.1
1 | 48001 | 90001 | 103 | 103 | 01 | D | 25/00 | 0 | 200604 | |||||||||||||||||||||||||||
1 | 48001 | 90001 | 624 | 624 | 01 | D | 25/00 | 0 | 200701 | |||||||||||||||||||||||||||
1 | 48001 | 90001 | 103 | 103 | 01 | D | 25/00 | 0 | 200607 | |||||||||||||||||||||||||||
1 | 48001 | 90001 | 103 | 103 | 01 | D | 25/00 | 0 | 201008 | |||||||||||||||||||||||||||
1 | 48133 | 90133 | 103 | 103 | 01 | D | 25/00 | 0 | 200610 |
Attachment 1 to Schedule 2.2.1
1 | 48093 | 90093 | 103 | 103 | 0C | F | 25/00 | 0 | 200907 | |||||||||||||||||||||||||||
1 | 48041 | 90044 | 103 | 103 | 0C | F | 25/00 | 0 | 200604 | |||||||||||||||||||||||||||
1 | 48093 | 90093 | 600 | 600 | 0C | F | 25/00 | 0 | 200611 | |||||||||||||||||||||||||||
1 | 48041 | 90043 | 103 | 103 | 0C | F | 25/00 | 0 | 200401 |
Attachment 1 to Schedule 2.2.1
1 | 48021 | 90021 | 103 | 103 | 0C | F | 25/00 | 0 | 200912 | |||||||||||||||||||||||||||
1 | 48101 | 90000 | 103 | 103 | 0C | F | 25/00 | 0 | 200611 | |||||||||||||||||||||||||||
1 | 48041 | 90044 | 103 | 103 | 0C | F | 25/00 | 0 | 200903 | |||||||||||||||||||||||||||
1 | 48101 | 90000 | 003 | 003 | 0C | F | 25/00 | 0 | 200801 | |||||||||||||||||||||||||||
1 | 48041 | 90043 | 103 | 103 | 0C | F | 25/00 | 0 | 200603 | |||||||||||||||||||||||||||
1 | 48101 | 90000 | 103 | 103 | 0C | F | 25/00 | 0 | 200612 | |||||||||||||||||||||||||||
1 | 48041 | 90043 | 103 | 103 | 0C | F | 25/00 | 0 | 200512 | |||||||||||||||||||||||||||
1 | 48093 | 90093 | 103 | 103 | 0C | F | 25/00 | 0 | 200412 | |||||||||||||||||||||||||||
1 | 48041 | 90044 | 103 | 103 | 0C | F | 25/00 | 0 | 200709 | |||||||||||||||||||||||||||
1 | 48041 | 90043 | 103 | 103 | 0C | F | 25/00 | 0 | 200512 | |||||||||||||||||||||||||||
1 | 48041 | 90044 | 103 | 103 | 0C | F | 25/00 | 0 | 200709 | |||||||||||||||||||||||||||
1 | 48101 | 90000 | 600 | 600 | 0C | F | 25/00 | 0 | 200705 | |||||||||||||||||||||||||||
1 | 48041 | 90044 | 103 | 103 | 0C | F | 25/00 | 0 | 200412 |
Attachment 1 to Schedule 2.2.1
20060322 | 2006 | 200603 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2006 | 200607 | |||||||||||||||||||||||||||||||||||||
20070101 | 2007 | 200701 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2007 | 200707 | |||||||||||||||||||||||||||||||||||||
20060715 | 2006 | 200607 | 593649301 | T | 03 | D | 10/00 | 1006 | 10/00 | 0 | 2006 | 200607 | ||||||||||||||||||||||||||||||||||||
20100731 | 2010 | 201007 | 593649301 | T | 03 | D | 10/00 | 1010 | 10/00 | 0 | 2010 | 201007 | ||||||||||||||||||||||||||||||||||||
20061013 | 2006 | 200610 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2006 | 200607 |
Attachment 1 to Schedule 2.2.1
20090707 | 2009 | 200907 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2009 | 200907 | |||||||||||||||||||||||||||||||||
20060317 | 2006 | 200603 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2006 | 200607 | |||||||||||||||||||||||||||||||||
20061114 | 2006 | 200611 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2006 | 200607 | |||||||||||||||||||||||||||||||||
20040113 | 2004 | 200401 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2004 | 200407 |
Attachment 1 to Schedule 2.2.1
20091130 | 2009 | 200911 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2009 | 200907 | |||||||||||||||||||||||||||||||||||||
20061115 | 2006 | 200611 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2006 | 200607 | |||||||||||||||||||||||||||||||||||||
20090225 | 2009 | 200902 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2009 | 200907 | |||||||||||||||||||||||||||||||||||||
20071221 | 2007 | 200712 | 593649301 | C | 01 | N | 39/00 | 39/00 | 0 | 2007 | 200712 | |||||||||||||||||||||||||||||||||||||
20060222 | 2006 | 200602 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2006 | 200607 | |||||||||||||||||||||||||||||||||||||
20061130 | 2006 | 200611 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2006 | 200607 | |||||||||||||||||||||||||||||||||||||
20051215 | 2005 | 200512 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2005 | 200507 | |||||||||||||||||||||||||||||||||||||
20041215 | 2004 | 200412 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2004 | 200407 | |||||||||||||||||||||||||||||||||||||
20070915 | 2007 | 200709 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2007 | 200707 | |||||||||||||||||||||||||||||||||||||
20051215 | 2005 | 200512 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2005 | 200507 | |||||||||||||||||||||||||||||||||||||
20070827 | 2007 | 200708 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2007 | 200707 | |||||||||||||||||||||||||||||||||||||
20070425 | 2007 | 200704 | 593649301 | T | 03 | D | 10/00 | 1007 | 10/00 | 0 | 2007 | 200707 | ||||||||||||||||||||||||||||||||||||
20041215 | 2004 | 200412 | 593649301 | C | 03 | N | 10/00 | 10/00 | 0 | 2004 | 200407 |
Attachment 1 to Schedule 2.2.1
A | 13300 | 00242 | W00020 | REPAIR | .00 | N | 3,369,728 | 11,232 | 662,713 | | 22,465 | | ||||||||||||||||||||||||||||||||||||
A | 13300 | 00251 | W00153 | REPAIR | .00 | N | 541,138 | 1,804 | 90,190 | | 3,608 | | ||||||||||||||||||||||||||||||||||||
A | 13300 | 00245 | W00108 | .00 | N | 80,784 | 269 | 15,080 | | 539 | 80,784 | |||||||||||||||||||||||||||||||||||||
A | 13300 | 00294 | W00290 | .00 | N | 56,600 | 189 | 1,321 | | 377 | 56,600 | |||||||||||||||||||||||||||||||||||||
A | 13300 | 00248 | W00067 | REPAIR | .00 | N | 29,500 | 98 | 5,212 | | 197 | |
Attachment 1 to Schedule 2.2.1
A | 13300 | 00000 | W00176 | TAX WD | .00 | N | 7,380,619 | | 7,380,619 | | | 7,380,619 | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00048 | TAX WD | .00 | N | 5,253,480 | | 5,253,480 | | | 5,253,480 | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00069 | REPAIR | .00 | N | 2,011,242 | | 2,011,242 | | | | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | TAX WD | .00 | U | 646,562 | | 646,562 | | | 889,023 |
Attachment 1 to Schedule 2.2.1
A | 13300 | 00000 | W00213 | REPAIR | .00 | N | 456,833 | | 456,833 | | | | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00046 | REPAIR | .00 | N | 289,259 | | 289,259 | | | | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00254 | TAX WD | .00 | N | 146,266 | | 146,266 | | | 146,266 | ||||||||||||||||||||||||||||||||||
B | 00000 | 00000 | W00200 | REPAIR | .00 | N | 114,632 | | 114,632 | | | | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00058 | REPAIR | .00 | N | 98,006 | | 98,008 | | | | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00141 | TAX WD | .00 | N | 97,443 | | 97,443 | | | 97,443 | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00039 | TAX WD | .00 | N | 96,299 | | 96,299 | | | 96,299 | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00019 | TAX WD | .00 | N | 92,757 | | 92,757 | | | 92,757 | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00189 | TAX WD | .00 | N | 63,423 | | 63,423 | | | 63,423 | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00032 | REPAIR | .00 | N | 59,638 | | 59,638 | | | | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00175 | TAX WD | .00 | N | 49,158 | | 49,158 | | | 49,158 | ||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00190 | .00 | N | 48,013 | | 48,013 | | | 48,013 | |||||||||||||||||||||||||||||||||||
A | 13300 | 00000 | W00035 | TAX WD | .00 | N | 42,403 | | 42,403 | | | 42,403 |
Attachment 1 to Schedule 2.2.1
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
51,004 | 7,445 | 51,004 | 7,445 | | | | 41,953 | 7,060 | 41,953 | 7,060 | | | ||||||||||||||||||||||||||||||||||||||
2,830 | 2,830 | 5,660 | 5,660 | 28,300 | | | 2,830 | 2,830 | 2,830 | 2,830 | | | ||||||||||||||||||||||||||||||||||||||
| | | | | | | | | | | | |
Attachment 1 to Schedule 2.2.1
7,268,451 | | 7,268,451 | | | | | 7,268,451 | | 7,268,451 | | | | ||||||||||||||||||||||||||||||||||||||
5,253,480 | | 5,253,480 | | | | | 5,253,460 | | 5,253,480 | | | | ||||||||||||||||||||||||||||||||||||||
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
889,023 | | 889,023 | | | | | 889,023 | | 889,023 | | | |
Attachment 1 to Schedule 2.2.1
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
146,266 | | 146,266 | | | | | 146,266 | | 146,266 | | | | ||||||||||||||||||||||||||||||||||||||
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
97,443 | | 97,443 | | | | | 97,443 | | 97,443 | | | | ||||||||||||||||||||||||||||||||||||||
96,299 | | 96,299 | | | | | 96,299 | | 96,299 | | | | ||||||||||||||||||||||||||||||||||||||
46,378 | | 92,757 | | 46,378 | | | 46,378 | | 46,378 | | | | ||||||||||||||||||||||||||||||||||||||
63,423 | | 63,423 | | | | | 63,423 | | 63,423 | | | |||||||||||||||||||||||||||||||||||||||
| | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||
49,158 | | 49,158 | | | | | 49,158 | | 49,158 | | | | ||||||||||||||||||||||||||||||||||||||
25,889 | 5,531 | 25,889 | 5,531 | | | | 20,738 | 4,813 | 20,738 | 4,813 | | | ||||||||||||||||||||||||||||||||||||||
21,201 | | 42,403 | | 21,201 | | | 21,201 | | 21,201 | | | |
Attachment 1 to Schedule 2.2.1
| | | | | wwtp | |||||||||||||||||
| | | | | wwtp | |||||||||||||||||
| | | | | wwtp | |||||||||||||||||
| | | | | wwtp | |||||||||||||||||
| | | | | wwtp |
Attachment 1 to Schedule 2.2.1
| | | | | Poho | |||||||||||||||
| | | | | ||||||||||||||||
| | | | | ||||||||||||||||
| | | | | poho |
Attachment 1 to Schedule 2.2.1
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho | |||||||||||||||||
| | | | | poho |
SCHEDULE 2.2.7
CONTRIBUTED ASSETS MISCELLANEOUS ASSETS
Contracts
1. Services Agreement #CW32429 made as of April 1, 2010 by and between the Contributor and Veolia Water North America Operating Services, LLC (Full Assignment).
2. Sidetrack Agreement between the Contributor and Consolidated Rail Corporation dated March 24, 2005 (Full Assignment).
3. Tenant-in-Common Agreement made and entered into on June 29, 2011, with an effective date of July 1, 2011, by and between the Contributor and Sunoco Power Generation LLC (Full Assignment).
4. The materials and services contracts listed below:
Counterparty Name |
Contract Number |
Expiration Date |
Consent Required |
Partial or Full Assignment | ||||
A C SCHULTES, INC, FSC | CW38684 | 6/30/2013 | No | Full | ||||
AIR COMPLIANCE CONSULTANTS, INC. | CW37226 | 1/3/2013 | No | Partial | ||||
AZIMA SVCS SOUTH | CW28905 | 9/30/2011 | No | Full | ||||
BAKER PETROLITE CORPORATION | CW38672 | 5/1/2014 | No | Partial | ||||
BASIC CHEMICAL SOLUTIONS (Caustic Soda) |
CW33545 | 5/1/2013 | Yes | Partial | ||||
BASIC CHEMICAL SOLUTIONS (Sulfuric Acid) |
CW2603 | 9/30/2011 | No | Full | ||||
BENTLY NEVADA CORPORATION | CW28681 | 8/31/2011 | Yes | Partial | ||||
DEANGELO BROTHERS, INCORPORATED | CW25382 | 10/1/2011 | No | Full |
2
DIXON ENVIRONMENTAL ASSOCIATES, INC. | CW26880 | 5/31/2012 | No | Full | ||||
EISCO-NJ (On-going Vacuum Service) | CW11678 | 10/31/2011 | No | Full | ||||
EISCO-NJ (Vacuum Power Wash Tank Cleaning) | PH14836 | 10/31/2011 | No | Partial | ||||
EISCO-NJ (Tank #3 Cleaning) | CW38979 | 10/1/2011 | No | Full | ||||
BRAND INSULATION SERVICES | EG10072 | 5/31/2012 | No | Full | ||||
DEVON PROPERTY SERVICES, LLC | CW29849 | 1/1/2012 | No | Full | ||||
ENVIRONMENTAL RESOURCE MANAGEMENT | CW3189 | 6/30/2011 | No | Partial | ||||
FLO-BIN RENTALS, INC. | CW36074 | 11/24/2012 | No | Partial | ||||
HULL & ASSOCIATES, INC. | CW21480 | 12/31/2011 | No | Partial | ||||
KENNY ATLANTIC INDUSTRIAL SERVICES | CW18413 | 10/30/2011 | No | Full | ||||
M DAVIS & SONS INC | CW22118 | 4/1/2012 | No | Full | ||||
MOTOR TECHNOLOGY, INC. | CW24959 | 4/1/2012 | No | Partial | ||||
NATIONAL BASIC SENSOR | CW17236 | 12/31/2011 | No | Partial | ||||
PRAXAIR SERVICES INC. | CW5277 | 6/30/2011 | Contract to be replaced by CW 39186. Consent not required. Assignment to be partial. | |||||
NORTH AMERICAN MACHINE WORKS | CW24380 | 2/1/2012 | No | Partial | ||||
OBRIEN & GERE ENGINEERS, INC. | CW27365 | 6/30/2012 | No | Partial |
3
PSC INDUSTRIAL OUTSOURCING, LP (Environmental Services) | CW16748 | 6/30/2011 | No | Partial | ||||
PSC INDUSTRIAL OUTSOURCING, LP (Industrial Cleaning Services) | CW35623 | 5/1/2014 | No | Partial | ||||
ROWSON ELECTRIC INC, | CW27572 | 7/31/2011 | No | Full | ||||
ROUX ASSOCIATES, INC. | CW37725 | 12/31/2013 | No | Partial | ||||
SAGE ENVIRONMENTAL | CW24357 | 6/30/2011 | No | Partial | ||||
SEALTEC | NER11219 | 6/30/2011 | No | Partial | ||||
SHAW ENVIRONMENTAL, INC. | CW24360 | 8/31/2011 | No | Full | ||||
ST HUDSON ENGINEERS, INC. | CW30830 | 12/31/2012 | No | Partial | ||||
VAL ASSOCIATES LABORATORY, INC. | CW30910 | 12/31/2012 | No | Partial | ||||
THE ENERGY COMPANY INC. | CW37889 | 2/15/2012 | No | Partial | ||||
WTC INC. | CW29957 | 12/2/2011 | No | Full | ||||
WASTE MANAGEMENT OF NEW JERSEY | CW21521 | 11/30/2011 | No | Full | ||||
XEROX | CW9893 | 12/12/2013 | Yes | Partial | ||||
ZEROCHAOS | CW26417 | 04/30/2012 | No | Partial |
5. All software licenses of the Contributor that are required for the operation of the Contributed Assets (excluding those software licenses to which the Acquirer already has ownership or use rights), such agreements to be identified by the Parties promptly after the Closing.
4
SCHEDULE 2.3.2
EXCLUDED ASSETS TANGIBLE ASSETS
1. | Ground water monitoring and recovery wells and their associated equipment. |
2. | See Attachment 1 to Schedule 2.3.2 (list of excluded processing unit piping/lines). |
5
SCHEDULE 2.3.3
EXCLUDED ASSETS CLAIMS
Property tax refund appeals are active for all years 2004 to 2010 for the Refinery Complex and its on-site Cogeneration Plant. The Refinery Complex and Cogeneration Plant have property assessments based on imputed fair market values averaging $265 million in these years, and approximately $43 million total property taxes have been paid to date. The Refinery Complex and Cogeneration Plant purchase prices were $111 million and $3.2 million (plus inventory and miscellaneous items), respectively. Based primarily on purchase price, property taxes on the facilities would not exceed a combined $3.5 million per year in 2004 or 2005, and marginally higher in succeeding years. A pretrial conference has been tentatively for June of 2011, with the trial to follow in July. The Contributor has engaged a third-party appraiser to provide valuations of the assets for all of the years in dispute to support its litigation argument and work continues to support its discovery filings as the Contributor prepares for trial.
6
SCHEDULE 2.4.1
ASSUMED LIABILITIES GUARANTEES
None.
7
SCHEDULE 3.1.2
AUTHORIZATION OF TRANSACTION CONTRIBUTOR
1. Consent of Veolia Water North America Operating Services, LLC in connection with the assignment of the Services Agreement #CW32429 made as of April 1, 2010 by and between Sunoco, Inc. (R&M) and Veolia Water North America Operating Services, LLC.
2. Consent of Consolidated Rail Corporation in connection with the assignment of the Sidetrack Agreement between Sunoco, Inc. (R&M) and Consolidated Rail Corporation dated March 24, 2005.
3. Reference is made to those counterparties listed in Item 4 of Schedule 2.2.7 as requiring consent.
4. Notice to the South Jersey Port Corporation, the Subzone, advising of the transactions contemplated by this Agreement, including the change in ownership of the Subzone to Sunoco Partners Marketing & Terminals L.P. and Sunoco, Inc. (R&M)s continuing operation of the Subzone as operator.
5. Filing with the EPA for modification of the CAA Consent Decree.
6. Notices of transfer to NJDEP in connection with:
(a) | The Wastewater Treatment Plant NPDES Permit #005401; |
(b) | The Water Allocation Permit #2205P; |
(c) | The Wastewater Treatment Plant Laboratory #08355 |
(d) | The Remediation Agreement between the Contributor and the NJDEP dated as of January 13, 2004 and encompassing ISRA Case Nos. E 84158, E 20030526 and E 20030521; and |
(e) | The Air Pollution Control Operating Permit (Title V) #55781. |
7. Notice of transfer to Delaware River Basin Commission for Docket D-86-15-3.
8
8. Filings with the FCC for consent to transfer the following FCC Radio Licenses:
Call Sign |
Location |
FRN |
Radio Service Code |
Expiration Date | ||||
KW4418 | HANDHELD WITHIN DOCK AREA OF COASTAL EAGLE POINT REFINERY WESTVILLE GLOUSTER COUNTY NJ | 6174510 | MC | 3/8/2011 | ||||
KB70290 | Fixed-Route 130 and I 295 Westville, NJ GLOUCESTER County | 6174510 | IG | 7/3/2015 | ||||
WNUA656 | Fixed-US RT 130 S WESTVILLE, NJ GLOUCESTER County | 6174510 | IG | 8/10/2015 | ||||
KQ4073 | Fixed-Route 130 and I 295 Westville, NJ GLOUCESTER County | 6174510 | IG | 12/5/2020 |
9
SCHEDULE 3.2.2
AUTHORIZATION OF TRANSACTION ACQUIRER
None.
10
SCHEDULE 4.1.2
LICENSES
1. NPDES Permit #005401
2. NJDEP Water Allocation Permit #2205P
3. Delaware River Basin Commission Docket D-86-15-3
4. NJDEP Non-Community Non-Transient (NCNT) Water System #0820301
5. NJDEP WWTP Laboratory #08355
6. Air Pollution Control Operating Permit (Title V) #55781
7. State of New Jersey Bureau of Boiler and Pressure Vessel Compliance Certificate of Inspection Registration Numbers:
NJ037016-07S NB111 Inspection Date 8/12/2010
NJ032476-07S NB110 Inspection Date 8/12/2010
NJ031809-07S NB109 Inspection Date 8/12/2010
NJ032994-07S NB108 Inspection Date 8/12/2010
8. FCC Radio Licenses
Call Sign |
Location |
FRN |
Radio Service Code |
Expiration | ||||
KW4418 | HANDHELD WITHIN DOCK AREA OF COASTAL EAGLE POINT REFINERY WESTVILLE GLOUSTER COUNTY NJ | 6174510 | MC | 3/8/2011 | ||||
KB70290 | Fixed-Route 130 and I 295 Westville, NJ GLOUCESTER County | 6174510 | IG | 7/3/2015 | ||||
WNUA656 | Fixed-US RT 130 S WESTVILLE, NJ GLOUCESTER County | 6174510 | IG | 8/10/2015 | ||||
KQ4073 | Fixed-Route 130 and I 295 Westville, NJ GLOUCESTER County | 6174510 | IG | 12/5/2020 |
9. The software identified in Item 5 of Schedule 2.2.7.
11
SCHEDULE 4.1.4
ENVIRONMENTAL MATTERS
1. Draft ACO and Settlement agreement received on June 7, 2010 relating to alleged noncompliance with air regulations between July 2007 and December 2009.
2. Deviations and exceedances disclosed in reports filed pursuant to Air Pollution Control Operating Permit (Title V) #55781 and NJPDES Permit #005401.
3. Remediation Agreement between Contributor and the NJDEP dated as of January 13, 2004 and encompassing ISRA Case Nos. E 84158, E 20030526 and E 20030521.
4. CAA Consent Decree - United States of America & the State of New Jersey v. Eagle Point Oil Company, Civil Act. No. 03-4625 U.S. Dist. Ct. N.J. (2003)
12
SCHEDULE 4.1.5
LITIGATION
LawTrac No. 100011, Employee of Environmental Industrial Services Corporation, Andre Wells. Claimant alleges he has a personal injury claim arising out of an accident that occurred at the Refinery Complex on September 2, 2009. The alleged accident occurred at approximately 2:20 p.m. near Tank No. 6, North. Claimant further alleges he was leaving a job site at the Refinery Complex and was traveling down an access road to enter the main road when another vehicle ran into the rear of the vehicle operated by the Claimant. Siris Incident Report No. 88940 also sets forth information regarding the incident. Claimant is represented by Dennis E. Block from the Law Offices of Dennis E. Block, Esquire, P.C. On January 14, 2010, this claim matter was turned over to ESIS for further handling. ESIS has since denied Claimants claim and closed its file. The Contributor established a LawTrac matter for the incident in the event Claimant seeks to litigate this matter prior to the expiration of the statute of limitations. If no further activity occurs in this matter by September 2, 2011, the matter can be closed in LawTrac.
13
SCHEDULE 4.1.6
EMPLOYEE MATTERS
(A) & (B) None
(C) Contracts of Employment.
Certain Current Employees have signed employment agreements and confidentiality agreements and waivers of patent rights, copies of the forms of which have been provided to the Acquirer. Non-represented employees of the Contributor are covered under the terms of the Contributors Employee Resolution in Action Program, a copy of which has been provided to the Acquirer.
14
SCHEDULE 5.4.1
CURRENT EMPLOYEES
5.4.1 Current Employees
First |
Last |
Job Title |
Service Dt |
Base Sal |
Status |
Pay Status |
Accrued But | |||||||
John | Austin | Fire & ER Supr | 9/1/1988 | 93,856 | F | A | 184.0 | |||||||
Jeffrey | Bilger | Fire & ER Supr | 9/1/1994 | 84,597 | F | A | 188.0 | |||||||
Robert | Etschman | Metals Mech Fully Qual (6+mos) | 5/1/1985 | 71,365 | F | A | 280.0 | |||||||
Thomas | Hadfield | Instrument Fully Qual (6+ mos) | 2/1/1995 | 71,365 | F | A | 152.0 | |||||||
Michael | Harverson | Fully Qualified Oper (3 yrs) | 2/5/2007 | 71,365 | F | A | 80.0 | |||||||
Frederick | Hesser | Metals Mech Fully Qual (6+mos) | 5/1/1994 | 71,365 | F | A | 172.0 | |||||||
Ronald | Holton | Head Operator | 12/1/1998 | 79,269 | F | A | 160.0 | |||||||
Stephen | Hurff | Electrician Full Qual (6+ mos) | 2/20/2001 | 71,365 | F | A | 160.0 | |||||||
Roland | ONeal | Head Operator | 7/1/1987 | 79,269 | F | A | 240.0 | |||||||
Douglas | Ries | Head Operator | 5/1/1990 | 79,269 | F | A | 256.0 | |||||||
Thomas | Stratton | Fire & ER Supr | 4/17/2006 | 81,653 | F | A | 132.0 |
15
SCHEDULE 5.4.5
CONTRIBUTOR BENEFIT PLANS
Retirement Plans:
Sunoco, Inc. Retirement Plan
Sunoco, Inc. Pension Restoration Plan
Sunoco, Inc. Capital Accumulation Plan
Sunoco, Inc. Savings Restoration Plan
Welfare Plans:
Sunoco, Inc. National Medical Program
Sunoco, Inc. Dental Assistance Plan
Sunoco, Inc. Health Care Reimbursement Plan
Sunoco, Inc. Cafeteria Plan
Sunoco, Inc. Dependent Care Reimbursement Plan
Sunoco, Inc. Disability Income Plan
Sunoco, Inc. Death Benefits Plan
Sunoco, Inc. Travel Accident Insurance Plan
Sunoco, Inc. Occupational Death Benefits Plan
Sunoco, Inc. Accidental Death & Disability Plan
Sunoco, Inc. Employee Assistance Plan
Sunoco, Inc. Optional Retirement Benefit Income Trust
Termination Plans:
Sunoco, Inc. Involuntary Termination Plan
Incentive Plans:
Sunoco, Inc. Annual Incentive Plan
Sunoco, Inc. Leadership Recognition Plan
Executive Plans:
Sunoco, Inc. Executive Retirement Plan
Sunoco, Inc. Executive Involuntary Severance Plan
Sunoco, Inc. Special Executive Severance Plan
Sunoco, Inc. Senior Executive Incentive Plan
Sunoco, Inc. Long-Term Performance Enhancement Plan II
Sunoco, Inc. Long-Term Performance Enhancement Plan III
Policies:
Paid Holidays (including Floating Holidays)
Paid Absence for Death in Family
Paid Absence for Jury Duty
Vacation
Civil Leaves of Absence
Family and Medical Leave
Military Leave
Educational Assistance for Employees
Flexible Schedule (9/80) Program
16
SCHEDULE 5.5
REFINERY SITE-WIDE LICENSES
1. NJPDES Permit #005401
2. Water Allocation Permit #2205P
3. Delaware River Basin Commission Docket D-86-15-3
4. Non-Community Non-Transient (NCNT) Water System #0820301
5. Air Pollution Control Operating Permit (Title V) #55781
6. CAA Consent Decree - United States of America & the State of New Jersey v. Eagle Point Oil Company, Civil Act. No. 03-4625 U.S. Dist. Ct. NJ. (2003).
17
Exhibit 12.1
STATEMENT OF COMPUTATION OF RATIO OF EARNINGS TO FIXED CHARGES
(UNAUDITED)
Six Months Ended June 30, 2011 |
||||
(in millions) | ||||
Fixed Charges: |
||||
Interest cost and debt expense |
$ | 42 | ||
Interest allocable to rental expense(1) |
1 | |||
|
|
|||
Total |
$ | 43 | ||
|
|
|||
Earnings: |
||||
Income before income tax expense(2) |
$ | 157 | ||
Income before income tax expense attributable to noncontrolling interests |
(6 | ) | ||
Equity in income of 50 percent or less owned affiliated companies |
(5 | ) | ||
Dividends received from 50 percent or less owned affiliated companies(3) |
5 | |||
Fixed charges |
43 | |||
Interest capitalized |
(3 | ) | ||
Amortization of previously capitalized interest |
| |||
|
|
|||
Total |
$ | 191 | ||
|
|
|||
Ratio of Earnings to Fixed Charges |
4.4 | |||
|
|
(1) | Represents one-third of the total operating lease rental expense which is that portion deemed to be interest. |
(2) | Represents income before income tax expense for all consolidated entities, including Mid-Valley Pipeline Company, West Texas Gulf Pipe Line Company and Inland Corporation. |
(3) | Represents dividends received from equity-method investments, which excludes dividends from Mid-Valley Pipeline Company, West Texas Gulf Pipe Line Company and Inland Corporation. |
Exhibit 31.1
CERTIFICATION
Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
I, Lynn L. Elsenhans, Chairman and Chief Executive Officer of Sunoco Partners LLC, the general partner of the registrant Sunoco Logistics Partners L.P., certify that:
1. | I have reviewed this Quarterly Report on Form 10-Q; |
2. | Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report; |
3. | Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report; |
4. | The registrants other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have: |
a) | Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated entities, is made known to us by others within those entities, particularly during the period in which this report is being prepared; |
b) | Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles; |
c) | Evaluated the effectiveness of the registrants disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and |
d) | Disclosed in this report any change in the registrants internal control over financial reporting that occurred during the registrants most recent fiscal quarter (the registrants fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrants internal control over financial reporting; and |
5. | The registrants other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrants auditors and the audit committee of the registrants board of directors (or persons performing the equivalent functions): |
a) | All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrants ability to record, process, summarize and report financial information; and |
b) | Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrants internal control over financial reporting. |
Date: August 4, 2011
/S/ LYNN L. ELSENHANS |
Name: Lynn L. Elsenhans |
Title: Chairman and Chief Executive Officer |
Exhibit 31.2
CERTIFICATION
Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
I, Brian P. MacDonald, Vice President, Chief Financial Officer of Sunoco Partners LLC, the general partner of the registrant Sunoco Logistics Partners L.P., certify that:
1. | I have reviewed this Quarterly Report on Form 10-Q; |
2. | Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report; |
3. | Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report; |
4. | The registrants other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have: |
a) | Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated entities, is made known to us by others within those entities, particularly during the period in which this report is being prepared; |
b) | Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles; |
c) | Evaluated the effectiveness of the registrants disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and |
d) | Disclosed in this report any change in the registrants internal control over financial reporting that occurred during the registrants most recent fiscal quarter (the registrants fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrants internal control over financial reporting; and |
5. | The registrants other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrants auditors and the audit committee of the registrants board of directors (or persons performing the equivalent functions): |
a) | All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrants ability to record, process, summarize and report financial information; and |
b) | Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrants internal control over financial reporting. |
Date: August 4, 2011
/S/ BRIAN P. MACDONALD |
Name: Brian P. MacDonald |
Title: Vice President, Chief Financial Officer |
Exhibit 32.1
Certification of Chairman and Chief Executive Officer of Sunoco Partners LLC
Pursuant to 18 U.S.C. Section 1350
In connection with this Quarterly Report on Form 10-Q of Sunoco Logistics Partners L.P. for the quarter ended June 30, 2011, I, Lynn L. Elsenhans, Chairman and Chief Executive Officer of Sunoco Partners LLC, the general partner of the registrant Sunoco Logistics Partners L.P., certify pursuant to 18 U.S.C Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that the Quarterly Report on Form 10-Q for the quarter ended June 30, 2011 fully complies with the requirements of section 13(a) or 15(d) of the Securities Exchange Act of 1934 and that the information contained in the periodic report fairly presents, in all material respects, the financial condition and results of operations of Sunoco, Inc.
Date: August 4, 2011
/s/ Lynn L. Elsenhans |
Lynn L. Elsenhans |
Chairman and Chief Executive Officer |
Exhibit 32.2
Certification of Vice President, Chief Financial Officer of Sunoco Partners LLC
Pursuant to 18 U.S.C. Section 1350
In connection with this Quarterly Report on Form 10-Q of Sunoco Logistics Partners L.P. for the quarter ended June 30, 2011, I, Brian P. MacDonald, Vice President, Chief Financial Officer of Sunoco Partners LLC, the general partner of the registrant Sunoco Logistics Partners L.P., certify pursuant to 18 U.S.C Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that the Quarterly Report on Form 10-Q for the quarter ended June 30, 2011 fully complies with the requirements of section 13(a) or 15(d) of the Securities Exchange Act of 1934 and that the information contained in the periodic report fairly presents, in all material respects, the financial condition and results of operations of Sunoco, Inc.
Date: August 4, 2011
/S/ Brian P. MacDonald |
Brian P. MacDonald |
Vice President, Chief Financial Officer |